02/04/2011 07:00 UTC Unit  1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ  In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but stable RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - Power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – Lighting to Central Control Room AC power available – power to instrumentation  - Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is shown uncovered (Stable) Around half of Fuel is uncovered  (Stable) Around half of Fuel is uncovered  (Stable) Not applicable due to outage plant status Pressure of RPV Slightly decreasing Stable Stable CV Pressure Drywell Decreasing trend Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water spraying completed by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Seawater injection via Fuel Pool Cooling Line and Periodic spraying
02/04/2011 07:00 UTC Unit  5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building  Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

More Related Content

More from International Atomic Energy Agency

Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
International Atomic Energy Agency
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
International Atomic Energy Agency
 

More from International Atomic Energy Agency (20)

Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
 
Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)
 
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
 
Table summary of reactor unit status at 18-april 2011
Table  summary of reactor unit status at 18-april 2011Table  summary of reactor unit status at 18-april 2011
Table summary of reactor unit status at 18-april 2011
 
Table summary of reactor unit status at 15-april-1200 utc
Table   summary of reactor unit status at 15-april-1200 utcTable   summary of reactor unit status at 15-april-1200 utc
Table summary of reactor unit status at 15-april-1200 utc
 
Tc programme presentation UN audience
Tc programme presentation UN audienceTc programme presentation UN audience
Tc programme presentation UN audience
 

Recently uploaded

R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatóriosR$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
Maurílio Júnior
 
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
Faga1939
 

Recently uploaded (20)

25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf
 
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatóriosR$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
 
Dominican American Coalition PAC Executive Summary
Dominican American Coalition PAC Executive SummaryDominican American Coalition PAC Executive Summary
Dominican American Coalition PAC Executive Summary
 
23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf
 
Have A Complimentary Cheat Sheet, On Us!!!
Have A Complimentary Cheat Sheet, On Us!!!Have A Complimentary Cheat Sheet, On Us!!!
Have A Complimentary Cheat Sheet, On Us!!!
 
20052024_First India Newspaper Jaipur.pdf
20052024_First India Newspaper Jaipur.pdf20052024_First India Newspaper Jaipur.pdf
20052024_First India Newspaper Jaipur.pdf
 
2024 - Love and Madness - a book about love, madness, heartbreak and politics
2024 - Love and Madness - a book about love, madness, heartbreak and politics2024 - Love and Madness - a book about love, madness, heartbreak and politics
2024 - Love and Madness - a book about love, madness, heartbreak and politics
 
Meta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejololMeta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejolol
 
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-ShirtNika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
 
Embed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;j
Embed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;jEmbed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;j
Embed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;j
 
21052024_First India Newspaper Jaipur.pdf
21052024_First India Newspaper Jaipur.pdf21052024_First India Newspaper Jaipur.pdf
21052024_First India Newspaper Jaipur.pdf
 
Embed-3-1-1.pdf The ECI direction on April 2, 2024 can be read here:
Embed-3-1-1.pdf  The ECI direction on April 2, 2024 can be read here:Embed-3-1-1.pdf  The ECI direction on April 2, 2024 can be read here:
Embed-3-1-1.pdf The ECI direction on April 2, 2024 can be read here:
 
24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf
 
May 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdfMay 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdf
 
19052024_First India Newspaper Jaipur.pdf
19052024_First India Newspaper Jaipur.pdf19052024_First India Newspaper Jaipur.pdf
19052024_First India Newspaper Jaipur.pdf
 
Minnesota Timberwolves Bring Ya Ass T Shirt
Minnesota Timberwolves Bring Ya Ass T ShirtMinnesota Timberwolves Bring Ya Ass T Shirt
Minnesota Timberwolves Bring Ya Ass T Shirt
 
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
 
Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[
Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[
Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[
 
Encore portal Project PPt on live portal
Encore portal Project PPt on live portalEncore portal Project PPt on live portal
Encore portal Project PPt on live portal
 
israeil_bnetaniahou_panel_report_eng.pdf
israeil_bnetaniahou_panel_report_eng.pdfisraeil_bnetaniahou_panel_report_eng.pdf
israeil_bnetaniahou_panel_report_eng.pdf
 

Summary of-reactor-status-02-april-2011-1200-utc

  • 1. 02/04/2011 07:00 UTC Unit 1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but stable RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - Power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – Lighting to Central Control Room AC power available – power to instrumentation - Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is shown uncovered (Stable) Around half of Fuel is uncovered (Stable) Around half of Fuel is uncovered (Stable) Not applicable due to outage plant status Pressure of RPV Slightly decreasing Stable Stable CV Pressure Drywell Decreasing trend Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Injection of freshwater – via mobile electric pump with diesel backup power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water spraying completed by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Seawater injection via Fuel Pool Cooling Line and Periodic spraying
  • 2. 02/04/2011 07:00 UTC Unit 5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

Editor's Notes

  1. 04/02/11 13:20
  2. 04/02/11 13:20