SAIVS SAND CASTING &
     MACHINING
     •Casting process and ability
     •Machining process and ability
     •Inspection process and ability
Sand casting-Automotive Line
                   Cast Ability
                   over
                   20 000Tons
Sand Core making
                     Sand blasting




                   Get Nice surface
Quality control- Incoming material;
         in-process; before machining




material test
                            Hardness;tensile test




                Magnetic                  Ultrasonic
                particle test                   test
Machining


            The CNC
            machining
            workshop
• CNC
       machining
       centers



• CNC Lathes.
• Machining
  holes, Inside &
  out side
  surface etc
•   Grinding

               •       Normal
                       Lathe




•   Milling
                   •    Drilling




•   Reaming
•   holes to reach tolerance
    0.02-0.03mm
Double Testing & Inspection
                              • Test Physical
                                strength and
                                yield strength




                  • Test impact
                    strength and
                    impact Joule



         • Ultra sonic
           tester.
         • Test inside
           bubbles, cracks,
           holes and sand
Spectrum analyser test
         chemical composition




                          Test product
                          hardness




Micro structure
analyser, test carbon
particles, class and
grade
• Salt fog tester




• CMM test
  precise
  dimensions
Ability Analysis to
       US Solar project 65-45-12
       Calculate based on 63 000pcs/Year
                  1200pcs/week
• Assembling whole set weight 17.6kg
• 3 tons furnace, casting over 24tons each
  day.
• 24000kg/17.6kg=1360pcs/day
Saivs Management
      •   Saivs company management
          and process rules
      •   The rulebook describes the
          process how to make technical
          process, producing schedule,
          inspection documents and
          schedule and so on.
      •   Every department with
          company’s general rules and
          detail rules. All people working
          step by step based on the rules
The Main Four Manage Systems
• K3 manage system
• The system records all
  processes and steps of
  planning and producing.
  From input the order, which
  process finished, how many
  quality good, how many bad,
  each process takes #minutes,
  how many pcs produced in
  8hours, equipement situation
  good or not, how many pcs
  packaged and sent to
  customer, how many finished
  products in stock and tracing
  back each process and step.
• BOM and technical document system
                           • This system
                             contains all Saivs
                             technical
                             information and
                             document.
                           • Engineers and QE
                             can check all (such
                             as OEM parts)
                             process flow-chart,
                             all detail
                             processes, 3D
                             drawing view, and
                             all other technical
                             information.
• Pro-e designing system




• Saivs engineer use Pro-e as well as Solid-works to design ,
  calculate and fatigue analysis etc.
• OA (office assistant) system




• This systems records all details and documents of meeting
  and communication between colleagues. We get an enquiry
  and put the drawings and customer requirement into the
  system, send them to technical or quality department to
  analyse and calculating. Customer quality report put into it
  and our engineers check it. Also can send notice to them
  what time for meeting and all responsible people will have
  the meeting together, discussing and solve problems.
Management documents
•   Before producing, technical department estimate and making
    producing schedule, prepare PPAP documents, estimate producing
    time and producing ability etc. Begin producing, technical
    department and quality department preparing the producing
    documents of each process and all inspection documents.
•   Each process and stage inspection and tests.
•   Each inspection with record, reject or approved
•   Incoming inspection
•   First Article inspection
•   Heat treatment documents and inspection
•   Surface treatment (painting) documents and inspection
•   Assemble and sub-assembly inspection
•   Final inspection and make quality control reports
•   Package documents and package inspection
•   PPAP documents for analyse producing ability and producing
    continues improving
•   Other documents
Management Flowchart
Production Line
        B


                          C
    H        H      L    G
A




                                      D




                                  J


                              E
More Information…
Please visit our website: www.saivs.com
or Contact Us directly:
Justin Hu 胡航誠
Business Development Engineer
Ningbo Saivs Machinery Co., Ltd
Jia Village Industrial Zone, Yunlong Town,
Ningbo 315135, Zhejiang, China.
Mobile:+86-0159 8869 2721
Tel:+86-574-8847 4573
Fax:+86-574-8834 5368
Skype: huhangcheng
MSN:Justin.Hu@msn.com
Web:www.saivs.com

More Related Content

What's hot

Garner Osborne Assembly Brochure
Garner Osborne Assembly BrochureGarner Osborne Assembly Brochure
Garner Osborne Assembly Brochure
Laura Goslin
 
