SlideShare une entreprise Scribd logo
1  sur  38
Télécharger pour lire hors ligne
Owners Manual
    Vibratory Hammers




Model           :   All (standard) Vibratory Hammers
Manual no.      :   VB0040
Revision no.    :   -
Date of issue   :   09-09-2008
Operation & Maintenance
                     Instructions
                   Vibratory Hammers
                                                         INTERNATIONAL CONTRUCTION EQUIPMENT




Page 2 of 38         ISO-9001 : 2000 certified company   subject to change without notice
Operation & Maintenance
                               Instructions
                                 Vibratory Hammers
                                                                                   INTERNATIONAL CONTRUCTION EQUIPMENT




All rights reserved. No part of this publication may be copied or published by means of printing, photocopying,
microfilm or otherwise without prior written consent of INTERNATIONAL CONSTRUCTION EQUIPMENT BV.
This restriction also applies to the corresponding drawings and diagrams.

INTERNATIONAL CONSTRUCTION EQUIPMENT BV has the right to change parts of the equipment at any
time without prior or direct notice to the client. The contents of this publication is subject to change without
notification.

This publication is to be used for the standard version of the equipment only.
For extra information as to adjustments, maintenance and repair, please contact your dealer.

This publication has been written with great care.
However, INTERNATIONAL CONSTRUCTION EQUIPMENT BV cannot be held responsible, either for any
errors occurring in this publication or for their consequences.


IMPORTANT!:
Important safety instructions are marked as shown below:


      CAUTION
Indicates a potentially hazardous situation which, if not avoided MAY result in minor or moderate injury.


      WARNING
Indicates a potentially hazardous situation which, if not avoided COULD result in serious injury or even death.


      DANGER
Indicates an threatening hazardous situation which, if not avoided CAN result in serious injury or even death.




Page 3 of 38                               ISO-9001 : 2000 certified company              Subject to change without notice
Operation & Maintenance
                                               Instructions
                                                    Vibratory Hammers
                                                                                                                           INTERNATIONAL CONTRUCTION EQUIPMENT




TABLE OF CONTENT

1      SAFETY INSTRUCTIONS................................................................................................ 7
1.1            General ............................................................................................................................... 7
1.2            Safety precautions .............................................................................................................. 7
1.3            Safety signs on the hammer and the clamp....................................................................... 9
      1.3.1    Safety signs on the free hanging vibratory hammer .......................................................... 9
      1.3.2    Safety signs on the SH & B-hammers.............................................................................. 10
1.4            Safety instructions ............................................................................................................ 11
1.5            Limits for operational conditions....................................................................................... 12
      1.5.1    Refusal.............................................................................................................................. 12
      1.5.2    Rebound ........................................................................................................................... 12
      1.5.3    Max. bearing temperatures .............................................................................................. 12
1.6            Incorporated safety precautions ....................................................................................... 12

2      DESCRIPTION OF THE EQUIPMENT .......................................................................... 13
2.1            Description of the free hanging vibratory hammers ......................................................... 13
      2.1.1    The main components the free hanging vibratory hammers ........................................... 13
      2.1.2    The vibration case ............................................................................................................ 13
      2.1.3    The suppressor housing ................................................................................................... 13
      2.1.4    The clamp (option)............................................................................................................ 14
      2.1.5    Rigging of vibrator ............................................................................................................ 14
      2.1.6    Installation......................................................................................................................... 14
2.2            Description the B-hammers.............................................................................................. 15
      2.2.1    Introduction ....................................................................................................................... 15
      2.2.2    The main components ...................................................................................................... 15
      2.2.3    The vibration case ............................................................................................................ 15
      2.2.4    The extraction head .......................................................................................................... 16
      2.2.5    The clamp (option)............................................................................................................ 16
      2.2.6    Attaching the hammer to the excavator ........................................................................... 16
      2.2.7    Goose neck / mounting fork (option) ................................................................................ 16
      2.2.8    Installation......................................................................................................................... 17
2.3            Description of the SH-hammer ......................................................................................... 17
      2.3.1    Introduction ....................................................................................................................... 17
      2.3.2    The main components ...................................................................................................... 17
      2.3.3    The vibration case ............................................................................................................ 18
      2.3.4    The swivelling extraction head ......................................................................................... 18
      2.3.5    The clamp (option)............................................................................................................ 18
      2.3.6    Goose neck / mounting fork (option) ................................................................................ 18
      2.3.7    Attaching the hammer to the excavator ........................................................................... 19
      2.3.8    Installation......................................................................................................................... 19

3      OPERATION ................................................................................................................... 20
3.1         Clamping a pile ................................................................................................................. 20
      3.1.1 Picking up sheet pileswith a swivel head hammer........................................................... 20
3.2         Starting/stopping vibration ................................................................................................ 21
3.3         Off-clamping from a pile ................................................................................................... 22
3.4         Emergency stop................................................................................................................ 22
3.5         Changing the frequency ................................................................................................... 22
3.6         Securing the locks of a swivel head hammer................................................................... 22


Page 4 of 38                                              ISO-9001 : 2000 certified company                                subject to change without notice
Operation & Maintenance
                                      Instructions
                                            Vibratory Hammers
                                                                                                                  INTERNATIONAL CONTRUCTION EQUIPMENT




3.7            Clamps.............................................................................................................................. 23
3.8            Safety chain...................................................................................................................... 23

4      SPECIAL OPERATIONS ................................................................................................25
4.1            Operating instructions for ICE-RF vibratory hammers .................................................... 25
4.2            Operating at low temperatures......................................................................................... 25
4.3            Operating under water (up to 10 m depth) ...................................................................... 26
4.4            Operating in deep water (> 10m deep) ............................................................................ 26

5      MAINTENANCE ..............................................................................................................28
5.1            General............................................................................................................................. 28
5.2            Daily maintenance............................................................................................................ 28
5.3            Weekly maintenace .......................................................................................................... 28
5.4            Monthly maintenance ....................................................................................................... 28
5.5            Yearly maintenance .......................................................................................................... 29
5.6            Lubrication intervals (operating hours of the hammer).................................................... 29
5.7            Recommended liquids...................................................................................................... 30
5.8            Heavy driving conditions .................................................................................................. 30
5.9            Long term storage ............................................................................................................ 30
5.10           Hydraulic oil...................................................................................................................... 30
5.11           Lubrication of the vibration case under extreme circumstances ..................................... 31
5.12           Maintenance of hydraulic circuit elements....................................................................... 32
5.13           Oil capacity ....................................................................................................................... 32
5.14           Bolt torque information..................................................................................................... 33

6      ORDERING OF PARTS ..................................................................................................35
6.1            Procedure ......................................................................................................................... 35
6.2            Original equipment ........................................................................................................... 35
6.3            Shipment .......................................................................................................................... 35
6.4            Shortages ......................................................................................................................... 35
6.5            Return of parts.................................................................................................................. 35
6.6            Screws and bolts .............................................................................................................. 35
6.7            Hoses................................................................................................................................ 36
6.8            Fittings .............................................................................................................................. 37




Page 5 of 38                                              ISO-9001 : 2000 certified company                                Subject to change without notice
Operation & Maintenance
                                     Instructions
                                       Vibratory Hammers
                                                                                         INTERNATIONAL CONTRUCTION EQUIPMENT




Preface
This owner’s manual has been written for the users of ICE Vibratory hammers.
The owner’s manual explains how to use, service and inspect the hammer, with the intention to use the vibratory
hammer safe and efficiently.

One copy of the present manual shall at any time be at the location where the hammer is in operation.

When the instructions of this owner’s manual are not strictly followed, accidents may happen, therefore, check if
you have understood all instructions in this manual before you start using the vibratory hammer.

For ordering of parts we refer to the parts manual of the relating vibratory hammer.

For the operation of the power pack which may be attached to the vibratory hammer, we refer to the owner’s
manual of the relating manufacturer.

If operational or maintenance problems arise which are beyond the scope of this manual, please contact your
dealer. They are prepared to assist you in order to make the best use of your equipment.
Please have the following at hand:
• Model
• Equipment serial number




Page 6 of 38                               ISO-9001 : 2000 certified company             subject to change without notice
Operation & Maintenance
                                Instructions
                                  Vibratory Hammers
                                                                                     INTERNATIONAL CONTRUCTION EQUIPMENT




1 SAFETY INSTRUCTIONS
1.1            General
Foundation equipment and especially pile driving hammers including vibratory hammers are designed to transfer
extremely high energy from the pile driver/extractor to a pile and the soil beneath.
The forces generated, either through impact or through vibration are so high that without proper maintenance and
skilful operation the equipment has to be considered as self destructive and dangerous. Never exeed the maximum
line pull of the hammer. The maximum line pull is mentioned on specification sheet of the hammer. Also, the
system is operating under high hydraulic pressure. Therefore pay special attention to the safety instructions and
the operation and maintenance sections in the present manual

1.2            Safety precautions
ICE accepts no liability for any damage or physical injury caused by non-compliance with the safety instructions in
this manual or by carelessness during the installation, use, adjustment or maintenance of the equipment.

Regularly maintenance and skilful operation will not only lengthen the mechanical life, but is essential for
the safety of the user.


        WARNING
It is the responsibility of the user or operator to ensure that the local health and safety regulations are observed
before and during the use of the equipment.


Operators
• Only trained personnel shall be permitted to operate the hammer.
• Temporary employees and trainees shall only be permitted to work with the equipment under the supervision
  and instruction of trained personnel.
• The operator of the hammer shall be familiar with the contents of the Owner’s manual and shall follow the
  instructions accurately.

Always
• Watch a hammer in operation. Some parts might unexpectedly fail, fall down and injure people. Stop the
  operation IMMEDIATELY for a check if you expect that the above may happen.
• Pay attention to irregular or unusual noises and analyse where they originate from.
• Let the hammer cool down before you start maintenance or repairs on the hammer.
• Warn colleagues when you feel uncomfortable with the way the hammer is functioning.
• Stay away from moving or rotating parts.
• Remove all tools and electrical cords before starting the hammer.
• Use a safety chain on the sheet pile or casing

Never
•   Run the hammer in horizontal position.
•   Stay nearby a working vibratory hammer.
•   Continue operation when it’s known that one of the safety provisions is out of order or not working properly
•   Continue operation when service inspection is due, or when a repair is necessary.
•   Make adjustments or repairs while the hammer is working.




Page 7 of 38                                 ISO-9001 : 2000 certified company              Subject to change without notice
Operation & Maintenance
                                      Instructions
                                        Vibratory Hammers
                                                                                          INTERNATIONAL CONTRUCTION EQUIPMENT




Tools
• Never use defective (maintenance) tools.
• Only use a tool for the purpose it was designed for.

Clothing and footwear
• When working with the equipment, do NOT wear rings, watches, jewellery or any loose clothing which could be
  caught in moving or rotating parts.
• Always wear protective goggles, a safety helmet, protective footwear and hearing protection specially suited for
  the work.
• Follow local health and safty regulations.

Water and moisture
•   Do not allow water to enter the hydraulic system.
•   NEVER direct a jet of water at electrical parts.
•   Avoid internal condensation by rapid temperature changes
•   Make sure all protective devices of the electric installation (if applicable) have been installed to guarantee
    adequate protection from moisture and water. Failure to do so can result in malfunction of safety circuits and
    cause harm to personnel and equipment components.

Technical specifications
1. The permissible limits for operationalconditions as mentioned in the present manual shall NOT be exceeded.

Safeguards
2. Never change the settings of the valve(s) on the system. Only ICE service engineers are allowed to adjust
   these valves.

Safety directions and warnings
3. Any safety direction, warning or instruction fitted on the equipment shall NOT be removed, rendered illegible
   or covered. They shall be present and legible throughout the entire operating life of the equipment.
4. Illegible, damaged or covered safety directions, warnings or instructions shall immediately be replaced or
   repaired.

Service and maintenance
5. The service and maintenance activities shall only be carried out by qualified ICE personnel or one of ICE’s
   appointed and certified dealers in full compliance with all safety instructions and service intervals.

Electrical system (if applicable)
6. Work on the electrical system or equipment shall only be carried out by skilled electricians.

Hydraulic system
7. The hydraulic system is a high pressure high oil flow system. Work on the hydraulic equipment shall only be
   carried out by persons having special knowledge and experience in high pressure hydraulic systems.

Use according to purpose
8. In order to guarantee correct operation, the equipment should only be used in accordance with the purpose as
   described in this owner’s manual.

Suspension
9. Always assure proper suspension of the vibratory hammer before operation.




Page 8 of 38                                ISO-9001 : 2000 certified company             subject to change without notice
Operation & Maintenance
                                Instructions
                                    Vibratory Hammers
                                                                                  INTERNATIONAL CONTRUCTION EQUIPMENT




1.3            Safety signs on the hammer and the clamp

1.3.1          Safety signs on the free hanging vibratory hammer
This part of the manual contains the description of the following vibratory hammers
free hanging vibratory hammer types
ICE - 625             ICE - 815C       ICE - 6RF            ICE - 32RF         ICE - 416L
ICE - 1223            ICE - 3220       ICE - 8RF            ICE - 28RF(s)      ICE - 32NF
ICE - 1423C           ICE - 6420       ICE - 11RF(s)        ICE - 36RF(-ts)    ICE – 54NF
ICE - 423             ICE - 1412C      ICE - 14RF           ICE - 46RF
ICE - 528             ICE – 250NF      ICE - 18RF(-ts)      ICE - 64RF
                                       ICE - 23RF




Page 9 of 38                               ISO-9001 : 2000 certified company             Subject to change without notice
Operation & Maintenance
                                     Instructions
                                       Vibratory Hammers
                                                                                         INTERNATIONAL CONTRUCTION EQUIPMENT




1.3.2       Safety signs on the SH & B-hammers
This part of the manual contains the description of the following vibratory hammers
Vibratory SH-hammer types
ICE – 428SH            ICE – 625SH             ICE – 823SH                ICE – 6RFSH         ICE – 11RFSH
ICE – 525SH                                                               ICE – 8RFSH

ICE – 230B             ICE – 528B              ICE – 6RFB                 ICE – 11RFBs        ICE – 14RFB
ICE – 328B             ICE – 625B              ICE – 8RFB                 ICE – 11RFB         ICE – 18RFB
ICE – 428B             ICE – 825B                                         ICE – 1223B




Page 10 of 38                              ISO-9001 : 2000 certified company             subject to change without notice
Operation & Maintenance
                                    Instructions
                                     Vibratory Hammers
                                                                                        INTERNATIONAL CONTRUCTION EQUIPMENT




1.4        Safety instructions

                HAZARD DESCRIPTION                                   HOW TO PREVENT


                Safety sign                                          Read the operation manual




                Make sure the machine is in good condition           Read the maintenance instructions in the owner’s
                                                                     manual for proper service procedures




                Surface can be hot                                   Do not touch, allow the surface to cool down.




                Crushing of finger(s) or hand(s)                     Never reach into the danger area as long as parts
                                                                     may fall down




                Parts may fall down                                  Stay at a safe distance from the machine




                Component is pressurised                             Depressurise before maintenance




Page 11 of 38                                 ISO-9001 : 2000 certified company                Subject to change without notice
Operation & Maintenance
                                      Instructions
                                        Vibratory Hammers
                                                                                            INTERNATIONAL CONTRUCTION EQUIPMENT




1.5        Limits for operational conditions
As with all machinery there is a limit for the operational conditions under which the machinery is expected to
operate safe, long lasting and efficiently.

For vibrating, ICE defines these limit conditions for REFUSAL and REBOUND as shown below.

1.5.1       Refusal
Refusal under NORMAL conditions:
Less than 25 cm penetration per 5 min (10” per 5 min)

The penetration distance of 25 cm is absolute, no conversion is allowed to, for instance, 1 meter per 60 minutes.

1.5.2       Rebound
Rebound occurs when a large portion of the hammer’s energy is transfered back into the pile as a result of force
reflection at the pile tip. This may be due to the pile hitting a nearly impenetrable layer or obstruction. The
rebound forces will be transferred back into the hammer and the hammerhead (suppressor head), as a result of
which the head will start “jumping” relative to the vibratory case. In this situation driving should be stopped
immediately and the hammer should be retracted.

1.5.3       Max. bearing temperatures
The maximum bearing temperature, as measured on the bearing covers (after some paint is removed), should not
exceed 90 ˚C (194 ˚F).

IMPORTANT:
ICE will not accept any warranty claims when the above conditions are not adhered to.

