SlideShare a Scribd company logo
1 of 27
MAIN MENU
                         STEEL FABRICATION
                              FINANCIAL PROJECTION
 Ke SUB MENU
 Click di bawah ini:
FORM-A                 INVESTMENT COST
FORM-B                 FACTORY OVERHEAD COST
FORM-C                 SELLING EXPENSES
FORM V-D               GENERAL & ADMINISTRATIVE EXPENSES
FORM V-E               PRODUTION, RAW MATERIALS COST & SELLING PRICE (Rp/MT)

APPENDIX-0             SUMMARY
APPENDIX-1             PROJECTED BALANCE SHEET
APPENDIX-2             CASH FLOW PROJECTION
APPENDIX-3             PROFIT & LOSS PROJECTION
APPENDIX-3A            PROFIT & LOSS PROJECTION (Estimated Taxex with Double Declining Ba
APPENDIX-4             COST OF GOODS SOLD
APPENDIX-5             PRODUCTION, SALES AND COLLECTION SCHEDULE
LAMPIRAN 6             STRUCTURE OF FUNDS
APPENDIX-6A            DETAIL OF REPAYMENT SCHEDULE
APPENDIX-7             DRAW DOWN OF PROJECT COST SCHEDULE
APPENDIX-7A            INTEREST DURING CONSTRUCTION (IDC)
APPENDIX-8             INVESTMENT AND REINTVESMENT SCHEDULE
APPENDIX-9             DEPRECIATION AND MAINTENANCE SCHEDULE
APPENDIX-9A            DEPRECIATION SCHEDULE WITH "double declining balance method" FOR
APPENDIX-10            CASH REQUIREMENT FOR OPERATION
APPENDIX-11            ESTIMATED WORKING CAPITAL NEEDED
APPENDIX-12            FINANCIAL RATIO
APPENDIX-13            INTERNAL RATE OF RETURN
APPENDIX-14            SENSITIVITY ANALYSIS
ELLING PRICE (Rp/MT)




Taxex with Double Declining Balance Depreciation Method)

SCHEDULE




declining balance method" FOR INCOME TAX
FORM-A
Steel Fabrication Co. ltd.
INVESTMENT COST
NO.              DESCRIPTION                      VOLUME        UNIT      PRICE
                                                                          PER-UNIT

BI        LAND COST
      1      LAND COST                                30,000      m2               60.00
      2      LAND IMPROVEMENT COST                    30,000      m2               2.500

 II     CONSTRUCTION :
      1 BUILDING COST:
           FACTORY BUILDINGS COST
             FACTORY BUILDING                         13,428      M2            150.000
             HOIST CRANE (10 TON)                          2     UNIT       150,000.000
             GARDU LISTRIK                                 1      LS         50,000.000
             PLUMBING & PUMP (ARTHESIS)                    2     UNIT        50,000.000
                                                                             Total A

           OFFICE BUILDING
             OFFICE BUILDING                             500      M2             450.000
             GUARD HOUSE                                  50      M2             300.000
             CANTEEN                                      50      M2             300.000
             ROAD                                      7,500      M2              30.000
             FENCE HIGHT 3 M, ROUND :                    220       M              15.000
                                                                              Total B
                                                                         Total A+B
      2 ISBL (INSIDE BATTERY LIMIT)
            BARNNERS MACHINERIES                        1.00      LS        716,760.000
            MOTOR (4150 kW)                             1.00      LS        586,440.000
            ROLLING CONSTRUCTION 850 T                  1.00      LS      5,212,800.000
            INST. OF ELECTR. & CONTROL                  1.00      LS        586,440.000

      3 OSBL (OUTSIDE BATTERY LIMIT)
            GENSET (500 kW CADANGAN)                    1.00      LS        150,000.000
            PLN COST                               6,000,000      VA              0.163

      4 VEHICLES
            PLANT DIRECTOR                                  1    UNIT        75,000.000
            MANAGER'S VEHICLES                              3    UNIT        40,000.000
            MINIBUS (KIJANG)                                2    UNIT        30,000.000
            FORKLIFTS                                       1    UNIT        50,000.000
            MOTOR CARS                                      2    UNIT         4,000.000

      5 TOOLS & OFFICE EQUIPMENT




          Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
Rp 000
TOTAL
PRICE                        1.00


  1,800,000.00             60.00
     75,000.00              2.50




  2,014,200.00            150.00
    300,000.00        150,000.00
     50,000.00            50,000
    100,000.00         50,000.00
  2,464,200.00               850


    225,000.00            450.00
     15,000.00            300.00
     15,000.00            300.00
    225,000.00             30.00
      3,300.00             15.00
    483,300.00
  2,947,500.00

    716,760.00        716,760.00
    586,440.00        586,440.00
  5,212,800.00      5,212,800.00
    586,440.00        586,440.00
  7,102,440.00

    150,000.00           150,000
    978,000.00             0.163
  1,128,000.00

    75,000.00          75,000.00
   120,000.00          40,000.00
    60,000.00          30,000.00
    50,000.00          50,000.00
     8,000.00           4,000.00
   313,000.00            250,346




         Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
APPENDIX-7                   Main Menu
Steel Fabrication Co. ltd.
DRAW DOWN OF PROJECT COST SCHEDULE                                                                                                                       Rp 000
                               AMOUNT                                                        YEAR - I                                           YEAR - II
NO               DESCRIPTION                                   (%)       --------------- --------------- --------------- --------------- --------------- ---------------
                                  Rp                                          Q-1             Q-2             Q-3             Q-4             Q-1             Q-2
A I LAND :
  1     LAND COST               1,800,000                      11.37% 1,800,000
  2     LAND IMPROVEMENT           75,000                       0.47%    37,500               37,500
                                                                0.00%
 II CONSTRUCTION :                                              0.00%
 1    BUILDING COST                              2,947,500     18.62%                        294,750   884,250   884,250   589,500   294,750
 2    ISBL                                       7,102,440     44.87%                                1,420,488 2,485,854 2,485,854   710,244
 3    OSBL                                       1,128,000      7.13%                                  225,600   394,800   394,800   112,800
 4    VEHICLES                                     313,000      1.98%                                   78,250    78,250    78,250    78,250
 5    TOOLS & OFFICE EQUIPMENT                     405,500      2.56%                                  101,375   101,375   101,375   101,375
              TOTAL A                           13,771,440     87.01% 1,837,500              332,250 2,709,963 3,944,529 3,649,779 1,297,419
B PRE-OPERATING :
      OFFICES EXPENSES                             250,000       1.58%        37,500          37,500          50,000          50,000          37,500          37,500
      CONSULTAN FEE                                100,000       0.63%        15,000          15,000          20,000          20,000          15,000          15,000
      DESIGNING FEE                                152,040       0.96%        22,806          22,806          30,408          30,408          22,806          22,806
      EXPATRIATE (+ 1 MONTH)                       136,836       0.86%        20,525          20,525          27,367          27,367          20,525          20,525
              TOTAL B                              638,876       4.04%        95,831          95,831         127,775         127,775          95,831          95,831

