Week 1

Week 2

Monday

Create the production schedule
Start work on draft designs

Get feedback on rough draft and make any
further changes and begin work on final
design

Tuesday

Continue work on draft designs

Continue work on final design

Wednesday

Finish work on draft designs and start work
on pitch email

Continue work on final design

Thursday

Finish work on pitch emails
Write up feedback and makes changes
based on the feedback
If have time start work on artist case study
based on final design

DEADLINE - 4:10
ABSENT

Friday

Color and typography experiments

Saturday

If needed continue any work from the week
that is unfinished or needs more work

Sunday

Contenu connexe

Tendances

Year 13 art this weeks work
Year 13 art this weeks workYear 13 art this weeks work
Year 13 art this weeks workmissfcmay
 
Engl 317 p4 schedule_spring20
Engl 317 p4 schedule_spring20Engl 317 p4 schedule_spring20
Engl 317 p4 schedule_spring20Brian Malone
 
Engl207 syllabus online fall 2021
Engl207 syllabus online fall 2021Engl207 syllabus online fall 2021
Engl207 syllabus online fall 2021RileyBallard
 
Aaron cork as pre production tasks feedback sheet
Aaron cork as pre production tasks feedback sheetAaron cork as pre production tasks feedback sheet
Aaron cork as pre production tasks feedback sheetThatMediaGuy
 
Theresa sopko virtual presentation
Theresa sopko  virtual presentationTheresa sopko  virtual presentation
Theresa sopko virtual presentationtrsopko
 
Updated English 313 Project 1 Schedule-Spr 2019-TThF2F
Updated English 313 Project 1 Schedule-Spr 2019-TThF2FUpdated English 313 Project 1 Schedule-Spr 2019-TThF2F
Updated English 313 Project 1 Schedule-Spr 2019-TThF2FShannon Dryden
 
F2 f project2_schedule_engl317_spring2019
F2 f project2_schedule_engl317_spring2019F2 f project2_schedule_engl317_spring2019
F2 f project2_schedule_engl317_spring2019Zachary Williamson
 
Reese hamill finalassesment
Reese hamill finalassesmentReese hamill finalassesment
Reese hamill finalassesmentJames Hamill
 
6 Minute Solutions - Building Fluency
6 Minute Solutions - Building Fluency6 Minute Solutions - Building Fluency
6 Minute Solutions - Building Fluencyrosekv4
 
5 Tips to Solve Critical Assignments on Electrical Engineering
5 Tips to Solve Critical Assignments on Electrical Engineering 5 Tips to Solve Critical Assignments on Electrical Engineering
5 Tips to Solve Critical Assignments on Electrical Engineering Lesa Cote
 
English 313 Project 1 Schedule-F2F-TTH
English 313 Project 1 Schedule-F2F-TTHEnglish 313 Project 1 Schedule-F2F-TTH
English 313 Project 1 Schedule-F2F-TTHShannon Dryden
 
G235 1a) combi questions
G235 1a) combi questionsG235 1a) combi questions
G235 1a) combi questionsCharis Creber
 
Project4 schedule steps_engl313_summer2021
Project4 schedule steps_engl313_summer2021Project4 schedule steps_engl313_summer2021
Project4 schedule steps_engl313_summer2021KatieKrahn
 

Tendances (15)

Year 13 art this weeks work
Year 13 art this weeks workYear 13 art this weeks work
Year 13 art this weeks work
 
Review test # 5
Review test # 5Review test # 5
Review test # 5
 
Engl 317 p4 schedule_spring20
Engl 317 p4 schedule_spring20Engl 317 p4 schedule_spring20
Engl 317 p4 schedule_spring20
 
Engl207 syllabus online fall 2021
Engl207 syllabus online fall 2021Engl207 syllabus online fall 2021
Engl207 syllabus online fall 2021
 
Aaron cork as pre production tasks feedback sheet
Aaron cork as pre production tasks feedback sheetAaron cork as pre production tasks feedback sheet
Aaron cork as pre production tasks feedback sheet
 