1.6        Incorporated safety precautions
The hammer has a number of built-in safety provisions which ensure that the risk for failures, human injuries and
environmental pollution is reduced to a minimum.
1. The hammer cannot be put in operation when the clamp is open.
2. A pilot-operated check valve on the clamp ensures that the clamp pressure is maintained in case one of the
     clamp hoses fails.
3. Individual pressure relief valves in pressure line, both clamp lines and leak oil line avoid over pressurizing these
     lines.
4. Stopper blocks maintain a connection between vibration case and suppressor housing in case of elastomer
     failure.
All above mentioned safety precautions should be folowed when the hammer is driven by an ICE powerpack.
Precautions 2 & 4 should be followed by excavator mounted hammers.
Maintenance schedule
Before operation the hammer, check the maintenace scedule. See chapter 5 Maintenance of the manual.




Page 12 of 38                                ISO-9001 : 2000 certified company              subject to change without notice
Operation & Maintenance
                               Instructions
                                  Vibratory Hammers
                                                                                    INTERNATIONAL CONTRUCTION EQUIPMENT




2 DESCRIPTION OF THE EQUIPMENT
2.1        Description of the free hanging vibratory hammers
This part of the manual contains the description of the following vibratory hammers
free hanging vibratory hammer types
ICE - 625           ICE - 815C           ICE - 6RF            ICE - 32RF         ICE - 416L
ICE - 1223          ICE - 3220           ICE - 8RF            ICE - 28RF(s)      ICE - 32NF
ICE - 1423C         ICE - 6420           ICE - 11RF(s)        ICE - 36RF(-ts)    ICE – 54NF
ICE - 423           ICE - 1412C          ICE - 14RF           ICE - 46RF
ICE - 528           ICE - 250NF          ICE - 18RF(-ts)      ICE - 64RF
                                         ICE - 23RF

2.1.1       The main components the free hanging vibratory hammers
The hammer consists of 2 main components:
   1. vibration case
   2. suppressor housing

The hammer can be equipped with a hydraulic clamp.
   3. hydraulic clamp (option)




                                    2




                                    1




                                     3




2.1.2       The vibration case
The vibration case contains eccentric weights which rotate in a vertical plane to create vibration. The eccentric
weights are driven by one, two or four hydraulic motor(s) mounted on the outside of the vibration case. The
motor(s) and the eccentrics are gear connected to maintain proper synchronisation. The eccentric shafts are
mounted in heavy-duty roller bearings. Lubrication is provided by a splash lubrication or by a forced lubrication
system.

2.1.3       The suppressor housing
The extraction head contains rubber elements (elastomers) to isolate the vibrations from the vibration case to the
crane or pile driving rig. The hammer is attached to the crane with a steel wire rope sling.


Page 13 of 38                                ISO-9001 : 2000 certified company             Subject to change without notice
Operation & Maintenance
                                      Instructions
                                        Vibratory Hammers
                                                                                          INTERNATIONAL CONTRUCTION EQUIPMENT




2.1.4       The clamp (option)
The hydraulic clamp contains two gripping jaws, one fixed and one moveable. An in the clamp body integrated
cylinder operates the moveable jaw. The clamp cylinder is provided with a pilot operating check valve which keeps
the clamp cylinder under pressure in case of hose damage.

2.1.5       Rigging of vibrator
A steel wire rope sling must be connected to the lifting pin of the suppressor housing. The required strength of this
sling depends on the capacity of the crane and the work to be carried out. A safety factor of five is recommended.
Several turns of a smaller diameter cable will usually last longer than one turn of a larger diameter cable.
Daily check steel wire rope sling for damage. Immediately replace damaged steel wire rope sling.
Refer to the table on the next page for general guidance on slings or grommets.
Always check for local regulation(s) on steel wire rope sling.

General guidance for slings or grommets:
Max.            Hammer type                          Grommet             Allow. Single        Allow. Double
linepull                                             diameter            work load            work load
120kN           625; 6RF; 8RF                        24mm                6200 kg              12400 kg
180kN           11RF(s)                              33mm                11880 kg             17820 kg
240kN           1223;1423C; 14RF; 18RF(-ts)          39mm                16520 kg             24780 kg
360kN           416L; 23RF; 28RFs; 32RF              54mm                31820 kg             47730 kg
400kN           423; 3220; 815C                      54mm                31820 kg             47730 kg
500kN           6420; 28RF; 36RF(-ts)                57mm                35340 kg             53010 kg
800kN           1412C; 250NF; 46RF; 64RF 54NF        72mm                56100 kg             84150 kg
1200kN          1412C; 250NF                         120mm               80400 kg             120600 kg

2.1.6       Installation
Please refer to the installation sheet of your hammer




Page 14 of 38                               ISO-9001 : 2000 certified company             subject to change without notice
Operation & Maintenance
                                Instructions
                                  Vibratory Hammers
                                                                                    INTERNATIONAL CONTRUCTION EQUIPMENT




2.2        Description the B-hammers
This part of the manual contains the description of the following vibratory hammers
Mini vibratory hammer types
ICE – 230B          ICE – 428B           ICE – 6RFB           ICE – 11RFBs       ICE – 14RFB         ICE – 18RFBTS
ICE – 328B          ICE – 625B           ICE – 8RFB           ICE – 11RFB        ICE – 18RFB
                    ICE – 825B                                ICE – 1223B

2.2.1       Introduction
The B-hammer can be used for the following purposes:
• To compact ground / base material / ditches etc.
• To vibrate piles / sheet piling / profiles etc. into the ground.
• To extract piles / sheet piling / profiles etc. out of the ground.

2.2.2       The main components




The hammer consists of 3 main components:
    1. rotator
    2. extraction head
    3. vibration case
The hammer is provided with a manifold to limit the oil flow, and to control the hydraulic clamp (optional) and the
rotary actuator (optional).
    4. manifold
    5. hydraulic clamp (option)

2.2.3       The vibration case
The vibration case contains eccentric weights which rotate in a vertical plane to create vibration. The eccentric
weights are driven by a hydraulic motor mounted on one of the bearing covers. The motor and the eccentrics are
gear connected to maintain proper synchronisation. The eccentric shafts are mounted in heavy-duty roller
bearings.
Lubrication is provided by a splash system, activated by the rotating eccentrics and gears, or a forced lubrication
system.




Page 15 of 38                                ISO-9001 : 2000 certified company             Subject to change without notice
Operation & Maintenance
                                     Instructions
                                       Vibratory Hammers
                                                                                         INTERNATIONAL CONTRUCTION EQUIPMENT




2.2.4       The extraction head
The extraction head contains rubber elements (elastomers) to isolate the vibrations from the vibration case going
into the boom of the excavator. The hammer is attached to the excavator with a rotator.

2.2.5       The clamp (option)
The hydraulic clamp contains two gripping jaws, one fixed and one moveable. An in the clamp body integrated
cylinder operates the moveable jaw. The clamp cylinder is provided with a pilot operating check valve which keeps
the clamp cylinder under pressure.
In case of hose damage or drop of pressure and/or flow to the clamp, the operation should be stopped
immediately. The clamp cylinder is operated by a hydraulic control in the cabin of the excavator
When operating the clamp please make sure nobody is within the working area of the vibratory hammer.

2.2.6       Attaching the hammer to the excavator
To operate the vibratory hammer by means of an excavator, one needs to make two types of connections between
excavator and hammer.
• Mechanical connection
• Hydraulic connection

2.2.7       Goose neck / mounting fork (option)
The gooseneck is an extension for the excavator boom. The goose neck can be mounted in different ways,
depending on the connection.




1 = Goose neck
2 = Mounting fork

By using a gooseneck the lifting height and the reach of the excavator will increase. Working with a gooseneck
changes the momentom applied to the excavator by the vibratory hammer. Please consult the excavator supplier
for maximum boom and load lengths.
To attach the hammer to the goose neck or excavator, ICE can supply a suitable mounting fork.

Important
Working with a gooseneck requires a learning period!




Page 16 of 38                              ISO-9001 : 2000 certified company             subject to change without notice
Operation & Maintenance
                                 Instructions
                                  Vibratory Hammers
                                                                                      INTERNATIONAL CONTRUCTION EQUIPMENT




      CAUTION
When using a gooseneck, please check that reach and lifting capacity of the excavator are sufficient in order to
avoid tilting of the axcavator.

2.2.8       Installation
Please refer to the installation sheet of your hammer

2.3        Description of the SH-hammer
This part of the manual contains the description of the following vibratory Hammers
Vibratory SH-hammer types
ICE – 428SH             ICE – 625SH              ICE – 825SH                ICE – 6RFSH            ICE – 11RFSH
ICE – 525SH                                                                 ICE – 8RFSH

2.3.1       Introduction
The SH-hammer can be used for the following purposes:
• To compact ground / base material / ditches etc.
• To vibrate piles / sheet piling / profiles etc. into the ground.
• To extract piles / sheet piling / profiles etc. out of the ground.

2.3.2       The main components




The hammer consists of 3 main components:
    1. rotator
    2. swivelling extraction head
    3. vibration case
The hammer is provided with a manifold to limit the oil flow, and to control the hydraulic clamp (optional) and the
rotary actuator (optional).
    4. manifold
    5. hydraulic clamp (option)




Page 17 of 38                                ISO-9001 : 2000 certified company               Subject to change without notice
Operation & Maintenance
                                     Instructions
                                        Vibratory Hammers
                                                                                          INTERNATIONAL CONTRUCTION EQUIPMENT




2.3.3       The vibration case
The vibration case contains eccentric weights which rotate in a vertical plane to create vibration. The eccentric
weights are driven by a hydraulic motor mounted on one of the bearing covers. The motor and the eccentrics are
gear connected to maintain proper synchronisation. The eccentric shafts are mounted in heavy-duty roller
bearings.
Lubrication is provided by a splash system, activated by the rotating eccentrics and gears, or a forced lubrication
system.


2.3.4       The swivelling extraction head
The extraction head contains rubber elements (elastomers) to isolate the vibrations from the vibration case going
into the boom of the excavator. The hammer is attached to the excavator with a rotator.

2.3.5       The clamp (option)
The hydraulic clamp contains two gripping jaws, one fixed and one moveable. An in the clamp body integrated
cylinder operates the moveable jaw. The clamp cylinder is provided with a pilot operating check valve which keeps
the clamp cylinder under pressure.
In case of hose damage or drop of pressure and/or flow to the clamp, the operation should be stopped
immediately. The clamp cylinder is operated by a hydraulic control in the cabin of the excavator
When operating the clamp please make sure nobody is within the working area of the vibratory hammer.

2.3.6       Goose neck / mounting fork (option)
The gooseneck is an extension for the excavator boom. The goose neck can be mounted in different ways,
depending on the connection.


                          1




                          2




    1. Goose neck
    2. Mounting fork

By using a gooseneck the lifting height and the reach of the excavator will increase. Working with a gooseneck
changes the momentom applied to the excavator by the vibratory hammer. Please consult the excavator supplier
for maximum boom and load lengths.
To attach the hammer to the goose neck or excavator, ICE can supply a suitable mounting fork.


Page 18 of 38                               ISO-9001 : 2000 certified company             subject to change without notice
Operation & Maintenance
                                 Instructions
                                 Vibratory Hammers
                                                                                   INTERNATIONAL CONTRUCTION EQUIPMENT




Important
Working with a gooseneck requires a learning period!


      CAUTION
When using a gooseneck, please check that reach and lifting capacity of the excavator are sufficient in order to
avoid tilting of the axcavator.


2.3.7       Attaching the hammer to the excavator
To operate the vibratory hammer by means of an excavator, one needs to make three sorts of connections
between excavator and hammer.
1.     Mechanical connection
2.     Hydraulic connection
3.     Electrical connection

Mechanical connection
The vibrator has to be connected mechanically to the boom of the excavator by means of a suitable adaptor.
In co-operation with ICE and/or the supplier of the excavator, each operator can determine for himself the most
suitable adaptor for the hammer.

Hydraulic connection
There are 3 hydraulic connections between hammer and excavator.
• pressure hose
• return hose
• leak oil hose
The leak oil hose should always be connected to the hydraulic tank without any restrictions. This secures that the
leak oil hose will not be pressurized.

IMPORTANT!
• As the lay-out of the hydraulic system and hydraulic hoses can differ, each operator has to judge for himself in
  co-operation with ICE and/or the supplier of the excavator how to connect the hammer to the excavator in the
  most suitable way.
• The connections should be clean before they are connected.
• Always connect the hydraulic lines to an excavator with a double-action hydraulic function.


2.3.8       Installation
Please refer to the installation sheet of your hammer




Page 19 of 38                              ISO-9001 : 2000 certified company              Subject to change without notice
Operation & Maintenance
                                       Instructions
                                         Vibratory Hammers
                                                                                             INTERNATIONAL CONTRUCTION EQUIPMENT




3 OPERATION
In case of a pile driving rig, parts of the controls may be integrated in the pile driving rig and/or excavator.
In such a case, please refer to the operating and maintenace manual of pile draving rig and/or excavator.


      CAUTION
Make sure to have a clear view over the vibrator and the working area. Ensure that communication between the
crane driver and other operators is always possible.


       WARNING
Stay clear from the direct surrounding of the vibrator

Always allow the machine to warm-up by running at low RPM for some moments when starting.
The vibratory hammer may be operated from a cable pendant, a remote control or from the IQAN PLC of the
power pack.

3.1        Clamping a pile
Position the vibratory hammer first over and than on the sheetpile. Turn the clamp switch to close.
Don’t start vibrating until the hydraulic clamp has reached maximum clamping pressure to permit vibration to
begin.

The clamp light on the power pack (if applicable) will light up when the hydraulic clamp has achieved adequate
clamping pressure. The light will normally light up in a few seconds.

Always use a safety chain or sling between the sheet pile or tube and the piling rig.


     Danger
Improper clamping may result in sheet pile and/or tubing releasing the clamp.

3.1.1       Picking up sheet pileswith a swivel head hammer
This part of the manual contains the description of the following vibratory hammers
Vibratory SH-hammer types
ICE – 428SH             ICE – 625SH              ICE – 825SH                ICE – 6RFSH           ICE – 11RFSH
ICE – 525SH                                                                 ICE – 8RFSH

Picture 1
• Lift a sheet pile with a hoisting chain.
• Place a beam between the sheet piles.
• Make sure that hammer is in reverse so the lock pins of the swivel head are not pressurised.




Page 20 of 38                                ISO-9001 : 2000 certified company               subject to change without notice
Operation & Maintenance
                                Instructions
                                  Vibratory Hammers
                                                                                    INTERNATIONAL CONTRUCTION EQUIPMENT




                                                         1                                       2




Picture 2
• Lower the hammer with the pile feed
• Guide on the sheet pile, the hammer starts swivelling.

Picture 3
• When the hammer is fully swivelled (90°),make sure that the clamp is slide completely over the sheet pile
  before closing the clamp.

Picture 4
•   After closing the clamp, the hammer
•   Can be lifted with the sheet pile.
•   When the sheet pile is lifted completely, the hammer should be swivelled back in vertical position.
•   Always secure the sheet pile mechanically from falling with a chain or sling.


                                                     3                                     4




3.2        Starting/stopping vibration
Turn the vibration switch to start/forward or press the start button to start vibrating.
Turn the vibration switch to stop/reverse or press the stop button to stop vibrating.


      CAUTION
Never use the emergency stop button for normal stops.




Page 21 of 38                               ISO-9001 : 2000 certified company              Subject to change without notice
Operation & Maintenance
                                      Instructions
                                        Vibratory Hammers
                                                                                           INTERNATIONAL CONTRUCTION EQUIPMENT




3.3        Off-clamping from a pile
Turn the clamp switch to open to release the hydraulic clamp so that the vibrator can be removed from the pile.
Never open the clamp before the vibratory hammer has come to a complete stand still. Make sure , the pile or
casing can not drop from the clamp when the clamp is opened.


      CAUTION
Check if lifting line is slightly under tension before the clamp pressure is released.
Do not turn the switch to open until a visual check indicates that vibration has stopped



3.4        Emergency stop
For an emergency stop, press the button on the power pack, crane, pile driving rig? or the remote control.


      CAUTION
Before continuing operation reset the emergency stop button by turning it clockwise. Always reset the emergency
stop button immediately after the hammer and power pack have been shut down completely.

