Ce diaporama a bien été signalé.
Nous utilisons votre profil LinkedIn et vos données d’activité pour vous proposer des publicités personnalisées et pertinentes. Vous pouvez changer vos préférences de publicités à tout moment.
قطار الرياض 
Riyadh Metro
Riyadh Metro 
•Riyadh is one of the world’s fasting growing metropolitan areas – it has more than doubled in size since 19...
Riyadh Metro 
•The Council of Ministers approved the Riyadh Public Transport Program on 23 April, 2012. 
•The approval req...
Riyadh Metro - Challenges The delivery of the public transport program presents some unique challenges due to its extent, ...
ADA-Program Management Office Package 3 Package 2 Package 1 Main Elements of Work in RPT Design-Build of Riyadh Metro Proj...
Riyadh Metro 
Diplomatic Quarter Princess Nora University Second Industrial City خشم العان 
King Khalid International Airp...
Riyadh Metro 
Diplomatic Quarter Princess Nora University Second Industrial City خشم العان 
King Khalid International Airp...
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Riyadh Metro
Main Components
Riyadh Metro
Riyadh Metro
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Technology
Rolling Stock
Rolling Stock
Rolling Stock
Rolling Stock
Rolling Stock
Unified Rolling Stock Design
Unified Rolling Stock Design
Unified Rolling Stock Design
Unified Rolling Stock Design
Unified Rolling Stock Design
Unified Rolling Stock Design
Unified Rolling Stock Design
Stations
Stations
Stations
Stations
Stations
Stations
Stations
Main Stations 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internat...
Main Stations 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internat...
King Abdullah Financial Center Station
King Abdullah Financial Center Station
King Abdullah Financial Center Station
King Abdullah Financial Center Station
King Abdullah Financial Center Station
Main Stations 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internat...
Main Stations 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internat...
Main Stations 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internat...
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Park & Ride
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro 
Diplomatic Quarter Princess Nora University 
للبنات 
Second Industrial City خشم العان 
King Khalid Internati...
Riyadh Metro
Project Duration 
8 months 
Design and Preliminary Works 
48 months 
Project Implimentation 
4 months 
Trial running and H...
Progress Summary
Contract Award 
•On 28 July 2013 letters of award were issued for the design build contracts of the Riyadh Metro Project. ...
الرسالة ، الرؤية ، القيم ... 
Design-Build Consortiums 
1 
2 
حي السفارات 
جانعة الأنيرة نورة 
للبنات 
المدينة الصناعية ال...
الرسالة ، الرؤية ، القيم ... 
حي السفارات 
جانعة الأنيرة نورة 
للبنات 
المدينة الصناعية الثانية 
خشم العان 
نطار الملك خال...
الرسالة ، الرؤية ، القيم ... 
حي السفارات 
جانعة الأنيرة نورة 
للبنات 
المدينة الصناعية الثانية 
خشم العان 
نطار الملك خال...
الرسالة ، الرؤية ، القيم ... 
Project Management-Construction Management Package 2 
Package 1
الرسالة ، الرؤية ، القيم ... 
Project Management-Construction Management Package
Monthly Progress Meeting His Royal Highness the governor of Riyadh Chairs the Monthly Progress meeting
Start of Construction Ground Breaking Ceremony on 3/4/2014
Monthly Progress Follow-up His Royal Highness the governor of Riyadh conducting bi-monthly site visits
Sites with ongoing activities
Areas of Preparation and 
Utility Diversion
Construction Photographs Olaya Station
Construction Photographs Olaya Station: East NATM Shaft excavation Line 1: North launching shaft excavation
Construction Photographs Line 1: Tunnel Boring Machines
Construction Photographs Downtown Station
Construction Photographs Line 3 Tunnel Boring Machine
Construction Photographs Line 4 - 132kV Relocation Works
Construction Photographs Line 4 Station 4G1 (KKIA) Excavation
Construction Photographs Line 5: North launching shaft 
Line 5: Central launching shaft
Construction Photographs Line 5: Tunnel Boring Machine
Public Engagement Public Engagement Plan Traffic Management Strategy – Road Diversions 
Face to Face Engagement with Busin...
Public Engagement 
•His royal highness Prince Turki bin Abdullah commenced Public Engagement Plan on September 10, 2014, p...
Public Engagement 
Face to Face Engagement with Business and Residents 
Teams: PR representatives from ADA and Constructio...
Public Engagement Extensive Advertising Campaign Started 2 weeks before major traffic disruptions Newspaper advertisements...
Public Engagement Campaign Results Traffic Management Strategy – Road Diversions Traffic Management and Road Diversions
Public Engagement Campaign Results 
Mobile App Traffic Routing GPS Mobile App
Public Engagement Campaign Results 
•1,250 individual face-to-face visits of shops and residences conducted 
•Feedback 
•V...
Conclusion 
Diplomatic Quarter Princess Nora University Second Industrial City خشم العان 
King Khalid International Airpor...
قطار الرياض 
Riyadh Metro
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
Prochain SlideShare
Chargement dans…5
×

