Implementing Agency : Gujarat – Surface Water
Category wise Expenditure, SW
Sr.
No.
Item
Provision as
per RCT
(Oct-2013)
Cumulative
Expenditure
(Up to Mar-
2013)
Annual
Work Plan
(2013-14)
Expenditure
2013-14
(Up to Mar-
2014
Cumulative
Expenditure
up to Mar-
2014
1 Civil Works 5.42 5.42 0.00 0.00 5.42
2 Goods 42.24 24.95 17.29 16.65 41.60
3 Consultancy 0.00 0.00 0.00 0.00 0.00
4 Trainings 7.34 4.46 2.89 1.02 5.48
Total Investment
Cost
55.00 34.83 20.18 17.67 52.49
5 Recurrent 23.29 21.40 2.32 1.97 23.37
Total Cost
(Inv + Rec)
78.29 56.23 22.50 19.64 75.86
Rs in Million
2Gujarat - SW
Component wise Expenditure, SW
Sr.
No.
Item Total
Provision
as per
RCT (Oct-
2013)
Cumulative
Expenditure
(Up to Mar-
2013)
Annual
Work Plan
(2013-14)
Expenditure
2013-14
(Up to Mar-
2014
Cumulative
Expenditure
up to Mar-
2014
I.A Consolidation of HP - I 29.61 13.24 16.37 16.02 29.26
I.B
Awareness
Dissemination &
Knowledge Sharing
7.52 5.41 2.11 0.73 6.13
I.C
Implementation
Support
29.76 28.85 1.34 1.06 29.91
II.A
Hydrological Design
Aids
0.04 0.04 0.01 0.01 0.04
II.B
Decision Support
System
9.04 6.62 2.43 1.67 8.29
II.C
Purpose Driven
Studies
2.32 2.08 0.25 0.16 2.23
Total 78.29 56.23 22.50 19.64 75.86
Rs in Million
3Gujarat - SW
Status of Financial Targets and Achievement, SW
Sr.
No.
Description
Amount in
Rs. Million
1
Allocation under the project as per Project Implementation
Plan (PIP)
94.39
2 Total Base Cost as per Revised Cost Table (Oct. – 13) 78.29
3 Cumulative Expenditure Up to March – 2014 75.86
4 Total Likely cumulative expenditure up to 31st May 2014
75.86
81%
5 Probable Saving (1 - 4)
18.53
19%
4Gujarat - SW
Major Reasons for Savings
• Exclusion of charges for
• Maintenance for RTDAS for River gauging and Weather Stations,
beyond the HP-II period. (Rs 15.00 Million)
• IT related provisions (Backup infrastructure , Satellite imageries
etc.) for Decision Support System (DSS)- Planning (Rs. 1.30 Million)
• Provisions made for International and Local trainings not fully
implemented. - (Rs. 2.00 Million)
• Other Miscellaneous Items. - (0.23 Million)
• Total Saving = 18.53 Million
5Gujarat - SW
Status of Disbursement of Claims (SW)
Category Name Category No
Eligible
Expenditure
Amount of Claim &
Disbursement
Civil Works 1 5.42 4.88
Goods 2 41.30 39.62
Consultancy 3 0.00 0.00
Training 4 5.48 4.71
Operating Cost 5 22.92 15.78
Total 75.12 64.98
6Gujarat - SW
Rs in Million
I.A. Consolidation of HP –I:
• 928 officers have been trained,
• Procured IT related hardwares e.g. Workstations – 1 No, Server – 1 No,
printer – 1 No, copier Machine – 1 No, Fax – 1 No etc.
• Upgraded 50 Weather Stations & 60 River Gauging stations with Real
Time Data Acquisition System
Physical Progress Achieved - SW
7Gujarat - SW
Physical Progress Achieved - SW
8Gujarat - SW
Installation of 50 Automatic (RTDAS) Weather Stations
Physical Progress Achieved - SW
9Gujarat - SW
Installation of 60 Automatic (RTDAS) River Gauging Stations
Real Time Data Acquisition System : Weather Station
10Gujarat - SW
Physical Progress Achieved - SW
Real Time Data Acquisition System : River gauging Station
Real Time Data Acquisition System for River Gauging stations:
• 60 existing stations equipped with Shaft Encoder type Digital Water Level
Recorders are converted in to RTDAS by installing telemetry system (M/s
Komoline Aerospace Limited)
• Data updation Frequency : 10 - 30 Minutes
• The Major Component of Telemetry System Installed are :
• GSM modem with an on-board host
• Solar Charge Controller Lead-Acid Battery (12V DC) and a Solar
Panel (10W)
• Data base management software
• Mast
• Environmental enclosure
• Training
• Operation and Maintenance : 5 yrs (Inclusive of 2 yrs warranty period)
Physical Progress Achieved - SW
11Gujarat - SW
Real Time Data Acquisition System for Weather stations:
• 50 New Automatic Weather Station (AWS) are installed to Measure Wind speed,
Wind direction, Air temperature, Relative humidity, Rainfall, Solar radiation, Air
pressure (M/s Cellcomm solutions pvt. ltd)
• Data updation Frequency : 60 Minutes
• The Major component are :
• Design and execute civil works
• Preparation of AWS field sites
• SITC of AWS equipment consisting of Sensors
• Data logger (with built-in display)
• GSM Modem and transmission system,
• Rechargeable power unit
• Sensor mast
• Environmental enclosure
• GSM/GPRS service
• Development of database management software
• Training
• Operation and Maintenance : 5 yrs (Inclusive of 2 yrs warranty period)
Physical Progress Achieved - SW
12Gujarat - SW
Achievements Related to HIS -
(A,A,A)
• Awareness
• Availability
• Accuracy
Gujarat - SW 13
I.B. Awareness, Dissemination and Knowledge Sharing:
• Organized 41 awareness raising workshops, 19 meetings of HDUG and 11
meetings of RHDUG
• Registration of 109 Govt. and Non-Govt. HDUG members.
• Publication of Information booklet, Brouchers, calendar, Water year book
for year-2010 and 2011, produced film and Quickee for awareness raising