Custom Molds Inc
Custom  Molds  IncCustom  Molds  Inc
Custom Molds Inc
almodian
 
Garner Osborne Manufacturing Brochure
Garner Osborne Manufacturing BrochureGarner Osborne Manufacturing Brochure
Garner Osborne Manufacturing Brochure
Laura Goslin
 
vijay_Resume
vijay_Resumevijay_Resume
vijay_Resume
Vzu viji
 
Tectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room SpecialistTectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Manoj M
 
Smith-SecureTest
Smith-SecureTestSmith-SecureTest
Smith-SecureTest
Nora Gibbs
 

What's hot (17)

Garner Osborne Assembly Brochure
Garner Osborne Assembly BrochureGarner Osborne Assembly Brochure
Garner Osborne Assembly Brochure
 
SMT 2011
SMT  2011SMT  2011
SMT 2011
 
Custom Molds Inc
Custom  Molds  IncCustom  Molds  Inc
Custom Molds Inc
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
Business Process Planning
Business Process PlanningBusiness Process Planning
Business Process Planning
 
Ashish jariwala -Resume
Ashish jariwala -ResumeAshish jariwala -Resume
Ashish jariwala -Resume
 
Garner Osborne Manufacturing Brochure
Garner Osborne Manufacturing BrochureGarner Osborne Manufacturing Brochure
Garner Osborne Manufacturing Brochure
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
COMPANY
COMPANYCOMPANY
COMPANY
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
vijay_Resume
vijay_Resumevijay_Resume
vijay_Resume
 
Tectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room SpecialistTectonics-Hospitality Furniture Manufacter and Guest Room Specialist
Tectonics-Hospitality Furniture Manufacter and Guest Room Specialist
 
Smith-SecureTest
Smith-SecureTestSmith-SecureTest
Smith-SecureTest
 
DDSH Technologies Pte. Ltd. Singapore
DDSH Technologies Pte. Ltd. SingaporeDDSH Technologies Pte. Ltd. Singapore
DDSH Technologies Pte. Ltd. Singapore
 
Qc
QcQc
Qc
 
ars resume
ars resumears resume
ars resume
 
Ikram _CV.
Ikram _CV.Ikram _CV.
Ikram _CV.
 

Viewers also liked (8)

Creative Casting through 3D printing DOC
Creative Casting through 3D printing DOCCreative Casting through 3D printing DOC
Creative Casting through 3D printing DOC
 
Sand casting
Sand castingSand casting
Sand casting
 
Sand casting
Sand castingSand casting
Sand casting
 
Sand Casting
Sand CastingSand Casting
Sand Casting
 
Sand Casting
Sand Casting Sand Casting
Sand Casting
 
Sand casting
Sand castingSand casting
Sand casting
 
casting ppt
casting pptcasting ppt
casting ppt
 
Casting
CastingCasting
Casting
 

Similar to Saivs Sand Casting & Machining

Kaysun overview
Kaysun overviewKaysun overview
Kaysun overview
mdelrealkc
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
Prabhu Bose
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
Fides Sales
 
E&I QC INSPECTOR RESUM AND documents.pdf
E&I QC INSPECTOR RESUM AND  documents.pdfE&I QC INSPECTOR RESUM AND  documents.pdf
E&I QC INSPECTOR RESUM AND documents.pdf
Irfan786pak
 
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdfFAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
FAROOQ RASHEED ANSARI ( BABA GE )
 

Similar to Saivs Sand Casting & Machining (20)

Experts in Precision Laserage Contract Manufacturing
Experts in Precision Laserage Contract ManufacturingExperts in Precision Laserage Contract Manufacturing
Experts in Precision Laserage Contract Manufacturing
 
Getech Corporate Overview
Getech Corporate OverviewGetech Corporate Overview
Getech Corporate Overview
 
Kaysun overview
Kaysun overviewKaysun overview
Kaysun overview
 
Resume
ResumeResume
Resume
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
 
Arshad Jamal
Arshad JamalArshad Jamal
Arshad Jamal
 
Khurshid WI cswip 3.1
Khurshid WI cswip 3.1Khurshid WI cswip 3.1
Khurshid WI cswip 3.1
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
 
PPCE Unit-2.pptx
PPCE Unit-2.pptxPPCE Unit-2.pptx
PPCE Unit-2.pptx
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activities
 
PPCE Unit-2.pptx
PPCE Unit-2.pptxPPCE Unit-2.pptx
PPCE Unit-2.pptx
 
CV
CVCV
CV
 
E&I QC INSPECTOR RESUM AND documents.pdf
E&I QC INSPECTOR RESUM AND  documents.pdfE&I QC INSPECTOR RESUM AND  documents.pdf
E&I QC INSPECTOR RESUM AND documents.pdf
 
