Operation Management – Term Project
Objectives:
1. Introduction / Structure,
2. Capacity Preferences,
3. Location Preferences,
4. Productivity Measures,
5. Product / Process Selection,
6. Differentiation Strategy,
7. Environmental effects,
8. Recent Projects,
9. Future Outlook,
10. Recommendations.
1. Introduction:
 La Montana is offering grand natural visit of
  Margalla Hills and Panoramic View of
  Capital City.
 Just 10 Km drive way from heart of
  Islamabad, Very Adventurous and lovely
  track up to PIRSOHAWA.
 La Montana Now offering party events,
  meetings and wedding arrangements.
 Open balconies, Halls for all activities and
  Large parking area.
   La Montana has added taste to the natural greatness, Making the
    Hill top most attractive for tourists and People seeking stunning
    natural beauty and mouth watering taste at one Place.
Organizational Structure
“Functional”:
                                              General
                                              Manager



                                                                   Food &
                    Operations
                                                                  Beverage
                     Manager
                                                                  Manager



HR manager   Accountant        Security   Store         Kitchen          Supervisor




                     Cash                                                 Floor
                                                         Chefs
                   Personnel                                             Manager




                                                        Cooks            Stewards




                                                         Dish
                                                        washers
2. Capacity Preferences:
   La Montana is increasing their Capacity with
    Preference of bringing more guests into the
    business to achieve competitive advantage.
Current Capacity
   The current capacity of La Montana restaurant is
    about 800 customers at area of max 15000 Square
    feet. There are three halls in la Montana:

   1 - Sapphire Hall,
   2 - Sapphire Patio Hall,
   3 - Emeral Deck Hall.
Sapphire Hall
   Sapphire Hall Capacity 300 guests and Area is 5000
    square feet.
Sapphire Patio
Hall




 Sapphire   Patio Hall Capacity is 250
  guests and Area is 5000 Square feet
Emeral Deck
Hall




   Emeral Deck capacity 250 guests and
    Area is 5000 Square feet.
3. Location Preferences:
   Pir-Sohawa is Islamabad‟s highest tourist Spot according to
    Wikipedia:
   http://en.wikipedia.org/wiki/Pir_Sohawa

   PIR-SOHAWA is ranked at 6th number in Pakistan by TRIP
    ADVISIOR.Com
   http://www.tripadvisor.com/Attraction_Review-g293960-
    d2435190-Reviews-Pir_Sohawa-Islamabad.html
3. Location Preferences:
   La Montana is located at 3000 feet above sea level and it is attracting
    Customer due to its cool and unique climate.

   Pir-Sohawa is the most famous and romantic place to visit for newly
    married couples and Students.
3. Location Preferences
   They have started a new project in December
    2011 to exploit this unique location.
   The main objective is to increase current capacity
    to 1200 guests, to avoid loosing business and gain
    higher market share.
4. PRODUCTIVITY MEASURES
La Montana is offering a list of over 250 meals (Products).

They are serving about 200 customers daily.

This number is increasing in week ends to 285 average.
4. PRODUCTIVITY MEASURES
In order to calculate productivity, we need to
explore Output/Input.
               Sale              Customer          Customer / Day

