The Nethermayne Site – as of now
1.3.3. Scheme Description
The proposed new neighbourhood at Nethermayne
will deliver the following benefits:
• 725 new homes delivered on
approximately 22.32 ha residential
land at an average net density of 32
dwellings per hectare;
• A 2.1ha site for a primary school that can
accommodate up to 2 forms of entry;
• 16.7ha of public open space, exceeding
the total policy requirements, with
additional provision of sports pitches
made available through access to
school playing fields;
• A local centre accommodating 622 sq.m
retail floor space featuring a local food
store and 3 smaller retail units
providing day to day facilities required
by residents on their ‘door step’;
• 0.81ha of land adjacent to St. Luke’s
hospice to allow for future expansion
of the hospice.
“Illustrative Masterplan” for Nethermayne Site
Policy BAS
S3 states that
the
Nethermayne
site is
expected to
comprise of’
residential
development,
open space,
the provision
of the
community
centre, shops
and health
centre. No
Buildings to be demolished
•Basildon
(S.Essex) College
will be demolished;
•Basildon Sports
Hall will be
demolished;
•The Longwood
complex will be
demolished
Development
Phases
6.2 2014 Opening year
6.2.1 It is proposed that
Phase one of the
development will gain
access via the Dry Street
junction. This assumes that
by 2014, 30 dwellings will
be built and will use the
existing
Dry Street junction to
access the site.
(Transport Assessment
Final)
•Phase 1: 2014: 30 units
•Phase 2: 2016 - 2019:
Approximately 225 units
•Phase 3: 2019 - 2022:
Approximately 198 units
•Phase 4: 2022 – 2024:
Approximately 110 units
•Phase 5: 2024 – 2026:
Approximately 164 units
Phase 1
• 6.1.3 Phasing Sequence
• Phase 1 will comprise circa 30 units located near
the Dry Street entrance to the site. This will
require the demolition of the existing equestrian centre.
• Assuming planning permission is granted in May 2013, it
is anticipated that construction will start towards the end
of 2013.
• On this basis sales can be expected to commence in
2014.
• N.B. If planning permission is granted it is likely to be
before May 2013. The outline plan is due to be
considered in January or February 2013
Huh
?
Phase 2
• Phase 2 is dependant on the creation of
increased traffic capacity via the upgrading
of Nethermayne roundabout. Phase 2
therefore evolves from the spine road off
this junction.
• The main construction activity in terms of
unit build out will occur in phase 2. The
timing of this will allow for the relocation of
South Essex College, which is scheduled for
July 2015.
• From this point a 124 month (10 year)
construction programme is envisaged which
equates to a construction rate of circa 6
units a month. On this basis the main
construction, phase 2, would start in July
2015 with the unit sales commencing a year
later in July 2016 at rate of circa 70 units a
year until 2026.
• In addition to the relocation of South Essex
College in advance of the main construction
phases, the phasing strategy also proposes
delivery of essential works to the
Nethermayne roundabout which will trigger
commencement of phase 2.
The Design & Accessment
Statement seems to lump
phases 2-5 in one Phase 2.
6.1.2 Phasing
Strategy
The phasing strategy is
based on 2 strategic
phases of development
to deliver up to 725
units with the
associated mixed uses
and open spaces.
(Design & Accesss
Statement)
Access to the finished development
Dry Street Junction
10.3.3 Dry Street will be widened to
provide additional capacity for this
vehicular access –
from a four metres country lane to a
six-metre wide carriageway.
In conjunction with
this the existing footpath
along Dry Street will be
replaced and improved to
provide a high quality two
metre wide off-carriageway link
pedestrians, the on road cycling
route will continue to be promoted.
10.3.4 The Dry Street / A176
junction is proposed to be upgraded
from a priority junction to a
signalised all-movements junction.
This will enable traffic from all
directions to negotiate the junction
safely, in particular traffic coming
from Dry Street turning onto
the A176.
Access during development
• 1.3.2 The first phase of development will be
located to the south of the site, for which access
will be gained via Dry Street. Further phases will
gain access via the Nethermayne Roundabout
which will be the main development access.
• Phase five will gain access from Dry Street. It is
proposed that phases two to five of the
development will commence from 2015 when
the college has relocated to the town centre site.
Access through Lee Chapel South
• 4.3.13 Along with
the access points
detailed above
(that’s the hospital
roundabout and
Dry Street),
additional
pedestrian and
cycle links will be
provided to the
north of the site,
providing links
through to the
existing residential
areas of Lee
Chapel.
“mitigation” Measures
• 4.3.16 The proposed junction improvement will consist of the removal of
the hospice arm (changing the existing layout from a six arm roundabout
to a five arm roundabout), widening the A176 N to three traffic lanes,
widening the A176 S and the Hospital arm to two lanes. In addition the
circulatory carriageway on the eastern half of the roundabout will be
widened from two lanes to three lanes with the provision of spiral road
