http://www.iaeme.com/IJCIET/index.asp 257 editor@iaeme.com
International Journal of Civil Engineering and Technology (IJCIET)
Volume 8, Issue 1, January 2017, pp. 257–262, Article ID: IJCIET_08_01_027
Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
ISSN Print: 0976-6308 and ISSN Online: 0976-6316
© IAEME Publication
LOGISTICS CONTROL OVER MATERIALS OF
METRO RAIL
MD Nawaz Khan
PG Student, Department of Civil Engineering,
K L University, Vaddeswaram, Andhra Pradesh, India
T Naga Seshu Babu
Assistant Professor, Department of Civil Engineering,
K L University, Vaddeswaram, Andhra Pradesh, India
ABSTRACT
Objectives: To study the movement of materials from casting yard to the specific location in
successful metros. The practices and methodologies adopted in the logistics exercise. Planning
effective structured links and tradeoffs which aim for best customer service and profits. Methods:
Operations done at the workplace of metro project observed and various methodologies,
procedures during logistics are taken into consideration. Also, finance of the logistics is modified
according to the economic values with the help of flow charts. Findings: With the case study of the
successful project, the procedures which they have taken for logistics management are considered
to implement on to the upcoming metros to make success without blenders. Type of order,
Provision, Purchase and type of customer are the main findings and arrange in an order. With the
comparison of other better works, we can overcome the problems while executing the work.
Applications: In constructing metro rails of precast elements in metropolitan cities. Bridges and
Fly-over of precast segments. Also in all Infrastructures using precast segments and heavy
transportation.
Key words: Logistics, Management, Material flow, Inventory.
Cite this Article: MD Nawaz Khan and T Naga Seshu Babu, Logistics Control Over Materials of
Metro Rail. International Journal of Civil Engineering and Technology, 8(1), 2017, pp. 257–262.
http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
1. INTRODUCTION
The Logistics is the program and scheduling of replace operations at the hand of proper floating
management, by all of the capable material management position that manages the operation flow of raw
materials over the indisputable process and guilty for customers assistance keeping in mind of time of
delivery and charge containment1-2
. It by the same token explains fuel management and materials handling.
To shuffle reverse Logistics, effective communication should reside between the end user's and
manufacturers and behave the quality of the output at the time of delivery. To ratiocinate this happen
transportation, distribution, warehousing, spending and order management must execute together3
.
As metros are no a small task, especially in an environment that is becoming increasingly in demand,
with customers expecting their products to be delivered soon according to their specifications4
. The
MD Nawaz Khan and T Naga Seshu Babu
http://www.iaeme.com/IJCIET/index.asp 258 editor@iaeme.com
objective of logistics management is to plan and co-ordinate all the activities to achieve peak levels of
delivered service and quality at the lowest possible cost in order to succeed in today’s global market place5
.
2. METHOD OF WORK
Logistic operations have been done with a case study in a way that it leads to the success of the project.
The Figure 1 shows the procedure to be followed by the starters for long-term cost savings, annual
operating costs, re-configuring.
Figure 2 Logistic operation mentioned in method of work
Also, a holistic approach for vehicle use during the plan and creative materials management plans may
qualify for LEAD Innovation in Design credits.
2.1. Logistic Operation in Detail
2.1.1. Provision
It targets for the perfect flow of all activities necessary to source materials to make the final products
deliver in the correct link of the supply chain.
2.1.2. Purchasing
• Choosing the companies which are suitable for giving the components which are necessary to the desired
project.
• Placing the purchase orders to the companies for delivering the quantities which have been ordered in time.
2.1.3. Production
Converting the raw materials and components of proper quality into the final product. Quality is achieved
with zero-defect practices like measurement, tools, control charts with full quality management.
2.1.4. Dispatch
From the manufacturing plant after completing the manufactured products, they are loaded into the
containers to deliver it to the final destination as they are pre-casted components. This is a part of the
process of distribution which transports products from manufacturers through various transporters. In time,
the finished products should be delivered without any damage by means of transport like aircraft, ship,
train, truck etc.
2.2. Integrated Logistics
• Processing order
• Purchasing
Order-taking Provision
ProduceDispatchCustomer
Purchase
Logistics Control Over Materials of Metro Rail
http://www.iaeme.com/IJCIET/index.
• Transport
• Scheduling production
• Inventory management
• Delivery
• Managing warehouse
3. FINANCE
3.1. Cost Involved
For calculation of the price of vehicle for
3.1.1. Fixed Cost
