IDMP CEE Activity 1.2 by Elena Fatulova
1. Act. 1.2 Review of the current status
of the implementation of DM plans
and measures within RBMP
according to EU WFD
First IDMP workshop – 15-16 October,
Hodrusa Hamre, Slovakia
Elena Fatulova, GWP Slovakia
2. Content
● Background information on EU drought
policy
● Activity 1.2 – aim, tasks, timetable,
partners, outputs
● Questionnaire – draft on place
3. What is EU Drought Policy?
● EU Drought Policy - based on drought risk
management
● Legal framework – Water Framework
Directive
● Drought management plan – part of
River Basin Management Plan
4. Water scarcity and drought policy
Water
scarcity
Drought
man-made phenomenon - recurrent
imbalance that arises from an overuse of water
resources, caused by consumption being
significantly higher than the natural renewable
availability
natural phenomenon - temporary, negative
and severe deviation along a significant time
period and over a large region from average
precipitation values (a rainfall deficit), which
might lead to meteorological, agricultural,
hydrological and socioeconomic drought,
depending on its severity and duration
5. WS&D policy – milestones at EU level
● 2001 - Common implementation Strategy
for WFD (CIS) launched
● 2003– WS&D expert group established
● 2007 – Communication „Addressing the
challenge of water scarcity and droughts in
the European Union” (COM/2007/0414 final)
● 2012 – “A Blueprint to Safeguard Europe's
Water Resources” (COM/2012/673 final)
6. Communication 2007 – policy options
● Putting the right price tag on water
● Allocating water and water-related funding more
efficiently
● Improving drought risk management Developing
drought risk management plans (by 2009)
● Considering additional water supply infrastructures
● Fostering water efficient technologies and practices
● Fostering the emergence of a water-saving culture in
Europe
● Improve knowledge and data collection
7. Blueprint – problems and solutions
● Land use and ecological status of EU waters
● Chemical status and pollution of EU waters
● EU water efficiency
● Vulnerability of EU waters
● Knowledge base and improving governance
● Global aspects – access to safe drinking water
and basic sanitation services
8. What are main outputs of WS&D EG?
Drought Management
Plan Report Including
Agricultural, Drought
Indicators and Climate
Change Aspects
EU indicators:
General guidelines for DMP:
Indicators and thresholds establishing
onset, ending, and severity levels
Measures to be taken in each drought
phase
Organizational framework to deal with
drought
• Standardized Precipitation Index (SPI)
• Fraction of Absorbed Photosynthetically
Active Solar Radiation (fAPAR)
• Water Exploitation Index Plus (WEI+)
9. Activity 1.2 Review of the current
status ....
Objective
To gather information and analyse the
current situation in preparation of the DMP
and implementation of mitigation measures
Methodology
Questionnaire
E-mail communication
Output
Report on the review of the current status
of implementation of the Drought
Management plans and measures
10. Activity 1.2 Review of the current
status ....
Partners
Timetable
SK, CZ, HU, PL, LIT, ROM, BG, UA,
MD, SLO
Draft of the questionnaire – 10/10/2013
Comments to questionnaire - 20/10/2013
Questionnaire completed - 31/10/2013
Filling in questionnaire – 31/12/13
Draft of the report for comments – 1/3/2014
Comments to the report – 15/3/2014
Report completed – 31/3/2014
11. Questionnaire
Part 1
Part 2
Personal data
Information on the development of DMP or WRMPs
●Has the DMP/WRMP been developed?
- Which items does it contain?
- On which level has it been developed?
●Has the DMP been included in the RBMP?
●Have the water scarcity issues been identified as relevant?
- If yes, which effects have been identified?
●Have the drought issues been identified as relevant?
- If yes, which effects have been identified?
- If no, are there evident drought impacts on society, nature, economy?
●Have water scarcity and drought aspects been distinguished
in DMP or WRMP?
12. Questionnaire
Part 2
● Are the data on water demand included in the RBMP
or WRMP?
● Are the data on water availability included in the
RBMP or WRMP?
● Which parameters indicating the drought period are
being monitored?
● Which parameters characterising the drought impact
are being recorded and assessed?
● Which of the under mentioned EU indicators have
been assessed?
13. Questionnaire
Part 2
● Has an early warning indicator system been
developed?
- If yes, for which drought indicators have the thresholds been
established?
- If yes, which categories of the drought stages have been classified?
● Has another plan independent of DMP been
developed?
● Have the drought risk maps been developed?
● Have some guidelines for DMP/WRMP or drought
risk maps been developed?
14. Questionnaire
Part 2
● Are there ongoing activities focused on the
development or updating DMP or WRMP?
● Have the National Action Programmes (NAP) key
instruments in the implementation of the Convention
been developed?
Institutional analysis
Part 3
● Which istitutions are mostly dealing with the
drought management issues?
15. Questionnaire
Part 3
Part 4
● Has the drought management organisational
structure been established?
● Has the competent entity for the DMP development
been established?
● Has the working group for identification of drought
impacts and development of the DMP – composition
been established ?
Analysis of management measures
● Which measures to deal with WS&D have been
implemented or are planned?
16. Questionnaire
Part 5
Transparency and public participation in the
development of the DMP
●Are the RBMP, DMP, WRMP publicly available?
●Have the contact points been determined for making
information accessible?
●Which are the main weaknesses in preparation of
the DMP or WRMP?
Part 6
Remarks
17. Questionnaire – next steps
● By 20 October 2013 – send a comments
to draft of the questionnaire
● By 15 December 2013 – fill in the
questionnaire