    Jan           4,256,789.00              7026                234.2005210

    Feb           5,255,678.00              6925                230.8333333

    Mar           5,087,231.00              9125                304.1666667

    Apr           5,183,250.64              8425                280.8333333

    May           6,276,458.92              8756                291.8666667

    Jun           5,448,987.00              9125                304.1666667
4. PRODUCTIVITY
MEASURES:
S.No
1
       Particulars
       Salaries
                               January
                                2,000,000.00
                                               February
                                                2,000,000.00
                                                               March
                                                                2,000,000.00
                                                                               April
                                                                                 2,000,000.00
                                                                                                May
                                                                                                 2,000,000.00
2      Daily & Misc Salaries        3,600.00        3,600.00        3,600.00         3,600.00        3,600.00
3      Staff Entertainment         27,000.00       30,000.00       33,000.00        36,000.00       39,000.00
4      Rent                        70,000.00       70,000.00       70,000.00        70,000.00       70,000.00
5      Depreciation                50,000.00       50,000.00       50,000.00        50,000.00       50,000.00
6      Printing & Stationary       18,000.00       19,000.00       20,000.00        21,000.00       22,000.00
7      Medicines                    1,500.00        1,000.00          500.00                -          500.00
8      Bank Charges                        -        1,500.00               -                -          300.00
9      Frieghrt Charges             8,000.00          400.00          900.00         3,000.00          400.00
10     Packing Meterial               500.00        3,000.00        2,000.00                -               -
11     Consumables                 80,000.00       50,000.00       30,000.00        25,000.00       50,000.00
12     Misc Exp                    10,000.00        5,000.00        3,000.00         8,000.00        6,000.00
13     Travelling                   7,000.00               -        3,000.00                -               -
14     Repair & Maintinance        60,000.00       72,000.00       35,000.00         4,000.00       51,000.00
15     Conveyance                     300.00          500.00          700.00         1,500.00          200.00
16     Postage                        500.00               -               -                -               -
17     Bad Debts                           -               -               -                -               -
18     Telephone                   10,000.00       12,000.00       11,000.00        13,000.00       15,000.00
19     Vehicle Running            150,000.00      130,000.00      130,000.00       150,000.00      110,000.00
20     Elec, Water & Gas          170,000.00      160,000.00      120,000.00       130,000.00      200,000.00
21     Staff Food                  60,000.00       70,000.00       80,000.00        50,000.00       60,000.00
       Total                    2,726,400.00    2,678,000.00    2,592,700.00     2,565,100.00    2,678,000.00
4. PRODUCTIVITY
MEASURES
PKR 7,000,000.00



PKR 6,000,000.00



PKR 5,000,000.00



PKR 4,000,000.00

                                                                Sale(output)

PKR 3,000,000.00                                                Production Cost(input)



PKR 2,000,000.00



PKR 1,000,000.00



         PKR -
                   Jan-12   Feb-12   Mar-12   Apr-12   May-12
4. PRODUCTIVITY MEASURES
In case of La Montana, and according to
our available data, we will calculate ratio of
sales/operating expenses “Profitability”.

           Average month sales: Rs 5,183,250.
          Average month expenses: Rs 2,902,900.

         April = 5,183,250 / 2,565,100 = 2.02 = 202 %
5. Product & Process Selection
Preferences:




 The product selection is mainly based on
  Customer expectations and seeking
  competitive advantage over Monal
  restaurant as well.
 As Restaurant industry offers different food
  products is directly affected by the strength
  of the kitchen staff and Capacity. The
  product is selected carefully by the chiefs
  and stewards.
5.1 Product Selection
Preferences:



   - Product is selected according to the
    availability of the raw material as well.
   - For example Sea food is available in Karachi
    and Islamabad, La Montana keep tracking the
    given prices by the suppliers at specific time.
   - The availability of raw materials in the store
    and inventory is analyzed before selecting the
    product.
5.2 Process Selection &
Preferences




 It starts with the arrival of the guests where they are
  welcomed in professional manner by the two Guest relation
  officers and guiding them to their reserved tables.
 Often is encouraged to visit different places in the
  restaurants with little briefing about the natural beauty of
  the Islamabad from 3000 feet above sea level.
Process Selection &
Preferences




   Then the Floor manager comes to the table
    and is introduced by the guest relation
    office, the floor manager monitored by the
    floor supervisor who then gives the menu
    and take order from the guests.
Process Selection &
Preferences




   The order is moved to the main Counter
    where he is given the Kitchen Order Token
    (KOT), which is the authority for Kitchen to
    prepare food and deliver on time.
Process Selection &
Preferences




   The KOT consist of different receipts for every BAR in
    the Kitchen, As shown for Pakistani Bar separate
    token, Tandori Bar & Bar (drinks) tokens.
    Tokens are issued separately to help smoothing and
    speeding the operations.
Process Selection &
Preferences
   The normal time, from order taking to serving food, is 20 to
    25 minutes.
   The guest‟s feedback and complaints are highly appreciated
    in La Montana where they are given short questionnaires for
    improving their services.
6. Differentiation Strategy:




   La Montana has recently opened its corporate
    banquet and conference Sapphire hall offering
    300 guests capacity with high regulation
    multimedia projectors along with Wi-Fi and sound
    system available for different national and
    multinational companies where they can enjoy
    comfortably their business meetings.
6. Differentiation Strategy:




   La Montana offers 60 different items Silver
    buffet service to all customers especially for
    wedding and dinning programs.
6. Differentiation Strategy:




   The staff is highly trained and Hospitable .
   Operations classes are conducted at the end of every
    month inviting different high profile hospitality
    professionals to ensure the operations are carried out at
    international standards levels.
7. Effects on Environment




 The restaurant annually consumes roughly 500,000 kilowatt hours
  of electricity, 20,000 thermos of natural gas and 800,000 gallons of
  water.
 Using the latest EPA carbon equivalents, that amounts to 490 tons
  of carbon dioxide produced per year per restaurant, PG&E
  estimates.
 Restaurants produce far more garbage on a daily basis than most
  other retail businesses.
 Typical restaurant generates 100,000 pounds of garbage per
  location per year, as the Green Restaurant Association
  estimates.
7. Effects on Environment




   La Montana has signed a contract with sub contractor who is
    taking the trash of the restaurant on daily bases.

   La Montana has discouraged the use of plastic bags but giving
    take away food in paper packing to reduce the negative impact
    of the plastic bags on our environment.

    8. have started the new project of increasing the capacity in
    They
         Recent Projects:
    December 2011.The main objective is to ensure La Montana has
    capacity to serve more guests in the future.

   The New Project is expected to be completed by 14th August
    later in the year. This New hall will be able to accommodate
    400 more guests covering Area of 9000 Square feet.
9. Future Outlook of La Montana




 La Montana has planned to build Kids Park with Parking
  area of the restaurant Where Kids can enjoy their time
  and have fun with other kids of different families.
 The Park will offer different play pin games with 3D
  animations to enjoy themselves in a perfect environment.
10.
Recommendations:
   - Dress code should strictly be implemented and violator should
    be fined and given official warning letter from HR office.
   - The process selection is complicated and time consuming
    especially with business customers.
10.
Recommendations:
   - The floor supervisor should always be standing at doors on
    the available dices to welcome new guests throughout the
    working hours.
10.
Recommendations:




   - There should be separate order taker machine in Kitchen in every
    Bar to help in smoothing operations at the La Montana which can
    increase productivity through using higher capacity.
   - Order should be send from main counter to respective
    „Department‟ of the kitchen immediately.
10.
Recommendations:




   - Safety measures should be improved to avoid negative incidents.

   - The Kitchen hygienic environment should be improved to keep highest
    standards for guests health as primary task.

More Related Content

Viewers also liked

Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...Elizabeth Kelly
 
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...Zakaria Yahya
 
Proposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipurProposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipurAkash Kshirsagar
 
Halim Hani HH-UWR001-UNDERWATER RESTAURANT
Halim Hani  HH-UWR001-UNDERWATER RESTAURANTHalim Hani  HH-UWR001-UNDERWATER RESTAURANT
Halim Hani HH-UWR001-UNDERWATER RESTAURANTHalim Hani
 
Project 1 Presentation Small Business Plan
Project 1 Presentation Small Business PlanProject 1 Presentation Small Business Plan
Project 1 Presentation Small Business PlanLau Hui Ming Belinda
 
Project on restaurant management
Project on restaurant managementProject on restaurant management
Project on restaurant managementraditele30
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 

Viewers also liked (14)

Pull's Coffee _ Company Profile
Pull's Coffee _ Company ProfilePull's Coffee _ Company Profile
Pull's Coffee _ Company Profile
 
Group Presentation Final
Group Presentation FinalGroup Presentation Final
Group Presentation Final
 
Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...Social Media Monitoring/Reputation Management Consulting Project for Restaura...
Social Media Monitoring/Reputation Management Consulting Project for Restaura...
 