3.5        Changing the frequency
In order to provide maximum flexibility in achieving optimum piling penetration and extraction rates, the frequency
of the vibrator is adjustable. The frequency can be varied by changing engine speed. Engine speed is changed with
the engine throttle or rpm +/- switch on the dashboard or on the remote control.

3.6        Securing the locks of a swivel head hammer
This part of the manual contains the description of the following vibratory hammers
Vibratory SH-hammer types
ICE – 428SH             ICE – 625SH             ICE – 825SH                ICE – 6RFSH          ICE – 11RFSH
ICE – 525SH                                                                ICE – 8RFSH

• The hydraulic locks on the swivelling extractor head will be activated when port “P” is pressurized .
• Make sure that the swivelling extractor head is put up straight before starting vibration
• If the swivelling extractor head is not put up straight, when vibrating, the hydraulic locks will not be locked
  properly, and damage may occur.
• Therefore you have to make sure that the swivelling extractor head is put up straight before activating the
  hydraulic locks.
• For unlocking the hydraulic locks, stop vibrating and pressurize port “T”.




Page 22 of 38                               ISO-9001 : 2000 certified company              subject to change without notice
Operation & Maintenance
                                Instructions
                                   Vibratory Hammers
                                                                                        INTERNATIONAL CONTRUCTION EQUIPMENT




                                    Not ready for operation               Ready for operation
                                     Put up straight first.


3.7        Clamps
Please refer to your clamp manual for operating instructions.

3.8        Safety chain
ICE clamps are equipped with a check valve to prevent a sheet pile from falling in case of hose fracture. This is a
hydraulic safetyy measure. However, clamp failure is always possible. Therefore it is compulsory to have a
mechanical safety precaution to prevent the sheet pile from falling down.

An additional mechanical safety measure shall be used. A safety chain shall be used to maintain a fixed connection
between sheet pile or tubing and the rig in case of a hydraulic failure.

Available safety chains from ICE
Part number           Description                           Related macnines
0503201               Assembly consisting of                11RFB, 1223B, 14RFB, 18RFB, 11RFSH, 1100H
     0509003          Safety chain max. load 3150kg
     0509002          D-shackle
9110213               Assembly consisting of                230B, 328B, 428B, 528B, 625B, 825B, 923B, 6RFB, 8RFB,
     9110009          Safety chain max. load 1600kg         230SH, 328SH, 428SH, 528SH, 625SH, 825SH, 923SH,
     0509002          D-shackle                             6RFSH, 8RFSH


      Warning
This chain is for safety measure only. Do not lift or extract sheet piles by means of this chain.
When driving or extracting a sheet pile, ALWAYS use this mechanical safety precaution!

Use of the chain:
• Make a hole in the sheet pile just big enough to get the chain through. (see drawing below)
• Attach the chain to the clamp or vibratory hammer using the D-shackle.
• Clamp the sheet pile.



Page 23 of 38                                ISO-9001 : 2000 certified company                  Subject to change without notice
Operation & Maintenance
                                  Instructions
                                    Vibratory Hammers
                                                                                 INTERNATIONAL CONTRUCTION EQUIPMENT




Hole diameters:
• Safety chain 0509003: ø 60mm minimum, ø 65mm maximum to avoid the chain from falling out.
• Safety chain 9110009: ø 40mm minimum, ø 45mm maximum to avoid the chain from falling out.




Page 24 of 38                          ISO-9001 : 2000 certified company         subject to change without notice
Operation & Maintenance
                                Instructions
                                  Vibratory Hammers
                                                                                      INTERNATIONAL CONTRUCTION EQUIPMENT




4 SPECIAL OPERATIONS
4.1        Operating instructions for ICE-RF vibratory hammers
ICE Resonance Free vibratory hammers allow starting up and stopping the vibratory hammer without
vibration. This is achieved by shifting the upper row eccentrics with respect to the lower row of eccentrics. The
total eccentric moment of the hammer can be varied from 0 -100%. For this reason there is/are one or two
actuator(s) on the hammer.


                eccentric moment 100%                                    eccentric moment 0%
                          Actuators

                          eccentics




Proceed as follows:
• Start the diesel engine and warm-up as described in the operating manual of the power pack.
• Increase the diesel engine rpm.
• Hold the ecc mom switch on the remote control in [-] position until pressure has reached 190 bar. This will
  take a few seconds.
• Start the hammer.
• Wait until the eccentrics rotate at full speed.
• Hold the ecc mom switch on the remote control in [+] position until the required amplitude or maximum
  vibration level is reached.
• To stop the hammer proceed in reverse order.

4.2        Operating at low temperatures
When using the hammer at low ambient temperatures (below 10°C), please make sure that you carry out the
following instructions
• When starting the hammer never run the hammer at maximum rpm immediately. Allow the machine and the
    oils to warm-up.
• Make sure that the bearings get enough oil by taking off one of the bearing covers (with forced lubrication
    hammers at the position furthest away from the oil input location.)
• The lubrication oil may be changed for a lower viscosity oil. However, care should be taken to have the correct
    oil viscosity at operational temperature. In case of doubt, measure hydraulic oil and vibration case lubrication oil
    temperaures and contact ICE with these values.
• One should check the oil viscosity also at higher temperatures as the hammer warms up rapidly at full speed.




Page 25 of 38                                ISO-9001 : 2000 certified company               Subject to change without notice
Operation & Maintenance
                                     Instructions
                                       Vibratory Hammers
                                                                                            INTERNATIONAL CONTRUCTION EQUIPMENT




4.3        Operating under water (up to 10 m depth)
It is recommended to contact ICE for under water operation.
Pay attention to the following when operating under water with the vibratory hammer:
• Check the seals and gaskets (O-rings, gasket between vibration case and vibration case adapter).
• Check all bolt connections.
• Remove the vibration case breather and replace it by a plug.
• Check for possible leakage by increasing the pressure in the vibration case to approx. 0.2 bars.
• Check all hydraulic hoses for leakage.
• Check the oil level in the vibration case (case level)
• Connect the vibration case to a compressor and increase the pressure in the vibration case to 0.5 bars over
    pressure.
• Increase the air pressure to 1.0 bar overpressure when the hammer is at 5 m below the water line. In this way
    there is a constant excess pressure of min. 0.2 bars and max. 0.5 bars present.
• During under water operation regularly check the oil level. If the oil becomes white/grey check immediately for
    leakage and replace the oil.
• Check the lubrication oil after completing the work under water and change the oil when required


     CAUTION
Watch carefully that the hammer is not “hot” when lowered or driving through the water surface. This may cause a
thermo-shock and damage the vibration case and its contents.


      CAUTION
Excess pressure of more than 0.5 bar may damage the transmission case.

In case of water depths of over 10 m, always use the air regulation system for under water operation.


      CAUTION
Check lubrication oil regularly during and in any case after completion on water content.
Water may also enter the case as condensate from non-dried compressed air.


4.4        Operating in deep water (> 10m deep)
Contact ICE for preparation for deep water operation.
An air regulating system must be installed for deep water operation.

Air regulation system
Before operating, read and check the vibratory hammer according to chapter 5 of this manual.

Connect the air regulating system to an air compressor with an air buffer.
The air pressure you need under water is 1/10 of the depth in meters.
For example, 200 meters under water = 200 x 1/10 + 1.1 bar* = 21.1 bar




Page 26 of 38                              ISO-9001 : 2000 certified company                subject to change without notice
Operation & Maintenance
                              Instructions
                                Vibratory Hammers
                                                                                 INTERNATIONAL CONTRUCTION EQUIPMENT




      WARNING
By lowering and retrieving the hammer be aware of the maximum speed of 15 mtr/min.




Testing the air regulating system
• Disconnect the hose (b) from air valve R.
• Screw a plug in the hose connector .
• Start the compressor. At 1.1 bar over-pressure the safety valve S will be opened (you can hear the valve breath
  out).The 1.1 bar overpressure is needed to avoid leaking seawater into the vibration gearbox.

Maintenance
After operating under water check the oil of the vibration gearbox. (refer to chapter 5)
Check the membrane of the air regulating valve every 6 months by removing the screws of the cover. When it’s
damaged, replace it.




Page 27 of 38                             ISO-9001 : 2000 certified company             Subject to change without notice
Operation & Maintenance
                                      Instructions
                                        Vibratory Hammers
                                                                                           INTERNATIONAL CONTRUCTION EQUIPMENT




5 MAINTENANCE
       DANGER
All maintenance work is strictly reserved to qualified and authorized personnel.
Except for the visual inspections, all maintenance work must be carried out with the diesel engine stopped.
Make sure that the main power switch is in OFF position.
Install a DO NOT OPERATE or similar warning label to the main power switch.

5.1        General
Preventive maintenance includes normal servicing in order to keep the vibratory hammer in operation condition
and prevents unnecessary breakdowns. The preventive maintenance consists of periodic inspection and exchange
of the liquids, filters and moving parts of the unit.

Lubrication is essential for the system, determining to a great extent the useful life of the vibratory hammer.
Therefore it is important that the instructions regarding types of oils and exchange intervals are closely adhered to.
• Prevent dirt from entering lubricants and the system.
• Thoroughly clean all lubrication fittings, caps, filter plugs and level plugs and their surrounding surfaces before
   servicing.

5.2        Daily maintenance
The daily instructions apply to routine or daily starting of a vibratory hammer.
• Each day -or at the beginning of each shift- check the entire vibratory hammer before start-up, after start-up
  and during operation.
• Before start-up, proceed as follows:
      o Inspect all bolts, nuts and screws. If necessary tighten.
      o Check the oil level in the vibration case and if required fill to the proper level. The oil level shoull be
          between the middle and top of the sight glass. Change oil if it is milky or black
      o Visually check all hoses for signs of damage or cuts that may cause hose failure during operation. Be sure
          all connections are tight, especially the quick-disconnect couplers.
      o When the first steel layer of the hose is damaged, it should be replaced
      o Visually inspect all suppressor elastomers on cracks and loose bolts
      o Visually inspect for cracks in metal parts.
• After start-up:
      o Check all hydraulic hoses for leaks. Make sure they hang freely with no kinks.
      o Check the hydraulic manifold and fittings for leaks.
• During operation:
      o Be alert on rattling noises. These may indicate that one or more bolts have come loose. Check all bolts
          immediately and retighten them.
      o Rattling noises may also indicate gear case failures
      o Handle all hoses with care and pay attention that no sharp curves or bends occur.

5.3        Weekly maintenace
• Tighten all bolts on the hammer and the hydraulic clamp. Always use a torch wrench. To obtain the listed
  torque, a steady pull should be exerted to the handle until the desired torque is reached.
• Check the air breather, located on the side of the hammer. If necessary, clean the breather with diesel fuel.

5.4        Monthly maintenance
• Check the proper functioning of the forced lubrication pump by removing a plug or a hose on the pressure side
  of the pump.
• Check on the hour counter of the engine if the vibratory hammer is due for inspection or maintenance.
• Check the functioning of the pump.



Page 28 of 38                               ISO-9001 : 2000 certified company              subject to change without notice
Operation & Maintenance
                                Instructions
                                  Vibratory Hammers
                                                                                      INTERNATIONAL CONTRUCTION EQUIPMENT




5.5        Yearly maintenance
• Have the hydraulic fluid analysed by a local hydraulic service centre. Replace fluid if required. Refer to
  paragraph 5.7 Recommended liquids.
• Replace the forced lubrication pump on the vibration case.
• Have the hydraulic system inspected by ICE (authorized) service personnel.


     CAUTION
Any contamination of the hydraulic fluid will drastically shorten the life of the high-pressure hydraulic system.

5.6        Lubrication intervals (operating hours of the hammer)

INSPECTION INTERVALS BASED ON OPERATING HOURS VIBRATORY HAMMER
Description                                                   Normal driving        Heavy driving           Min.
                                                              conditions            conditions
                                                              First      Interval First        Interval
Hammer                   Oil level                            Check level                                   daily
                         Lubrication oil vibration case       25         100        10         50           Yearly
                         Main hydraulic filter (optional)     25         100        10         50           Yearly
Cooler unit              Filter forced lubrication system     25         100        10         50           Yearly
                         Lubrication pump                     Monthly               Every 2 weeks           Yearly
Bearings                                                                 500                   250          Yearly
Actuator                 (Optional)                                      500                   250          Yearly
Elastomers                                                    Check for hair cracks                         Daily
Hoses                                                         Check for damaged steel wire                  Daily
Clamp                                                         Check for leaks                               Daily
Bolts, nuts and screws                                        Check torque                                  Daily

CHANGE INTERVALS BASED ON OPERATING HOURS VIBRATORY HAMMER
Description                                                   Normal driving        Heavy driving           Min
                                                              conditions            conditions
                                                              First      Interval   First      Interval
Hammer                   Lubrication oil vibration case       50         200        25         200          Yearly
                         Main hydraulic filter (optional)     50         200        25         200          Yearly
                         Hydro engines                                                         200          Every 5   years
Cooler unit              Filter forced lubrication system     50           200      25         200          Yearly
                         Lubrication pump                                  500                 500          Yearly
Bearings                                                                   1500                1000         Every 3   years
Actuator                 (Optional)                                        1500                1000         Every 3   years
Elastomers               Exchange when small haircracks are visible                                         Every 5   years
Hoses                    Exchange when first steel layer is damaged                                         Every 2   years

• When operating in an environmental air with high salt or moisture content, the service intervals need not to be
  changed. However, the unit shall be thoroughly inspected weekly to determine what additional servicing, if any,
  might be required.
• During stand-by or inactive periods, the service intervals may be extended twice from those specified.




Page 29 of 38                                ISO-9001 : 2000 certified company               Subject to change without notice
Operation & Maintenance
                                       Instructions
                                         Vibratory Hammers
                                                                                             INTERNATIONAL CONTRUCTION EQUIPMENT




5.7        Recommended liquids

TEMPERATURES              NORMAL                  HIGH AMBIENT               LOW                   EXTREME LOW
                          AMBIENT                                            AMBIENT               AMBIENT
                          -10°C < T < 55°C      T > 55°C         -20°C < T < 20°C                  -35°C < T < 20°C
VIBRATION CASE            Total Carter          Total Carter     Total Carter                      Total Carter
FORCED LUB                75W140                75W140           75W90                             75W90
VIBRATION CASE            Total Carter          Total Carter     Total Carter                      Total Carter
SPLASH LUB                SH 460                SH 460           SH 460                            SH 460
HYDRAULIC OIL             Total                 Total            Total                             Total EQUIVIS XV
                          EQUIVIS ZS 46         EQUIVIS ZS 68    EQUIVIS ZS 32                     32
                          Alt. Total
                          EQUIVIS XV 46
BIO OIL                   Total BIOHYDRAN       Total BIOHYDRAN  not recommended                   not recommended
                          TMP 46                SE 46
ENGINE OIL                Total Rubia TIR 7400 5W30
ENGINE COOLANT            50% Total GLYCOLFREEZE + 50% water + additive

5.8        Heavy driving conditions
The following conditions have to be considered heavy driving conditions
• When the average temperature is above +30°C or below -20°C
• When operating in excess of 8 hours per day
• Leader guided machines are considered heavy driving conditions.

5.9        Long term storage
Should the hammer not be used for any extended period of time (approximately 2 – 3 months), the gear case
lubrication oil should be removed and the complete gear case be filled by any type of oil. The hammer should
preferably be stored vertical, otherwise with the hydraulic motors facing upwards. When laid down the hammer
head should be supported slightly higher than the clamp to ensure that the bearings facing upwards are filled with
oil as well and are not trapped in an air gap. If it is not possible to fill up the gear case with oil, the hammer should
be run at least every 3 to 4 weeks.

5.10       Hydraulic oil
New power units are shipped with Total Equivis ZS 46 hydraulic oil, unless otherwise specified by the client. Check
label in power pack for actual oil type. When replacing fluid other than this, use a fluid with the following
specifications:

Viscosity index           150
Viscosity (mm²/s)         46,6 @ 40°C
                          31,3 @ 50°C
                            8,2 @ 100°C
ISO.VG                    46
DIN 51524                 HLP 25

When operating in arctic conditions, it is recommended to use an immersion heater to preheat the oil prior to
starting. It may also be necessary in extreme cold or hot climates to use a different viscosity oil which is better
adapted to adverse conditions
• Contact the nearest oil supply representative for suggested procedures




Page 30 of 38                                ISO-9001 : 2000 certified company               subject to change without notice
Operation & Maintenance
                                Instructions
                                  Vibratory Hammers
                                                                                     INTERNATIONAL CONTRUCTION EQUIPMENT




Biodegradable hydraulic oil
It is allowed to use biodegradable oil in combination with ICE equipment, but only if the biodegradable oil is an
ester-type oil with the same specifications as the mineral oil used by ICE. Operating the hammer with other types
of biodegradable oil is not allowed. Should you have any doubt, please contact ICE before using the oil.