Theresa sopko virtual presentation
Theresa sopko  virtual presentationTheresa sopko  virtual presentation
Theresa sopko virtual presentation
 
Updated English 313 Project 1 Schedule-Spr 2019-TThF2F
Updated English 313 Project 1 Schedule-Spr 2019-TThF2FUpdated English 313 Project 1 Schedule-Spr 2019-TThF2F
Updated English 313 Project 1 Schedule-Spr 2019-TThF2F
 
F2 f project2_schedule_engl317_spring2019
F2 f project2_schedule_engl317_spring2019F2 f project2_schedule_engl317_spring2019
F2 f project2_schedule_engl317_spring2019
 
Reese hamill finalassesment
Reese hamill finalassesmentReese hamill finalassesment
Reese hamill finalassesment
 
6 Minute Solutions - Building Fluency
6 Minute Solutions - Building Fluency6 Minute Solutions - Building Fluency
6 Minute Solutions - Building Fluency
 
5 Tips to Solve Critical Assignments on Electrical Engineering
5 Tips to Solve Critical Assignments on Electrical Engineering 5 Tips to Solve Critical Assignments on Electrical Engineering
5 Tips to Solve Critical Assignments on Electrical Engineering
 
English 313 Project 1 Schedule-F2F-TTH
English 313 Project 1 Schedule-F2F-TTHEnglish 313 Project 1 Schedule-F2F-TTH
English 313 Project 1 Schedule-F2F-TTH
 
G235 1a) combi questions
G235 1a) combi questionsG235 1a) combi questions
G235 1a) combi questions
 
Project4 schedule steps_engl313_summer2021
Project4 schedule steps_engl313_summer2021Project4 schedule steps_engl313_summer2021
Project4 schedule steps_engl313_summer2021
 
Final Lesson
Final LessonFinal Lesson
Final Lesson
 

En vedette

Award-Winning Water Supply System Lowers Usage and Costs
Award-Winning Water Supply System Lowers Usage and CostsAward-Winning Water Supply System Lowers Usage and Costs
Award-Winning Water Supply System Lowers Usage and CostsMcKenney's Inc
 
Origin of chinese characters 说文解字 299 从 從
Origin of chinese characters 说文解字 299 从 從Origin of chinese characters 说文解字 299 从 從
Origin of chinese characters 说文解字 299 从 從LEGOO MANDARIN
 
Nicole B. Martins--summary 1.7.16
Nicole B. Martins--summary 1.7.16Nicole B. Martins--summary 1.7.16
Nicole B. Martins--summary 1.7.16Nicole Martins
 
6 compromisos de gestion escolar para el 2016
6 compromisos de gestion escolar para el 20166 compromisos de gestion escolar para el 2016
6 compromisos de gestion escolar para el 2016JUAN GUERRERO
 
Estándares de gestión empresarial tania
Estándares de gestión empresarial taniaEstándares de gestión empresarial tania
Estándares de gestión empresarial taniatitoaudon
 
Inicial personal social-ii
Inicial personal social-iiInicial personal social-ii
Inicial personal social-iiJUAN GUERRERO
 
10. metonimias. construcciones simuladas
10. metonimias. construcciones simuladas10. metonimias. construcciones simuladas
10. metonimias. construcciones simuladascmiglesias
 
OeRC_BioNatMedSciences_TeamOverview_Dec2013
OeRC_BioNatMedSciences_TeamOverview_Dec2013OeRC_BioNatMedSciences_TeamOverview_Dec2013
OeRC_BioNatMedSciences_TeamOverview_Dec2013Susanna-Assunta Sansone
 
SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...
SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...
SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...Rooswelth Gerardo Zavaleta Benites
 
Meaning of market segmentation
Meaning of market segmentationMeaning of market segmentation
Meaning of market segmentationPrem Pun
 

En vedette (12)

Award-Winning Water Supply System Lowers Usage and Costs
Award-Winning Water Supply System Lowers Usage and CostsAward-Winning Water Supply System Lowers Usage and Costs
Award-Winning Water Supply System Lowers Usage and Costs
 