workshops.
Physical Progress Achieved - SW
14Gujarat - SW
I.B. Awareness, Dissemination and Knowledge Sharing:
• Updating of Data in SWDES software till Feb-2013
• Interagency validation : IMD validated data up to 2010 & CWC validated
data up to 2009
• Procurement of Audio-visual equipment: (Multimedia Projector -1 No,
Laptop – 2 No, CCTV – 7 No, LCD – 1 No etc.)
Physical Progress Achieved - SW
15Gujarat - SW
Physical Progress Achieved - SW
16Gujarat - SW
0
100
200
300
400
500
600
700
800
900
2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14
Datarequest
Year
Cumulative Data Dissemination Requests
H P - II Period
H P - I Period
Physical Progress Achieved - SW
17Gujarat - SW
Study
18%
Research
30%
Project Planning &
Implementation
26%
Flood Management
7%
Design
16%
Other
3%
Data Usage
I.C. Implementation support -Logistical support
• Civil work and Interior work of Conference hall at SWDC, Gandhinagar
and renovation of Conference hall and Committee Room at GERI,
Vadodara completed.
• Procurement of 10 Vehicles, office equipments etc.
Physical Progress Achieved - SW
18Gujarat - SW
II.A. Hydrological Design Aids:
• Consultants-M/S CES (India) Pvt. Ltd., New Delhi presented the first
Draft State of The Art Report in May, 2010 for Development of HDA
• 2 officers have attended the first course in Sept., 2012 (HDA - 1)
• 2 officers have attended the course in December, 2013. (HDA-2).
Physical Progress Achieved - SW
19Gujarat - SW
II.B. Decision Support System – Planning (DSS-P)
• Mahi Basin (Gujarat State Portion ) had been selected as State Pilot Basin.
• The components of DSS - Planning are:
• Surface water planning.
• Integrated operation of reservoirs.
• Conjunctive surface water and ground water planning.
• Drought monitoring, assessment and management.
• Management of both surface and ground water quality.
• Software & Imageries procured & used : Arc GIS Software (ver.9.3) (i.e. Arc
Info, Spatial Analyst & 3D Analyst), Image Processing Software (ENVI-EX.),
Image Processing Software (ENVI-5), LISS 4 satellite imageries (12 Nos.) for
Mahi Basin
Physical Progress Achieved - SW
20Gujarat - SW
DSS (Planning) for Integrated Water Resources Development & Management
under HP-II MAHI RIVER BASIN ( GUJARAT )
Physical Progress Achieved - SW
Issues
• Managing the increasing demands from water
resources sectors
• Managing reservoirs and inter-basin transfer
under normal, flood, and drought conditions.
• Impacts of importing water from the Narmada
Canal
• Managing water use in command areas (e.g.
cropping pattern)
• Assess the inundation when heavy rain falls
on irrigated land
• Basin area in some part is drought prone
• Pollution from villages and industries is an
increasing problem
DSS (Planning) for Integrated Water Resources Development & Management
under HP-II MAHI RIVER BASIN ( GUJARAT )
Physical Progress Achieved - SW
22Gujarat - SW
Status of Modeling activities:
• The Rainfall - Runoff analysis for the catchments of Mahi Basin has been done
using “NAM” module
• Basin schematization work of the Mahi River Basin Modeling has been done in
MIKE BASIN SOFTWARE . The same has been converted to MIKE HYDRO
BASIN .
• Basin schematization work of the Mahi River Basin Modeling done in MIKE
BASIN SOFTWARE has been imported to the DSS-P Platform (ver3.2a)
provided by the consultants in Sept. 2013. Now, the model developed in MIKE
HYDRO BASIN software is to be imported to the DSS-P Platform (ver. 4)
Physical Progress Achieved - SW
DSS (Planning) for Integrated Water Resources Development & Management
under HP-II MAHI RIVER BASIN ( GUJARAT )
23Gujarat - SW
Applications have been developed for Mahi basin using available tools :
• Irrigation Seasonal Planning application for Patadungari Project as a test case.
• Water resources planning in general using Reservoir Working Table (RWT)
analysis and dependability.
• Scenario Analysis for sustainability of supply/deficit in meeting demands.
• Improvement in analysis of Integrated Reservoir Operation case study @
Wanakbori (Kadana-Panam - Bhadar Reservoir) is in progress.
Physical Progress Achieved - SW
DSS (Planning) for Integrated Water Resources Development & Management
under HP-II MAHI RIVER BASIN ( GUJARAT )
24Gujarat - SW
• Surface water planning;
– Irrigation Seasonal Planning application for Patadungari Project as a
test case. Application being developed for other reservoirs of the basin
also.
DSS (Planning) - Application
Physical Progress Achieved - SW
25Gujarat - SW
• Surface water planning;
– Water resources planning in general using Reservoir Working Table
(RWT) analysis and dependability.
DSS (Planning) – Application
Physical Progress Achieved - SW
26Gujarat - SW
• Surface water planning;
– Dependable flows reaching Gulf of Cambay from Mahi Basin
DSS (Planning) - Application
Physical Progress Achieved - SW
27Gujarat - SW
Integrated Reservoir Operation including Management : case study @ Wanakbori