         TOTAL BEFORE IDC (A+B)                 14,410,316     91.04% 1,933,331              428,081 2,837,738 4,072,304 3,745,610 1,393,250

C        OTHERS :
           Interest During Construction          1,226,501       7.75%        47,367          61,537         135,520         243,242         346,172         392,663
           MANAGEMENT FEE                           50,436       0.32%        50,436
           COMMITMENT FEE                          140,942       0.89%        43,669          42,171          32,239          17,986           4,876               0
                     TOTAL C                     1,417,879       8.96%       141,472         103,709         167,759         261,228         351,048         392,663

            GRAND TOTAL                         15,828,195    100.00% 2,074,804              531,790 3,005,497 4,333,532 4,096,658 1,785,913

D        PORTION OF INVESTMENT :
     I     BY BANK LOAN
            INVESTMENT                          10,087,221     70.00% 1,353,332              299,657 1,986,417 2,850,613 2,621,927   975,275
            I. D. C.                             1,226,501               47,367               61,537   135,520   243,242   346,172   392,663
                  TOTAL BANK LOAN               11,313,722            1,400,699              361,194 2,121,937 3,093,855 2,968,099 1,367,938

    II      BY EQUITY :
             INVESTMENT                          4,323,095     30.00%        579,999         128,424         851,321 1,221,691 1,123,683                     417,975
             MANAGEMENT FEE                         50,436      0.50%         50,436
             COMMITMENT FEE                        140,942      0.50%         43,669          42,171          32,239    17,986     4,876                           0
                   TOTAL EQUITY                  4,514,473                   674,105         170,596         883,561 1,239,677 1,128,559                     417,975

            TOTAL BANK LOAN + EQUITY            15,828,195                2,074,804          531,790 3,005,497 4,333,532 4,096,658 1,785,913




                                          Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
MARK-UP INVESTMENT                 100.00%                Main Menu
MARK-UP PRODUCTION                 100.00%
MARK-UP PRICE                      100.00%
MARK-UP RAW MATERIAL               100.00%
MARK UP SALES QUATITY              100.00%

NAME OF PROJECT                              Steel Fabrication Co. ltd.
COMPUTER FILE NAME                           Steel

START YEAR                                                 YEAR 0     YEAR 1       YEAR 2

MARK-UP REINVESTMENT COST                        10.00%                 100.00%     110.00%
MARK-UP/DOWN SALES PRICE                          5.00%                 100.00%     105.00%
MARK-UP/DOWN RAW MATERIALS COST                   5.00%                 100.00%     105.00%
MARK-UP COST :
- FACTORY OVERHEAD                               10.00%                 100.00%     110.00%
- SELLING EXPENSES                               10.00%                 100.00%     110.00%
- GENERAL ADM. EXPENSES                          10.00%                 100.00%     110.00%
- LABOUR COST                                    15.00%                 100.00%     115.00%
PRODUCTION SCHEDULE (MT/YEAR)                                             80.00%     90.00%
PORTION OF LOAN :                                         INTEREST
    INVESTMENT              70.00%                        INVESTMENT    :            14.00%
    WORKING CAPITAL           0.00%                       WORKING CAPITAL :          16.00%

INVENTORIES :
    RAW MATERIALS :
      FIRST OF THE YEAR                         MTH
      END OF THE YEAR                1.00       MTH           8.33%
    GOODS IN PROCESS :
      FIRST OF THE YEAR                         MTH
      END OF THE YEAR                0.03       MTH           0.25%
    FINISHED GOODS :
      FIRST OF THE YEAR                         MTH           0.00%
      END OF THE YEAR                0.50       MTH           4.17%
CASH REQUIREMENT                     3.00       MTH          25.00%
ACCOUNTS PAYABLE               PORTION          A/P                   ACCOUNTS RECEIVABLE :
    IMPORT    0.0 MTH                0.00%       0.00%                EXPORT      0.00
    LOCAL     2.0 MTH             100.00%       16.67%                LOCAL       2.00

                                                           YEAR 0     YEAR 1       YEAR 2
MARK-UP PRICE (Rp 000/MT) :
   FERROS :
       - LOCAL MARKET                              800                      800        840
       - EXPORT MARKET                               0                        0          0

RAW MATERIALS COST (Rp 000/MT)
   FERROS :                                        625                      625        656

PRODUCTION SCHEDULE (MT/YEAR)                   60,000                   48,000      54,000

      Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
PRODUCTION EFFICIENCY
   MARKET PORTION (%):
    LOCAL MARKET                                                   100.00%     100.00%
    EXPORT MARKET                                                    0.00%       0.00%
   MARKET PORTION (MT/YEAR):
      - LOCAL MARKET                                                 48,000        54,000
      - EXPORT MARKET                                                     0             0




     Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
Rp 000

      YEAR 3       YEAR 4      YEAR 5      YEAR 6     YEAR 7      YEAR 8     YEAR 9      YEAR 10

       121.00%      133.10%     146.41%     161.05%    177.16%     194.87%    214.36%      235.79%
       110.25%      115.76%     121.55%     127.63%    134.01%     140.71%    147.75%      155.13%
       110.25%      115.76%     121.55%     127.63%    134.01%     140.71%    147.75%      155.13%

       121.00%      133.10%     146.41%     161.05%    177.16%     194.87%    214.36%      235.79%
       121.00%      133.10%     146.41%     161.05%    177.16%     194.87%    214.36%      235.79%
       121.00%      133.10%     146.41%     161.05%    177.16%     194.87%    214.36%      235.79%
       132.25%      152.09%     174.90%     201.14%    231.31%     266.00%    305.90%      351.79%
       100.00%       100.00%     100.00%    100.00%     100.00%    100.00%     100.00%      100.00%

     IN Rp 000        1,000




CEIVABLE :
        MTH                                   0.00%
        MTH                                  16.67%

      YEAR 3       YEAR 4      YEAR 5      YEAR 6     YEAR 7      YEAR 8     YEAR 9      YEAR 10


          882           926         972       1,021      1,072       1,126       1,182         1,241
            0             0           0           0          0           0           0             0


          689           724         760         798        838         879        923             970

        60,000       60,000      60,000      60,000     60,000      60,000     60,000       60,000

                 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
100.00%      100.00%     100.00%    100.00%     100.00%    100.00%     100.00%     100.00%
  0.00%        0.00%       0.00%      0.00%       0.00%      0.00%       0.00%       0.00%

 60,000       60,000      60,000      60,000     60,000      60,000     60,000      60,000
      0            0           0           0          0           0          0           0




          Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
APPENDIX-3
 Steel Fabrication Co. ltd.
 PROFIT & LOSS PROJECTION                                                                                                                                          Rp 000

   ITEMS                      (%)           YEAR 0   YEAR 1        YEAR 2        YEAR 3        YEAR 4         YEAR 5        YEAR 6       YEAR 7       YEAR 8        YEAR 9        YEAR 10

SALES :
 SALES OF PRODUCTS            100.00%                 34,400,000    42,415,800    49,511,070     52,232,040    54,843,642   57,585,824   60,465,115   63,488,371     66,662,790    69,995,929
 COST OF GOODS SOLD            87.46%                 30,483,900    37,106,118    43,099,376     45,445,850    47,752,665   50,264,394   52,840,186   55,555,816     58,423,844    61,454,122
  GROSS PROFIT                 12.54%                  3,916,100     5,309,682     6,411,694      6,786,190     7,090,977    7,321,430    7,624,929    7,932,555      8,238,945     8,541,808

  GEN & ADM. EXPENSE             1.84%                   553,074       623,361       702,925        793,028       895,114    1,010,825    1,142,038    1,290,891      1,459,827     1,651,634
  GEN & ADM. DEPRECIATION        0.17%                    71,850        71,850        71,850         71,850        71,850      115,715      115,715      115,715        115,715       115,715
  AMORTIZATION                   0.37%                   411,351       411,351       411,351        411,351       411,351            0            0            0              0             0
 OPERATING INCOME               10.16%                 2,879,825     4,203,120     5,225,569      5,509,961     5,712,663    6,194,890    6,367,176    6,525,948      6,663,403     6,774,458

 INTEREST EXPENSE :
   - LONG TERM LOAN                 0.91%              1,552,253     1,321,837     1,040,986        736,267       363,614            0            0            0              0             0
   - SHORT TERM LOAN                0.75%                714,721       877,545       876,073        716,073       556,073      396,073            0            0              0             0
 EARNING BEFORE TAX                 8.50%                612,851     2,003,738     3,308,510      4,057,621     4,792,976    5,798,817    6,367,176    6,525,948      6,663,403     6,774,458

 INCOME TAX                      3.01%                         0             0     1,090,748      1,522,547     1,885,335    1,995,622    2,348,783    2,493,454      2,595,102     2,667,481
 NET PROFIT/LOSS                 5.49%                   612,851     2,003,738     2,217,762      2,535,074     2,907,641    3,803,195    4,018,393    4,032,494      4,068,301     4,106,977
 DIVIDEND                        0.00%                         0             0             0              0             0            0            0            0             0              0
 RETAINED EARNINGS              24.75%                   612,851     2,616,590     4,834,351      7,369,425    10,277,066   14,080,261   18,098,654   22,131,148     26,199,450    30,306,427




                                                     Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
APPENDIX-6A           Main Menu
Steel Fabrication Co. ltd.
DETAIL OF REPAYMENT SCHEDULE
                      INTEREST              BEGINNING           Repayment       Repayment
360          DATE       14.00%               BALANCE

 90     30-MAR-96    395,980                 11,313,722                   0
 91     30-JUN-96    400,380                 11,313,722             750,000
 92     30-SEP-96    377,946                 10,563,722                   0
 92     30-DEC-96    377,946 1,552,253       10,563,722             750,000      1,500,000

 90     30-MAR-97    343,480                  9,813,722                   0
 92     30-JUN-97    351,113                  9,813,722           1,000,000
 92     30-SEP-97    315,335                  8,813,722                   0
 91     30-DEC-97    311,908 1,321,837        8,813,722           1,000,000      2,000,000

 91     30-MAR-98    276,519                  7,813,722                   0
 92     30-JUN-98    279,558                  7,813,722           1,000,000
 92     30-SEP-98    243,780                  6,813,722                   0
 91     30-DEC-98    241,130 1,040,986        6,813,722           1,000,000      2,000,000

 90     30-MAR-99    203,480                  5,813,722                   0
 92     30-JUN-99    208,002                  5,813,722           1,250,000
 92     30-SEP-99    163,280                  4,563,722                   0
 91     30-DEC-99    161,505     736,267      4,563,722           1,250,000      2,500,000

 90     30-MAR-00    115,980                  3,313,722                   0
 92     30-JUN-00    118,558                  3,313,722           1,500,000
 92     30-SEP-00     64,891                  1,813,722                   0
 91     30-DEC-00     64,186     363,614      1,813,722            1,813,722     3,313,722

 90     30-MAR-01           0                         0                    0
 92     30-JUN-01           0                         0                    0
 92     30-SEP-01           0                         0                    0
 91     30-DEC-01           0           0             0                     0           0

 91     30-MAR-02           0                         0                    0
 92     30-JUN-02           0                         0                    0
 92     30-SEP-02           0                         0                    0
 91     30-DEC-02           0           0             0                    0            0

 90     30-MAR-03           0                         0                    0
 92     30-JUN-03           0                         0                    0
 92     30-SEP-03           0                         0                    0
 91     30-DEC-03           0           0             0                     0           0




        Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
ENDING
BALANCE

11,313,722
10,563,722
10,563,722
 9,813,722

 9,813,722
 8,813,722
 8,813,722
 7,813,722

 7,813,722
 6,813,722
 6,813,722
 5,813,722

 5,813,722
 4,563,722
 4,563,722
 3,313,722

 3,313,722
 1,813,722
 1,813,722
         0

        0
        0
        0
        0

        0
        0
        0
        0

        0
        0
        0
        0




   Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
Main Menu
APPENDIX-7A
Steel Fabrication Co. ltd.
INTEREST DURING CONSTRUCTION (IDC)
                       Cash    Total                          Accumulation   Interest
  PERIOD            Withdrawl  Loan              Balance         Loan          Rate
                              70.00%                                         14.00%

                                                10,087,221

 YEAR-I   Q-1         1,933,331     1,353,332     8,733,889      1,353,332     47,367
          Q-2           428,081       299,657     8,434,232      1,652,989     57,855
          Q-3         2,837,738     1,986,417     6,447,816      3,639,406    127,379
          Q-4         4,072,304     2,850,613     3,597,203      6,490,019    227,151
 YEAR-II Q-1          3,745,610     2,621,927       975,275      9,111,946    318,918
          Q-2         1,393,250       975,275             0     10,087,221    353,053
          Q-3
          Q-4
 YEAR-III Q-1
          Q-2
                     14,410,316    10,087,221                   32,334,912 1,131,722




            Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
Accumulation   Interest
  Interest       from      IDC
               Interest   12.16%



     47,367                47,367
    105,221       3,683    61,537
    232,600       8,141   135,520
    459,751      16,091   243,242
    778,669      27,253   346,172
  1,131,722      39,610   392,663




