1. Main Office: 4 Ha'Omanut St. I.Z. Poleg POB 6190 Netanya 42160 Tel +972 9 8630888 Fax +972 9 8655049 www.elco-cs.co.il
DATE OF PIN BRAZING: 9.06.2015 REPORT NO: 1
Brazing Procedure Daily Test
Point G
Client: NESHER PLANT
Supervision: ELCO Constracting&Services
Contractor: NIKA Engineering Ltd.
Project: NATURAL GAS PIPELINE SYSTEM
Weld/Braze
No.
Description Operator Visual Inspection
1 pin: M8 - THREADED Ruslan Lukin Acceptable
2 pin: M8 - THREADED Ruslan Lukin Acceptable
Details:
Contractor: NIKA Engineering Ltd.
Brazing Performed By: Ruslan Lukin
Date Of Brazing: 9.06.15
Equipment Used: "BAC"
Brazed samples: Silver Containing Brazing Pins/Lugs From "Bac"
Cable Lug: 10mm, Pins M8.
Base Metal: 12" gas pipeline
Contractor 2nd
party 3rd
Party Client
Tests 1: Result:
Visual Inspection accepted
Electrical Test
Accepted, less
than 0.1 ohm
Hammer Test
Accepted, no
connections
break off
Tests 2: Result:
Visual Inspection accepted
Electrical Test
Accepted, less
than 0.1 ohm
Hammer Test
Accepted, no
connections
break off