Fixed costs are independent of the
range and they usually considered sunk for it.
3.1.2. Variable cost
Variable costs are dependent on output. Because the constant rate increases relative
while accounting they also often prefer mixed costs which are partly fixed and partly variable.
3.2. Price Escalation
Cost escalation is experienced as a
supposing economy everywhere a period. This is evocative to the
protest that escalation is dead set on to factor or piece of action of items, it is r
with changes in the corruption supply, and it tends to be few and far between sustained. Escalation
considers genuine inflation familiar to the supply of capital and is furthermore driven by changes in
technology, practices. Specifically
given economy, shown in Figure 2.
Vf= Pf * fixed rate *(current diesel price
50%
Logistics Control Over Materials of Metro Rail
IJCIET/index.asp 259
For calculation of the price of vehicle for transportation, there are two factors involved
of the output value. They preferably remain constant throughout the desired
range and they usually considered sunk for it.
output. Because the constant rate increases relative
while accounting they also often prefer mixed costs which are partly fixed and partly variable.
a climax in the charge or worth of flat chapter and verse or services in a
supposing economy everywhere a period. This is evocative to the concept of deficit finance and downfall
protest that escalation is dead set on to factor or piece of action of items, it is r
with changes in the corruption supply, and it tends to be few and far between sustained. Escalation
considers genuine inflation familiar to the supply of capital and is furthermore driven by changes in
ecifically, supply on demand imbalances that are tenacious to
given economy, shown in Figure 2.
Vf= Pf * fixed rate *(current diesel price – previous diesel price)/ (previous diesel price)
Figure 3 Price escalation
15%
35%
less
distance
editor@iaeme.com
there are two factors involved
value. They preferably remain constant throughout the desired
output. Because the constant rate increases relative to labor and capital
while accounting they also often prefer mixed costs which are partly fixed and partly variable.
in the charge or worth of flat chapter and verse or services in a
deficit finance and downfall
protest that escalation is dead set on to factor or piece of action of items, it is regular not to a great degree
with changes in the corruption supply, and it tends to be few and far between sustained. Escalation
considers genuine inflation familiar to the supply of capital and is furthermore driven by changes in
supply on demand imbalances that are tenacious to a profitable in a
previous diesel price)/ (previous diesel price)
MD Nawaz Khan and T Naga Seshu Babu
http://www.iaeme.com/IJCIET/index.asp 260 editor@iaeme.com
4. MATERIAL MANAGEMENT
The classification of materials, logistics will be easy for the transportation to the desired site where
necessary in time. Divide the components according to their value and size; use the proper transporters for
easy handling without any damages in a logistics methodology. This leads to an effect in capital
investment6-7
.
5. MOVEMENT OF COMPONENTS
5.1. Transportation
Transportation means a grant of materials from one dormitory to another in a cost sensible way under the
imposition of time. To certify effectively, cost sensible Logistics Management, an organization should lay
the roots for a certain, economical transportation operation. With a reasonable transportation network, an
organization is sensible to implement major strategic changes to reduce costs and take a turn for better
customer job levels with absolutely little eruption to the complete supply chain flow.
A certain transportation network begins mutually end-to-end combine visibility. Visibility allows the
function to focus production operations to low-cost places without an impact on customer service levels,
for any uncertainty within the network can be monitored and at the proper time managed to protect
inventory levels as reserved as possible.
5.2. Modes of Transportation
5.2.1. Roadways
A road is a considered path chose to travel, which is surfaced with asphalt, gravel or cement concrete
which supports passage by foot or by a number of vehicles. The common road vehicle is the automobile, a
wheeled passenger vehicle that carries its own motor.
Truck plays an important role in the supply chain management. Complete deregulation for all states
didn’t occur until 1995. After 1996 deregulation, buyers got the better options for the selection of the better
transportation type. At the same time, pricing was opened to free markets. Trucks are the better option to
retrieve many greater locations than airplanes or rails. Local truck lines are fine for little, regular shipments
that demand follow-up or expediting. They are virtually effective with small distances. However, the
trucks are little slower than some distinctive type of transportation (air). Trucks cannot carry as much
cargo as ships or trains can and they cannot go completely without stopping.
5.2.2. Railways
Railways charge less than other modes while shipping sample of quantities or bulked goods during far