Lubrication oil vibratory gear case
The fluid level is easily read through the side-glass located at the lower centre of the long side of the vibratory
case (motor side). Under normal gear case temperatures the level of the lubrication oil shall be at mid-level of the
side glass. Lubrication gear oil may be added when necessary through the special filling plug or through the
vibration case top plate, above the motor recess. The oil may be drained by removing the plug at the motor end of
the base plate.

The most preferred lubrication oil is a synthetic lubricant, since synthetics were designed for applications where
service conditions are more severe due to high operating temperatures. Moreover they have good oxidation
stability. Synthetics also provide considerably longer service life than natural, petroleum-based lubricants
consequently resulting in less maintenance hours spent on the mechanic service of the unit. The vibration case
lubricant (synthetic).

Viscosity index          Total                  Total
                         150                    155
Viscosity (mm²/s)        218,0 @ 40°C           430,0 @ 40°C
                         137,6 @ 50°C           264,5 @ 50°C
                          25,9 @ 100°C           44,5 @ 100°C
ISO.VG                   220                    460

The vibration case lubricant installed at the factory is Total Carter SH 220 for systems with forced lubrication and
Total Carter SH 460 for systems with splash lubrication. When replacing the lubricant, a gear oil with the following
specifications must be used:

5.11       Lubrication of the vibration case under extreme circumstances
Extreme circumstances are e.g.:
• Outside temperature over 55°C.
• Soil compaction , semi-continuous operations like installation of drains, installation of diaphragm walls, etc.
• Long driving times at high operating pressure.
• Rebound

In these cases, the temperature in the vibration case may rise to 60°C - 70°C. Please contact ICE with actual
vibration case temperature for recommendations on lubrication oil and special instructions.




Page 31 of 38                               ISO-9001 : 2000 certified company               Subject to change without notice
Operation & Maintenance
                                         Instructions
                                        Vibratory Hammers
                                                                                            INTERNATIONAL CONTRUCTION EQUIPMENT




5.12       Maintenance of hydraulic circuit elements
NOTE:
Check al lines, hoses and connections regularly for leaks and obvious damage. Repair damage immediately;
splashed oil may cause injuries, fire and contaminations.


      CAUTION
Any contamination will drastically shorten the life of the high-pressure system. Therefore, the hydraulic oil should
be kept clean and no dirt should enter when (re-)filling.



5.13       Oil capacity

Oil capacities per model
model               Quantity (l)        model                Quantity (l)          model              Quantity (l)
ICE - 625           ±4                  ICE - 6RF            ± 14                  ICE - 416L         ± 10
ICE - 1223          ± 15                ICE - 8RF            ± 14                  ICE - 32NF         ± 10
ICE - 1423C         ± 18                ICE - 11RF(s)        ± 20                  ICE – 54NF         ± 55
ICE - 423           ± 45                ICE - 14RF           ± 27
                                        ICE - 18RF(-ts)      ± 27
ICE - 815C          ±   70              ICE - 23RF           ± 40
ICE - 3220          ±   60              ICE - 32RF           ± 40
ICE - 6420          ±   50              ICE - 28RF(s)        ± 40
ICE - 1412C         ±   80              ICE - 36RF(-ts)      ± 60
ICE – 250NF         ±   80              ICE - 46RF           ± 110
                                        ICE - 64RF           ± 73




NOTE:
When an oil cooler for forced lubrication is used: 25l extra for cooling system.




Page 32 of 38                               ISO-9001 : 2000 certified company               subject to change without notice
Operation & Maintenance
                               Instructions
                                 Vibratory Hammers
                                                                                     INTERNATIONAL CONTRUCTION EQUIPMENT




5.14       Bolt torque information
The following torque specifications apply to the bolts from the component assemblies listed.
Whenever any of these bolts are replaced, the given torque specifications shall be adhered to. Refer to the tables
next page.




Tightening moment and force for UNC bolts with coarse pitch
                          Tightening force [KN]                                Tightening   moments [Nm]
Diameter      Pitch       Class        Class       Class                       Class         Class     Class
[mm]          [mm]        8.8          10.9        12.9                        8.8           10.9      12.9
1/4''         4.2         8.0          11.3        13.5                        10            14        17
5/16''        3.7         13.2         18.5        22.3                        20            28        33
3/8''         3.4         20.8         29.2        35.1                        38            53        64
7/16''        3.3         28.5         40.1        48.1                        60            85        102
1/2''         3.1         38.0         53.4        64.1                        91            129       154
5/8''         2.9         60.5         85.0        102                         178           250       300
3/4''         2.7         89.4         126         151                         309           435       522
7/8''         2.5         129          182         218                         514           723       867
1''           2.5         169          238         286                         774           1088      1306
1 1/4''       2.3         271          381         457                         1532          2154      2585
1 1/2''       2.2         392          552         662                         2659          3740      4488

Tightening moment and force for UNC bolts with fine pitch
                          Tightening force [KN]                                Tightening   moments [Nm]
Diameter      Pitch       Class       Class         Class                      Class         Class     Class
[mm]          [mm]        8.8         10.9          12.9                       8.8           10.9      12.9
1 1/8''x12    2.12        247.4       347.9         417.4                      1229          1728      2073
1 1/4''x12    2.12        310.3       436.3         523.6                      1704          2397      2876




Page 33 of 38                              ISO-9001 : 2000 certified company                Subject to change without notice
Operation & Maintenance
                                 Instructions
                                  Vibratory Hammers
                                                                                      INTERNATIONAL CONTRUCTION EQUIPMENT




Tightening moment and force for metric bolts with coarse pitch
                          Tightening force [KN]                          Tightening   moments [Nm]
Diameter      Pitch       Class        Class        Class                Class         Class     Class
[mm]          [mm]        8.8          10.9         12.9                 8.8           10.9      12.9
M6            1.0         8.2          11.6         13.9                 10            14        16
M8            1.3         15.0         21.1         25.3                 23            33        39
M10           1.5         23.8         33.4         40.1                 46            64        77
M12           1.8         34.5         48.5         58.2                 78            110       132
M14           2.0         47.3         66.5         79.8                 125           176       211
M16           2.0         66.2         93.1         112                  198           278       333
M18           2.5         81.3         114          137                  275           387       465
M20           2.5         103          145          174                  386           542       651
M22           2.5         128          180          216                  522           734       881
M24           3.0         149          209          251                  667           937       1125
M27           3.0         194          273          327                  966           1358      1630
M30           3.5         237          333          400                  1318          1854      2225
M33           3.5         293          431          517                  1788          2628      3154
M36           4.0         345          507          609                  2297          3377      4053
M39           4.0         412          606          727                  2950          4338      5205
M42           4.5         473          696          835                  3669          5394      6473
M48           5.0         623          915          1098                 5504          8091      9709
M56           5.5         857          1261         1513                 8842          12999     15599
M64           6.0         1130         1662         1994                 13199         19405     23286

Tightening moment and force for metric bolts with     fine pitch
                      Tightening force [KN]                         Tightening moments [Nm]
Diameter     Pitch    Class           Class            Class        Class         Class                  Class
[mm]         [mm]     8.8             10.9             12.9         8.8           10.9                   12.9
M16x1.5      1.5      74.9            105              126          219           309                    370
M20x1.5      1.5      122             171              205          440           619                    743
M24x2        2.0      172             242              291          752           1057                   1268
M30x2        2.0      278             391              470          1503          2113                   2535
M36x3        3.0      387             545              654          2536          3567                   4280




Page 34 of 38                        ISO-9001 : 2000 certified company                subject to change without notice
Operation & Maintenance
                                Instructions
                                  Vibratory Hammers
                                                                                      INTERNATIONAL CONTRUCTION EQUIPMENT




6 ORDERING OF PARTS
6.1        Procedure
When ordering parts, be sure to include the model and serial number of the unit or component. confirm all
telephone and/or e-mail orders immediately to avoid duplicating shipment.

6.2        Original equipment
Where serial numbers are given, these numbers only apply to equipment and components originally furnished with
the unit. Where equipment has been changed or added to, these numbers may not necessarily apply.

6.3        Shipment
State to whom shipment is to be made and method of shipment desired, otherwise our own judgement will be
made.

6.4        Shortages
Claims for shortages or errors shall be made immediately on receipt of parts. No responsibility will be assumed for
delay, damage or loss of material while in transit. Broken, damaged or loss of material shall be refused or a full
description made of damage or loss to the carrier agent on the freight or express bill

6.5        Return of parts
If for any reason you desire to return parts to the factory or to any distributor from whom these parts were
obtained, first secure permission to return the parts. Shipping instructions will be given along with this permission

6.6        Screws and bolts
Almost all connections on the unit are made with socket-head cap (Allen) screws. These high-strength screws are
available at most industrial supply houses. Screws and bolts are designated in the PARTS LIST in abbreviated form.
The information, in parenthesis, immediately following the bolt or screw designation shows the size as follows:

½ - 13 x 1 ½

½” Diameter
13 Threads Per Inch
1 ½" Length

NOTE:
Some screws or bolts require a specific torque when replacing. For identification of these bolts and a more
thorough understanding of torque, refer to section 5.14

ABBREVIATIONS USED
BHCS            Button Head Cap Screw                      HSSS             Hex. Socket Set Screw
FHCS            Flat Head Cap Screw                        PHMS             Philips Head Machine Screw
FLCS            FLanged head Cap Screw                     RHMS             Round Head Machine Screw
HC              High Collar                                SHCS             Socket Head Cap Screw
HHCS            Hex. Head Cap Screw                        SHPP             Socket Head Pipe Plug
HHPP            Hex. Head Pipe Plug                        SHSS             Socket Head Shaller Screw




Page 35 of 38                               ISO-9001 : 2000 certified company                Subject to change without notice
Operation & Maintenance
                                  Instructions
                                 Vibratory Hammers
                                                                                 INTERNATIONAL CONTRUCTION EQUIPMENT




6.7        Hoses
EXAMPLE OF HOSE DESIGNATION
            A      B        C      D           E            F           G   H            I            J
HOSE        125    R01      F      9           24           P           0   20           LO395        S

Explanation of hose codes
A   HOSE I.D. (3 digits)                             B    SAE or MANUFACTURER RATING (3 digits)
    (125 = 1/14”) (050 = ½”), etc.                        (PT4 = Power Track)
    In inches; 2 place decimal                            (R01 = SAE Rating 100R1), etc.
C   FIRST END – TYPE OF FITTING (1 digit)            D    FIRST END – BEND ANGLE (1 digit)
    (F = 3000 PSI Flange) (P = NPT-male)                  (0 = None) (3 = 30°) (9 = 90°),etc.
    (H = 6000 PSI Flange) (M = JIC-male)
    (J = JIC-female swivel), etc.
E   FIRST END – SIZE(2 digits)                       F    SECOND END – TYPE OF FITTING (1 digit)
    (In 1/16th)                                           (See codes for first end)
G   SECOND END – BEND ANGLE (1 digit)                H    SECOND END – SIZE (2 digits)
    (See codes for first end)                             (in 1/16th)
I   LENGTH                                           J    SPECIAL CODES
    In inches; 1 place decimal                            (0 = None)
    (0395 = 39 ½”) (1240 = 124”), etc.                    (S = Spring Guard)
                                                          (L = S.S.Braid)
                                                          (D = Offset)




Page 36 of 38                       ISO-9001 : 2000 certified company            subject to change without notice
Operation & Maintenance
                                 Instructions
                                  Vibratory Hammers
                                                                                      INTERNATIONAL CONTRUCTION EQUIPMENT




6.8        Fittings
EXAMPLE OF FITTING DESIGNATION
                       A      B       C      D       E        F       G         H   I        J       K        L       M
FITT                   2      L       16     M       12       J       0         0   00L      0       0        0       1

Explanation of fitting codes
A     SELECTOR INDEX                                          B   CONFIGURATION OR SHADE OF FITTING
      2: inch fittings                                            S: Straight fitting C: Cap
      9: metric fittings                                          L: 90° elbow         P: Plus
                                                                  V: 45° elbow         U: Union, pipe
                                                                  T: Tee               X: Cross (fourth end fitting
                                                                  required).
C     FIRST END SIZE                                          D   FIRST END FITTING STYLE
      In sixteenth of an inch (index 2)                           See fitting style selector chart.
      In millimetres (index 9)
      Exceptions:
      90 = 10” 94 = 14” 98 = 8”
      92 = 12” 96 = 6”          99 = none code size
      See general specification sheet for sequence of
      order.
E     SECOND END SIZE                                         F   SECOND END FITTING STYLE
      If applicable. See first end size.                          If applicable. See first end fitting style.
G     THIRD END SIZE                                          H   THIRD END FITTING STYLE
      If applicable. See first end size.                          If applicable. See first end fitting style.
      FOURTH END SIZE (crosses only)                              FOURTH END FITTING STYLE (crosses only)
      See first end fitting size or end style.                    See first end fitting size or end style.
I     LENGTH CODE pipe nipples (long) only                    J   INSTALLATION AID OR STYLE OF HEAD
      (in decimal inches for index 2)                             0:       not applicable.
      050 = 5.0 inches              105 = 10.5 inches             H:       regular hex.
      In millimetres for index 9                                  W:       wide or large hex.
      120 = 12.0 inches             084 = 8.4 inches              Q:       square head (ext.)
                                                                  R:       square head (int)
      LENGTH CODE (elbows / nipples)                              S:       hex. head (int. socket)
      00L – long (elbow)        00C – close (nipple)              T:       hex. head (ext.)
      00x – extra long (elbow) 00S – short (nipple)
K     PRESSURE RATING                                         L   SPECIAL NOTATIONS
      0:      not applicable                                      0:    none
      1:      125 lb                                              A:    tapped hole in fitting
      3:      standard weight (40)                                B:    orifice
      4:      extra heavy (80)                                    F:    special fab., non-stock item.
                                                                  G:    galvanized
                                                                  M:    magnetic
M     MATERIAL
      1:   carbon steel
      2:   brass
      3:   cast brass
      4:   stainless steel
      5:   A.A.R. mal. Iron
      6:   maleable iron
      7:   cast iron
      8:   forged steel
      9:   aluminium




Page 37 of 38                               ISO-9001 : 2000 certified company                Subject to change without notice
Operation & Maintenance
                      Instructions
                    Vibratory Hammers
                                                          INTERNATIONAL CONTRUCTION EQUIPMENT




Page 38 of 38         ISO-9001 : 2000 certified company   subject to change without notice

Contenu connexe

Tendances

Weight chart for_hexagon_bolts_&amp;_nuts
Weight chart for_hexagon_bolts_&amp;_nutsWeight chart for_hexagon_bolts_&amp;_nuts
Weight chart for_hexagon_bolts_&amp;_nutsManish Thakur
 
Manual Operação e Manutenção AP300
Manual Operação e Manutenção AP300Manual Operação e Manutenção AP300
Manual Operação e Manutenção AP300Marcelo Cardozo
 
Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)Hedi Ben Mohamed
 
Electronic modular control panel ii + paralleling emcp ii + p systems ope...
Electronic modular control panel ii + paralleling   emcp ii + p   systems ope...Electronic modular control panel ii + paralleling   emcp ii + p   systems ope...
Electronic modular control panel ii + paralleling emcp ii + p systems ope...Otorongosabroso
 
Jcb 3230 plus fastrac service repair manual
Jcb 3230 plus fastrac service repair manualJcb 3230 plus fastrac service repair manual
Jcb 3230 plus fastrac service repair manualjksmmde
 
New holland tl90 a tractor service repair manual
New holland tl90 a tractor service repair manualNew holland tl90 a tractor service repair manual
New holland tl90 a tractor service repair manualujdjjkkskmme
 
perkins 2800 series workshop manual
perkins 2800 series workshop manualperkins 2800 series workshop manual
perkins 2800 series workshop manualIanJameson4
 
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESBs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESANA ISABEL R.R.
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha classBill Brown
 
Atlas copco cai gx 7. manual de instrucciones
Atlas copco cai gx 7. manual de instruccionesAtlas copco cai gx 7. manual de instrucciones
Atlas copco cai gx 7. manual de instruccionesJuan Peraza Cuen
 
Iveco nef67 te2 service repair manual
Iveco nef67 te2 service repair manualIveco nef67 te2 service repair manual
Iveco nef67 te2 service repair manualfjsjekfkselmm
 
SCAFFOLDING SAFETY.ppt
SCAFFOLDING SAFETY.pptSCAFFOLDING SAFETY.ppt
SCAFFOLDING SAFETY.ppthamoudahedi
 
Sdmo mics-nexys-control panel-manual
Sdmo mics-nexys-control panel-manualSdmo mics-nexys-control panel-manual
Sdmo mics-nexys-control panel-manualCarlos Callirgos
 
Volvo Fe Truck Wiring Diagram Service Manual Download June 2009
 Volvo Fe Truck Wiring Diagram Service Manual Download June 2009  Volvo Fe Truck Wiring Diagram Service Manual Download June 2009
Volvo Fe Truck Wiring Diagram Service Manual Download June 2009 SantySingh5
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 

Tendances (20)

Weight chart for_hexagon_bolts_&amp;_nuts
Weight chart for_hexagon_bolts_&amp;_nutsWeight chart for_hexagon_bolts_&amp;_nuts
Weight chart for_hexagon_bolts_&amp;_nuts
 
2017 CRW: Below the Hook Lifting – Slings and Hardware
2017 CRW: Below the Hook Lifting – Slings and Hardware2017 CRW: Below the Hook Lifting – Slings and Hardware
2017 CRW: Below the Hook Lifting – Slings and Hardware
 
Manual Operação e Manutenção AP300
Manual Operação e Manutenção AP300Manual Operação e Manutenção AP300
Manual Operação e Manutenção AP300
 
Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)Ei 1540 design_construction_commissionin (2)
Ei 1540 design_construction_commissionin (2)
 
Electronic modular control panel ii + paralleling emcp ii + p systems ope...
Electronic modular control panel ii + paralleling   emcp ii + p   systems ope...Electronic modular control panel ii + paralleling   emcp ii + p   systems ope...
Electronic modular control panel ii + paralleling emcp ii + p systems ope...
 