  2,755,330      94,779 1,226,501




         Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
APPENDIX-9A Main Menu
 Steel Fabrication Co. ltd.
 DEPRECIATION SCHEDULE WITH "double declining balance method" FOR INCOME TAX
                                                       Live Time
 DESCRIPTION METHOD              RATE                   (YEARS)
DEPRECIATION :
 CLASS 1          REDUCING VALUE       100% WITHIN         4
 CLASS 2          REDUCING VALUE         50%  WITHIN       4
 CLASS 3          REDUCING VALUE         25% WITHIN       4-8
 CLASS 4          REDUCING VALUE         10% WITHIN
 BULIDINGS        STRAIGH LINE            5%                -

 AMORTIZATION REDUCING VALUE                    50%                  4

                ITEMS                                 YEAR 0       YEAR 1     YEAR 2
                                         SALVAGE
FACTORY DEPRECIATION:
  LAND IMPROVEMENT                           4,224                  18,750    14,063
  BUILDINGS COST                         1,473,750                 147,375   147,375
  I. S. B. L.                              399,963               1,775,610 1,331,708
  O. S. B. L.                                1,102                 564,000   282,000
  VEHICLES                                  16,058                 156,500    78,250
  TOOLS & OFFICE EQUIPMENT                  20,804                 202,750   101,375
  TOTAL                                      1,308             0 2,864,985 1,954,770

AMORT. FOR EXPANSION & DEFER. CH.
 PREOPERATING EXPENSES                     35,977                   159,719    119,789
 I D C + MGT & COMT FEE                    79,846                   354,470    265,852
 TOTAL                                    115,823              0    514,189    385,642

 TOTAL DEPRECIATION & AMORTIZATION                             0 3,379,174 2,340,412




        Part of Book "A to Z Entrepreneur in Parctice" Writer: Harmaizar Zaharuddin
COME TAX                                                                     Rp 000



     OSBL, VEHICLE, F&F
     ISBL




      YEAR 3      YEAR 4      YEAR 5      YEAR 6     YEAR 7      YEAR 8       YEAR 9     YEAR 10


         10,547     7,910         5,933     4,449        3,337       2,503       1,877      1,408
        147,375   147,375       147,375   147,375      147,375     147,375     147,375    147,375
        998,781   749,085       561,814   421,361      316,020     237,015     177,761    133,321
        141,000    70,500        35,250    17,625        8,813       4,406       2,203      1,102
         39,125    19,563         9,781   256,935      128,468      64,234      32,117     16,058
         50,688    25,344        12,672   332,867      166,433      83,217      41,608     20,804
      1,387,515 1,019,777       772,825 1,180,612      770,446     538,750     402,942    320,068


        89,842       67,381      50,536     37,902      28,427      21,320      15,990     11,992
       199,389      149,542     112,156     84,117      63,088      47,316      35,487     26,615
       289,231      216,923     162,693    122,019      91,515      68,636      51,477     38,608

      1,676,746 1,236,700       935,517 1,302,632      861,961     607,386     454,419    358,676




                 Part of Book "A to Z Entrepreneur in Parctice" Writer: Harmaizar Zaharuddin
ATTENTION!
   Income tax (Pajak Penghasilan) dihitung berdasarkan kondisi lapangan yang sebenarnya, dalam penyajia
   laporan keuangan dibuat 2 laporan Laba - Rugi, yaitu:
   - APPENDIX-3, untuk para pemegang saham, yang menggambarkan tahun pertama dan seterusnya lebih
   - APPENDIX-3A, untuk laporan pajak, yang menggambarkan tahun ke-1 rugi, dan selanjutnya keuntunga
   Perbedaannya pada perhitungan DEPRECIATION & AMORTIZATION


Main Menu
APPENDIX-3A
Steel Fabrication Co. ltd.
PROFIT & LOSS PROJECTION (Estimated Taxex with Double Declining Balance Depreciation Method)

ITEMS                                                YEAR 0          YEAR 1            YEAR 2

EARNING BEFORE TAX                                              0        612,851           2,003,738

DEPRECIATION WITH "STRAIGH LINE METHOD :
  FACTORY DEPRECIATION                               0      1,046,019           1,046,019
  GEN. & ADM DEPRECIATION                            0          71,850              71,850
  AMORTIZATION                                       0        411,351             411,351
                                        --------------- ----------------- -------------------
                                                     0      2,142,071           3,532,958

DEPRECIATION "DOUBLE DECLINING BALANCE" :
  TOTAL DEPRE. & AMORTIZATION                           (3,379,174)          (2,340,412)
                                      --------------- ----------------- -------------------
EARNING BEFORE TAX                                      (1,237,102)           1,192,547

INCOME TAXES                                                                      0                   0
                                                    --------------- ----------------- -------------------
NET PROFIT                                                       0    (1,237,102)           1,192,547
RETAINED EARNING                                                 0 (1,237,102)                 (44,556)




            Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
narnya, dalam penyajian

ma dan seterusnya lebih menguntungkan
 selanjutnya keuntungan lebih kecil




Depreciation Method)                                                                                                  Rp 000

        YEAR 3             YEAR 4             YEAR 5             YEAR 6            YEAR 7            YEAR 8             YEAR 9

           3,308,510          4,057,621         4,792,976         5,798,817          6,367,176          6,525,948           6,663,403


            1,046,019         1,046,019         1,046,019         1,089,884          1,089,884          1,089,884           1,089,884
                71,850            71,850             71,850          115,715            115,715            115,715             115,715
              411,351            411,351           411,351                    0                  0                  0                   0
       ------------------ ------------------ ----------------- ----------------- ------------------ ------------------ -------------------
            4,837,730         5,586,841         6,322,196         7,004,416          7,572,776          7,731,548           7,869,002


          (1,676,746) (1,236,700)                 (935,517) (1,302,632)               (861,961)          (607,386)            (454,419)
       ------------------ ------------------ ----------------- ----------------- ------------------ ------------------ -------------------
            3,160,983         4,350,141         5,386,678         5,701,785          6,710,815          7,124,162           7,414,583

          1,090,748          1,522,547         1,885,335         1,995,622          2,348,783          2,493,454           2,595,102
       ------------------ ------------------ ----------------- ----------------- ------------------ ------------------ -------------------
            2,070,235         2,827,594         3,501,343         3,706,163          4,362,032          4,630,708           4,819,481
            2,025,680         4,853,273         8,354,617 12,060,779 16,422,811 21,053,519                                 25,873,000




                      Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
YEAR 10

    6,774,458


    1,089,884
       115,715
                0
------------------
    7,980,057


      (358,676)
------------------
    7,621,382

   2,667,481
------------------
    4,953,901
   30,826,901




               Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
APPENDIX-13             Main Menu
  Steel Fabrication Co. ltd.
  INTERNAL RATE OF RETURN