distances. Trains run with a constant time schedule than lorries or airplanes. Shippers make out to be not
much efficient for an absolute divert of a load of freight from one destination to another destination. The
desired delivery point changes for obtaining products in transit cases of urgency may be not convenient.
The train booking for bulk order has to be done 1-2 months prior. Mode of transportation is feasible if
the distance between origin and destination is greater than 250 km to reduce the price of transportation and
control logistics.
By the case studies of metros, materials have been classified into 5 classes based on their value to
divide the transporters to their destinations for time saving.
5.2.3. Airways
Cost per pound significantly off from different transportation types. Airlines demand much for the indirect
destination or destinations that are not eligible with road and water. With proper studies, we have
discovered that many exclusive air freight delivery shipments could be delivered for low-cost type and
Logistics Control Over Materials of Metro Rail
http://www.iaeme.com/IJCIET/index.asp 261 editor@iaeme.com
again posted within the necessary pioneer range. Airways at the site are used when the machines break
down suddenly and the replacement of it has to be done urgently.
5.2.4. Waterways
This method is slow when compared to air, as this can uphold much greater cargo than an air cargo; costs
are weakened obviously by choosing ships from air type of transport. The cars of metros brought at the
heels of the rails have been laid, as they are a little bit slowly when compared to the distinctive modes of
transportation as demanded by the customer.
6. DISCUSSIONS AND RECOMMENDATIONS
• The site of the precast yard to be constructed near to the construction site where local resources available.
• Material Management is done by using the nearest available sources.
• Fly-Ash to be brought from local thermal power stations as they are the bottom product.
• The cost of aggregates should be lower by ordering metric tons and distance from the site should be not
more than 40kms.
• Sand to be brought from local river sand wholesalers within 60 kms.
• Cement should be bought of good quality from major suppliers within the distance of 30kms far from the
site with the best rate of the deal.
• A contract to be signed by the concessionaire with the petroleum services which to be reviewed for a certain
period of days. With this, we can reduce the whole project cost with the fuel itself.
• Large tankers for filling to be provided in the casting yard itself.
• Necessary vehicles and equipment with capacity are to be used for the desired work.
• As per economy, the best to be chosen from Fixed and Variable cost for the transportation.
• 60kms to 260kms of the radius of distance is to be permitted for trucks and greater than 250kms for trains.
• As the month ending from 26th
-4th
trucks will be at a higher cost to hire, so 5th
-25th
would be better at low
cost.
• Two months prior booking of trains will reduce the economy.
• It doesn’t matter as ship cargos are slow, the cars of the rails are brought only after laying rails.
7. CONCLUSIONS
With some case studies carried on inventory storages for metro, projects are different from traditional
construction projects. Now we are able to understand the importance played by the logistics management
department and various techniques pertaining logistics management to casting yard. A systematic policy
right from the request of materials should be followed till delivery and store department playing a major
role in material supplying. The strategies followed are the best ways for metro projects to control wastages
and project cost from the material management activities. This will help in generalizing the logistic
methodology and good practices adopted in several other metro rails.
REFERENCES
[1] Xu Xiaofan. Industrial cluster and logistics network to promote the new development of chengdu rail
transit industry. ASCE library. 2014; 1296-1300.
[2] Yu ZHOU, Guodong SUI, Jie ZHANG, Shaofeng WANG. Research on Automatic Monitoring System
of Track Real-time Condition of Urban Rail Transit. ASCE library. 1877-1893.
MD Nawaz Khan and T Naga Seshu Babu
http://www.iaeme.com/IJCIET/index.asp 262 editor@iaeme.com
[3] Datta A K. Materials management: Procedures text and cases. Prentice Hall International, New Delhi,
2004.
[4] Virat P. On the optimization of rotating float in the closed loop stochastic inventory systems.
Unpublished Ph.D. thesis, Mechanical Engineering Department, IIT Delhi 1974.
[5] Johnson J C, Wood D F. Contemporary Logistics. 6th
edition Prentice Hall, Upper Saddle River 1996.
[6] P. Uma Maheswari and Dr. R. Perumal, Women Career Influencers In Indian Logistics Industry.
International Journal of Management, 7(7), 2016, pp. 232–239.
[7] Mrs. U. Priya and Dr. A. Peer Mohideen. A Study on Attitude of Worker's towards Performance
Management System at Robinsons Cargo and Logistics Pvt. Ltd., Chennai. International Journal of
Management, 7(2), 2016, pp. 629-635
[8] Starr M K, Miller J W. Inventory control: theory and practice. Prentice Hall of India, New Delhi, 1975.
[9] Gopalakrishnan P. Purchasing and materials management. Tata McGraw Hill Pub. Co. Ltd., New Delhi,
1990.