markings and destination markings.
• 4.3.25 Mitigation measures have also been drawn up for the Ashdon Way
junction to maximise the amount of Green Time to reduce delays and
queuing. The scheme includes the installation two signalised, staggered
pedestrian crossings and to optimise the road layout. The first of these
will be across the A176 to the north of the junction and consist of an 8
metre by 2.5 metre island. The second crossing will be across the
entrance on Ashdon Way and included a staggered crossing using the
existing road island. The carriageway layout has been modified with a 40
metres right turn only filter lane. The lane width of the Ashdon Way exit is
now a uniform 5 metres.
• 4.3.15 As detailed above, the Nethermayne Roundabout will be the main
development access via the existing college arm. The college arm will also provide
access to the hospice as, commencing from Phase two of the development; it is
proposed that the hospice arm will be closed.
4.3.25 Mitigation measures have also been drawn up for the Ashdon Way junction to maximise the
amount of Green Time to reduce delays and queuing. The scheme includes the installation
two signalised, staggered pedestrian crossings and to optimise the road layout. The first of
these will be across the A176 to the north of the junction and consist of an 8 metre by 2.5
metre island. The second crossing will be across the entrance on Ashdon Way and included a
staggered crossing using the existing road island. The carriageway layout has been modified
with a 40 metres right turn only filter lane. The lane width of the Ashdon Way exit is now a
uniform 5 metres.
What is not
clear is
whether the
40 metres
right turn
only filter
lane is for all
traffic, not
just buses
and taxis.
“The southern exit
connects directly with the
existing Dry Street,
offering users a quiet
route to the countryside
offerings of Martinhole
Wood and Langdon Hills
Country Park.”
“The southern access
on Dry street has
limited capacity and
the design of the
primary street will need
to respond to this by
directing to use the
Nethermayne access.”“5. Dry Street Village:
Located at the site’s southerly end, the Dry
Street Village character area has a more
rural character reflective of existing
residential properties further along Dry
Street. This area is connected to the rest
of the new neighbourhood by the
Neighbourhood Spine which continues to
act as the primary route that links residents
with the community core.”
I thought I
already
lived in a
village
called Dry
Street
So what ?
• One of the biggest concerns to users and residents of Dry Street must be
the threat of an enormous increase in through traffic. It’s bad enough as it
is !!
• The planning application assumes that traffic from the new development
will use the Hospital roundabout for the most part.
• It appears to neglect the strong probability that traffic going North, i.e.
towards Basildon TC or West, towards Dunton, Laindon Station or the
A127 or A13 will do what it can to avoid the congestion on Nethermayne,
using Dry Street instead.
• No “mitigation” measures are planned for Dry Street beyond the planned
entrance to the new development
Between the proposed Dry Street access
point and the B1007 there are 15 official
footpaths, bridleways and private roads.
There are no footpaths.
GROUNDS FOR REFUSAL
• A. Contrary to Green Belt policy. X
• B. Contrary to Development Plan zoning. X
• C. Over-development of the site by reason of
……X
• D. Prejudicial to the replanning of the area by
reason of ……
• E. Objection on highway safety grounds.
• F. Lack of car parking/servicing facilities. X
• G. Damage to residential amenity by reason of
……
• H. Damage to visual amenity/poor design by
reason of ……
• I. Unsatisfactory layout by reason of ……X
• J. Objection by the Anglian Water Authority. ?
Send your comments to:
Chief Planning Officer
Basildon Borough Council
St.Martin’s Square
Basildon
SS14 1DL
Land At Nether Mayne
Kingswood Basildon
Essex SS16 5NL
Ref. No: 12/01080/OUT
National Planning Policy Framework
74. Existing open space, sports and recreational buildings
and land, including playing fields, should not be built on
unless:
●● an assessment has been undertaken which has clearly
shown the open space, buildings or land to be surplus to
requirements; (we haven’t seen anything like this)
or
●● the loss resulting from the proposed development would
be replaced by equivalent or better provision in terms of
quantity and quality in a suitable location (the HCA
have said it will be relocated, but that could be
out of Essex !); or
●● the development is for alternative sports and
recreational provision, the needs for which clearly
outweigh the loss.(which it clearly isn’t)
11. Conserving and enhancing the natural environment
109. The planning system should contribute to and
enhance the natural and local environment by:
●● protecting and enhancing valued landscapes,
geological conservation interests and soils;
●● recognising the wider benefits of ecosystem
services;
●● minimising impacts on biodiversity and
providing net gains in biodiversity where
possible, contributing to the Government’s
commitment to halt the overall decline in
biodiversity, including by establishing coherent
ecological networks that are more resilient to
current and future pressures;