Riyadh Metro Presentation ADA

Dr. alwalid alekrish
arriyadh development authority
Riyadh Metro breakdown and all components

  • Soyez le premier à commenter

Riyadh Metro Presentation ADA

  1. 1. قطار الرياض Riyadh Metro
  2. 2. Riyadh Metro •Riyadh is one of the world’s fasting growing metropolitan areas – it has more than doubled in size since 1990. •The population of the city was over 5.7 million in 2012 and is expected to grow to 8.3 million by 2030. •Riyadh is heavily car-dependent and faces costly and frustrating road traffic congestion that will only get worse in the future without a major public transport initiative. •In 2002 the Arriyadh Development Authority completed its Metropolitan Development Strategy which included the provision of a public transport system.
  3. 3. Riyadh Metro •The Council of Ministers approved the Riyadh Public Transport Program on 23 April, 2012. •The approval required that all phases of the Program be completed during 4 years of construction. •Arriyadh Development Authority began the planning and conceptual design of the Riyadh Public Transport system.
  4. 4. Riyadh Metro - Challenges The delivery of the public transport program presents some unique challenges due to its extent, scope and implementation strategy. Delivering a complete public transport system across a large part of the city within 5 years. Minimizing disruption to the city. Gaining the support of the people of Riyadh during construction and as future users.
  5. 5. ADA-Program Management Office Package 3 Package 2 Package 1 Main Elements of Work in RPT Design-Build of Riyadh Metro Project O & M of Riyadh Metro Infrastructure of Riyadh Bus Project Operation & Maintenance of Riyadh Bus Project Supporting Studies Bus Supporting Studies Metro Supervision & Management RMTC + RAMPED BACS ANM Fast 1 2 3 4 5 6 O & M Institutional Framework Supervision & Management Supervision & Management Supervision & Management Supervision & Management Contract for Trans. & Cont. Center Road Modification Contracts Bus station & public parking contracts Supply, Operation & Maint. Contract for Buses Contract for Maint. Of Bus Facilities Land Acquisition AFC contract Transportation Man. Plan During Const. Public Engagement Policies & Regulations Measures to Encourage Use of Public Transport Utility Coordination Transit Oriented Development Other Studies AVM & RTPI contracts IT PLATFORM
  6. 6. Riyadh Metro Diplomatic Quarter Princess Nora University Second Industrial City خشم العان King Khalid International Airport
  7. 7. Riyadh Metro Diplomatic Quarter Princess Nora University Second Industrial City خشم العان King Khalid International Airport The backbone of the public transport system in Riyadh. Achieves integration with the Bus transport network and other means of transport. Covers majority of densely populated areas, government installations, commercial, educational, and health activities. Linked to King Khalid International Airport, King Abdullah Financial Center, universities, and the city center.
  8. 8. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  9. 9. Riyadh Metro
  10. 10. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  11. 11. Riyadh Metro
  12. 12. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  13. 13. Riyadh Metro
  14. 14. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  15. 15. Riyadh Metro
  16. 16. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  17. 17. Riyadh Metro
  18. 18. Riyadh Metro
  19. 19. Main Components
  20. 20. Riyadh Metro
  21. 21. Riyadh Metro
  22. 22. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  23. 23. Riyadh Metro
  24. 24. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  25. 25. Riyadh Metro
  26. 26. Technology
  27. 27. Rolling Stock
  28. 28. Rolling Stock
  29. 29. Rolling Stock
  30. 30. Rolling Stock
  31. 31. Rolling Stock
  32. 32. Unified Rolling Stock Design
  33. 33. Unified Rolling Stock Design
  34. 34. Unified Rolling Stock Design
  35. 35. Unified Rolling Stock Design
  36. 36. Unified Rolling Stock Design
  37. 37. Unified Rolling Stock Design
  38. 38. Unified Rolling Stock Design
  39. 39. Stations
  40. 40. Stations
  41. 41. Stations
  42. 42. Stations
  43. 43. Stations
  44. 44. Stations
  45. 45. Stations
  46. 46. Main Stations Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  47. 47. Main Stations Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  48. 48. King Abdullah Financial Center Station
  49. 49. King Abdullah Financial Center Station
  50. 50. King Abdullah Financial Center Station
  51. 51. King Abdullah Financial Center Station
  52. 52. King Abdullah Financial Center Station
  53. 53. Main Stations Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  54. 54. Main Stations Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  55. 55. Main Stations Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  56. 56. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  57. 57. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport P P P P P P P P P P P P P P P P P P P P P P P