More Related Content

What's hot

Human Resource Development Logistics In Japan
Human  Resource  Development Logistics In JapanHuman  Resource  Development Logistics In Japan
Human Resource Development Logistics In JapanPrakij Lertpredanant
 
Integrated inventory and transportation mode selection
Integrated inventory and transportation mode selectionIntegrated inventory and transportation mode selection
Integrated inventory and transportation mode selectionwarrasade
 
A03620109
A03620109A03620109
A03620109theijes
 
Supply chain management basics
Supply chain management basicsSupply chain management basics
Supply chain management basicstibinaugustine36
 

What's hot (9)

Human Resource Development Logistics In Japan
Human  Resource  Development Logistics In JapanHuman  Resource  Development Logistics In Japan
Human Resource Development Logistics In Japan
 
Am03302380242
Am03302380242Am03302380242
Am03302380242
 
Logistical Performance Cycle
Logistical Performance CycleLogistical Performance Cycle
Logistical Performance Cycle
 
Integrated inventory and transportation mode selection
Integrated inventory and transportation mode selectionIntegrated inventory and transportation mode selection
Integrated inventory and transportation mode selection
 
Production and cost
Production and costProduction and cost
Production and cost
 
A03620109
A03620109A03620109
A03620109
 
Drivers in sc
Drivers in scDrivers in sc
Drivers in sc
 
Supply chain management basics
Supply chain management basicsSupply chain management basics
Supply chain management basics
 
Logistics management
Logistics managementLogistics management
Logistics management
 

Viewers also liked

Vietnam taxation and transfer pricing
Vietnam taxation and transfer pricingVietnam taxation and transfer pricing
Vietnam taxation and transfer pricingDr. Oliver Massmann
 
Factors associated adherence to TB treatment in Georgia report (eng)
Factors associated adherence to TB treatment in Georgia report (eng)Factors associated adherence to TB treatment in Georgia report (eng)
Factors associated adherence to TB treatment in Georgia report (eng)Ina Charkviani
 
2015 Program Dallas E&P Forum
2015 Program Dallas E&P Forum2015 Program Dallas E&P Forum
2015 Program Dallas E&P ForumDonald Muth
 
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELSOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELIAEME Publication
 
IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...
IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...
IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...IAEME Publication
 

Viewers also liked (8)

Spirit 2 2016
Spirit 2 2016Spirit 2 2016
Spirit 2 2016
 
Vietnam taxation and transfer pricing
Vietnam taxation and transfer pricingVietnam taxation and transfer pricing
Vietnam taxation and transfer pricing
 
Factors associated adherence to TB treatment in Georgia report (eng)
Factors associated adherence to TB treatment in Georgia report (eng)Factors associated adherence to TB treatment in Georgia report (eng)
Factors associated adherence to TB treatment in Georgia report (eng)
 
2015 Program Dallas E&P Forum
2015 Program Dallas E&P Forum2015 Program Dallas E&P Forum
2015 Program Dallas E&P Forum
 
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELSOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
 
ADS-B: A Special Report
ADS-B: A Special ReportADS-B: A Special Report
ADS-B: A Special Report
 
Spirit 3 2015
Spirit 3 2015Spirit 3 2015
Spirit 3 2015
 
IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...
IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...
IjcA CRITICAL EVALUATION ON POZZOLONIC PROPERTIES OF SELECTED MATERIALS AND T...
 