Origin of chinese characters 说文解字 299 从 從
Origin of chinese characters 说文解字 299 从 從Origin of chinese characters 说文解字 299 从 從
Origin of chinese characters 说文解字 299 从 從
 
Nicole B. Martins--summary 1.7.16
Nicole B. Martins--summary 1.7.16Nicole B. Martins--summary 1.7.16
Nicole B. Martins--summary 1.7.16
 
Asc
AscAsc
Asc
 
Listen
ListenListen
Listen
 
6 compromisos de gestion escolar para el 2016
6 compromisos de gestion escolar para el 20166 compromisos de gestion escolar para el 2016
6 compromisos de gestion escolar para el 2016
 
Estándares de gestión empresarial tania
Estándares de gestión empresarial taniaEstándares de gestión empresarial tania
Estándares de gestión empresarial tania
 
Inicial personal social-ii
Inicial personal social-iiInicial personal social-ii
Inicial personal social-ii
 
10. metonimias. construcciones simuladas
10. metonimias. construcciones simuladas10. metonimias. construcciones simuladas
10. metonimias. construcciones simuladas
 
OeRC_BioNatMedSciences_TeamOverview_Dec2013
OeRC_BioNatMedSciences_TeamOverview_Dec2013OeRC_BioNatMedSciences_TeamOverview_Dec2013
OeRC_BioNatMedSciences_TeamOverview_Dec2013
 
SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...
SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...
SUNAFIL - Resolución N° 209-2015 y Anexo Directiva N° 003-2015 - disposicione...
 
Meaning of market segmentation
Meaning of market segmentationMeaning of market segmentation
Meaning of market segmentation
 

Plus de Aaron Newbigging (20)

Game keynote
Game keynoteGame keynote
Game keynote
 
Graphics design keynote
Graphics design keynoteGraphics design keynote
Graphics design keynote
 
Google glass
Google glassGoogle glass
Google glass
 
Terrains, landscapes and level of detail
Terrains, landscapes and level of detailTerrains, landscapes and level of detail
Terrains, landscapes and level of detail
 
Terrains, landscapes and level of detail
Terrains, landscapes and level of detailTerrains, landscapes and level of detail
Terrains, landscapes and level of detail
 
Photography evaluation
Photography evaluationPhotography evaluation
Photography evaluation
 
Batmannarrativestructure
BatmannarrativestructureBatmannarrativestructure
Batmannarrativestructure
 
Photoshoot plan
Photoshoot planPhotoshoot plan
Photoshoot plan
 
Hunted evaluation
Hunted evaluationHunted evaluation
Hunted evaluation
 
Green 1
Green 1Green 1
Green 1
 
Marketing plan
Marketing planMarketing plan
Marketing plan
 
Flappu bird analysis
Flappu bird analysisFlappu bird analysis
Flappu bird analysis
 
Pixar
PixarPixar
Pixar
 
Evaluation
EvaluationEvaluation
Evaluation
 
Programmer
ProgrammerProgrammer
Programmer
 
Audio engineer
Audio engineerAudio engineer
Audio engineer
 
Last of us pipeline
Last of us pipelineLast of us pipeline
Last of us pipeline
 
Last of us
Last of usLast of us
Last of us
 
Walkthrough
WalkthroughWalkthrough
Walkthrough
 
Stewart copeland
Stewart copelandStewart copeland
Stewart copeland
 

Schedule

  • 1. Schedule Week 1 Week 2 Monday Create the production schedule Start work on draft designs Get feedback on rough draft and make any further changes and begin work on final design Tuesday Continue work on draft designs Continue work on final design Wednesday Finish work on draft designs and start work on pitch email Continue work on final design Thursday Finish work on pitch emails Write up feedback and makes changes based on the feedback If have time start work on artist case study based on final design DEADLINE - 4:10 ABSENT Friday Color and typography experiments Saturday If needed continue any work from the week that is unfinished or needs more work Sunday