Project Presentation Slides > UFRJ Restaurant
Project Presentation Slides > UFRJ RestaurantProject Presentation Slides > UFRJ Restaurant
Project Presentation Slides > UFRJ Restaurant
 
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...
 
CAFÉ Project Evaluation
CAFÉ Project EvaluationCAFÉ Project Evaluation
CAFÉ Project Evaluation
 
Wo-Men-X Cafe
Wo-Men-X Cafe Wo-Men-X Cafe
Wo-Men-X Cafe
 
Proposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipurProposal for opening a new restaurant on jaipur
Proposal for opening a new restaurant on jaipur
 
My restaurant finder hci
My restaurant finder hciMy restaurant finder hci
My restaurant finder hci
 
Halim Hani HH-UWR001-UNDERWATER RESTAURANT
Halim Hani  HH-UWR001-UNDERWATER RESTAURANTHalim Hani  HH-UWR001-UNDERWATER RESTAURANT
Halim Hani HH-UWR001-UNDERWATER RESTAURANT
 
Project 1 Presentation Small Business Plan
Project 1 Presentation Small Business PlanProject 1 Presentation Small Business Plan
Project 1 Presentation Small Business Plan
 
restaurant development + design: Project Management 101
restaurant development + design: Project Management 101restaurant development + design: Project Management 101
restaurant development + design: Project Management 101
 
Project on restaurant management
Project on restaurant managementProject on restaurant management
Project on restaurant management
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 

Recently uploaded

WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 

Recently uploaded (20)

WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 

la Montana Restaurant ISLAMABAD

  • 2. Objectives: 1. Introduction / Structure, 2. Capacity Preferences, 3. Location Preferences, 4. Productivity Measures, 5. Product / Process Selection, 6. Differentiation Strategy, 7. Environmental effects, 8. Recent Projects, 9. Future Outlook, 10. Recommendations.
  • 3. 1. Introduction:  La Montana is offering grand natural visit of Margalla Hills and Panoramic View of Capital City.  Just 10 Km drive way from heart of Islamabad, Very Adventurous and lovely track up to PIRSOHAWA.  La Montana Now offering party events, meetings and wedding arrangements.  Open balconies, Halls for all activities and Large parking area.
  • 4. La Montana has added taste to the natural greatness, Making the Hill top most attractive for tourists and People seeking stunning natural beauty and mouth watering taste at one Place.
  • 5. Organizational Structure “Functional”: General Manager Food & Operations Beverage Manager Manager HR manager Accountant Security Store Kitchen Supervisor Cash Floor Chefs Personnel Manager Cooks Stewards Dish washers
  • 6. 2. Capacity Preferences:  La Montana is increasing their Capacity with Preference of bringing more guests into the business to achieve competitive advantage.
  • 7. Current Capacity  The current capacity of La Montana restaurant is about 800 customers at area of max 15000 Square feet. There are three halls in la Montana:  1 - Sapphire Hall,  2 - Sapphire Patio Hall,  3 - Emeral Deck Hall.
  • 8. Sapphire Hall  Sapphire Hall Capacity 300 guests and Area is 5000 square feet.
  • 9. Sapphire Patio Hall  Sapphire Patio Hall Capacity is 250 guests and Area is 5000 Square feet
  • 10. Emeral Deck Hall  Emeral Deck capacity 250 guests and Area is 5000 Square feet.
  • 11. 3. Location Preferences:  Pir-Sohawa is Islamabad‟s highest tourist Spot according to Wikipedia:  http://en.wikipedia.org/wiki/Pir_Sohawa  PIR-SOHAWA is ranked at 6th number in Pakistan by TRIP ADVISIOR.Com  http://www.tripadvisor.com/Attraction_Review-g293960- d2435190-Reviews-Pir_Sohawa-Islamabad.html
  • 12. 3. Location Preferences:  La Montana is located at 3000 feet above sea level and it is attracting Customer due to its cool and unique climate.  Pir-Sohawa is the most famous and romantic place to visit for newly married couples and Students.
  • 13. 3. Location Preferences  They have started a new project in December 2011 to exploit this unique location.  The main objective is to increase current capacity to 1200 guests, to avoid loosing business and gain higher market share.
  • 14. 4. PRODUCTIVITY MEASURES La Montana is offering a list of over 250 meals (Products). They are serving about 200 customers daily. This number is increasing in week ends to 285 average.
  • 15. 4. PRODUCTIVITY MEASURES In order to calculate productivity, we need to explore Output/Input. Sale Customer Customer / Day Jan 4,256,789.00 7026 234.2005210 Feb 5,255,678.00 6925 230.8333333 Mar 5,087,231.00 9125 304.1666667 Apr 5,183,250.64 8425 280.8333333 May 6,276,458.92 8756 291.8666667 Jun 5,448,987.00 9125 304.1666667
  • 16. 4. PRODUCTIVITY MEASURES: S.No 1 Particulars Salaries January 2,000,000.00 February 2,000,000.00 March 2,000,000.00 April 2,000,000.00 May 2,000,000.00 2 Daily & Misc Salaries 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3 Staff Entertainment 27,000.00 30,000.00 33,000.00 36,000.00 39,000.00 4 Rent 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 5 Depreciation 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 6 Printing & Stationary 18,000.00 19,000.00 20,000.00 21,000.00 22,000.00 7 Medicines 1,500.00 1,000.00 500.00 - 500.00 8 Bank Charges - 1,500.00 - - 300.00 9 Frieghrt Charges 8,000.00 400.00 900.00 3,000.00 400.00 10 Packing Meterial 500.00 3,000.00 2,000.00 - - 11 Consumables 80,000.00 50,000.00 30,000.00 25,000.00 50,000.00 12 Misc Exp 10,000.00 5,000.00 3,000.00 8,000.00 6,000.00 13 Travelling 7,000.00 - 3,000.00 - - 14 Repair & Maintinance 60,000.00 72,000.00 35,000.00 4,000.00 51,000.00 15 Conveyance 300.00 500.00 700.00 1,500.00 200.00 16 Postage 500.00 - - - - 17 Bad Debts - - - - - 18 Telephone 10,000.00 12,000.00 11,000.00 13,000.00 15,000.00 19 Vehicle Running 150,000.00 130,000.00 130,000.00 150,000.00 110,000.00 20 Elec, Water & Gas 170,000.00 160,000.00 120,000.00 130,000.00 200,000.00 21 Staff Food 60,000.00 70,000.00 80,000.00 50,000.00 60,000.00 Total 2,726,400.00 2,678,000.00 2,592,700.00 2,565,100.00 2,678,000.00
  • 17. 4. PRODUCTIVITY MEASURES PKR 7,000,000.00 PKR 6,000,000.00 PKR 5,000,000.00 PKR 4,000,000.00 Sale(output) PKR 3,000,000.00 Production Cost(input) PKR 2,000,000.00 PKR 1,000,000.00 PKR - Jan-12 Feb-12 Mar-12 Apr-12 May-12
  • 18. 4. PRODUCTIVITY MEASURES In case of La Montana, and according to our available data, we will calculate ratio of sales/operating expenses “Profitability”. Average month sales: Rs 5,183,250. Average month expenses: Rs 2,902,900. April = 5,183,250 / 2,565,100 = 2.02 = 202 %
  • 19. 5. Product & Process Selection Preferences:  The product selection is mainly based on Customer expectations and seeking competitive advantage over Monal restaurant as well.  As Restaurant industry offers different food products is directly affected by the strength of the kitchen staff and Capacity. The product is selected carefully by the chiefs and stewards.