(Kadana-Panam-Bhadar Reservoir) Refinement of scripting is in progress.
DSS (Planning) - Application
Physical Progress Achieved - SW
28Gujarat - SW
Drought monitoring, assessment and management - Dashboard
application for populating SPI-monthly data.
Physical Progress Achieved - SW
29Gujarat - SW
Present Status of development of DSS-P applications:
• The following interfaces forwarded by the DSS-P consultants, to populate results
for following applications, are being evaluated for their suitability:
• General Seasonal Planning
• General Seasonal Planning and conjunctive use
• Integrated Reservoir Operation case study
• The consultants have developed Dashboard application to populate Drought
Indices based on monthly Standard Precipitation Index (SPI-1). Suggestion have
been made to improve the same by adding utility like frequency analysis of
Drought etc.
• The activities related to development of DSS-P for Water Quality would be
initiated by the consultant
Physical Progress Achieved - SW
30Gujarat - SW
II.C. Purpose-Driven studies:
• Four PDS under SW Component have been carried out and the Final
Report has been submitted to HISMG (T) for approval.
• WQ fluctuation in river Sabarmati: Assessment of highly polluted zone to
take remedial action.
• WQ fluctuation in river Vishwamitri: Assessment of source of pollution to
take remedial action
• Study of trend in WQ at Hotspot location: Assessment of source of
pollution to take remedial action
• Crop Water Requirement Study: To work out Irrigation water requirement
& subsequent system design & applicable to nearby area.
Physical Progress Achieved - SW
31Gujarat - SW
Post project plan for continuation of HP2 activities
• Exporting Mike Basin Models to Mike Hydro Basin 2014.
– Implementation of R-r relations in Mike Hydro Basin
– Implementation of Irrigation Module in Mike Hydro Basin
– Modeling of Water Quality module in Mike Hydro Basin
• Development of Rule levels for operation of gated reservoirs in DSS-P.
• Annual Maintenance for Upgrading of 50 Weather stations & 60 River Gauge
stations will be continued.
• Trainings and refresher courses for staff will be continued to sustain the HIS
activities.
• Awareness raising workshops will be continued for data users.
• Maintenance of the infra-structural facilities created from the state funds.
32Gujarat - SW
• Development of DSS-P already initiated for four new River Basins viz. Sabarmati
River Basin, Ambika River Basin, Bhadar (Saurashtra) River Basin & Shetrunji
River Basin.
• New recruited Assistant Engineers (9) in Central Designs Organisation,
Gandhinagar trained by the State DSS-P team and are working on these basins.
Mahi
Sabarmati
Ambika
Bhadar
Shetrunji
Post project plan for continuation of HP2 activities
33Gujarat - SW
Proposals for HP-III
• Targeted smooth, time bound implementation of applying DSS – (P)
model to other needy river basins from model Mahi Basin.
• Development of Real time flood forecasting system of Tapi basin.
• Establishing Real Time Data Acquisition System for River gauging,
Rain gauging and Weather stations
• Creation of ToT‟s at state level.
Post project plan for continuation of HP2 activities
34Gujarat - SW
Post project plan for continuation of HP2 activities
35Gujarat - SW
Sr. No. Name of work
No. of
Stations
Rs in Million
1
Supply, Installation, Testing, Commissioning and Maintenance Of Real Time
Data Acquisition Network AUTOMATIC WEATRHER STATIONS. (AMC for 5
Years, including Security Arrangements)
13 No. 23.75
2
Supply, Installation, Testing, Commissioning and Maintenance Of Real Time
Data Acquisition Network Automatic Rain gauge Stations. (AMC for 5 Years,
including Security Arrangements)
39 No. 31.43
3
Supply, Installation, Testing, Commissioning and Maintenance Of Real Time
Data Acquisition Network at River Gauge Stations.(AMC for 5 Years, including
Security Arrangements)
24 No. 22.46
4 Purchase of DWLR for all River Gauge Stations. 54 No. 21.60
5
Real Time Gauging & Monitoring for ONE pilot project including 2 Nos of Radar
Level sensor.(AMC for 5 Years, including Security Arrangements) 1 no. 1.90
6
Horizontal Extension (DSS-P) for Mahi BasinDecision Support System for
Surface Water Planning on „IWRM‟ for other basins (New Basins)Sabarmati
Basin &Shetrunji Basin
2 basin 10.00
7 Real time DSS for Tapi Basin 1 basin 50.00
Total Investment Cost 161.15
Recurrent Cost (@20% of Investment Cost) LS 32.23
Total 193.38
Financial Proposal : HP-III
Lessons Learnt
• Effective and efficient use of the HIS will help in water resources planning and
management in a systematic way.
• Development of Decision Support System will facilitate in informed Decision
making process.
• The applications developed under DSS-P would be replicated to other Basins
of the state.
36Gujarat - SW
Lessons Learnt ?(A-B-C-D)
• Avoiding Ambiguity
• Brevity
• Communication & Correct Approach
• Decision Making
Gujarat - SW 37
THANKS
38Gujarat - SW