  58. 58. Park & Ride
  59. 59. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  60. 60. Riyadh Metro Diplomatic Quarter Princess Nora University للبنات Second Industrial City خشم العان King Khalid International Airport
  61. 61. Riyadh Metro
  62. 62. Project Duration 8 months Design and Preliminary Works 48 months Project Implimentation 4 months Trial running and Handover
  63. 63. Progress Summary
  64. 64. Contract Award •On 28 July 2013 letters of award were issued for the design build contracts of the Riyadh Metro Project. •The contracts were then signed on 1/10/2013 •Notice to Proceed letters were issued on 28/10/2013
  65. 65. الرسالة ، الرؤية ، القيم ... Design-Build Consortiums 1 2 حي السفارات جانعة الأنيرة نورة للبنات المدينة الصناعية الثانية خشم العان نطار الملك خالد الدولي Package 1
  66. 66. الرسالة ، الرؤية ، القيم ... حي السفارات جانعة الأنيرة نورة للبنات المدينة الصناعية الثانية خشم العان نطار الملك خالد الدولي Package 2 3 Design-Build Consortiums
  67. 67. الرسالة ، الرؤية ، القيم ... حي السفارات جانعة الأنيرة نورة للبنات المدينة الصناعية الثانية خشم العان نطار الملك خالد الدولي 4 5 6 Design-Build Consortiums Package 3
  68. 68. الرسالة ، الرؤية ، القيم ... Project Management-Construction Management Package 2 Package 1
  69. 69. الرسالة ، الرؤية ، القيم ... Project Management-Construction Management Package
  70. 70. Monthly Progress Meeting His Royal Highness the governor of Riyadh Chairs the Monthly Progress meeting
  71. 71. Start of Construction Ground Breaking Ceremony on 3/4/2014
  72. 72. Monthly Progress Follow-up His Royal Highness the governor of Riyadh conducting bi-monthly site visits
  73. 73. Sites with ongoing activities
  74. 74. Areas of Preparation and Utility Diversion
  75. 75. Construction Photographs Olaya Station
  76. 76. Construction Photographs Olaya Station: East NATM Shaft excavation Line 1: North launching shaft excavation
  77. 77. Construction Photographs Line 1: Tunnel Boring Machines
  78. 78. Construction Photographs Downtown Station
  79. 79. Construction Photographs Line 3 Tunnel Boring Machine
  80. 80. Construction Photographs Line 4 - 132kV Relocation Works
  81. 81. Construction Photographs Line 4 Station 4G1 (KKIA) Excavation
  82. 82. Construction Photographs Line 5: North launching shaft Line 5: Central launching shaft
  83. 83. Construction Photographs Line 5: Tunnel Boring Machine
  84. 84. Public Engagement Public Engagement Plan Traffic Management Strategy – Road Diversions Face to Face Engagement with Business and Residents Extensive Advertising Campaign Digital & Social Media Interactive Support Call Centre Traffic Routing GPS Mobile App
  85. 85. Public Engagement •His royal highness Prince Turki bin Abdullah commenced Public Engagement Plan on September 10, 2014, prior to implementation of the first detour at Olaya Road.
  86. 86. Public Engagement Face to Face Engagement with Business and Residents Teams: PR representatives from ADA and Construction Representatives from Contractors Face to Face Teams in Action
  87. 87. Public Engagement Extensive Advertising Campaign Started 2 weeks before major traffic disruptions Newspaper advertisements All major publications in Arabic English Urdu Extensive brochure distribution all major stakeholders and residents 35,000 brochures distributed SMS 3,000,000 messages Outdoor 350 locations on major roads and intersections around the city Radio coverage All major radio stations Digital www.riyadh- metro.com On Computers and Mobile Phones. Twitter active monitoring
  88. 88. Public Engagement Campaign Results Traffic Management Strategy – Road Diversions Traffic Management and Road Diversions
  89. 89. Public Engagement Campaign Results Mobile App Traffic Routing GPS Mobile App
  90. 90. Public Engagement Campaign Results •1,250 individual face-to-face visits of shops and residences conducted •Feedback •Very positive (95%) •Queries (1%) •Suggestions (3%) •Complaints (1%) •Typical comments from shops owners and residents: •“Such courtesy never happened before for government projects and even for private sector projects” •“Hats off to ADA for having taken the time to inform us” •“Never seen something like that in Riyadh” •“Our Riyadh Governor is truly hands-on for this project” •“It’s as if we were in Europe” •“Even in my home country they don’t have such level of courtesy” (Arab expat)
  91. 91. Conclusion Diplomatic Quarter Princess Nora University Second Industrial City خشم العان King Khalid International Airport •By any standards I hope that you will have appreciated that this is an ambitious program with major benefits for the city of Riyadh. •There are major challenges associated with designing, constructing and bringing into operation a complete public transport network within 5 years, but we are make good progress. •Engaging and gaining the support of the people of Riyadh has been our highest priority.
  92. 92. قطار الرياض Riyadh Metro

×