  ITEMS                                YEAR 0      YEAR 1       YEAR 2                   YEAR 3
IRR ON EBIT (NET PROFIT)
  INVESTMENT (EQUITY + L/T LOAN)      (15,828,195)           0           0                       0
  WORKING CAP. (EQUITY + S/T LOAN)                  (4,467,005) (1,517,650)               (990,799)
  NET PROFIT                                           612,851   2,003,738               2,217,762
  DEPRECIATION & AMORTIZATION                        1,457,370   1,457,370               1,457,370
  INTEREST EXPENSE                                   2,266,974   2,199,381               1,917,059
  INCOME TAX                                                 0           0               1,090,748
  SALVAGE VALUE
            TOTAL    IRR     -194.05% (15,828,195)    (129,809) 4,142,839                5,692,139




-- --------------- --------------- --------- ---------------




               Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
YEAR 4    YEAR 5      YEAR 6      YEAR 7     YEAR 8      YEAR 9     YEAR 10

        0         0         0         0         0         0                   0
        0         0         0         0         0         0                   0
2,535,074 2,907,641 3,803,195 4,018,393 4,032,494 4,068,301           4,106,977
1,457,370 1,457,370 1,089,884 1,089,884 1,089,884 1,089,884           1,089,884
1,452,340   919,687   396,073         0         0         0                   0
1,522,547 1,885,335 1,995,622 2,348,783 2,493,454 2,595,102           2,667,481
                                                                      3,311,250
6,967,331 7,170,033 7,284,774 7,457,060 7,615,833 7,753,287          11,175,592




         Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
APPENDIX-14             Main Menu
Steel Fabrication Co. ltd.
SENSITIVITY ANALYSIS

  Sales         IRR       -194.05% Raw Material     IRR       -194.05% Production       IRR
  Price                               Cost                                Cost

  -5.00%         -5.93%                -5.00%        49.16%               -5.00%        29.52%
  -4.00%          2.86%                -4.00%        45.58%               -4.00%        29.32%
  -3.00%         10.08%                -3.00%        41.89%               -3.00%        29.11%
  -2.00%         16.27%                -2.00%        36.47%               -2.00%        28.90%
  -1.00%         21.85%                -1.00%        32.56%               -1.00%        27.93%
   0.00%         27.71%                 0.00%        27.71%                0.00%        27.71%
   1.00%         33.31%                 1.00%        22.60%                1.00%        27.50%
   2.00%         39.66%                 2.00%        17.95%                2.00%        27.28%
   3.00%         44.28%                 3.00%        12.52%                3.00%        27.05%
   4.00%         48.82%                 4.00%         6.52%                4.00%        26.83%
   5.00%         53.31%                 5.00%        -0.37%                5.00%        26.61%
   6.00%         57.75%                 6.00%        -9.34%                6.00%        26.37%
   7.00%         62.16%                 7.00%       -24.12%                7.00%        26.14%




          Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
Sales
-194.05%     Quanitity     IRR       -194.05% Investment      IRR       -194.05%
             (MTPA)                              Cost

                70.00%      14.35%               -5.00%        29.11%
                72.50%      15.69%               -4.00%        28.83%
                75.00%      16.84%               -3.00%        28.54%
                77.50%      17.95%               -2.00%        28.26%
                80.00%      19.05%               -1.00%        27.98%
                82.50%      20.11%                0.00%        27.71%
                85.00%      21.15%                1.00%        27.45%
                87.50%      22.31%                2.00%        27.18%
                90.00%      23.58%                3.00%        26.92%
                92.50%      24.74%                4.00%        26.67%
                95.00%      25.85%                5.00%        26.41%
                97.50%      26.79%                6.00%        26.16%
               100.00%      27.71%                7.00%        25.91%




           Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
APPENDIX-0                                  Main Menu
  Steel Fabrication Co. ltd.
  SUMMARY
  INVESTMENT COST :                                                                           SALES PRICE :
  BANK LOAN :                                                                                 FERROS :
  - INVESTMENT                                Rp           10,087,221                         - LOCAL MARKET
  - I. D. C.                                  Rp            1,226,501                         RAW MATERIAL :
  EQUITY :                                                                                    FERROS
  - INVESTMENT                                Rp            4,323,095                         NORMAL CAPACITY :
  - MANAGEMENT FEE                            Rp               50,436                         FERROS
  - COMMITMENT FEE                            Rp              140,942                         PRODUCTION EFFICIENCY 0,94%
  TOTAL INVESTMENT                            Rp           15,828,195

  PORTION OF FUNDS :                                      INTEREST RATE :
  BANK LOAN         70.00%                                 INVESTMENT                                  14.00%
  EQUITY            30.00%                                 WORKING CAPITAL                             16.00%

WORKING CAPITAL TURNOVER :                                                  ACCOUNTS RECEIVABLE :
 RAW MATERIALS                                     1.00   MONTH              EXPORT           0                           MONTH
 GOODS IN PROCESS                                  0.03   MONTH              LOCAL            2                           MONTH
 FINISHED GOODS                                    0.50   MONTH
 CASH REQUIREMENT                                  3.00   MONTH

RATIOS :                                                                      YEAR 0             YEAR 1              YEAR 2
GROSS PROFIT (% TO SALES)                                                                               11.38%              12.52%
NET OPERATING INCOME (% TO SALES)                                                                         8.37%               9.91%
NET INCOME AFTER TAX (% TO SALES)                                                                         1.78%               4.72%
-- ---- ----- ----- --------- --------------- ----------- ----------------- ------------------ ------------------- -------------------
MATERIALS COST TO SALES                                                                                 78.13%              78.13%
ASSETS TURNOVER (SALES ON ASSETS)                                                                      141.42%             167.05%
R.O.I. (EBIT ON ASSETS)                                                                                 11.84%              16.55%
R.O.E. (EFIT ON EQUITY)                                                                                 11.95%              28.10%
PAYBACK PERIOD                                                (YEAR)         (15,828,195) (11,419,149)                 (5,686,810)

                    IRR         -194.05%

CURRENT ASSETS ON TOTAL ASSETS                                                                         41.22%              49.71%
LIQUIDITY                                                                                             106.84%             120.82%
EQUITY ON ASSETS                                                                                       21.08%              28.09%

DEBT TO EQUITY                                                                                        374.41%             256.05%
DEBT TO TOTAL ASSETS                                                               71.48%              78.92%              71.91%

TOTAL CAPITALIZATION                                                               71.48%              65.68%              52.28%




               Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
Rp 000
                                                       MARK-UP COST :
                                                       REINVESTMENT COST                             10.00%
        800,000         Rp/MT                          SALES PRICE                                    5.00%
                                                       RAW MATERIALS COST                             5.00%
        625,000         Rp/MT                          OTHER COSTS :
                                                       - FACTORY OVERHEAD                            10.00%
                          60,000          MTPA         - SELLING EXPENSES                            10.00%
ENCY 0,94%      ON        56,400          MTPA         - GENERAL ADM. EXPENSES                       10.00%
                                                       - LABOUR COST                                 15.00%