Similar to Logistics Control of Metro Rail Materials

Optimization in Supply Logistics Cost of Construction Projects of a Company
Optimization in Supply Logistics Cost of Construction Projects of a CompanyOptimization in Supply Logistics Cost of Construction Projects of a Company
Optimization in Supply Logistics Cost of Construction Projects of a CompanyIRJET Journal
 
Transportation and logistics
Transportation and logistics Transportation and logistics
Transportation and logistics guest06c40002
 
supply chain management with very easy case study
supply chain management with very easy case studysupply chain management with very easy case study
supply chain management with very easy case studyJayesh Gupta
 
Transportation management
Transportation managementTransportation management
Transportation managementSugun Subudhi
 
Logistics for better exports
Logistics for better exportsLogistics for better exports
Logistics for better exportsRudresh Kumar
 
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENTSUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENTSwati Rehan
 
45694501 logistics-project
45694501 logistics-project45694501 logistics-project
45694501 logistics-projectBishtdeep
 
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET-  	  Importance of Proper Cost Management in Construction IndustryIRJET-  	  Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction IndustryIRJET Journal
 
Forecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction IndustryForecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction IndustryIRJET Journal
 
Forecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction IndustryForecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction IndustryIRJET Journal
 
How to choose the best transportation with supply chain
How to choose the best transportation with supply chainHow to choose the best transportation with supply chain
How to choose the best transportation with supply chainguest06c40002
 
Supply chain-network-optimization-services
Supply chain-network-optimization-servicesSupply chain-network-optimization-services
Supply chain-network-optimization-servicesITC Infotech
 
logistic notes for student who needs it to study
logistic notes for student who needs it to studylogistic notes for student who needs it to study
logistic notes for student who needs it to studyAyienAdenan
 
Introduction of logistics management.pptx
Introduction of logistics management.pptxIntroduction of logistics management.pptx
Introduction of logistics management.pptxRajeevRanjan743854
 
LSCM U4 NOTES MAR2022_23 - Copy.pdf
LSCM U4 NOTES MAR2022_23 - Copy.pdfLSCM U4 NOTES MAR2022_23 - Copy.pdf
LSCM U4 NOTES MAR2022_23 - Copy.pdfkishorereddy_btech
 
Assetmanagement
AssetmanagementAssetmanagement
AssetmanagementBarry Hol
 
Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...
Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...
Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...IOSR Journals
 

Similar to Logistics Control of Metro Rail Materials (20)

Optimization in Supply Logistics Cost of Construction Projects of a Company
Optimization in Supply Logistics Cost of Construction Projects of a CompanyOptimization in Supply Logistics Cost of Construction Projects of a Company
Optimization in Supply Logistics Cost of Construction Projects of a Company
 
Transportation and logistics
Transportation and logistics Transportation and logistics
Transportation and logistics
 
supply chain management with very easy case study
supply chain management with very easy case studysupply chain management with very easy case study
supply chain management with very easy case study
 
Transportation management
Transportation managementTransportation management
Transportation management
 
LSCM.pptx
LSCM.pptxLSCM.pptx
LSCM.pptx
 
Logistics for better exports
Logistics for better exportsLogistics for better exports
Logistics for better exports
 
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENTSUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENT
 
45694501 logistics-project
45694501 logistics-project45694501 logistics-project
45694501 logistics-project
 
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET-  	  Importance of Proper Cost Management in Construction IndustryIRJET-  	  Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction Industry
 
Mo-1.pdf
Mo-1.pdfMo-1.pdf
Mo-1.pdf
 
Transportation management
Transportation managementTransportation management
Transportation management
 
Forecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction IndustryForecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction Industry
 
Forecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction IndustryForecasting and Rate Analysis of Cost Escalation for Construction Industry
Forecasting and Rate Analysis of Cost Escalation for Construction Industry
 
How to choose the best transportation with supply chain
How to choose the best transportation with supply chainHow to choose the best transportation with supply chain
How to choose the best transportation with supply chain
 
Supply chain-network-optimization-services
Supply chain-network-optimization-servicesSupply chain-network-optimization-services
Supply chain-network-optimization-services
 
logistic notes for student who needs it to study
logistic notes for student who needs it to studylogistic notes for student who needs it to study
logistic notes for student who needs it to study
 
Introduction of logistics management.pptx
Introduction of logistics management.pptxIntroduction of logistics management.pptx
Introduction of logistics management.pptx
 
LSCM U4 NOTES MAR2022_23 - Copy.pdf
LSCM U4 NOTES MAR2022_23 - Copy.pdfLSCM U4 NOTES MAR2022_23 - Copy.pdf
LSCM U4 NOTES MAR2022_23 - Copy.pdf
 