More Related Content

What's hot

Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Crosstown TO
 
Laurencekirk Report 2
Laurencekirk Report 2Laurencekirk Report 2
Laurencekirk Report 2Ashley Rabot
 
Public Utility Corridor in Lick Creek Park
Public Utility Corridor in Lick Creek ParkPublic Utility Corridor in Lick Creek Park
Public Utility Corridor in Lick Creek ParkCity of College Station
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Planawweiss
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Stephen Bolduc
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house Crosstown TO
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
City Council March 1 - Planning Presentation
City Council March 1 - Planning PresentationCity Council March 1 - Planning Presentation
City Council March 1 - Planning PresentationCity of San Angelo Texas
 
Staff report Revised final
Staff report Revised finalStaff report Revised final
Staff report Revised finalHunter Moore
 
Hengistbury Head Phase II Development
Hengistbury Head Phase II Development Hengistbury Head Phase II Development
Hengistbury Head Phase II Development Joshua Brunsdon
 
Planning Department Response to Primary Questions re: Johnwoods
Planning Department Response to Primary Questions re: JohnwoodsPlanning Department Response to Primary Questions re: Johnwoods
Planning Department Response to Primary Questions re: JohnwoodsStittsvilleCentral.ca
 
Flood Alleviation Scheme Banbury
Flood Alleviation Scheme BanburyFlood Alleviation Scheme Banbury
Flood Alleviation Scheme BanburyCPCLLP69
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyCity of College Station
 
Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017Fairfax County
 

What's hot (20)

Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
Laurencekirk Report 2
Laurencekirk Report 2Laurencekirk Report 2
Laurencekirk Report 2
 
Public Utility Corridor in Lick Creek Park
Public Utility Corridor in Lick Creek ParkPublic Utility Corridor in Lick Creek Park
Public Utility Corridor in Lick Creek Park
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
 
Beaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentationBeaufort-Sector1-Charrette-FinalPresentation
Beaufort-Sector1-Charrette-FinalPresentation
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010
 
Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
City Council March 1 - Planning Presentation
City Council March 1 - Planning PresentationCity Council March 1 - Planning Presentation
City Council March 1 - Planning Presentation
 
111009 Tri-Rail
111009 Tri-Rail111009 Tri-Rail
111009 Tri-Rail
 
Staff report Revised final
Staff report Revised finalStaff report Revised final
Staff report Revised final
 