                      ACCOUNTS PAYABLE :
                      IMPORT         0                       MONTH
                      LOCAL          2                       MONTH



       YEAR 3          YEAR 4          YEAR 5            YEAR 6             YEAR 7             YEAR 8             YEAR 9
          12.95%          12.99%             12.93%            12.71%             12.61%             12.49%              12.36%
          10.55%          10.55%             10.42%            10.76%             10.53%             10.28%              10.00%
            4.48%           4.85%             5.30%              6.60%              6.65%              6.35%              6.10%
     --------------- --------------- ----------------- ------------------ ------------------ ------------------ -------------------
          78.13%          78.13%             78.13%            78.13%             78.13%             78.13%              78.13%
         186.23% 201.60%                   220.58%           216.72%            195.12%             179.14%            166.87%
          19.66%          21.27%             22.98%            23.31%             20.55%             18.41%              16.68%
          23.72%          21.33%             19.66%            20.45%             17.77%             15.13%              13.25%
         (22,769) 5,493,865 10,850,412 15,098,128 20,322,121 25,560,214 30,834,115



         57.72%           62.52%            67.09%            69.39%             77.64%             83.85%              88.69%
        134.33%          151.22%           165.62%           231.14%            287.27%            337.92%             383.70%
         35.16%           45.87%            59.49%            69.98%             72.97%             75.19%              76.88%

        184.38%          118.01%            68.10%             42.90%             37.04%             33.00%             30.06%
         64.84%           54.13%            40.51%             30.02%             27.03%             24.81%             23.12%

          38.34%          21.80%              0.00%              0.00%             0.00%              0.00%               0.00%




                    Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
YEAR 10
         12.20%
          9.68%
          5.87%
-------------------
         78.13%
       157.24%
         15.22%
         11.79%
   36,146,691



        92.56%
       424.98%
        78.22%

        27.84%
        21.78%

          0.00%




               Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin

More Related Content

What's hot (8)

Seminar Saham
Seminar SahamSeminar Saham
Seminar Saham
 
Analisis Teknikal Saham 2
Analisis Teknikal Saham 2Analisis Teknikal Saham 2
Analisis Teknikal Saham 2
 
Financial Projection Restoran
Financial Projection RestoranFinancial Projection Restoran
Financial Projection Restoran
 
Resource procurement
 Resource procurement Resource procurement
Resource procurement
 
Supply Chain Management - R Bays
Supply  Chain  Management - R BaysSupply  Chain  Management - R Bays
Supply Chain Management - R Bays
 
Parker Hannifin 2012 Annual Report
Parker Hannifin 2012 Annual ReportParker Hannifin 2012 Annual Report
Parker Hannifin 2012 Annual Report
 
Marutisuzuki citigrp 14june08
Marutisuzuki citigrp 14june08Marutisuzuki citigrp 14june08
Marutisuzuki citigrp 14june08
 
Metro High Capacity Transit System Plan
Metro High Capacity Transit System PlanMetro High Capacity Transit System Plan
Metro High Capacity Transit System Plan
 

Viewers also liked

Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014Chris May
 
База членства і розсилки для християн-медиків
База членства і розсилки для християн-медиківБаза членства і розсилки для християн-медиків
База членства і розсилки для християн-медиківVitaliy Shabunin
 
Комунікація для Асоцації христян-юристів
Комунікація для Асоцації христян-юристівКомунікація для Асоцації христян-юристів
Комунікація для Асоцації христян-юристівVitaliy Shabunin
 
Pengurusan bangunan berstrata
Pengurusan bangunan berstrataPengurusan bangunan berstrata
Pengurusan bangunan berstrataAimi Filzah
 
3-Minute Critical Thinking Advert - first draft
3-Minute Critical Thinking Advert - first draft3-Minute Critical Thinking Advert - first draft
3-Minute Critical Thinking Advert - first draftDamian T. Gordon
 
Corporate training - Mind Programming - Kushalta Academy
Corporate training - Mind Programming - Kushalta AcademyCorporate training - Mind Programming - Kushalta Academy
Corporate training - Mind Programming - Kushalta AcademyJohn Bhatt
 
Mini market bab iii
Mini market   bab iiiMini market   bab iii
Mini market bab iiiimecommunity
 
Magazine spreads
Magazine spreadsMagazine spreads
Magazine spreadszenmariku
 
Put your polling station on the map
Put your polling station on the mapPut your polling station on the map
Put your polling station on the mapFiifi Baidoo
 
UOW-Caching and new ways to improve response time (Paper)
UOW-Caching and new ways to improve response time (Paper)UOW-Caching and new ways to improve response time (Paper)
UOW-Caching and new ways to improve response time (Paper)Guson Kuntarto
 
Introhive overview general
Introhive overview   generalIntrohive overview   general
Introhive overview generalChris May
 
Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...
Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...
Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...Vitaliy Shabunin
 
Bridge metrics channel marketing overview 2013
Bridge metrics channel marketing overview 2013Bridge metrics channel marketing overview 2013
Bridge metrics channel marketing overview 2013Chris May
 
File 2 office building
File 2 office buildingFile 2 office building
File 2 office buildingimecommunity
 
Universal Design, Education and Technology
Universal Design, Education and TechnologyUniversal Design, Education and Technology
Universal Design, Education and TechnologyDamian T. Gordon
 
Lcc healthy air
Lcc healthy airLcc healthy air
Lcc healthy airzenmariku
 

Viewers also liked (20)

Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014Socialondemand newsondemand purechannelapps_2014
Socialondemand newsondemand purechannelapps_2014
 
База членства і розсилки для християн-медиків
База членства і розсилки для християн-медиківБаза членства і розсилки для християн-медиків
База членства і розсилки для християн-медиків
 
Комунікація для Асоцації христян-юристів
Комунікація для Асоцації христян-юристівКомунікація для Асоцації христян-юристів
Комунікація для Асоцації христян-юристів
 
Pengurusan bangunan berstrata
Pengurusan bangunan berstrataPengurusan bangunan berstrata
Pengurusan bangunan berstrata
 
3-Minute Critical Thinking Advert - first draft
3-Minute Critical Thinking Advert - first draft3-Minute Critical Thinking Advert - first draft
3-Minute Critical Thinking Advert - first draft
 
Corporate training - Mind Programming - Kushalta Academy
Corporate training - Mind Programming - Kushalta AcademyCorporate training - Mind Programming - Kushalta Academy
Corporate training - Mind Programming - Kushalta Academy
 
Mini market bab iii
Mini market   bab iiiMini market   bab iii
Mini market bab iii
 
Magazine spreads
Magazine spreadsMagazine spreads
Magazine spreads
 
Put your polling station on the map
Put your polling station on the mapPut your polling station on the map
Put your polling station on the map
 
UOW-Caching and new ways to improve response time (Paper)
UOW-Caching and new ways to improve response time (Paper)UOW-Caching and new ways to improve response time (Paper)
UOW-Caching and new ways to improve response time (Paper)
 
Introhive overview general
Introhive overview   generalIntrohive overview   general
Introhive overview general
 
Praktek dokter
Praktek dokterPraktek dokter
Praktek dokter
 
Jesuitslideshow
JesuitslideshowJesuitslideshow
Jesuitslideshow
 
Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...
Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...
Как ваше служение может сделать вас конкурентными на рынке труда и поможет ва...
 