Contenu connexe

Tendances

2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed Riegelmann
2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed Riegelmann2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed Riegelmann
2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed RiegelmannGIS in the Rockies
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission hydrologywebsite1
 
Annual report 2015 edited
Annual report 2015 editedAnnual report 2015 edited
Annual report 2015 editedValerie Alarcon
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resumeAbdul Basit
 
Survey camp ii
Survey camp iiSurvey camp ii
Survey camp iiDraemmraj
 
The nia piag cy 2012 year end report
The nia  piag cy 2012 year end reportThe nia  piag cy 2012 year end report
The nia piag cy 2012 year end reportcherreg1piag
 
4th Technical Meeting - WP6
4th Technical Meeting - WP64th Technical Meeting - WP6
4th Technical Meeting - WP6SLOPE Project
 
The NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportThe NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportcherreg1piag
 
Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014aceas13tern
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharmaindiawrm
 
Rain Check: Preparing Your Stormwater System for Historic Flooding
Rain Check: Preparing Your Stormwater System for Historic FloodingRain Check: Preparing Your Stormwater System for Historic Flooding
Rain Check: Preparing Your Stormwater System for Historic FloodingCartegraph
 

Tendances (13)

2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed Riegelmann
2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed Riegelmann2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed Riegelmann
2013 Mission First Track, Navy GeoReadiness: Return on Location by Ed Riegelmann
 
NAVFAC Conference Briefing
NAVFAC Conference BriefingNAVFAC Conference Briefing
NAVFAC Conference Briefing
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Annual report 2015 edited
Annual report 2015 editedAnnual report 2015 edited
Annual report 2015 edited
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resume
 
Survey camp ii
Survey camp iiSurvey camp ii
Survey camp ii
 
The nia piag cy 2012 year end report
The nia  piag cy 2012 year end reportThe nia  piag cy 2012 year end report
The nia piag cy 2012 year end report
 
4th Technical Meeting - WP6
4th Technical Meeting - WP64th Technical Meeting - WP6
4th Technical Meeting - WP6
 
The NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportThe NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end report
 
Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014Adam Lewis–SPEDDEXES 2014
Adam Lewis–SPEDDEXES 2014
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
 
Rain Check: Preparing Your Stormwater System for Historic Flooding
Rain Check: Preparing Your Stormwater System for Historic FloodingRain Check: Preparing Your Stormwater System for Historic Flooding
Rain Check: Preparing Your Stormwater System for Historic Flooding
 

En vedette

Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworkshydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...hydrologywebsite1
 
Mp gw applying aquifer modification techniques like hydrofraking, bore blast...
Mp gw  applying aquifer modification techniques like hydrofraking, bore blast...Mp gw  applying aquifer modification techniques like hydrofraking, bore blast...
Mp gw applying aquifer modification techniques like hydrofraking, bore blast...hydrologywebsite1
 
Download-manuals-training-trainingformats
 Download-manuals-training-trainingformats Download-manuals-training-trainingformats
Download-manuals-training-trainingformatshydrologywebsite1
 
Download-manuals-training-training sustainability coordinators' perception
 Download-manuals-training-training sustainability coordinators' perception Download-manuals-training-training sustainability coordinators' perception
Download-manuals-training-training sustainability coordinators' perceptionhydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...hydrologywebsite1
 
Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
 Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-... Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...hydrologywebsite1
 
transport in human being
transport in human beingtransport in human being
transport in human beingAyush Verma
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...hydrologywebsite1
 
Download-manuals-training-studytourscataloguemaster
 Download-manuals-training-studytourscataloguemaster Download-manuals-training-studytourscataloguemaster
Download-manuals-training-studytourscataloguemasterhydrologywebsite1
 
Download-manuals-gis-gis methodology-manual
 Download-manuals-gis-gis methodology-manual Download-manuals-gis-gis methodology-manual
Download-manuals-gis-gis methodology-manualhydrologywebsite1
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014hydrologywebsite1
 
Managing national hydrometric data from data to information
Managing national hydrometric data   from data to informationManaging national hydrometric data   from data to information
Managing national hydrometric data from data to informationhydrologywebsite1
 
Data dissemination policy 2013
Data dissemination policy 2013Data dissemination policy 2013
Data dissemination policy 2013hydrologywebsite1
 

En vedette (17)

Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 
Mp gw applying aquifer modification techniques like hydrofraking, bore blast...
Mp gw  applying aquifer modification techniques like hydrofraking, bore blast...Mp gw  applying aquifer modification techniques like hydrofraking, bore blast...
Mp gw applying aquifer modification techniques like hydrofraking, bore blast...
 