Assetmanagement
AssetmanagementAssetmanagement
Assetmanagement
 
Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...
Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...
Optimization of Physical Distribution of Consumer Goods in Nigeria: A Case St...
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Logistics Control of Metro Rail Materials

  • 1. http://www.iaeme.com/IJCIET/index.asp 257 editor@iaeme.com International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 1, January 2017, pp. 257–262, Article ID: IJCIET_08_01_027 Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 © IAEME Publication LOGISTICS CONTROL OVER MATERIALS OF METRO RAIL MD Nawaz Khan PG Student, Department of Civil Engineering, K L University, Vaddeswaram, Andhra Pradesh, India T Naga Seshu Babu Assistant Professor, Department of Civil Engineering, K L University, Vaddeswaram, Andhra Pradesh, India ABSTRACT Objectives: To study the movement of materials from casting yard to the specific location in successful metros. The practices and methodologies adopted in the logistics exercise. Planning effective structured links and tradeoffs which aim for best customer service and profits. Methods: Operations done at the workplace of metro project observed and various methodologies, procedures during logistics are taken into consideration. Also, finance of the logistics is modified according to the economic values with the help of flow charts. Findings: With the case study of the successful project, the procedures which they have taken for logistics management are considered to implement on to the upcoming metros to make success without blenders. Type of order, Provision, Purchase and type of customer are the main findings and arrange in an order. With the comparison of other better works, we can overcome the problems while executing the work. Applications: In constructing metro rails of precast elements in metropolitan cities. Bridges and Fly-over of precast segments. Also in all Infrastructures using precast segments and heavy transportation. Key words: Logistics, Management, Material flow, Inventory. Cite this Article: MD Nawaz Khan and T Naga Seshu Babu, Logistics Control Over Materials of Metro Rail. International Journal of Civil Engineering and Technology, 8(1), 2017, pp. 257–262. http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1 1. INTRODUCTION The Logistics is the program and scheduling of replace operations at the hand of proper floating management, by all of the capable material management position that manages the operation flow of raw materials over the indisputable process and guilty for customers assistance keeping in mind of time of delivery and charge containment1-2 . It by the same token explains fuel management and materials handling. To shuffle reverse Logistics, effective communication should reside between the end user's and manufacturers and behave the quality of the output at the time of delivery. To ratiocinate this happen transportation, distribution, warehousing, spending and order management must execute together3 . As metros are no a small task, especially in an environment that is becoming increasingly in demand, with customers expecting their products to be delivered soon according to their specifications4 . The
  • 2. MD Nawaz Khan and T Naga Seshu Babu http://www.iaeme.com/IJCIET/index.asp 258 editor@iaeme.com objective of logistics management is to plan and co-ordinate all the activities to achieve peak levels of delivered service and quality at the lowest possible cost in order to succeed in today’s global market place5 . 2. METHOD OF WORK Logistic operations have been done with a case study in a way that it leads to the success of the project. The Figure 1 shows the procedure to be followed by the starters for long-term cost savings, annual operating costs, re-configuring. Figure 2 Logistic operation mentioned in method of work Also, a holistic approach for vehicle use during the plan and creative materials management plans may qualify for LEAD Innovation in Design credits. 2.1. Logistic Operation in Detail 2.1.1. Provision It targets for the perfect flow of all activities necessary to source materials to make the final products deliver in the correct link of the supply chain. 2.1.2. Purchasing • Choosing the companies which are suitable for giving the components which are necessary to the desired project. • Placing the purchase orders to the companies for delivering the quantities which have been ordered in time. 2.1.3. Production Converting the raw materials and components of proper quality into the final product. Quality is achieved with zero-defect practices like measurement, tools, control charts with full quality management. 2.1.4. Dispatch From the manufacturing plant after completing the manufactured products, they are loaded into the containers to deliver it to the final destination as they are pre-casted components. This is a part of the process of distribution which transports products from manufacturers through various transporters. In time, the finished products should be delivered without any damage by means of transport like aircraft, ship, train, truck etc. 2.2. Integrated Logistics • Processing order • Purchasing Order-taking Provision ProduceDispatchCustomer Purchase