Jcb 3230 plus fastrac service repair manual
Jcb 3230 plus fastrac service repair manualJcb 3230 plus fastrac service repair manual
Jcb 3230 plus fastrac service repair manual
 
Rigging Presentation
Rigging PresentationRigging Presentation
Rigging Presentation
 
New holland tl90 a tractor service repair manual
New holland tl90 a tractor service repair manualNew holland tl90 a tractor service repair manual
New holland tl90 a tractor service repair manual
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 
perkins 2800 series workshop manual
perkins 2800 series workshop manualperkins 2800 series workshop manual
perkins 2800 series workshop manual
 
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESBs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
 
volvo wiring diagram vm
volvo wiring diagram vmvolvo wiring diagram vm
volvo wiring diagram vm
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
Atlas copco cai gx 7. manual de instrucciones
Atlas copco cai gx 7. manual de instruccionesAtlas copco cai gx 7. manual de instrucciones
Atlas copco cai gx 7. manual de instrucciones
 
Iveco nef67 te2 service repair manual
Iveco nef67 te2 service repair manualIveco nef67 te2 service repair manual
Iveco nef67 te2 service repair manual
 
SCAFFOLDING SAFETY.ppt
SCAFFOLDING SAFETY.pptSCAFFOLDING SAFETY.ppt
SCAFFOLDING SAFETY.ppt
 
M035
M035M035
M035
 
Sdmo mics-nexys-control panel-manual
Sdmo mics-nexys-control panel-manualSdmo mics-nexys-control panel-manual
Sdmo mics-nexys-control panel-manual
 
Volvo Fe Truck Wiring Diagram Service Manual Download June 2009
 Volvo Fe Truck Wiring Diagram Service Manual Download June 2009  Volvo Fe Truck Wiring Diagram Service Manual Download June 2009
Volvo Fe Truck Wiring Diagram Service Manual Download June 2009
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 

En vedette

The manual of of vibratory hammer
The manual of of vibratory hammerThe manual of of vibratory hammer
The manual of of vibratory hammertaohui
 
Alfanar Generator Assessment Process
Alfanar Generator Assessment ProcessAlfanar Generator Assessment Process
Alfanar Generator Assessment ProcessAnil Panjani
 
Instruction manual for dhr v2.2
Instruction manual for dhr v2.2Instruction manual for dhr v2.2
Instruction manual for dhr v2.2Kaizer Bo
 
Yanmar diesel generator operation manual
Yanmar  diesel generator operation manualYanmar  diesel generator operation manual
Yanmar diesel generator operation manualManuel Sotelo
 
Roller compaction machines
Roller compaction machinesRoller compaction machines
Roller compaction machinespradip dangar
 
Rapid compression machine_monthly meeting
Rapid compression machine_monthly meetingRapid compression machine_monthly meeting
Rapid compression machine_monthly meetingNathan Loveldi
 
Principle of DC Generator
Principle of DC GeneratorPrinciple of DC Generator
Principle of DC Generatorguest60b26e
 
Universal testing machines
Universal testing machinesUniversal testing machines
Universal testing machinesShivam Tiwari
 
Service Operation Management_Maruti
Service Operation Management_MarutiService Operation Management_Maruti
Service Operation Management_MarutiAnkit Suneja
 
Leonardo da Vinci- Powerpoint Presentation
Leonardo da Vinci- Powerpoint PresentationLeonardo da Vinci- Powerpoint Presentation
Leonardo da Vinci- Powerpoint PresentationJay Vinson Dahay
 
Leonardo Da Vinci Ppt
Leonardo Da Vinci PptLeonardo Da Vinci Ppt
Leonardo Da Vinci Pptguest6c27ff
 
Shaft driven bicycle(chainless)
Shaft driven bicycle(chainless)Shaft driven bicycle(chainless)
Shaft driven bicycle(chainless)venkatwhite
 

En vedette (20)

The manual of of vibratory hammer
The manual of of vibratory hammerThe manual of of vibratory hammer
The manual of of vibratory hammer
 
Tribology Portfolio
Tribology PortfolioTribology Portfolio
Tribology Portfolio
 
Alfanar Generator Assessment Process
Alfanar Generator Assessment ProcessAlfanar Generator Assessment Process
Alfanar Generator Assessment Process
 
Instruction manual for dhr v2.2
Instruction manual for dhr v2.2Instruction manual for dhr v2.2
Instruction manual for dhr v2.2
 
2002 MAXIMA OWNER'S MANUAL
2002 MAXIMA OWNER'S MANUAL2002 MAXIMA OWNER'S MANUAL
2002 MAXIMA OWNER'S MANUAL
 
Yanmar diesel generator operation manual
Yanmar  diesel generator operation manualYanmar  diesel generator operation manual
Yanmar diesel generator operation manual
 
Final
FinalFinal
Final
 
Delmag Pile Driving Equipment
Delmag Pile Driving EquipmentDelmag Pile Driving Equipment
Delmag Pile Driving Equipment
 
Roller compaction machines
Roller compaction machinesRoller compaction machines
Roller compaction machines
 
Rapid compression machine_monthly meeting
Rapid compression machine_monthly meetingRapid compression machine_monthly meeting
Rapid compression machine_monthly meeting
 
Principle of DC Generator
Principle of DC GeneratorPrinciple of DC Generator
Principle of DC Generator
 
Project
ProjectProject
Project
 
Universal testing machines
Universal testing machinesUniversal testing machines
Universal testing machines
 
Service Operation Management_Maruti
Service Operation Management_MarutiService Operation Management_Maruti
Service Operation Management_Maruti
 
Leonardo da Vinci
Leonardo da VinciLeonardo da Vinci
Leonardo da Vinci
 
Leonardo da Vinci- Powerpoint Presentation
Leonardo da Vinci- Powerpoint PresentationLeonardo da Vinci- Powerpoint Presentation
Leonardo da Vinci- Powerpoint Presentation
 
Press machines ppt
Press machines pptPress machines ppt
Press machines ppt
 
dc Generator Ppt
dc Generator Pptdc Generator Ppt
dc Generator Ppt
 
Leonardo Da Vinci Ppt
Leonardo Da Vinci PptLeonardo Da Vinci Ppt
Leonardo Da Vinci Ppt
 
Shaft driven bicycle(chainless)
Shaft driven bicycle(chainless)Shaft driven bicycle(chainless)
Shaft driven bicycle(chainless)
 

Similaire à ICE Vibratory Hammer Owners Manual

Case ih farmall 95 n tractor service repair manual
Case ih farmall 95 n tractor service repair manualCase ih farmall 95 n tractor service repair manual
Case ih farmall 95 n tractor service repair manualfujsejfkskemem
 
Case ih farmall 75 n tractor service repair manual
Case ih farmall 75 n tractor service repair manualCase ih farmall 75 n tractor service repair manual
Case ih farmall 75 n tractor service repair manualfuhsejskekmmm
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualikdkdmdm
 
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manualDaewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manualdufjdjskkemm
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualcdfzxs
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualfksjksmmde
 
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manualDaewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manualudfjjsjekkemm
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualdueikdkmem
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualfjskekxcddmmme
 
John Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdf
John Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdfJohn Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdf
John Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdfExcavator
 
Instruction Manual | Nitehog Boomslang | Optics Trade
Instruction Manual | Nitehog Boomslang | Optics TradeInstruction Manual | Nitehog Boomslang | Optics Trade
Instruction Manual | Nitehog Boomslang | Optics TradeOptics-Trade
 
Case ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manualCase ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manualfjjskksekmemm
 
Case ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manualCase ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manualfhsjjefksekme
 
Case ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manualCase ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manualjfdjjskfkksmemm
 
Case ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manualCase ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manualfjsjjefskekmem
 
New holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manualNew holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manualkjsmmds jksemmd
 
New holland w70 btc compact wheel loader service repair manual
New holland w70 btc compact wheel loader service repair manualNew holland w70 btc compact wheel loader service repair manual
New holland w70 btc compact wheel loader service repair manualkjskemmd
 
New holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manualNew holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manualkjskemmd
 
NEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair Manual
NEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair ManualNEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair Manual
NEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair Manualhfvgcbt
 

Similaire à ICE Vibratory Hammer Owners Manual (20)

Case ih farmall 95 n tractor service repair manual
Case ih farmall 95 n tractor service repair manualCase ih farmall 95 n tractor service repair manual
Case ih farmall 95 n tractor service repair manual
 
Case ih farmall 75 n tractor service repair manual
Case ih farmall 75 n tractor service repair manualCase ih farmall 75 n tractor service repair manual
Case ih farmall 75 n tractor service repair manual
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
 
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manualDaewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
 
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manualDaewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
Daewoo Doosan Solar 170LC-V Excavator Operator and Maintenance manual
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
 
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manualDaewoo doosan solar 170 lc v excavator operator and maintenance manual
Daewoo doosan solar 170 lc v excavator operator and maintenance manual
 
John Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdf
John Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdfJohn Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdf
John Deere Tango E5 MOWiT 500F Series II Robotic Mower Technical Manual.pdf
 
Instruction Manual | Nitehog Boomslang | Optics Trade
Instruction Manual | Nitehog Boomslang | Optics TradeInstruction Manual | Nitehog Boomslang | Optics Trade
Instruction Manual | Nitehog Boomslang | Optics Trade
 
Case ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manualCase ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manual
 
Case ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manualCase ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manual
 
Case ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manualCase ih dx33 tractor service repair manual
Case ih dx33 tractor service repair manual
 
Case ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manualCase ih dx29 tractor service repair manual
Case ih dx29 tractor service repair manual
 
Thomas and Betts Cable Crimping Tools
Thomas and Betts Cable Crimping ToolsThomas and Betts Cable Crimping Tools
Thomas and Betts Cable Crimping Tools
 
New holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manualNew holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manual
 
New holland w70 btc compact wheel loader service repair manual
New holland w70 btc compact wheel loader service repair manualNew holland w70 btc compact wheel loader service repair manual
New holland w70 btc compact wheel loader service repair manual
 
New holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manualNew holland w80 btc compact wheel loader service repair manual
New holland w80 btc compact wheel loader service repair manual
 
NEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair Manual
NEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair ManualNEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair Manual
NEW HOLLAND W80BTC COMPACT WHEEL LOADER Service Repair Manual
 

Dernier

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsYoss Cohen
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxAna-Maria Mihalceanu
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfAarwolf Industries LLC
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024TopCSSGallery
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...itnewsafrica
 

Dernier (20)

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Infrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platformsInfrared simulation and processing on Nvidia platforms
Infrared simulation and processing on Nvidia platforms
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
A Glance At The Java Performance Toolbox
A Glance At The Java Performance ToolboxA Glance At The Java Performance Toolbox
A Glance At The Java Performance Toolbox
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Landscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdfLandscape Catalogue 2024 Australia-1.pdf
Landscape Catalogue 2024 Australia-1.pdf
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
 