Hengistbury Head Phase II Development
Hengistbury Head Phase II Development Hengistbury Head Phase II Development
Hengistbury Head Phase II Development
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Planning Department Response to Primary Questions re: Johnwoods
Planning Department Response to Primary Questions re: JohnwoodsPlanning Department Response to Primary Questions re: Johnwoods
Planning Department Response to Primary Questions re: Johnwoods
 
Flood Alleviation Scheme Banbury
Flood Alleviation Scheme BanburyFlood Alleviation Scheme Banbury
Flood Alleviation Scheme Banbury
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park Property
 
Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017Original Mount Vernon HS Status Update April 2017
Original Mount Vernon HS Status Update April 2017
 

Similar to Nethermayne Site Planning Application

3870 a4 8pp brochure no bleed
3870  a4 8pp brochure no bleed3870  a4 8pp brochure no bleed
3870 a4 8pp brochure no bleedpennyschultz
 
James Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Crosstown TO
 
Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018Crosstown TO
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Cork street environment improvement strategy 2003
Cork street environment improvement strategy 2003Cork street environment improvement strategy 2003
Cork street environment improvement strategy 2003kieran rose
 
Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003kieran rose
 
Cork Street Dublin 8 Environmental Improvement Strategy 2003
Cork Street Dublin 8 Environmental Improvement Strategy 2003Cork Street Dublin 8 Environmental Improvement Strategy 2003
Cork Street Dublin 8 Environmental Improvement Strategy 2003kieran rose
 
Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003kieran rose
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor WideCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINALCandice Spiroski
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018Crosstown TO
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown UpdateCrosstown TO
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open HouseCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Crosstown TO
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 John M Riggs
 
Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House Crosstown TO
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...hisimp
 

Similar to Nethermayne Site Planning Application (20)

3870 a4 8pp brochure no bleed
3870  a4 8pp brochure no bleed3870  a4 8pp brochure no bleed
3870 a4 8pp brochure no bleed
 
James Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility ReviewJames Assinder | Transport Accessibility Review
James Assinder | Transport Accessibility Review
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Cork street environment improvement strategy 2003
Cork street environment improvement strategy 2003Cork street environment improvement strategy 2003
Cork street environment improvement strategy 2003
 
Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003
 
Cork Street Dublin 8 Environmental Improvement Strategy 2003
Cork Street Dublin 8 Environmental Improvement Strategy 2003Cork Street Dublin 8 Environmental Improvement Strategy 2003
Cork Street Dublin 8 Environmental Improvement Strategy 2003
 
Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003Cork street environmental improvement strategy 2003
Cork street environmental improvement strategy 2003
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018Pharmacy  to Kennedy Construction Liaison Committee Meeting - April 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - April 2018
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown Update
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
Eastern Works Open House
Eastern Works Open House Eastern Works Open House
Eastern Works Open House
 
St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...St Andrew's Centre minor highways project supported by Histon & Impington Par...
St Andrew's Centre minor highways project supported by Histon & Impington Par...
 

Recently uploaded

Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 

Recently uploaded (20)

Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 

Nethermayne Site Planning Application

  • 1. The Nethermayne Site – as of now
  • 2. 1.3.3. Scheme Description The proposed new neighbourhood at Nethermayne will deliver the following benefits: • 725 new homes delivered on approximately 22.32 ha residential land at an average net density of 32 dwellings per hectare; • A 2.1ha site for a primary school that can accommodate up to 2 forms of entry; • 16.7ha of public open space, exceeding the total policy requirements, with additional provision of sports pitches made available through access to school playing fields; • A local centre accommodating 622 sq.m retail floor space featuring a local food store and 3 smaller retail units providing day to day facilities required by residents on their ‘door step’; • 0.81ha of land adjacent to St. Luke’s hospice to allow for future expansion of the hospice.
  • 3. “Illustrative Masterplan” for Nethermayne Site Policy BAS S3 states that the Nethermayne site is expected to comprise of’ residential development, open space, the provision of the community centre, shops and health centre. No
  • 4. Buildings to be demolished •Basildon (S.Essex) College will be demolished; •Basildon Sports Hall will be demolished; •The Longwood complex will be demolished
  • 5. Development Phases 6.2 2014 Opening year 6.2.1 It is proposed that Phase one of the development will gain access via the Dry Street junction. This assumes that by 2014, 30 dwellings will be built and will use the existing Dry Street junction to access the site. (Transport Assessment Final) •Phase 1: 2014: 30 units •Phase 2: 2016 - 2019: Approximately 225 units •Phase 3: 2019 - 2022: Approximately 198 units •Phase 4: 2022 – 2024: Approximately 110 units •Phase 5: 2024 – 2026: Approximately 164 units
  • 6. Phase 1 • 6.1.3 Phasing Sequence • Phase 1 will comprise circa 30 units located near the Dry Street entrance to the site. This will require the demolition of the existing equestrian centre. • Assuming planning permission is granted in May 2013, it is anticipated that construction will start towards the end of 2013. • On this basis sales can be expected to commence in 2014. • N.B. If planning permission is granted it is likely to be before May 2013. The outline plan is due to be considered in January or February 2013 Huh ?
  • 7. Phase 2 • Phase 2 is dependant on the creation of increased traffic capacity via the upgrading of Nethermayne roundabout. Phase 2 therefore evolves from the spine road off this junction. • The main construction activity in terms of unit build out will occur in phase 2. The timing of this will allow for the relocation of South Essex College, which is scheduled for July 2015. • From this point a 124 month (10 year) construction programme is envisaged which equates to a construction rate of circa 6 units a month. On this basis the main construction, phase 2, would start in July 2015 with the unit sales commencing a year later in July 2016 at rate of circa 70 units a year until 2026. • In addition to the relocation of South Essex College in advance of the main construction phases, the phasing strategy also proposes delivery of essential works to the Nethermayne roundabout which will trigger commencement of phase 2. The Design & Accessment Statement seems to lump phases 2-5 in one Phase 2. 6.1.2 Phasing Strategy The phasing strategy is based on 2 strategic phases of development to deliver up to 725 units with the associated mixed uses and open spaces. (Design & Accesss Statement)
  • 8. Access to the finished development Dry Street Junction 10.3.3 Dry Street will be widened to provide additional capacity for this vehicular access – from a four metres country lane to a six-metre wide carriageway. In conjunction with this the existing footpath along Dry Street will be replaced and improved to provide a high quality two metre wide off-carriageway link pedestrians, the on road cycling route will continue to be promoted. 10.3.4 The Dry Street / A176 junction is proposed to be upgraded from a priority junction to a signalised all-movements junction. This will enable traffic from all directions to negotiate the junction safely, in particular traffic coming from Dry Street turning onto the A176.
  • 9. Access during development • 1.3.2 The first phase of development will be located to the south of the site, for which access will be gained via Dry Street. Further phases will gain access via the Nethermayne Roundabout which will be the main development access. • Phase five will gain access from Dry Street. It is proposed that phases two to five of the development will commence from 2015 when the college has relocated to the town centre site.
  • 10. Access through Lee Chapel South • 4.3.13 Along with the access points detailed above (that’s the hospital roundabout and Dry Street), additional pedestrian and cycle links will be provided to the north of the site, providing links through to the existing residential areas of Lee Chapel.