  • 3. Logistics Control Over Materials of Metro Rail http://www.iaeme.com/IJCIET/index. • Transport • Scheduling production • Inventory management • Delivery • Managing warehouse 3. FINANCE 3.1. Cost Involved For calculation of the price of vehicle for 3.1.1. Fixed Cost Fixed costs are independent of the range and they usually considered sunk for it. 3.1.2. Variable cost Variable costs are dependent on output. Because the constant rate increases relative while accounting they also often prefer mixed costs which are partly fixed and partly variable. 3.2. Price Escalation Cost escalation is experienced as a supposing economy everywhere a period. This is evocative to the protest that escalation is dead set on to factor or piece of action of items, it is r with changes in the corruption supply, and it tends to be few and far between sustained. Escalation considers genuine inflation familiar to the supply of capital and is furthermore driven by changes in technology, practices. Specifically given economy, shown in Figure 2. Vf= Pf * fixed rate *(current diesel price 50% Logistics Control Over Materials of Metro Rail IJCIET/index.asp 259 For calculation of the price of vehicle for transportation, there are two factors involved of the output value. They preferably remain constant throughout the desired range and they usually considered sunk for it. output. Because the constant rate increases relative while accounting they also often prefer mixed costs which are partly fixed and partly variable. a climax in the charge or worth of flat chapter and verse or services in a supposing economy everywhere a period. This is evocative to the concept of deficit finance and downfall protest that escalation is dead set on to factor or piece of action of items, it is r with changes in the corruption supply, and it tends to be few and far between sustained. Escalation considers genuine inflation familiar to the supply of capital and is furthermore driven by changes in ecifically, supply on demand imbalances that are tenacious to given economy, shown in Figure 2. Vf= Pf * fixed rate *(current diesel price – previous diesel price)/ (previous diesel price) Figure 3 Price escalation 15% 35% less distance editor@iaeme.com there are two factors involved value. They preferably remain constant throughout the desired output. Because the constant rate increases relative to labor and capital while accounting they also often prefer mixed costs which are partly fixed and partly variable. in the charge or worth of flat chapter and verse or services in a deficit finance and downfall protest that escalation is dead set on to factor or piece of action of items, it is regular not to a great degree with changes in the corruption supply, and it tends to be few and far between sustained. Escalation considers genuine inflation familiar to the supply of capital and is furthermore driven by changes in supply on demand imbalances that are tenacious to a profitable in a previous diesel price)/ (previous diesel price)
  • 4. MD Nawaz Khan and T Naga Seshu Babu http://www.iaeme.com/IJCIET/index.asp 260 editor@iaeme.com 4. MATERIAL MANAGEMENT The classification of materials, logistics will be easy for the transportation to the desired site where necessary in time. Divide the components according to their value and size; use the proper transporters for easy handling without any damages in a logistics methodology. This leads to an effect in capital investment6-7 . 5. MOVEMENT OF COMPONENTS 5.1. Transportation Transportation means a grant of materials from one dormitory to another in a cost sensible way under the imposition of time. To certify effectively, cost sensible Logistics Management, an organization should lay the roots for a certain, economical transportation operation. With a reasonable transportation network, an organization is sensible to implement major strategic changes to reduce costs and take a turn for better customer job levels with absolutely little eruption to the complete supply chain flow. A certain transportation network begins mutually end-to-end combine visibility. Visibility allows the function to focus production operations to low-cost places without an impact on customer service levels, for any uncertainty within the network can be monitored and at the proper time managed to protect inventory levels as reserved as possible. 5.2. Modes of Transportation 5.2.1. Roadways A road is a considered path chose to travel, which is surfaced with asphalt, gravel or cement concrete which supports passage by foot or by a number of vehicles. The common road vehicle is the automobile, a wheeled passenger vehicle that carries its own motor. Truck plays an important role in the supply chain management. Complete deregulation for all states didn’t occur until 1995. After 1996 deregulation, buyers got the better options for the selection of the better transportation type. At the same time, pricing was opened to free markets. Trucks are the better option to retrieve many greater locations than airplanes or rails. Local truck lines are fine for little, regular shipments that demand follow-up or expediting. They are virtually effective with small distances. However, the trucks are little slower than some distinctive type of transportation (air). Trucks cannot carry as much cargo as ships or trains can and they cannot go completely without stopping. 