ICE Vibratory Hammer Owners Manual

  • 1. Owners Manual Vibratory Hammers Model : All (standard) Vibratory Hammers Manual no. : VB0040 Revision no. : - Date of issue : 09-09-2008
  • 2. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Page 2 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 3. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT All rights reserved. No part of this publication may be copied or published by means of printing, photocopying, microfilm or otherwise without prior written consent of INTERNATIONAL CONSTRUCTION EQUIPMENT BV. This restriction also applies to the corresponding drawings and diagrams. INTERNATIONAL CONSTRUCTION EQUIPMENT BV has the right to change parts of the equipment at any time without prior or direct notice to the client. The contents of this publication is subject to change without notification. This publication is to be used for the standard version of the equipment only. For extra information as to adjustments, maintenance and repair, please contact your dealer. This publication has been written with great care. However, INTERNATIONAL CONSTRUCTION EQUIPMENT BV cannot be held responsible, either for any errors occurring in this publication or for their consequences. IMPORTANT!: Important safety instructions are marked as shown below: CAUTION Indicates a potentially hazardous situation which, if not avoided MAY result in minor or moderate injury. WARNING Indicates a potentially hazardous situation which, if not avoided COULD result in serious injury or even death. DANGER Indicates an threatening hazardous situation which, if not avoided CAN result in serious injury or even death. Page 3 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 4. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT TABLE OF CONTENT 1 SAFETY INSTRUCTIONS................................................................................................ 7 1.1 General ............................................................................................................................... 7 1.2 Safety precautions .............................................................................................................. 7 1.3 Safety signs on the hammer and the clamp....................................................................... 9 1.3.1 Safety signs on the free hanging vibratory hammer .......................................................... 9 1.3.2 Safety signs on the SH & B-hammers.............................................................................. 10 1.4 Safety instructions ............................................................................................................ 11 1.5 Limits for operational conditions....................................................................................... 12 1.5.1 Refusal.............................................................................................................................. 12 1.5.2 Rebound ........................................................................................................................... 12 1.5.3 Max. bearing temperatures .............................................................................................. 12 1.6 Incorporated safety precautions ....................................................................................... 12 2 DESCRIPTION OF THE EQUIPMENT .......................................................................... 13 2.1 Description of the free hanging vibratory hammers ......................................................... 13 2.1.1 The main components the free hanging vibratory hammers ........................................... 13 2.1.2 The vibration case ............................................................................................................ 13 2.1.3 The suppressor housing ................................................................................................... 13 2.1.4 The clamp (option)............................................................................................................ 14 2.1.5 Rigging of vibrator ............................................................................................................ 14 2.1.6 Installation......................................................................................................................... 14 2.2 Description the B-hammers.............................................................................................. 15 2.2.1 Introduction ....................................................................................................................... 15 2.2.2 The main components ...................................................................................................... 15 2.2.3 The vibration case ............................................................................................................ 15 2.2.4 The extraction head .......................................................................................................... 16 2.2.5 The clamp (option)............................................................................................................ 16 2.2.6 Attaching the hammer to the excavator ........................................................................... 16 2.2.7 Goose neck / mounting fork (option) ................................................................................ 16 2.2.8 Installation......................................................................................................................... 17 2.3 Description of the SH-hammer ......................................................................................... 17 2.3.1 Introduction ....................................................................................................................... 17 2.3.2 The main components ...................................................................................................... 17 2.3.3 The vibration case ............................................................................................................ 18 2.3.4 The swivelling extraction head ......................................................................................... 18 2.3.5 The clamp (option)............................................................................................................ 18 2.3.6 Goose neck / mounting fork (option) ................................................................................ 18 2.3.7 Attaching the hammer to the excavator ........................................................................... 19 2.3.8 Installation......................................................................................................................... 19 3 OPERATION ................................................................................................................... 20 3.1 Clamping a pile ................................................................................................................. 20 3.1.1 Picking up sheet pileswith a swivel head hammer........................................................... 20 3.2 Starting/stopping vibration ................................................................................................ 21 3.3 Off-clamping from a pile ................................................................................................... 22 3.4 Emergency stop................................................................................................................ 22 3.5 Changing the frequency ................................................................................................... 22 3.6 Securing the locks of a swivel head hammer................................................................... 22 Page 4 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 5. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 3.7 Clamps.............................................................................................................................. 23 3.8 Safety chain...................................................................................................................... 23 4 SPECIAL OPERATIONS ................................................................................................25 4.1 Operating instructions for ICE-RF vibratory hammers .................................................... 25 4.2 Operating at low temperatures......................................................................................... 25 4.3 Operating under water (up to 10 m depth) ...................................................................... 26 4.4 Operating in deep water (> 10m deep) ............................................................................ 26 5 MAINTENANCE ..............................................................................................................28 5.1 General............................................................................................................................. 28 5.2 Daily maintenance............................................................................................................ 28 5.3 Weekly maintenace .......................................................................................................... 28 5.4 Monthly maintenance ....................................................................................................... 28 5.5 Yearly maintenance .......................................................................................................... 29 5.6 Lubrication intervals (operating hours of the hammer).................................................... 29 5.7 Recommended liquids...................................................................................................... 30 5.8 Heavy driving conditions .................................................................................................. 30 5.9 Long term storage ............................................................................................................ 30 5.10 Hydraulic oil...................................................................................................................... 30 5.11 Lubrication of the vibration case under extreme circumstances ..................................... 31 5.12 Maintenance of hydraulic circuit elements....................................................................... 32 5.13 Oil capacity ....................................................................................................................... 32 5.14 Bolt torque information..................................................................................................... 33 6 ORDERING OF PARTS ..................................................................................................35 6.1 Procedure ......................................................................................................................... 35 6.2 Original equipment ........................................................................................................... 35 6.3 Shipment .......................................................................................................................... 35 6.4 Shortages ......................................................................................................................... 35 6.5 Return of parts.................................................................................................................. 35 6.6 Screws and bolts .............................................................................................................. 35 6.7 Hoses................................................................................................................................ 36 6.8 Fittings .............................................................................................................................. 37 Page 5 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 6. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Preface This owner’s manual has been written for the users of ICE Vibratory hammers. The owner’s manual explains how to use, service and inspect the hammer, with the intention to use the vibratory hammer safe and efficiently. One copy of the present manual shall at any time be at the location where the hammer is in operation. When the instructions of this owner’s manual are not strictly followed, accidents may happen, therefore, check if you have understood all instructions in this manual before you start using the vibratory hammer. For ordering of parts we refer to the parts manual of the relating vibratory hammer. For the operation of the power pack which may be attached to the vibratory hammer, we refer to the owner’s manual of the relating manufacturer. If operational or maintenance problems arise which are beyond the scope of this manual, please contact your dealer. They are prepared to assist you in order to make the best use of your equipment. Please have the following at hand: • Model • Equipment serial number Page 6 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 7. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 1 SAFETY INSTRUCTIONS 1.1 General Foundation equipment and especially pile driving hammers including vibratory hammers are designed to transfer extremely high energy from the pile driver/extractor to a pile and the soil beneath. The forces generated, either through impact or through vibration are so high that without proper maintenance and skilful operation the equipment has to be considered as self destructive and dangerous. Never exeed the maximum line pull of the hammer. The maximum line pull is mentioned on specification sheet of the hammer. Also, the system is operating under high hydraulic pressure. Therefore pay special attention to the safety instructions and the operation and maintenance sections in the present manual 1.2 Safety precautions ICE accepts no liability for any damage or physical injury caused by non-compliance with the safety instructions in this manual or by carelessness during the installation, use, adjustment or maintenance of the equipment. Regularly maintenance and skilful operation will not only lengthen the mechanical life, but is essential for the safety of the user. WARNING It is the responsibility of the user or operator to ensure that the local health and safety regulations are observed before and during the use of the equipment. Operators • Only trained personnel shall be permitted to operate the hammer. • Temporary employees and trainees shall only be permitted to work with the equipment under the supervision and instruction of trained personnel. • The operator of the hammer shall be familiar with the contents of the Owner’s manual and shall follow the instructions accurately. Always • Watch a hammer in operation. Some parts might unexpectedly fail, fall down and injure people. Stop the operation IMMEDIATELY for a check if you expect that the above may happen. • Pay attention to irregular or unusual noises and analyse where they originate from. • Let the hammer cool down before you start maintenance or repairs on the hammer. • Warn colleagues when you feel uncomfortable with the way the hammer is functioning. • Stay away from moving or rotating parts. • Remove all tools and electrical cords before starting the hammer. • Use a safety chain on the sheet pile or casing Never • Run the hammer in horizontal position. • Stay nearby a working vibratory hammer. • Continue operation when it’s known that one of the safety provisions is out of order or not working properly • Continue operation when service inspection is due, or when a repair is necessary. • Make adjustments or repairs while the hammer is working. Page 7 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 8. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Tools • Never use defective (maintenance) tools. • Only use a tool for the purpose it was designed for. Clothing and footwear • When working with the equipment, do NOT wear rings, watches, jewellery or any loose clothing which could be caught in moving or rotating parts. • Always wear protective goggles, a safety helmet, protective footwear and hearing protection specially suited for the work. • Follow local health and safty regulations. Water and moisture • Do not allow water to enter the hydraulic system. • NEVER direct a jet of water at electrical parts. • Avoid internal condensation by rapid temperature changes • Make sure all protective devices of the electric installation (if applicable) have been installed to guarantee adequate protection from moisture and water. Failure to do so can result in malfunction of safety circuits and cause harm to personnel and equipment components. Technical specifications 1. The permissible limits for operationalconditions as mentioned in the present manual shall NOT be exceeded. Safeguards 2. Never change the settings of the valve(s) on the system. Only ICE service engineers are allowed to adjust these valves. Safety directions and warnings 3. Any safety direction, warning or instruction fitted on the equipment shall NOT be removed, rendered illegible or covered. They shall be present and legible throughout the entire operating life of the equipment. 4. Illegible, damaged or covered safety directions, warnings or instructions shall immediately be replaced or repaired. Service and maintenance 5. The service and maintenance activities shall only be carried out by qualified ICE personnel or one of ICE’s appointed and certified dealers in full compliance with all safety instructions and service intervals. Electrical system (if applicable) 6. Work on the electrical system or equipment shall only be carried out by skilled electricians. Hydraulic system 7. The hydraulic system is a high pressure high oil flow system. Work on the hydraulic equipment shall only be carried out by persons having special knowledge and experience in high pressure hydraulic systems. Use according to purpose 8. In order to guarantee correct operation, the equipment should only be used in accordance with the purpose as described in this owner’s manual. Suspension 9. Always assure proper suspension of the vibratory hammer before operation. Page 8 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 9. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 1.3 Safety signs on the hammer and the clamp 1.3.1 Safety signs on the free hanging vibratory hammer This part of the manual contains the description of the following vibratory hammers free hanging vibratory hammer types ICE - 625 ICE - 815C ICE - 6RF ICE - 32RF ICE - 416L ICE - 1223 ICE - 3220 ICE - 8RF ICE - 28RF(s) ICE - 32NF ICE - 1423C ICE - 6420 ICE - 11RF(s) ICE - 36RF(-ts) ICE – 54NF ICE - 423 ICE - 1412C ICE - 14RF ICE - 46RF ICE - 528 ICE – 250NF ICE - 18RF(-ts) ICE - 64RF ICE - 23RF Page 9 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 10. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 1.3.2 Safety signs on the SH & B-hammers This part of the manual contains the description of the following vibratory hammers Vibratory SH-hammer types ICE – 428SH ICE – 625SH ICE – 823SH ICE – 6RFSH ICE – 11RFSH ICE – 525SH ICE – 8RFSH ICE – 230B ICE – 528B ICE – 6RFB ICE – 11RFBs ICE – 14RFB ICE – 328B ICE – 625B ICE – 8RFB ICE – 11RFB ICE – 18RFB ICE – 428B ICE – 825B ICE – 1223B Page 10 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 11. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 1.4 Safety instructions HAZARD DESCRIPTION HOW TO PREVENT Safety sign Read the operation manual Make sure the machine is in good condition Read the maintenance instructions in the owner’s manual for proper service procedures Surface can be hot Do not touch, allow the surface to cool down. Crushing of finger(s) or hand(s) Never reach into the danger area as long as parts may fall down Parts may fall down Stay at a safe distance from the machine Component is pressurised Depressurise before maintenance Page 11 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 12. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 1.5 Limits for operational conditions As with all machinery there is a limit for the operational conditions under which the machinery is expected to operate safe, long lasting and efficiently. For vibrating, ICE defines these limit conditions for REFUSAL and REBOUND as shown below. 1.5.1 Refusal Refusal under NORMAL conditions: Less than 25 cm penetration per 5 min (10” per 5 min) The penetration distance of 25 cm is absolute, no conversion is allowed to, for instance, 1 meter per 60 minutes. 1.5.2 Rebound Rebound occurs when a large portion of the hammer’s energy is transfered back into the pile as a result of force reflection at the pile tip. This may be due to the pile hitting a nearly impenetrable layer or obstruction. The rebound forces will be transferred back into the hammer and the hammerhead (suppressor head), as a result of which the head will start “jumping” relative to the vibratory case. In this situation driving should be stopped immediately and the hammer should be retracted. 1.5.3 Max. bearing temperatures The maximum bearing temperature, as measured on the bearing covers (after some paint is removed), should not exceed 90 ˚C (194 ˚F). IMPORTANT: ICE will not accept any warranty claims when the above conditions are not adhered to. 1.6 Incorporated safety precautions The hammer has a number of built-in safety provisions which ensure that the risk for failures, human injuries and environmental pollution is reduced to a minimum. 