Download-manuals-training-trainingformats
 Download-manuals-training-trainingformats Download-manuals-training-trainingformats
Download-manuals-training-trainingformats
 
Download-manuals-training-training sustainability coordinators' perception
 Download-manuals-training-training sustainability coordinators' perception Download-manuals-training-training sustainability coordinators' perception
Download-manuals-training-training sustainability coordinators' perception
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 
Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
 Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-... Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 
transport in human being
transport in human beingtransport in human being
transport in human being
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 
Download-manuals-training-studytourscataloguemaster
 Download-manuals-training-studytourscataloguemaster Download-manuals-training-studytourscataloguemaster
Download-manuals-training-studytourscataloguemaster
 
Cwprs
CwprsCwprs
Cwprs
 
Download-manuals-gis-gis methodology-manual
 Download-manuals-gis-gis methodology-manual Download-manuals-gis-gis methodology-manual
Download-manuals-gis-gis methodology-manual
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Managing national hydrometric data from data to information
Managing national hydrometric data   from data to informationManaging national hydrometric data   from data to information
Managing national hydrometric data from data to information
 
Data dissemination policy 2013
Data dissemination policy 2013Data dissemination policy 2013
Data dissemination policy 2013
 

Similaire à Gujarat surface water

Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014hydrologyproject0
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface waterhydrologywebsite1
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014indiawrm
 
Integration of GIS Based Survey procedure to update Road Network Geo-Database...
Integration of GIS Based Survey procedure to update Road Network Geo-Database...Integration of GIS Based Survey procedure to update Road Network Geo-Database...
Integration of GIS Based Survey procedure to update Road Network Geo-Database...Soumik Chakraborty
 
Final Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP OrdersFinal Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP OrdersBrian Kaiser, PE
 
Bangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptxBangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptxacumenarchitect
 
United Utilities and GIS
United Utilities and GISUnited Utilities and GIS
United Utilities and GISEsri UK
 
RNK - GIS Brochure
RNK - GIS BrochureRNK - GIS Brochure
RNK - GIS BrochureRonak Ashar
 
MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015SURAJ CHOUDHARY
 
Draft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptxDraft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptximranzafar55
 
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-1723 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17indiawrm
 
Hydrological design aides surface water
Hydrological design aides surface waterHydrological design aides surface water
Hydrological design aides surface waterhydrologyproject2
 
Hydrological design aides surface water
Hydrological design aides surface waterHydrological design aides surface water
Hydrological design aides surface waterhydrologyproject0
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Septindiawrm
 

Similaire à Gujarat surface water (20)

Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
 
Integration of GIS Based Survey procedure to update Road Network Geo-Database...
Integration of GIS Based Survey procedure to update Road Network Geo-Database...Integration of GIS Based Survey procedure to update Road Network Geo-Database...
Integration of GIS Based Survey procedure to update Road Network Geo-Database...
 
Kerala sw
Kerala swKerala sw
Kerala sw
 
Final Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP OrdersFinal Report - Optimizing Work Distribution for NP Orders
Final Report - Optimizing Work Distribution for NP Orders
 
Bangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptxBangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptx
 
United Utilities and GIS
United Utilities and GISUnited Utilities and GIS
United Utilities and GIS
 
RNK - GIS Brochure
RNK - GIS BrochureRNK - GIS Brochure
RNK - GIS Brochure
 
Maharashtra sw_ce_050514
Maharashtra  sw_ce_050514Maharashtra  sw_ce_050514
Maharashtra sw_ce_050514
 
MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015MAPS GEOSYSTEM PROFILE 2015
MAPS GEOSYSTEM PROFILE 2015
 
Draft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptxDraft Baseline Survey Status (Updated Punjab).pptx
Draft Baseline Survey Status (Updated Punjab).pptx
 
3D Modeling by GIS
3D Modeling by GIS3D Modeling by GIS
3D Modeling by GIS
 
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-1723 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
23 - NRSC - Remote Satellite Imgae - Hydrology and Water Management-Sep-17
 
Cloud City 2022
Cloud City 2022 Cloud City 2022
Cloud City 2022
 
Hydrological design aides surface water
Hydrological design aides surface waterHydrological design aides surface water
Hydrological design aides surface water
 
Hydrological design aides surface water
Hydrological design aides surface waterHydrological design aides surface water
Hydrological design aides surface water
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept
 

Plus de hydrologywebsite1

Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-normshydrologywebsite1
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservationshydrologywebsite1
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...hydrologywebsite1
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...hydrologywebsite1
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryformshydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 Download-manuals-surface water-manual-sw-volume10protocolsandvalidation Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
Download-manuals-surface water-manual-sw-volume10protocolsandvalidationhydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...hydrologywebsite1
 

Plus de hydrologywebsite1 (15)

Kerala ground water
Kerala ground waterKerala ground water
Kerala ground water
 
Goa
GoaGoa
Goa
 
Bbmb
BbmbBbmb
Bbmb
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryforms
 
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 Download-manuals-surface water-manual-sw-volume10protocolsandvalidation Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 

Dernier

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 

Dernier (20)

WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 

Gujarat surface water

  • 1. Narmada, Water Resources, Water Supply and Kalpsar Department GANDHINAGAR, GUJARAT Phase – II (2006-2014) Implementing Agency : Gujarat – Surface Water
  • 2. Category wise Expenditure, SW Sr. No. Item Provision as per RCT (Oct-2013) Cumulative Expenditure (Up to Mar- 2013) Annual Work Plan (2013-14) Expenditure 2013-14 (Up to Mar- 2014 Cumulative Expenditure up to Mar- 2014 1 Civil Works 5.42 5.42 0.00 0.00 5.42 2 Goods 42.24 24.95 17.29 16.65 41.60 3 Consultancy 0.00 0.00 0.00 0.00 0.00 4 Trainings 7.34 4.46 2.89 1.02 5.48 Total Investment Cost 55.00 34.83 20.18 17.67 52.49 5 Recurrent 23.29 21.40 2.32 1.97 23.37 Total Cost (Inv + Rec) 78.29 56.23 22.50 19.64 75.86 Rs in Million 2Gujarat - SW
  • 3. Component wise Expenditure, SW Sr. No. Item Total Provision as per RCT (Oct- 2013) Cumulative Expenditure (Up to Mar- 2013) Annual Work Plan (2013-14) Expenditure 2013-14 (Up to Mar- 2014 Cumulative Expenditure up to Mar- 2014 I.A Consolidation of HP - I 29.61 13.24 16.37 16.02 29.26 I.B Awareness Dissemination & Knowledge Sharing 7.52 5.41 2.11 0.73 6.13 I.C Implementation Support 29.76 28.85 1.34 1.06 29.91 II.A Hydrological Design Aids 0.04 0.04 0.01 0.01 0.04 II.B Decision Support System 9.04 6.62 2.43 1.67 8.29 II.C Purpose Driven Studies 2.32 2.08 0.25 0.16 2.23 Total 78.29 56.23 22.50 19.64 75.86 Rs in Million 3Gujarat - SW
  • 4. Status of Financial Targets and Achievement, SW Sr. No. Description Amount in Rs. Million 1 Allocation under the project as per Project Implementation Plan (PIP) 94.39 2 Total Base Cost as per Revised Cost Table (Oct. – 13) 78.29 3 Cumulative Expenditure Up to March – 2014 75.86 4 Total Likely cumulative expenditure up to 31st May 2014 75.86 81% 5 Probable Saving (1 - 4) 18.53 19% 4Gujarat - SW
  • 5. Major Reasons for Savings • Exclusion of charges for • Maintenance for RTDAS for River gauging and Weather Stations, beyond the HP-II period. (Rs 15.00 Million) • IT related provisions (Backup infrastructure , Satellite imageries etc.) for Decision Support System (DSS)- Planning (Rs. 1.30 Million) • Provisions made for International and Local trainings not fully implemented. - (Rs. 2.00 Million) • Other Miscellaneous Items. - (0.23 Million) • Total Saving = 18.53 Million 5Gujarat - SW
  • 6. Status of Disbursement of Claims (SW) Category Name Category No Eligible Expenditure Amount of Claim & Disbursement Civil Works 1 5.42 4.88 Goods 2 41.30 39.62 Consultancy 3 0.00 0.00 Training 4 5.48 4.71 Operating Cost 5 22.92 15.78 Total 75.12 64.98 6Gujarat - SW Rs in Million
  • 7. I.A. Consolidation of HP –I: • 928 officers have been trained, • Procured IT related hardwares e.g. Workstations – 1 No, Server – 1 No, printer – 1 No, copier Machine – 1 No, Fax – 1 No etc. • Upgraded 50 Weather Stations & 60 River Gauging stations with Real Time Data Acquisition System Physical Progress Achieved - SW 7Gujarat - SW
  • 8. Physical Progress Achieved - SW 8Gujarat - SW Installation of 50 Automatic (RTDAS) Weather Stations
  • 9. Physical Progress Achieved - SW 9Gujarat - SW Installation of 60 Automatic (RTDAS) River Gauging Stations
  • 10. Real Time Data Acquisition System : Weather Station 10Gujarat - SW Physical Progress Achieved - SW Real Time Data Acquisition System : River gauging Station
  • 11. Real Time Data Acquisition System for River Gauging stations: • 60 existing stations equipped with Shaft Encoder type Digital Water Level Recorders are converted in to RTDAS by installing telemetry system (M/s Komoline Aerospace Limited) • Data updation Frequency : 10 - 30 Minutes • The Major Component of Telemetry System Installed are : • GSM modem with an on-board host • Solar Charge Controller Lead-Acid Battery (12V DC) and a Solar Panel (10W) • Data base management software • Mast • Environmental enclosure • Training • Operation and Maintenance : 5 yrs (Inclusive of 2 yrs warranty period) Physical Progress Achieved - SW 11Gujarat - SW
  • 12. Real Time Data Acquisition System for Weather stations: • 50 New Automatic Weather Station (AWS) are installed to Measure Wind speed, Wind direction, Air temperature, Relative humidity, Rainfall, Solar radiation, Air pressure (M/s Cellcomm solutions pvt. ltd) • Data updation Frequency : 60 Minutes • The Major component are : • Design and execute civil works • Preparation of AWS field sites • SITC of AWS equipment consisting of Sensors • Data logger (with built-in display) • GSM Modem and transmission system, • Rechargeable power unit • Sensor mast • Environmental enclosure • GSM/GPRS service • Development of database management software • Training • Operation and Maintenance : 5 yrs (Inclusive of 2 yrs warranty period) Physical Progress Achieved - SW 12Gujarat - SW
  • 13. Achievements Related to HIS - (A,A,A) • Awareness • Availability • Accuracy Gujarat - SW 13