Bridge metrics channel marketing overview 2013
Bridge metrics channel marketing overview 2013Bridge metrics channel marketing overview 2013
Bridge metrics channel marketing overview 2013
 
File 2 office building
File 2 office buildingFile 2 office building
File 2 office building
 
Universal Design, Education and Technology
Universal Design, Education and TechnologyUniversal Design, Education and Technology
Universal Design, Education and Technology
 
Cognitivism
CognitivismCognitivism
Cognitivism
 
Plat 03
Plat 03Plat 03
Plat 03
 
Lcc healthy air
Lcc healthy airLcc healthy air
Lcc healthy air
 

Similar to Steel

Bisnis plan-warnet-broadband
Bisnis plan-warnet-broadbandBisnis plan-warnet-broadband
Bisnis plan-warnet-broadbandRobby Ariebullah
 
Line by environment interaction, yield stability and grouping of test locatio...
Line by environment interaction, yield stability and grouping of test locatio...Line by environment interaction, yield stability and grouping of test locatio...
Line by environment interaction, yield stability and grouping of test locatio...ILRI
 
Profit And Loss Account
Profit And Loss AccountProfit And Loss Account
Profit And Loss AccountJohn Toon
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2armada7000
 
Erika Excel Graficos
Erika Excel GraficosErika Excel Graficos
Erika Excel Graficosguest4258c4
 
Your Dream Plot In Haridwar : Octagon vista Haridwar
Your Dream Plot In Haridwar : Octagon vista HaridwarYour Dream Plot In Haridwar : Octagon vista Haridwar
Your Dream Plot In Haridwar : Octagon vista HaridwarDna Real Estate Pvt. Ltd.
 
Earnings release 3 q09 presentation
Earnings release 3 q09 presentationEarnings release 3 q09 presentation
Earnings release 3 q09 presentationBrasilEcodiesel
 
Modelos economicos
Modelos economicosModelos economicos
Modelos economicosFrancoveliz
 
5 year cashflow Cal Marine SCAM????
5 year cashflow Cal Marine SCAM????5 year cashflow Cal Marine SCAM????
5 year cashflow Cal Marine SCAM????FingerPointer
 
S10 tr-tank rupturetutorial
S10 tr-tank rupturetutorialS10 tr-tank rupturetutorial
S10 tr-tank rupturetutorialazerty82
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculationsashleyyeap
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excelashleyyeap
 
Ms Ryndam Homogenizer Data.Docx
Ms Ryndam Homogenizer Data.DocxMs Ryndam Homogenizer Data.Docx
Ms Ryndam Homogenizer Data.DocxBart Sluimer
 
Business plan on fly ash bricks
Business plan on fly ash bricksBusiness plan on fly ash bricks
Business plan on fly ash bricksAtikant Kashyap
 

Similar to Steel (20)

Bisnis plan-warnet-broadband
Bisnis plan-warnet-broadbandBisnis plan-warnet-broadband
Bisnis plan-warnet-broadband
 
Line by environment interaction, yield stability and grouping of test locatio...
Line by environment interaction, yield stability and grouping of test locatio...Line by environment interaction, yield stability and grouping of test locatio...
Line by environment interaction, yield stability and grouping of test locatio...
 
Profit And Loss Account
Profit And Loss AccountProfit And Loss Account
Profit And Loss Account
 
Rate Card 2008 Ppt
Rate Card 2008 PptRate Card 2008 Ppt
Rate Card 2008 Ppt
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2
 
Accruals 16.02.09
Accruals 16.02.09Accruals 16.02.09
Accruals 16.02.09
 
Erika Excel Graficos
Erika Excel GraficosErika Excel Graficos
Erika Excel Graficos
 
Accruals 16.02.09
Accruals 16.02.09Accruals 16.02.09
Accruals 16.02.09
 
Accruals 16.02.09
Accruals 16.02.09Accruals 16.02.09
Accruals 16.02.09
 
Your Dream Plot In Haridwar : Octagon vista Haridwar
Your Dream Plot In Haridwar : Octagon vista HaridwarYour Dream Plot In Haridwar : Octagon vista Haridwar
Your Dream Plot In Haridwar : Octagon vista Haridwar
 
Acquisition management
Acquisition managementAcquisition management
Acquisition management
 
Earnings release 3 q09 presentation
Earnings release 3 q09 presentationEarnings release 3 q09 presentation
Earnings release 3 q09 presentation
 
Modelos economicos
Modelos economicosModelos economicos
Modelos economicos
 
5 year cashflow Cal Marine SCAM????
5 year cashflow Cal Marine SCAM????5 year cashflow Cal Marine SCAM????
5 year cashflow Cal Marine SCAM????
 
S10 tr-tank rupturetutorial
S10 tr-tank rupturetutorialS10 tr-tank rupturetutorial
S10 tr-tank rupturetutorial
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculations
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excel
 
Ms Ryndam Homogenizer Data.Docx
Ms Ryndam Homogenizer Data.DocxMs Ryndam Homogenizer Data.Docx
Ms Ryndam Homogenizer Data.Docx
 
WEIGHTING TABLE
WEIGHTING TABLEWEIGHTING TABLE
WEIGHTING TABLE
 
Business plan on fly ash bricks
Business plan on fly ash bricksBusiness plan on fly ash bricks
Business plan on fly ash bricks
 

More from imecommunity

More from imecommunity (20)

Exp imp-bab-03
Exp imp-bab-03Exp imp-bab-03
Exp imp-bab-03
 
Exp imp-bab-02
Exp imp-bab-02Exp imp-bab-02
Exp imp-bab-02
 
0167 surat diknas kab bondowoso
0167 surat diknas kab bondowoso0167 surat diknas kab bondowoso
0167 surat diknas kab bondowoso
 
0165 surat diknas kab banyuwangi
0165 surat diknas kab banyuwangi0165 surat diknas kab banyuwangi
0165 surat diknas kab banyuwangi
 
0164 surat diknas kab sumenep
0164 surat diknas kab sumenep0164 surat diknas kab sumenep
0164 surat diknas kab sumenep
 