1. The hammer cannot be put in operation when the clamp is open. 2. A pilot-operated check valve on the clamp ensures that the clamp pressure is maintained in case one of the clamp hoses fails. 3. Individual pressure relief valves in pressure line, both clamp lines and leak oil line avoid over pressurizing these lines. 4. Stopper blocks maintain a connection between vibration case and suppressor housing in case of elastomer failure. All above mentioned safety precautions should be folowed when the hammer is driven by an ICE powerpack. Precautions 2 & 4 should be followed by excavator mounted hammers. Maintenance schedule Before operation the hammer, check the maintenace scedule. See chapter 5 Maintenance of the manual. Page 12 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 13. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 2 DESCRIPTION OF THE EQUIPMENT 2.1 Description of the free hanging vibratory hammers This part of the manual contains the description of the following vibratory hammers free hanging vibratory hammer types ICE - 625 ICE - 815C ICE - 6RF ICE - 32RF ICE - 416L ICE - 1223 ICE - 3220 ICE - 8RF ICE - 28RF(s) ICE - 32NF ICE - 1423C ICE - 6420 ICE - 11RF(s) ICE - 36RF(-ts) ICE – 54NF ICE - 423 ICE - 1412C ICE - 14RF ICE - 46RF ICE - 528 ICE - 250NF ICE - 18RF(-ts) ICE - 64RF ICE - 23RF 2.1.1 The main components the free hanging vibratory hammers The hammer consists of 2 main components: 1. vibration case 2. suppressor housing The hammer can be equipped with a hydraulic clamp. 3. hydraulic clamp (option) 2 1 3 2.1.2 The vibration case The vibration case contains eccentric weights which rotate in a vertical plane to create vibration. The eccentric weights are driven by one, two or four hydraulic motor(s) mounted on the outside of the vibration case. The motor(s) and the eccentrics are gear connected to maintain proper synchronisation. The eccentric shafts are mounted in heavy-duty roller bearings. Lubrication is provided by a splash lubrication or by a forced lubrication system. 2.1.3 The suppressor housing The extraction head contains rubber elements (elastomers) to isolate the vibrations from the vibration case to the crane or pile driving rig. The hammer is attached to the crane with a steel wire rope sling. Page 13 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 14. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 2.1.4 The clamp (option) The hydraulic clamp contains two gripping jaws, one fixed and one moveable. An in the clamp body integrated cylinder operates the moveable jaw. The clamp cylinder is provided with a pilot operating check valve which keeps the clamp cylinder under pressure in case of hose damage. 2.1.5 Rigging of vibrator A steel wire rope sling must be connected to the lifting pin of the suppressor housing. The required strength of this sling depends on the capacity of the crane and the work to be carried out. A safety factor of five is recommended. Several turns of a smaller diameter cable will usually last longer than one turn of a larger diameter cable. Daily check steel wire rope sling for damage. Immediately replace damaged steel wire rope sling. Refer to the table on the next page for general guidance on slings or grommets. Always check for local regulation(s) on steel wire rope sling. General guidance for slings or grommets: Max. Hammer type Grommet Allow. Single Allow. Double linepull diameter work load work load 120kN 625; 6RF; 8RF 24mm 6200 kg 12400 kg 180kN 11RF(s) 33mm 11880 kg 17820 kg 240kN 1223;1423C; 14RF; 18RF(-ts) 39mm 16520 kg 24780 kg 360kN 416L; 23RF; 28RFs; 32RF 54mm 31820 kg 47730 kg 400kN 423; 3220; 815C 54mm 31820 kg 47730 kg 500kN 6420; 28RF; 36RF(-ts) 57mm 35340 kg 53010 kg 800kN 1412C; 250NF; 46RF; 64RF 54NF 72mm 56100 kg 84150 kg 1200kN 1412C; 250NF 120mm 80400 kg 120600 kg 2.1.6 Installation Please refer to the installation sheet of your hammer Page 14 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 15. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 2.2 Description the B-hammers This part of the manual contains the description of the following vibratory hammers Mini vibratory hammer types ICE – 230B ICE – 428B ICE – 6RFB ICE – 11RFBs ICE – 14RFB ICE – 18RFBTS ICE – 328B ICE – 625B ICE – 8RFB ICE – 11RFB ICE – 18RFB ICE – 825B ICE – 1223B 2.2.1 Introduction The B-hammer can be used for the following purposes: • To compact ground / base material / ditches etc. • To vibrate piles / sheet piling / profiles etc. into the ground. • To extract piles / sheet piling / profiles etc. out of the ground. 2.2.2 The main components The hammer consists of 3 main components: 1. rotator 2. extraction head 3. vibration case The hammer is provided with a manifold to limit the oil flow, and to control the hydraulic clamp (optional) and the rotary actuator (optional). 4. manifold 5. hydraulic clamp (option) 2.2.3 The vibration case The vibration case contains eccentric weights which rotate in a vertical plane to create vibration. The eccentric weights are driven by a hydraulic motor mounted on one of the bearing covers. The motor and the eccentrics are gear connected to maintain proper synchronisation. The eccentric shafts are mounted in heavy-duty roller bearings. Lubrication is provided by a splash system, activated by the rotating eccentrics and gears, or a forced lubrication system. Page 15 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 16. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 2.2.4 The extraction head The extraction head contains rubber elements (elastomers) to isolate the vibrations from the vibration case going into the boom of the excavator. The hammer is attached to the excavator with a rotator. 2.2.5 The clamp (option) The hydraulic clamp contains two gripping jaws, one fixed and one moveable. An in the clamp body integrated cylinder operates the moveable jaw. The clamp cylinder is provided with a pilot operating check valve which keeps the clamp cylinder under pressure. In case of hose damage or drop of pressure and/or flow to the clamp, the operation should be stopped immediately. The clamp cylinder is operated by a hydraulic control in the cabin of the excavator When operating the clamp please make sure nobody is within the working area of the vibratory hammer. 2.2.6 Attaching the hammer to the excavator To operate the vibratory hammer by means of an excavator, one needs to make two types of connections between excavator and hammer. • Mechanical connection • Hydraulic connection 2.2.7 Goose neck / mounting fork (option) The gooseneck is an extension for the excavator boom. The goose neck can be mounted in different ways, depending on the connection. 1 = Goose neck 2 = Mounting fork By using a gooseneck the lifting height and the reach of the excavator will increase. Working with a gooseneck changes the momentom applied to the excavator by the vibratory hammer. Please consult the excavator supplier for maximum boom and load lengths. To attach the hammer to the goose neck or excavator, ICE can supply a suitable mounting fork. Important Working with a gooseneck requires a learning period! Page 16 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 17. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT CAUTION When using a gooseneck, please check that reach and lifting capacity of the excavator are sufficient in order to avoid tilting of the axcavator. 2.2.8 Installation Please refer to the installation sheet of your hammer 2.3 Description of the SH-hammer This part of the manual contains the description of the following vibratory Hammers Vibratory SH-hammer types ICE – 428SH ICE – 625SH ICE – 825SH ICE – 6RFSH ICE – 11RFSH ICE – 525SH ICE – 8RFSH 2.3.1 Introduction The SH-hammer can be used for the following purposes: • To compact ground / base material / ditches etc. • To vibrate piles / sheet piling / profiles etc. into the ground. • To extract piles / sheet piling / profiles etc. out of the ground. 2.3.2 The main components The hammer consists of 3 main components: 1. rotator 2. swivelling extraction head 3. vibration case The hammer is provided with a manifold to limit the oil flow, and to control the hydraulic clamp (optional) and the rotary actuator (optional). 4. manifold 5. hydraulic clamp (option) Page 17 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 18. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 2.3.3 The vibration case The vibration case contains eccentric weights which rotate in a vertical plane to create vibration. The eccentric weights are driven by a hydraulic motor mounted on one of the bearing covers. The motor and the eccentrics are gear connected to maintain proper synchronisation. The eccentric shafts are mounted in heavy-duty roller bearings. Lubrication is provided by a splash system, activated by the rotating eccentrics and gears, or a forced lubrication system. 2.3.4 The swivelling extraction head The extraction head contains rubber elements (elastomers) to isolate the vibrations from the vibration case going into the boom of the excavator. The hammer is attached to the excavator with a rotator. 2.3.5 The clamp (option) The hydraulic clamp contains two gripping jaws, one fixed and one moveable. An in the clamp body integrated cylinder operates the moveable jaw. The clamp cylinder is provided with a pilot operating check valve which keeps the clamp cylinder under pressure. In case of hose damage or drop of pressure and/or flow to the clamp, the operation should be stopped immediately. The clamp cylinder is operated by a hydraulic control in the cabin of the excavator When operating the clamp please make sure nobody is within the working area of the vibratory hammer. 2.3.6 Goose neck / mounting fork (option) The gooseneck is an extension for the excavator boom. The goose neck can be mounted in different ways, depending on the connection. 1 2 1. Goose neck 2. Mounting fork By using a gooseneck the lifting height and the reach of the excavator will increase. Working with a gooseneck changes the momentom applied to the excavator by the vibratory hammer. Please consult the excavator supplier for maximum boom and load lengths. To attach the hammer to the goose neck or excavator, ICE can supply a suitable mounting fork. Page 18 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 19. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Important Working with a gooseneck requires a learning period! CAUTION When using a gooseneck, please check that reach and lifting capacity of the excavator are sufficient in order to avoid tilting of the axcavator. 2.3.7 Attaching the hammer to the excavator To operate the vibratory hammer by means of an excavator, one needs to make three sorts of connections between excavator and hammer. 1. Mechanical connection 2. Hydraulic connection 3. Electrical connection Mechanical connection The vibrator has to be connected mechanically to the boom of the excavator by means of a suitable adaptor. In co-operation with ICE and/or the supplier of the excavator, each operator can determine for himself the most suitable adaptor for the hammer. Hydraulic connection There are 3 hydraulic connections between hammer and excavator. • pressure hose • return hose • leak oil hose The leak oil hose should always be connected to the hydraulic tank without any restrictions. This secures that the leak oil hose will not be pressurized. IMPORTANT! • As the lay-out of the hydraulic system and hydraulic hoses can differ, each operator has to judge for himself in co-operation with ICE and/or the supplier of the excavator how to connect the hammer to the excavator in the most suitable way. • The connections should be clean before they are connected. • Always connect the hydraulic lines to an excavator with a double-action hydraulic function. 2.3.8 Installation Please refer to the installation sheet of your hammer Page 19 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 20. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 3 OPERATION In case of a pile driving rig, parts of the controls may be integrated in the pile driving rig and/or excavator. In such a case, please refer to the operating and maintenace manual of pile draving rig and/or excavator. CAUTION Make sure to have a clear view over the vibrator and the working area. Ensure that communication between the crane driver and other operators is always possible. WARNING Stay clear from the direct surrounding of the vibrator Always allow the machine to warm-up by running at low RPM for some moments when starting. The vibratory hammer may be operated from a cable pendant, a remote control or from the IQAN PLC of the power pack. 3.1 Clamping a pile Position the vibratory hammer first over and than on the sheetpile. Turn the clamp switch to close. Don’t start vibrating until the hydraulic clamp has reached maximum clamping pressure to permit vibration to begin. The clamp light on the power pack (if applicable) will light up when the hydraulic clamp has achieved adequate clamping pressure. The light will normally light up in a few seconds. Always use a safety chain or sling between the sheet pile or tube and the piling rig. Danger Improper clamping may result in sheet pile and/or tubing releasing the clamp. 3.1.1 Picking up sheet pileswith a swivel head hammer This part of the manual contains the description of the following vibratory hammers Vibratory SH-hammer types ICE – 428SH ICE – 625SH ICE – 825SH ICE – 6RFSH ICE – 11RFSH ICE – 525SH ICE – 8RFSH Picture 1 • Lift a sheet pile with a hoisting chain. • Place a beam between the sheet piles. • Make sure that hammer is in reverse so the lock pins of the swivel head are not pressurised. Page 20 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 21. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 1 2 Picture 2 • Lower the hammer with the pile feed • Guide on the sheet pile, the hammer starts swivelling. Picture 3 • When the hammer is fully swivelled (90°),make sure that the clamp is slide completely over the sheet pile before closing the clamp. Picture 4 • After closing the clamp, the hammer • Can be lifted with the sheet pile. • When the sheet pile is lifted completely, the hammer should be swivelled back in vertical position. • Always secure the sheet pile mechanically from falling with a chain or sling. 3 4 3.2 Starting/stopping vibration Turn the vibration switch to start/forward or press the start button to start vibrating. Turn the vibration switch to stop/reverse or press the stop button to stop vibrating. CAUTION Never use the emergency stop button for normal stops. Page 21 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 22. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 3.3 Off-clamping from a pile Turn the clamp switch to open to release the hydraulic clamp so that the vibrator can be removed from the pile. Never open the clamp before the vibratory hammer has come to a complete stand still. Make sure , the pile or casing can not drop from the clamp when the clamp is opened. CAUTION Check if lifting line is slightly under tension before the clamp pressure is released. Do not turn the switch to open until a visual check indicates that vibration has stopped 3.4 Emergency stop For an emergency stop, press the button on the power pack, crane, pile driving rig? or the remote control. CAUTION Before continuing operation reset the emergency stop button by turning it clockwise. Always reset the emergency stop button immediately after the hammer and power pack have been shut down completely. 3.5 Changing the frequency In order to provide maximum flexibility in achieving optimum piling penetration and extraction rates, the frequency of the vibrator is adjustable. The frequency can be varied by changing engine speed. Engine speed is changed with the engine throttle or rpm +/- switch on the dashboard or on the remote control. 3.6 Securing the locks of a swivel head hammer This part of the manual contains the description of the following vibratory hammers Vibratory SH-hammer types ICE – 428SH ICE – 625SH ICE – 825SH ICE – 6RFSH ICE – 11RFSH ICE – 525SH ICE – 8RFSH • The hydraulic locks on the swivelling extractor head will be activated when port “P” is pressurized . • Make sure that the swivelling extractor head is put up straight before starting vibration • If the swivelling extractor head is not put up straight, when vibrating, the hydraulic locks will not be locked properly, and damage may occur. • Therefore you have to make sure that the swivelling extractor head is put up straight before activating the hydraulic locks. • For unlocking the hydraulic locks, stop vibrating and pressurize port “T”. Page 22 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 23. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Not ready for operation Ready for operation Put up straight first. 3.7 Clamps Please refer to your clamp manual for operating instructions. 3.8 Safety chain ICE clamps are equipped with a check valve to prevent a sheet pile from falling in case of hose fracture. This is a hydraulic safetyy measure. However, clamp failure is always possible. Therefore it is compulsory to have a mechanical safety precaution to prevent the sheet pile from falling down. An additional mechanical safety measure shall be used. A safety chain shall be used to maintain a fixed connection between sheet pile or tubing and the rig in case of a hydraulic failure. Available safety chains from ICE Part number Description Related macnines 0503201 Assembly consisting of 11RFB, 1223B, 14RFB, 18RFB, 11RFSH, 1100H 0509003 Safety chain max. load 3150kg 0509002 D-shackle 9110213 Assembly consisting of 230B, 328B, 428B, 528B, 625B, 825B, 923B, 6RFB, 8RFB, 9110009 Safety chain max. load 1600kg 230SH, 328SH, 428SH, 528SH, 625SH, 825SH, 923SH, 0509002 D-shackle 6RFSH, 8RFSH Warning This chain is for safety measure only. Do not lift or extract sheet piles by means of this chain. When driving or extracting a sheet pile, ALWAYS use this mechanical safety precaution! Use of the chain: • Make a hole in the sheet pile just big enough to get the chain through. (see drawing below) • Attach the chain to the clamp or vibratory hammer using the D-shackle. • Clamp the sheet pile. Page 23 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 24. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Hole diameters: • Safety chain 0509003: ø 60mm minimum, ø 65mm maximum to avoid the chain from falling out. • Safety chain 9110009: ø 40mm minimum, ø 45mm maximum to avoid the chain from falling out. Page 24 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 25. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 4 SPECIAL OPERATIONS 4.1 Operating instructions for ICE-RF vibratory hammers ICE Resonance Free vibratory hammers allow starting up and stopping the vibratory hammer without vibration. This is achieved by shifting the upper row eccentrics with respect to the lower row of eccentrics. The total eccentric moment of the hammer can be varied from 0 -100%. For this reason there is/are one or two actuator(s) on the hammer. eccentric moment 100% eccentric moment 0% Actuators eccentics Proceed as follows: • Start the diesel engine and warm-up as described in the operating manual of the power pack. • Increase the diesel engine rpm. • Hold the ecc mom switch on the remote control in [-] position until pressure has reached 190 bar. This will take a few seconds. • Start the hammer. • Wait until the eccentrics rotate at full speed. • Hold the ecc mom switch on the remote control in [+] position until the required amplitude or maximum vibration level is reached. • To stop the hammer proceed in reverse order. 4.2 Operating at low temperatures When using the hammer at low ambient temperatures (below 10°C), please make sure that you carry out the following instructions • When starting the hammer never run the hammer at maximum rpm immediately. Allow the machine and the oils to warm-up. • Make sure that the bearings get enough oil by taking off one of the bearing covers (with forced lubrication hammers at the position furthest away from the oil input location.) • The lubrication oil may be changed for a lower viscosity oil. However, care should be taken to have the correct oil viscosity at operational temperature. In case of doubt, measure hydraulic oil and vibration case lubrication oil temperaures and contact ICE with these values. • One should check the oil viscosity also at higher temperatures as the hammer warms up rapidly at full speed. Page 25 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 26. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 4.3 Operating under water (up to 10 m depth) It is recommended to contact ICE for under water operation. Pay attention to the following when operating under water with the vibratory hammer: • Check the seals and gaskets (O-rings, gasket between vibration case and vibration case adapter). • Check all bolt connections. • Remove the vibration case breather and replace it by a plug. • Check for possible leakage by increasing the pressure in the vibration case to approx. 