  • 11. “mitigation” Measures • 4.3.16 The proposed junction improvement will consist of the removal of the hospice arm (changing the existing layout from a six arm roundabout to a five arm roundabout), widening the A176 N to three traffic lanes, widening the A176 S and the Hospital arm to two lanes. In addition the circulatory carriageway on the eastern half of the roundabout will be widened from two lanes to three lanes with the provision of spiral road markings and destination markings. • 4.3.25 Mitigation measures have also been drawn up for the Ashdon Way junction to maximise the amount of Green Time to reduce delays and queuing. The scheme includes the installation two signalised, staggered pedestrian crossings and to optimise the road layout. The first of these will be across the A176 to the north of the junction and consist of an 8 metre by 2.5 metre island. The second crossing will be across the entrance on Ashdon Way and included a staggered crossing using the existing road island. The carriageway layout has been modified with a 40 metres right turn only filter lane. The lane width of the Ashdon Way exit is now a uniform 5 metres.
  • 12. • 4.3.15 As detailed above, the Nethermayne Roundabout will be the main development access via the existing college arm. The college arm will also provide access to the hospice as, commencing from Phase two of the development; it is proposed that the hospice arm will be closed.
  • 13. 4.3.25 Mitigation measures have also been drawn up for the Ashdon Way junction to maximise the amount of Green Time to reduce delays and queuing. The scheme includes the installation two signalised, staggered pedestrian crossings and to optimise the road layout. The first of these will be across the A176 to the north of the junction and consist of an 8 metre by 2.5 metre island. The second crossing will be across the entrance on Ashdon Way and included a staggered crossing using the existing road island. The carriageway layout has been modified with a 40 metres right turn only filter lane. The lane width of the Ashdon Way exit is now a uniform 5 metres. What is not clear is whether the 40 metres right turn only filter lane is for all traffic, not just buses and taxis.
  • 14. “The southern exit connects directly with the existing Dry Street, offering users a quiet route to the countryside offerings of Martinhole Wood and Langdon Hills Country Park.” “The southern access on Dry street has limited capacity and the design of the primary street will need to respond to this by directing to use the Nethermayne access.”“5. Dry Street Village: Located at the site’s southerly end, the Dry Street Village character area has a more rural character reflective of existing residential properties further along Dry Street. This area is connected to the rest of the new neighbourhood by the Neighbourhood Spine which continues to act as the primary route that links residents with the community core.” I thought I already lived in a village called Dry Street
  • 15. So what ? • One of the biggest concerns to users and residents of Dry Street must be the threat of an enormous increase in through traffic. It’s bad enough as it is !! • The planning application assumes that traffic from the new development will use the Hospital roundabout for the most part. • It appears to neglect the strong probability that traffic going North, i.e. towards Basildon TC or West, towards Dunton, Laindon Station or the A127 or A13 will do what it can to avoid the congestion on Nethermayne, using Dry Street instead. • No “mitigation” measures are planned for Dry Street beyond the planned entrance to the new development Between the proposed Dry Street access point and the B1007 there are 15 official footpaths, bridleways and private roads. There are no footpaths.
  • 16. GROUNDS FOR REFUSAL • A. Contrary to Green Belt policy. X • B. Contrary to Development Plan zoning. X • C. Over-development of the site by reason of ……X • D. Prejudicial to the replanning of the area by reason of …… • E. Objection on highway safety grounds. • F. Lack of car parking/servicing facilities. X • G. Damage to residential amenity by reason of …… • H. Damage to visual amenity/poor design by reason of …… • I. Unsatisfactory layout by reason of ……X • J. Objection by the Anglian Water Authority. ? Send your comments to: Chief Planning Officer Basildon Borough Council St.Martin’s Square Basildon SS14 1DL Land At Nether Mayne Kingswood Basildon Essex SS16 5NL Ref. No: 12/01080/OUT
  • 17. National Planning Policy Framework 74. Existing open space, sports and recreational buildings and land, including playing fields, should not be built on unless: ●● an assessment has been undertaken which has clearly shown the open space, buildings or land to be surplus to requirements; (we haven’t seen anything like this) or ●● the loss resulting from the proposed development would be replaced by equivalent or better provision in terms of quantity and quality in a suitable location (the HCA have said it will be relocated, but that could be out of Essex !); or ●● the development is for alternative sports and recreational provision, the needs for which clearly outweigh the loss.(which it clearly isn’t)
  • 18. 11. Conserving and enhancing the natural environment 109. The planning system should contribute to and enhance the natural and local environment by: ●● protecting and enhancing valued landscapes, geological conservation interests and soils; ●● recognising the wider benefits of ecosystem services; ●● minimising impacts on biodiversity and providing net gains in biodiversity where possible, contributing to the Government’s commitment to halt the overall decline in biodiversity, including by establishing coherent ecological networks that are more resilient to current and future pressures;