Resume - NATARAJAN SIVASUBRAMANI
Resume - NATARAJAN  SIVASUBRAMANIResume - NATARAJAN  SIVASUBRAMANI
Resume - NATARAJAN SIVASUBRAMANI
 
ahmad new - 3
ahmad new - 3ahmad new - 3
ahmad new - 3
 
Rajendra_CV
Rajendra_CVRajendra_CV
Rajendra_CV
 
Ravi CV
Ravi CVRavi CV
Ravi CV
 
Pramod_Resume
Pramod_ResumePramod_Resume
Pramod_Resume
 
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdfFAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
 

Saivs Sand Casting & Machining

  • 1. SAIVS SAND CASTING & MACHINING •Casting process and ability •Machining process and ability •Inspection process and ability
  • 2.
  • 3.
  • 4.
  • 5. Sand casting-Automotive Line Cast Ability over 20 000Tons
  • 6. Sand Core making Sand blasting Get Nice surface
  • 7. Quality control- Incoming material; in-process; before machining material test Hardness;tensile test Magnetic Ultrasonic particle test test
  • 8. Machining The CNC machining workshop
  • 9. • CNC machining centers • CNC Lathes. • Machining holes, Inside & out side surface etc
  • 10. Grinding • Normal Lathe • Milling • Drilling • Reaming • holes to reach tolerance 0.02-0.03mm
  • 11. Double Testing & Inspection • Test Physical strength and yield strength • Test impact strength and impact Joule • Ultra sonic tester. • Test inside bubbles, cracks, holes and sand
  • 12. Spectrum analyser test chemical composition Test product hardness Micro structure analyser, test carbon particles, class and grade
  • 13. • Salt fog tester • CMM test precise dimensions
  • 14. Ability Analysis to US Solar project 65-45-12 Calculate based on 63 000pcs/Year 1200pcs/week • Assembling whole set weight 17.6kg • 3 tons furnace, casting over 24tons each day. • 24000kg/17.6kg=1360pcs/day
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Saivs Management • Saivs company management and process rules • The rulebook describes the process how to make technical process, producing schedule, inspection documents and schedule and so on. • Every department with company’s general rules and detail rules. All people working step by step based on the rules
  • 20. The Main Four Manage Systems • K3 manage system • The system records all processes and steps of planning and producing. From input the order, which process finished, how many quality good, how many bad, each process takes #minutes, how many pcs produced in 8hours, equipement situation good or not, how many pcs packaged and sent to customer, how many finished products in stock and tracing back each process and step.
  • 21. • BOM and technical document system • This system contains all Saivs technical information and document. • Engineers and QE can check all (such as OEM parts) process flow-chart, all detail processes, 3D drawing view, and all other technical information.
  • 22. • Pro-e designing system • Saivs engineer use Pro-e as well as Solid-works to design , calculate and fatigue analysis etc.
  • 23. • OA (office assistant) system • This systems records all details and documents of meeting and communication between colleagues. We get an enquiry and put the drawings and customer requirement into the system, send them to technical or quality department to analyse and calculating. Customer quality report put into it and our engineers check it. Also can send notice to them what time for meeting and all responsible people will have the meeting together, discussing and solve problems.
  • 24. Management documents • Before producing, technical department estimate and making producing schedule, prepare PPAP documents, estimate producing time and producing ability etc. Begin producing, technical department and quality department preparing the producing documents of each process and all inspection documents. • Each process and stage inspection and tests. • Each inspection with record, reject or approved • Incoming inspection • First Article inspection • Heat treatment documents and inspection • Surface treatment (painting) documents and inspection • Assemble and sub-assembly inspection • Final inspection and make quality control reports • Package documents and package inspection • PPAP documents for analyse producing ability and producing continues improving • Other documents
  • 26. Production Line B C H H L G A D J E
  • 27. More Information… Please visit our website: www.saivs.com or Contact Us directly: Justin Hu 胡航誠 Business Development Engineer Ningbo Saivs Machinery Co., Ltd Jia Village Industrial Zone, Yunlong Town, Ningbo 315135, Zhejiang, China. Mobile:+86-0159 8869 2721 Tel:+86-574-8847 4573 Fax:+86-574-8834 5368 Skype: huhangcheng MSN:Justin.Hu@msn.com Web:www.saivs.com