5.2.2. Railways Railways charge less than other modes while shipping sample of quantities or bulked goods during far distances. Trains run with a constant time schedule than lorries or airplanes. Shippers make out to be not much efficient for an absolute divert of a load of freight from one destination to another destination. The desired delivery point changes for obtaining products in transit cases of urgency may be not convenient. The train booking for bulk order has to be done 1-2 months prior. Mode of transportation is feasible if the distance between origin and destination is greater than 250 km to reduce the price of transportation and control logistics. By the case studies of metros, materials have been classified into 5 classes based on their value to divide the transporters to their destinations for time saving. 5.2.3. Airways Cost per pound significantly off from different transportation types. Airlines demand much for the indirect destination or destinations that are not eligible with road and water. With proper studies, we have discovered that many exclusive air freight delivery shipments could be delivered for low-cost type and
  • 5. Logistics Control Over Materials of Metro Rail http://www.iaeme.com/IJCIET/index.asp 261 editor@iaeme.com again posted within the necessary pioneer range. Airways at the site are used when the machines break down suddenly and the replacement of it has to be done urgently. 5.2.4. Waterways This method is slow when compared to air, as this can uphold much greater cargo than an air cargo; costs are weakened obviously by choosing ships from air type of transport. The cars of metros brought at the heels of the rails have been laid, as they are a little bit slowly when compared to the distinctive modes of transportation as demanded by the customer. 6. DISCUSSIONS AND RECOMMENDATIONS • The site of the precast yard to be constructed near to the construction site where local resources available. • Material Management is done by using the nearest available sources. • Fly-Ash to be brought from local thermal power stations as they are the bottom product. • The cost of aggregates should be lower by ordering metric tons and distance from the site should be not more than 40kms. • Sand to be brought from local river sand wholesalers within 60 kms. • Cement should be bought of good quality from major suppliers within the distance of 30kms far from the site with the best rate of the deal. • A contract to be signed by the concessionaire with the petroleum services which to be reviewed for a certain period of days. With this, we can reduce the whole project cost with the fuel itself. • Large tankers for filling to be provided in the casting yard itself. • Necessary vehicles and equipment with capacity are to be used for the desired work. • As per economy, the best to be chosen from Fixed and Variable cost for the transportation. • 60kms to 260kms of the radius of distance is to be permitted for trucks and greater than 250kms for trains. • As the month ending from 26th -4th trucks will be at a higher cost to hire, so 5th -25th would be better at low cost. • Two months prior booking of trains will reduce the economy. • It doesn’t matter as ship cargos are slow, the cars of the rails are brought only after laying rails. 7. CONCLUSIONS With some case studies carried on inventory storages for metro, projects are different from traditional construction projects. Now we are able to understand the importance played by the logistics management department and various techniques pertaining logistics management to casting yard. A systematic policy right from the request of materials should be followed till delivery and store department playing a major role in material supplying. The strategies followed are the best ways for metro projects to control wastages and project cost from the material management activities. This will help in generalizing the logistic methodology and good practices adopted in several other metro rails. REFERENCES [1] Xu Xiaofan. Industrial cluster and logistics network to promote the new development of chengdu rail transit industry. ASCE library. 2014; 1296-1300. [2] Yu ZHOU, Guodong SUI, Jie ZHANG, Shaofeng WANG. Research on Automatic Monitoring System of Track Real-time Condition of Urban Rail Transit. ASCE library. 1877-1893.
  • 6. MD Nawaz Khan and T Naga Seshu Babu http://www.iaeme.com/IJCIET/index.asp 262 editor@iaeme.com [3] Datta A K. Materials management: Procedures text and cases. Prentice Hall International, New Delhi, 2004. [4] Virat P. On the optimization of rotating float in the closed loop stochastic inventory systems. Unpublished Ph.D. thesis, Mechanical Engineering Department, IIT Delhi 1974. [5] Johnson J C, Wood D F. Contemporary Logistics. 6th edition Prentice Hall, Upper Saddle River 1996. [6] P. Uma Maheswari and Dr. R. Perumal, Women Career Influencers In Indian Logistics Industry. International Journal of Management, 7(7), 2016, pp. 232–239. [7] Mrs. U. Priya and Dr. A. Peer Mohideen. A Study on Attitude of Worker's towards Performance Management System at Robinsons Cargo and Logistics Pvt. Ltd., Chennai. International Journal of Management, 7(2), 2016, pp. 629-635 [8] Starr M K, Miller J W. Inventory control: theory and practice. Prentice Hall of India, New Delhi, 1975. [9] Gopalakrishnan P. Purchasing and materials management. Tata McGraw Hill Pub. Co. Ltd., New Delhi, 1990.