0.2 bars. • Check all hydraulic hoses for leakage. • Check the oil level in the vibration case (case level) • Connect the vibration case to a compressor and increase the pressure in the vibration case to 0.5 bars over pressure. • Increase the air pressure to 1.0 bar overpressure when the hammer is at 5 m below the water line. In this way there is a constant excess pressure of min. 0.2 bars and max. 0.5 bars present. • During under water operation regularly check the oil level. If the oil becomes white/grey check immediately for leakage and replace the oil. • Check the lubrication oil after completing the work under water and change the oil when required CAUTION Watch carefully that the hammer is not “hot” when lowered or driving through the water surface. This may cause a thermo-shock and damage the vibration case and its contents. CAUTION Excess pressure of more than 0.5 bar may damage the transmission case. In case of water depths of over 10 m, always use the air regulation system for under water operation. CAUTION Check lubrication oil regularly during and in any case after completion on water content. Water may also enter the case as condensate from non-dried compressed air. 4.4 Operating in deep water (> 10m deep) Contact ICE for preparation for deep water operation. An air regulating system must be installed for deep water operation. Air regulation system Before operating, read and check the vibratory hammer according to chapter 5 of this manual. Connect the air regulating system to an air compressor with an air buffer. The air pressure you need under water is 1/10 of the depth in meters. For example, 200 meters under water = 200 x 1/10 + 1.1 bar* = 21.1 bar Page 26 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 27. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT WARNING By lowering and retrieving the hammer be aware of the maximum speed of 15 mtr/min. Testing the air regulating system • Disconnect the hose (b) from air valve R. • Screw a plug in the hose connector . • Start the compressor. At 1.1 bar over-pressure the safety valve S will be opened (you can hear the valve breath out).The 1.1 bar overpressure is needed to avoid leaking seawater into the vibration gearbox. Maintenance After operating under water check the oil of the vibration gearbox. (refer to chapter 5) Check the membrane of the air regulating valve every 6 months by removing the screws of the cover. When it’s damaged, replace it. Page 27 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 28. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 5 MAINTENANCE DANGER All maintenance work is strictly reserved to qualified and authorized personnel. Except for the visual inspections, all maintenance work must be carried out with the diesel engine stopped. Make sure that the main power switch is in OFF position. Install a DO NOT OPERATE or similar warning label to the main power switch. 5.1 General Preventive maintenance includes normal servicing in order to keep the vibratory hammer in operation condition and prevents unnecessary breakdowns. The preventive maintenance consists of periodic inspection and exchange of the liquids, filters and moving parts of the unit. Lubrication is essential for the system, determining to a great extent the useful life of the vibratory hammer. Therefore it is important that the instructions regarding types of oils and exchange intervals are closely adhered to. • Prevent dirt from entering lubricants and the system. • Thoroughly clean all lubrication fittings, caps, filter plugs and level plugs and their surrounding surfaces before servicing. 5.2 Daily maintenance The daily instructions apply to routine or daily starting of a vibratory hammer. • Each day -or at the beginning of each shift- check the entire vibratory hammer before start-up, after start-up and during operation. • Before start-up, proceed as follows: o Inspect all bolts, nuts and screws. If necessary tighten. o Check the oil level in the vibration case and if required fill to the proper level. The oil level shoull be between the middle and top of the sight glass. Change oil if it is milky or black o Visually check all hoses for signs of damage or cuts that may cause hose failure during operation. Be sure all connections are tight, especially the quick-disconnect couplers. o When the first steel layer of the hose is damaged, it should be replaced o Visually inspect all suppressor elastomers on cracks and loose bolts o Visually inspect for cracks in metal parts. • After start-up: o Check all hydraulic hoses for leaks. Make sure they hang freely with no kinks. o Check the hydraulic manifold and fittings for leaks. • During operation: o Be alert on rattling noises. These may indicate that one or more bolts have come loose. Check all bolts immediately and retighten them. o Rattling noises may also indicate gear case failures o Handle all hoses with care and pay attention that no sharp curves or bends occur. 5.3 Weekly maintenace • Tighten all bolts on the hammer and the hydraulic clamp. Always use a torch wrench. To obtain the listed torque, a steady pull should be exerted to the handle until the desired torque is reached. • Check the air breather, located on the side of the hammer. If necessary, clean the breather with diesel fuel. 5.4 Monthly maintenance • Check the proper functioning of the forced lubrication pump by removing a plug or a hose on the pressure side of the pump. • Check on the hour counter of the engine if the vibratory hammer is due for inspection or maintenance. • Check the functioning of the pump. Page 28 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 29. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 5.5 Yearly maintenance • Have the hydraulic fluid analysed by a local hydraulic service centre. Replace fluid if required. Refer to paragraph 5.7 Recommended liquids. • Replace the forced lubrication pump on the vibration case. • Have the hydraulic system inspected by ICE (authorized) service personnel. CAUTION Any contamination of the hydraulic fluid will drastically shorten the life of the high-pressure hydraulic system. 5.6 Lubrication intervals (operating hours of the hammer) INSPECTION INTERVALS BASED ON OPERATING HOURS VIBRATORY HAMMER Description Normal driving Heavy driving Min. conditions conditions First Interval First Interval Hammer Oil level Check level daily Lubrication oil vibration case 25 100 10 50 Yearly Main hydraulic filter (optional) 25 100 10 50 Yearly Cooler unit Filter forced lubrication system 25 100 10 50 Yearly Lubrication pump Monthly Every 2 weeks Yearly Bearings 500 250 Yearly Actuator (Optional) 500 250 Yearly Elastomers Check for hair cracks Daily Hoses Check for damaged steel wire Daily Clamp Check for leaks Daily Bolts, nuts and screws Check torque Daily CHANGE INTERVALS BASED ON OPERATING HOURS VIBRATORY HAMMER Description Normal driving Heavy driving Min conditions conditions First Interval First Interval Hammer Lubrication oil vibration case 50 200 25 200 Yearly Main hydraulic filter (optional) 50 200 25 200 Yearly Hydro engines 200 Every 5 years Cooler unit Filter forced lubrication system 50 200 25 200 Yearly Lubrication pump 500 500 Yearly Bearings 1500 1000 Every 3 years Actuator (Optional) 1500 1000 Every 3 years Elastomers Exchange when small haircracks are visible Every 5 years Hoses Exchange when first steel layer is damaged Every 2 years • When operating in an environmental air with high salt or moisture content, the service intervals need not to be changed. However, the unit shall be thoroughly inspected weekly to determine what additional servicing, if any, might be required. • During stand-by or inactive periods, the service intervals may be extended twice from those specified. Page 29 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 30. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 5.7 Recommended liquids TEMPERATURES NORMAL HIGH AMBIENT LOW EXTREME LOW AMBIENT AMBIENT AMBIENT -10°C < T < 55°C T > 55°C -20°C < T < 20°C -35°C < T < 20°C VIBRATION CASE Total Carter Total Carter Total Carter Total Carter FORCED LUB 75W140 75W140 75W90 75W90 VIBRATION CASE Total Carter Total Carter Total Carter Total Carter SPLASH LUB SH 460 SH 460 SH 460 SH 460 HYDRAULIC OIL Total Total Total Total EQUIVIS XV EQUIVIS ZS 46 EQUIVIS ZS 68 EQUIVIS ZS 32 32 Alt. Total EQUIVIS XV 46 BIO OIL Total BIOHYDRAN Total BIOHYDRAN not recommended not recommended TMP 46 SE 46 ENGINE OIL Total Rubia TIR 7400 5W30 ENGINE COOLANT 50% Total GLYCOLFREEZE + 50% water + additive 5.8 Heavy driving conditions The following conditions have to be considered heavy driving conditions • When the average temperature is above +30°C or below -20°C • When operating in excess of 8 hours per day • Leader guided machines are considered heavy driving conditions. 5.9 Long term storage Should the hammer not be used for any extended period of time (approximately 2 – 3 months), the gear case lubrication oil should be removed and the complete gear case be filled by any type of oil. The hammer should preferably be stored vertical, otherwise with the hydraulic motors facing upwards. When laid down the hammer head should be supported slightly higher than the clamp to ensure that the bearings facing upwards are filled with oil as well and are not trapped in an air gap. If it is not possible to fill up the gear case with oil, the hammer should be run at least every 3 to 4 weeks. 5.10 Hydraulic oil New power units are shipped with Total Equivis ZS 46 hydraulic oil, unless otherwise specified by the client. Check label in power pack for actual oil type. When replacing fluid other than this, use a fluid with the following specifications: Viscosity index 150 Viscosity (mm²/s) 46,6 @ 40°C 31,3 @ 50°C 8,2 @ 100°C ISO.VG 46 DIN 51524 HLP 25 When operating in arctic conditions, it is recommended to use an immersion heater to preheat the oil prior to starting. It may also be necessary in extreme cold or hot climates to use a different viscosity oil which is better adapted to adverse conditions • Contact the nearest oil supply representative for suggested procedures Page 30 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 31. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Biodegradable hydraulic oil It is allowed to use biodegradable oil in combination with ICE equipment, but only if the biodegradable oil is an ester-type oil with the same specifications as the mineral oil used by ICE. Operating the hammer with other types of biodegradable oil is not allowed. Should you have any doubt, please contact ICE before using the oil. Lubrication oil vibratory gear case The fluid level is easily read through the side-glass located at the lower centre of the long side of the vibratory case (motor side). Under normal gear case temperatures the level of the lubrication oil shall be at mid-level of the side glass. Lubrication gear oil may be added when necessary through the special filling plug or through the vibration case top plate, above the motor recess. The oil may be drained by removing the plug at the motor end of the base plate. The most preferred lubrication oil is a synthetic lubricant, since synthetics were designed for applications where service conditions are more severe due to high operating temperatures. Moreover they have good oxidation stability. Synthetics also provide considerably longer service life than natural, petroleum-based lubricants consequently resulting in less maintenance hours spent on the mechanic service of the unit. The vibration case lubricant (synthetic). Viscosity index Total Total 150 155 Viscosity (mm²/s) 218,0 @ 40°C 430,0 @ 40°C 137,6 @ 50°C 264,5 @ 50°C 25,9 @ 100°C 44,5 @ 100°C ISO.VG 220 460 The vibration case lubricant installed at the factory is Total Carter SH 220 for systems with forced lubrication and Total Carter SH 460 for systems with splash lubrication. When replacing the lubricant, a gear oil with the following specifications must be used: 5.11 Lubrication of the vibration case under extreme circumstances Extreme circumstances are e.g.: • Outside temperature over 55°C. • Soil compaction , semi-continuous operations like installation of drains, installation of diaphragm walls, etc. • Long driving times at high operating pressure. • Rebound In these cases, the temperature in the vibration case may rise to 60°C - 70°C. Please contact ICE with actual vibration case temperature for recommendations on lubrication oil and special instructions. Page 31 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 32. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 5.12 Maintenance of hydraulic circuit elements NOTE: Check al lines, hoses and connections regularly for leaks and obvious damage. Repair damage immediately; splashed oil may cause injuries, fire and contaminations. CAUTION Any contamination will drastically shorten the life of the high-pressure system. Therefore, the hydraulic oil should be kept clean and no dirt should enter when (re-)filling. 5.13 Oil capacity Oil capacities per model model Quantity (l) model Quantity (l) model Quantity (l) ICE - 625 ±4 ICE - 6RF ± 14 ICE - 416L ± 10 ICE - 1223 ± 15 ICE - 8RF ± 14 ICE - 32NF ± 10 ICE - 1423C ± 18 ICE - 11RF(s) ± 20 ICE – 54NF ± 55 ICE - 423 ± 45 ICE - 14RF ± 27 ICE - 18RF(-ts) ± 27 ICE - 815C ± 70 ICE - 23RF ± 40 ICE - 3220 ± 60 ICE - 32RF ± 40 ICE - 6420 ± 50 ICE - 28RF(s) ± 40 ICE - 1412C ± 80 ICE - 36RF(-ts) ± 60 ICE – 250NF ± 80 ICE - 46RF ± 110 ICE - 64RF ± 73 NOTE: When an oil cooler for forced lubrication is used: 25l extra for cooling system. Page 32 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 33. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 5.14 Bolt torque information The following torque specifications apply to the bolts from the component assemblies listed. Whenever any of these bolts are replaced, the given torque specifications shall be adhered to. Refer to the tables next page. Tightening moment and force for UNC bolts with coarse pitch Tightening force [KN] Tightening moments [Nm] Diameter Pitch Class Class Class Class Class Class [mm] [mm] 8.8 10.9 12.9 8.8 10.9 12.9 1/4'' 4.2 8.0 11.3 13.5 10 14 17 5/16'' 3.7 13.2 18.5 22.3 20 28 33 3/8'' 3.4 20.8 29.2 35.1 38 53 64 7/16'' 3.3 28.5 40.1 48.1 60 85 102 1/2'' 3.1 38.0 53.4 64.1 91 129 154 5/8'' 2.9 60.5 85.0 102 178 250 300 3/4'' 2.7 89.4 126 151 309 435 522 7/8'' 2.5 129 182 218 514 723 867 1'' 2.5 169 238 286 774 1088 1306 1 1/4'' 2.3 271 381 457 1532 2154 2585 1 1/2'' 2.2 392 552 662 2659 3740 4488 Tightening moment and force for UNC bolts with fine pitch Tightening force [KN] Tightening moments [Nm] Diameter Pitch Class Class Class Class Class Class [mm] [mm] 8.8 10.9 12.9 8.8 10.9 12.9 1 1/8''x12 2.12 247.4 347.9 417.4 1229 1728 2073 1 1/4''x12 2.12 310.3 436.3 523.6 1704 2397 2876 Page 33 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 34. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Tightening moment and force for metric bolts with coarse pitch Tightening force [KN] Tightening moments [Nm] Diameter Pitch Class Class Class Class Class Class [mm] [mm] 8.8 10.9 12.9 8.8 10.9 12.9 M6 1.0 8.2 11.6 13.9 10 14 16 M8 1.3 15.0 21.1 25.3 23 33 39 M10 1.5 23.8 33.4 40.1 46 64 77 M12 1.8 34.5 48.5 58.2 78 110 132 M14 2.0 47.3 66.5 79.8 125 176 211 M16 2.0 66.2 93.1 112 198 278 333 M18 2.5 81.3 114 137 275 387 465 M20 2.5 103 145 174 386 542 651 M22 2.5 128 180 216 522 734 881 M24 3.0 149 209 251 667 937 1125 M27 3.0 194 273 327 966 1358 1630 M30 3.5 237 333 400 1318 1854 2225 M33 3.5 293 431 517 1788 2628 3154 M36 4.0 345 507 609 2297 3377 4053 M39 4.0 412 606 727 2950 4338 5205 M42 4.5 473 696 835 3669 5394 6473 M48 5.0 623 915 1098 5504 8091 9709 M56 5.5 857 1261 1513 8842 12999 15599 M64 6.0 1130 1662 1994 13199 19405 23286 Tightening moment and force for metric bolts with fine pitch Tightening force [KN] Tightening moments [Nm] Diameter Pitch Class Class Class Class Class Class [mm] [mm] 8.8 10.9 12.9 8.8 10.9 12.9 M16x1.5 1.5 74.9 105 126 219 309 370 M20x1.5 1.5 122 171 205 440 619 743 M24x2 2.0 172 242 291 752 1057 1268 M30x2 2.0 278 391 470 1503 2113 2535 M36x3 3.0 387 545 654 2536 3567 4280 Page 34 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 35. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 6 ORDERING OF PARTS 6.1 Procedure When ordering parts, be sure to include the model and serial number of the unit or component. confirm all telephone and/or e-mail orders immediately to avoid duplicating shipment. 6.2 Original equipment Where serial numbers are given, these numbers only apply to equipment and components originally furnished with the unit. Where equipment has been changed or added to, these numbers may not necessarily apply. 6.3 Shipment State to whom shipment is to be made and method of shipment desired, otherwise our own judgement will be made. 6.4 Shortages Claims for shortages or errors shall be made immediately on receipt of parts. No responsibility will be assumed for delay, damage or loss of material while in transit. Broken, damaged or loss of material shall be refused or a full description made of damage or loss to the carrier agent on the freight or express bill 6.5 Return of parts If for any reason you desire to return parts to the factory or to any distributor from whom these parts were obtained, first secure permission to return the parts. Shipping instructions will be given along with this permission 6.6 Screws and bolts Almost all connections on the unit are made with socket-head cap (Allen) screws. These high-strength screws are available at most industrial supply houses. Screws and bolts are designated in the PARTS LIST in abbreviated form. The information, in parenthesis, immediately following the bolt or screw designation shows the size as follows: ½ - 13 x 1 ½ ½” Diameter 13 Threads Per Inch 1 ½" Length NOTE: Some screws or bolts require a specific torque when replacing. For identification of these bolts and a more thorough understanding of torque, refer to section 5.14 ABBREVIATIONS USED BHCS Button Head Cap Screw HSSS Hex. Socket Set Screw FHCS Flat Head Cap Screw PHMS Philips Head Machine Screw FLCS FLanged head Cap Screw RHMS Round Head Machine Screw HC High Collar SHCS Socket Head Cap Screw HHCS Hex. Head Cap Screw SHPP Socket Head Pipe Plug HHPP Hex. Head Pipe Plug SHSS Socket Head Shaller Screw Page 35 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 36. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 6.7 Hoses EXAMPLE OF HOSE DESIGNATION A B C D E F G H I J HOSE 125 R01 F 9 24 P 0 20 LO395 S Explanation of hose codes A HOSE I.D. (3 digits) B SAE or MANUFACTURER RATING (3 digits) (125 = 1/14”) (050 = ½”), etc. (PT4 = Power Track) In inches; 2 place decimal (R01 = SAE Rating 100R1), etc. C FIRST END – TYPE OF FITTING (1 digit) D FIRST END – BEND ANGLE (1 digit) (F = 3000 PSI Flange) (P = NPT-male) (0 = None) (3 = 30°) (9 = 90°),etc. (H = 6000 PSI Flange) (M = JIC-male) (J = JIC-female swivel), etc. E FIRST END – SIZE(2 digits) F SECOND END – TYPE OF FITTING (1 digit) (In 1/16th) (See codes for first end) G SECOND END – BEND ANGLE (1 digit) H SECOND END – SIZE (2 digits) (See codes for first end) (in 1/16th) I LENGTH J SPECIAL CODES In inches; 1 place decimal (0 = None) (0395 = 39 ½”) (1240 = 124”), etc. (S = Spring Guard) (L = S.S.Braid) (D = Offset) Page 36 of 38 ISO-9001 : 2000 certified company subject to change without notice
  • 37. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT 6.8 Fittings EXAMPLE OF FITTING DESIGNATION A B C D E F G H I J K L M FITT 2 L 16 M 12 J 0 0 00L 0 0 0 1 Explanation of fitting codes A SELECTOR INDEX B CONFIGURATION OR SHADE OF FITTING 2: inch fittings S: Straight fitting C: Cap 9: metric fittings L: 90° elbow P: Plus V: 45° elbow U: Union, pipe T: Tee X: Cross (fourth end fitting required). C FIRST END SIZE D FIRST END FITTING STYLE In sixteenth of an inch (index 2) See fitting style selector chart. In millimetres (index 9) Exceptions: 90 = 10” 94 = 14” 98 = 8” 92 = 12” 96 = 6” 99 = none code size See general specification sheet for sequence of order. E SECOND END SIZE F SECOND END FITTING STYLE If applicable. See first end size. If applicable. See first end fitting style. G THIRD END SIZE H THIRD END FITTING STYLE If applicable. See first end size. If applicable. See first end fitting style. FOURTH END SIZE (crosses only) FOURTH END FITTING STYLE (crosses only) See first end fitting size or end style. See first end fitting size or end style. I LENGTH CODE pipe nipples (long) only J INSTALLATION AID OR STYLE OF HEAD (in decimal inches for index 2) 0: not applicable. 050 = 5.0 inches 105 = 10.5 inches H: regular hex. In millimetres for index 9 W: wide or large hex. 120 = 12.0 inches 084 = 8.4 inches Q: square head (ext.) R: square head (int) LENGTH CODE (elbows / nipples) S: hex. head (int. socket) 00L – long (elbow) 00C – close (nipple) T: hex. head (ext.) 00x – extra long (elbow) 00S – short (nipple) K PRESSURE RATING L SPECIAL NOTATIONS 0: not applicable 0: none 1: 125 lb A: tapped hole in fitting 3: standard weight (40) B: orifice 4: extra heavy (80) F: special fab., non-stock item. G: galvanized M: magnetic M MATERIAL 1: carbon steel 2: brass 3: cast brass 4: stainless steel 5: A.A.R. mal. Iron 6: maleable iron 7: cast iron 8: forged steel 9: aluminium Page 37 of 38 ISO-9001 : 2000 certified company Subject to change without notice
  • 38. Operation & Maintenance Instructions Vibratory Hammers INTERNATIONAL CONTRUCTION EQUIPMENT Page 38 of 38 ISO-9001 : 2000 certified company subject to change without notice