  • 14. I.B. Awareness, Dissemination and Knowledge Sharing: • Organized 41 awareness raising workshops, 19 meetings of HDUG and 11 meetings of RHDUG • Registration of 109 Govt. and Non-Govt. HDUG members. • Publication of Information booklet, Brouchers, calendar, Water year book for year-2010 and 2011, produced film and Quickee for awareness raising workshops. Physical Progress Achieved - SW 14Gujarat - SW
  • 15. I.B. Awareness, Dissemination and Knowledge Sharing: • Updating of Data in SWDES software till Feb-2013 • Interagency validation : IMD validated data up to 2010 & CWC validated data up to 2009 • Procurement of Audio-visual equipment: (Multimedia Projector -1 No, Laptop – 2 No, CCTV – 7 No, LCD – 1 No etc.) Physical Progress Achieved - SW 15Gujarat - SW
  • 16. Physical Progress Achieved - SW 16Gujarat - SW 0 100 200 300 400 500 600 700 800 900 2000 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Datarequest Year Cumulative Data Dissemination Requests H P - II Period H P - I Period
  • 17. Physical Progress Achieved - SW 17Gujarat - SW Study 18% Research 30% Project Planning & Implementation 26% Flood Management 7% Design 16% Other 3% Data Usage
  • 18. I.C. Implementation support -Logistical support • Civil work and Interior work of Conference hall at SWDC, Gandhinagar and renovation of Conference hall and Committee Room at GERI, Vadodara completed. • Procurement of 10 Vehicles, office equipments etc. Physical Progress Achieved - SW 18Gujarat - SW
  • 19. II.A. Hydrological Design Aids: • Consultants-M/S CES (India) Pvt. Ltd., New Delhi presented the first Draft State of The Art Report in May, 2010 for Development of HDA • 2 officers have attended the first course in Sept., 2012 (HDA - 1) • 2 officers have attended the course in December, 2013. (HDA-2). Physical Progress Achieved - SW 19Gujarat - SW
  • 20. II.B. Decision Support System – Planning (DSS-P) • Mahi Basin (Gujarat State Portion ) had been selected as State Pilot Basin. • The components of DSS - Planning are: • Surface water planning. • Integrated operation of reservoirs. • Conjunctive surface water and ground water planning. • Drought monitoring, assessment and management. • Management of both surface and ground water quality. • Software & Imageries procured & used : Arc GIS Software (ver.9.3) (i.e. Arc Info, Spatial Analyst & 3D Analyst), Image Processing Software (ENVI-EX.), Image Processing Software (ENVI-5), LISS 4 satellite imageries (12 Nos.) for Mahi Basin Physical Progress Achieved - SW 20Gujarat - SW
  • 21. DSS (Planning) for Integrated Water Resources Development & Management under HP-II MAHI RIVER BASIN ( GUJARAT ) Physical Progress Achieved - SW
  • 22. Issues • Managing the increasing demands from water resources sectors • Managing reservoirs and inter-basin transfer under normal, flood, and drought conditions. • Impacts of importing water from the Narmada Canal • Managing water use in command areas (e.g. cropping pattern) • Assess the inundation when heavy rain falls on irrigated land • Basin area in some part is drought prone • Pollution from villages and industries is an increasing problem DSS (Planning) for Integrated Water Resources Development & Management under HP-II MAHI RIVER BASIN ( GUJARAT ) Physical Progress Achieved - SW 22Gujarat - SW
  • 23. Status of Modeling activities: • The Rainfall - Runoff analysis for the catchments of Mahi Basin has been done using “NAM” module • Basin schematization work of the Mahi River Basin Modeling has been done in MIKE BASIN SOFTWARE . The same has been converted to MIKE HYDRO BASIN . • Basin schematization work of the Mahi River Basin Modeling done in MIKE BASIN SOFTWARE has been imported to the DSS-P Platform (ver3.2a) provided by the consultants in Sept. 2013. Now, the model developed in MIKE HYDRO BASIN software is to be imported to the DSS-P Platform (ver. 4) Physical Progress Achieved - SW DSS (Planning) for Integrated Water Resources Development & Management under HP-II MAHI RIVER BASIN ( GUJARAT ) 23Gujarat - SW
  • 24. Applications have been developed for Mahi basin using available tools : • Irrigation Seasonal Planning application for Patadungari Project as a test case. • Water resources planning in general using Reservoir Working Table (RWT) analysis and dependability. • Scenario Analysis for sustainability of supply/deficit in meeting demands. • Improvement in analysis of Integrated Reservoir Operation case study @ Wanakbori (Kadana-Panam - Bhadar Reservoir) is in progress. Physical Progress Achieved - SW DSS (Planning) for Integrated Water Resources Development & Management under HP-II MAHI RIVER BASIN ( GUJARAT ) 24Gujarat - SW
  • 25. • Surface water planning; – Irrigation Seasonal Planning application for Patadungari Project as a test case. Application being developed for other reservoirs of the basin also. DSS (Planning) - Application Physical Progress Achieved - SW 25Gujarat - SW
  • 26. • Surface water planning; – Water resources planning in general using Reservoir Working Table (RWT) analysis and dependability. DSS (Planning) – Application Physical Progress Achieved - SW 26Gujarat - SW
  • 27. • Surface water planning; – Dependable flows reaching Gulf of Cambay from Mahi Basin DSS (Planning) - Application Physical Progress Achieved - SW 27Gujarat - SW