  • 20. 5.1 Product Selection Preferences:  - Product is selected according to the availability of the raw material as well.  - For example Sea food is available in Karachi and Islamabad, La Montana keep tracking the given prices by the suppliers at specific time.  - The availability of raw materials in the store and inventory is analyzed before selecting the product.
  • 21. 5.2 Process Selection & Preferences  It starts with the arrival of the guests where they are welcomed in professional manner by the two Guest relation officers and guiding them to their reserved tables.  Often is encouraged to visit different places in the restaurants with little briefing about the natural beauty of the Islamabad from 3000 feet above sea level.
  • 22. Process Selection & Preferences  Then the Floor manager comes to the table and is introduced by the guest relation office, the floor manager monitored by the floor supervisor who then gives the menu and take order from the guests.
  • 23. Process Selection & Preferences  The order is moved to the main Counter where he is given the Kitchen Order Token (KOT), which is the authority for Kitchen to prepare food and deliver on time.
  • 24. Process Selection & Preferences  The KOT consist of different receipts for every BAR in the Kitchen, As shown for Pakistani Bar separate token, Tandori Bar & Bar (drinks) tokens.  Tokens are issued separately to help smoothing and speeding the operations.
  • 25. Process Selection & Preferences  The normal time, from order taking to serving food, is 20 to 25 minutes.  The guest‟s feedback and complaints are highly appreciated in La Montana where they are given short questionnaires for improving their services.
  • 26. 6. Differentiation Strategy:  La Montana has recently opened its corporate banquet and conference Sapphire hall offering 300 guests capacity with high regulation multimedia projectors along with Wi-Fi and sound system available for different national and multinational companies where they can enjoy comfortably their business meetings.
  • 27. 6. Differentiation Strategy:  La Montana offers 60 different items Silver buffet service to all customers especially for wedding and dinning programs.
  • 28. 6. Differentiation Strategy:  The staff is highly trained and Hospitable .  Operations classes are conducted at the end of every month inviting different high profile hospitality professionals to ensure the operations are carried out at international standards levels.
  • 29. 7. Effects on Environment  The restaurant annually consumes roughly 500,000 kilowatt hours of electricity, 20,000 thermos of natural gas and 800,000 gallons of water.  Using the latest EPA carbon equivalents, that amounts to 490 tons of carbon dioxide produced per year per restaurant, PG&E estimates.  Restaurants produce far more garbage on a daily basis than most other retail businesses.  Typical restaurant generates 100,000 pounds of garbage per location per year, as the Green Restaurant Association estimates.
  • 30. 7. Effects on Environment  La Montana has signed a contract with sub contractor who is taking the trash of the restaurant on daily bases.  La Montana has discouraged the use of plastic bags but giving take away food in paper packing to reduce the negative impact of the plastic bags on our environment.
  • 31. 8. have started the new project of increasing the capacity in They Recent Projects: December 2011.The main objective is to ensure La Montana has capacity to serve more guests in the future.  The New Project is expected to be completed by 14th August later in the year. This New hall will be able to accommodate 400 more guests covering Area of 9000 Square feet.
  • 32. 9. Future Outlook of La Montana  La Montana has planned to build Kids Park with Parking area of the restaurant Where Kids can enjoy their time and have fun with other kids of different families.  The Park will offer different play pin games with 3D animations to enjoy themselves in a perfect environment.
  • 33. 10. Recommendations:  - Dress code should strictly be implemented and violator should be fined and given official warning letter from HR office.  - The process selection is complicated and time consuming especially with business customers.
  • 34. 10. Recommendations:  - The floor supervisor should always be standing at doors on the available dices to welcome new guests throughout the working hours.
  • 35. 10. Recommendations:  - There should be separate order taker machine in Kitchen in every Bar to help in smoothing operations at the La Montana which can increase productivity through using higher capacity.  - Order should be send from main counter to respective „Department‟ of the kitchen immediately.
  • 36. 10. Recommendations:  - Safety measures should be improved to avoid negative incidents.  - The Kitchen hygienic environment should be improved to keep highest standards for guests health as primary task.

Editor's Notes

  1. Silver Buffet is defined as Normally its same like ordinary buffet system but in here Plates Crockery is placed with the buffet to make it easier for the guests taking their foods.
  2. The Management is highly trained hospitality professionals , Where young motivated determined Management students are highly encouraged offering career opportunities.
  3. As per the trash rate in restaurants across the world, Protection of green Margala hills requires special attention and actions from the Federal and Local administration.
  4. There are sign boards at different places and have requested to all the visitors to protect the Magala hills and respect the nature.
  5. In this background photo of Kitchen we can observe no one is wearing Hair Protection Caps and the uniforms are also not neat and clean.