  • 28. Integrated Reservoir Operation including Management : case study @ Wanakbori (Kadana-Panam-Bhadar Reservoir) Refinement of scripting is in progress. DSS (Planning) - Application Physical Progress Achieved - SW 28Gujarat - SW
  • 29. Drought monitoring, assessment and management - Dashboard application for populating SPI-monthly data. Physical Progress Achieved - SW 29Gujarat - SW
  • 30. Present Status of development of DSS-P applications: • The following interfaces forwarded by the DSS-P consultants, to populate results for following applications, are being evaluated for their suitability: • General Seasonal Planning • General Seasonal Planning and conjunctive use • Integrated Reservoir Operation case study • The consultants have developed Dashboard application to populate Drought Indices based on monthly Standard Precipitation Index (SPI-1). Suggestion have been made to improve the same by adding utility like frequency analysis of Drought etc. • The activities related to development of DSS-P for Water Quality would be initiated by the consultant Physical Progress Achieved - SW 30Gujarat - SW
  • 31. II.C. Purpose-Driven studies: • Four PDS under SW Component have been carried out and the Final Report has been submitted to HISMG (T) for approval. • WQ fluctuation in river Sabarmati: Assessment of highly polluted zone to take remedial action. • WQ fluctuation in river Vishwamitri: Assessment of source of pollution to take remedial action • Study of trend in WQ at Hotspot location: Assessment of source of pollution to take remedial action • Crop Water Requirement Study: To work out Irrigation water requirement & subsequent system design & applicable to nearby area. Physical Progress Achieved - SW 31Gujarat - SW
  • 32. Post project plan for continuation of HP2 activities • Exporting Mike Basin Models to Mike Hydro Basin 2014. – Implementation of R-r relations in Mike Hydro Basin – Implementation of Irrigation Module in Mike Hydro Basin – Modeling of Water Quality module in Mike Hydro Basin • Development of Rule levels for operation of gated reservoirs in DSS-P. • Annual Maintenance for Upgrading of 50 Weather stations & 60 River Gauge stations will be continued. • Trainings and refresher courses for staff will be continued to sustain the HIS activities. • Awareness raising workshops will be continued for data users. • Maintenance of the infra-structural facilities created from the state funds. 32Gujarat - SW
  • 33. • Development of DSS-P already initiated for four new River Basins viz. Sabarmati River Basin, Ambika River Basin, Bhadar (Saurashtra) River Basin & Shetrunji River Basin. • New recruited Assistant Engineers (9) in Central Designs Organisation, Gandhinagar trained by the State DSS-P team and are working on these basins. Mahi Sabarmati Ambika Bhadar Shetrunji Post project plan for continuation of HP2 activities 33Gujarat - SW
  • 34. Proposals for HP-III • Targeted smooth, time bound implementation of applying DSS – (P) model to other needy river basins from model Mahi Basin. • Development of Real time flood forecasting system of Tapi basin. • Establishing Real Time Data Acquisition System for River gauging, Rain gauging and Weather stations • Creation of ToT‟s at state level. Post project plan for continuation of HP2 activities 34Gujarat - SW
  • 35. Post project plan for continuation of HP2 activities 35Gujarat - SW Sr. No. Name of work No. of Stations Rs in Million 1 Supply, Installation, Testing, Commissioning and Maintenance Of Real Time Data Acquisition Network AUTOMATIC WEATRHER STATIONS. (AMC for 5 Years, including Security Arrangements) 13 No. 23.75 2 Supply, Installation, Testing, Commissioning and Maintenance Of Real Time Data Acquisition Network Automatic Rain gauge Stations. (AMC for 5 Years, including Security Arrangements) 39 No. 31.43 3 Supply, Installation, Testing, Commissioning and Maintenance Of Real Time Data Acquisition Network at River Gauge Stations.(AMC for 5 Years, including Security Arrangements) 24 No. 22.46 4 Purchase of DWLR for all River Gauge Stations. 54 No. 21.60 5 Real Time Gauging & Monitoring for ONE pilot project including 2 Nos of Radar Level sensor.(AMC for 5 Years, including Security Arrangements) 1 no. 1.90 6 Horizontal Extension (DSS-P) for Mahi BasinDecision Support System for Surface Water Planning on „IWRM‟ for other basins (New Basins)Sabarmati Basin &Shetrunji Basin 2 basin 10.00 7 Real time DSS for Tapi Basin 1 basin 50.00 Total Investment Cost 161.15 Recurrent Cost (@20% of Investment Cost) LS 32.23 Total 193.38 Financial Proposal : HP-III
  • 36. Lessons Learnt • Effective and efficient use of the HIS will help in water resources planning and management in a systematic way. • Development of Decision Support System will facilitate in informed Decision making process. • The applications developed under DSS-P would be replicated to other Basins of the state. 36Gujarat - SW
  • 37. Lessons Learnt ?(A-B-C-D) • Avoiding Ambiguity • Brevity • Communication & Correct Approach • Decision Making Gujarat - SW 37