Proyeksi keuangan office building
Proyeksi keuangan office buildingProyeksi keuangan office building
Proyeksi keuangan office building
 
Perhotelan
PerhotelanPerhotelan
Perhotelan
 
Perhotelan
PerhotelanPerhotelan
Perhotelan
 
Steel sm
Steel smSteel sm
Steel sm
 
Steel 3
Steel 3Steel 3
Steel 3
 
Steel 1
Steel 1Steel 1
Steel 1
 
Exp imp-rks
Exp imp-rksExp imp-rks
Exp imp-rks
 
Exp imp-di
Exp imp-diExp imp-di
Exp imp-di
 
Exp imp-bab-05
Exp imp-bab-05Exp imp-bab-05
Exp imp-bab-05
 
Exp imp-bab-04
Exp imp-bab-04Exp imp-bab-04
Exp imp-bab-04
 
Exp imp-bab-01
Exp imp-bab-01Exp imp-bab-01
Exp imp-bab-01
 
Sekolah menengah umum
Sekolah menengah umumSekolah menengah umum
Sekolah menengah umum
 
Sekolah menengah umum
Sekolah menengah umumSekolah menengah umum
Sekolah menengah umum
 
Rms ramalan smu
Rms ramalan smuRms ramalan smu
Rms ramalan smu
 
Plat 05
Plat 05Plat 05
Plat 05
 

Steel

  • 1. MAIN MENU STEEL FABRICATION FINANCIAL PROJECTION Ke SUB MENU Click di bawah ini: FORM-A INVESTMENT COST FORM-B FACTORY OVERHEAD COST FORM-C SELLING EXPENSES FORM V-D GENERAL & ADMINISTRATIVE EXPENSES FORM V-E PRODUTION, RAW MATERIALS COST & SELLING PRICE (Rp/MT) APPENDIX-0 SUMMARY APPENDIX-1 PROJECTED BALANCE SHEET APPENDIX-2 CASH FLOW PROJECTION APPENDIX-3 PROFIT & LOSS PROJECTION APPENDIX-3A PROFIT & LOSS PROJECTION (Estimated Taxex with Double Declining Ba APPENDIX-4 COST OF GOODS SOLD APPENDIX-5 PRODUCTION, SALES AND COLLECTION SCHEDULE LAMPIRAN 6 STRUCTURE OF FUNDS APPENDIX-6A DETAIL OF REPAYMENT SCHEDULE APPENDIX-7 DRAW DOWN OF PROJECT COST SCHEDULE APPENDIX-7A INTEREST DURING CONSTRUCTION (IDC) APPENDIX-8 INVESTMENT AND REINTVESMENT SCHEDULE APPENDIX-9 DEPRECIATION AND MAINTENANCE SCHEDULE APPENDIX-9A DEPRECIATION SCHEDULE WITH "double declining balance method" FOR APPENDIX-10 CASH REQUIREMENT FOR OPERATION APPENDIX-11 ESTIMATED WORKING CAPITAL NEEDED APPENDIX-12 FINANCIAL RATIO APPENDIX-13 INTERNAL RATE OF RETURN APPENDIX-14 SENSITIVITY ANALYSIS
  • 2. ELLING PRICE (Rp/MT) Taxex with Double Declining Balance Depreciation Method) SCHEDULE declining balance method" FOR INCOME TAX
  • 3. FORM-A Steel Fabrication Co. ltd. INVESTMENT COST NO. DESCRIPTION VOLUME UNIT PRICE PER-UNIT BI LAND COST 1 LAND COST 30,000 m2 60.00 2 LAND IMPROVEMENT COST 30,000 m2 2.500 II CONSTRUCTION : 1 BUILDING COST: FACTORY BUILDINGS COST FACTORY BUILDING 13,428 M2 150.000 HOIST CRANE (10 TON) 2 UNIT 150,000.000 GARDU LISTRIK 1 LS 50,000.000 PLUMBING & PUMP (ARTHESIS) 2 UNIT 50,000.000 Total A OFFICE BUILDING OFFICE BUILDING 500 M2 450.000 GUARD HOUSE 50 M2 300.000 CANTEEN 50 M2 300.000 ROAD 7,500 M2 30.000 FENCE HIGHT 3 M, ROUND : 220 M 15.000 Total B Total A+B 2 ISBL (INSIDE BATTERY LIMIT) BARNNERS MACHINERIES 1.00 LS 716,760.000 MOTOR (4150 kW) 1.00 LS 586,440.000 ROLLING CONSTRUCTION 850 T 1.00 LS 5,212,800.000 INST. OF ELECTR. & CONTROL 1.00 LS 586,440.000 3 OSBL (OUTSIDE BATTERY LIMIT) GENSET (500 kW CADANGAN) 1.00 LS 150,000.000 PLN COST 6,000,000 VA 0.163 4 VEHICLES PLANT DIRECTOR 1 UNIT 75,000.000 MANAGER'S VEHICLES 3 UNIT 40,000.000 MINIBUS (KIJANG) 2 UNIT 30,000.000 FORKLIFTS 1 UNIT 50,000.000 MOTOR CARS 2 UNIT 4,000.000 5 TOOLS & OFFICE EQUIPMENT Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 4. Rp 000 TOTAL PRICE 1.00 1,800,000.00 60.00 75,000.00 2.50 2,014,200.00 150.00 300,000.00 150,000.00 50,000.00 50,000 100,000.00 50,000.00 2,464,200.00 850 225,000.00 450.00 15,000.00 300.00 15,000.00 300.00 225,000.00 30.00 3,300.00 15.00 483,300.00 2,947,500.00 716,760.00 716,760.00 586,440.00 586,440.00 5,212,800.00 5,212,800.00 586,440.00 586,440.00 7,102,440.00 150,000.00 150,000 978,000.00 0.163 1,128,000.00 75,000.00 75,000.00 120,000.00 40,000.00 60,000.00 30,000.00 50,000.00 50,000.00 8,000.00 4,000.00 313,000.00 250,346 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 5. Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 6. APPENDIX-7 Main Menu Steel Fabrication Co. ltd. DRAW DOWN OF PROJECT COST SCHEDULE Rp 000 AMOUNT YEAR - I YEAR - II NO DESCRIPTION (%) --------------- --------------- --------------- --------------- --------------- --------------- Rp Q-1 Q-2 Q-3 Q-4 Q-1 Q-2 A I LAND : 1 LAND COST 1,800,000 11.37% 1,800,000 2 LAND IMPROVEMENT 75,000 0.47% 37,500 37,500 0.00% II CONSTRUCTION : 0.00% 1 BUILDING COST 2,947,500 18.62% 294,750 884,250 884,250 589,500 294,750 2 ISBL 7,102,440 44.87% 1,420,488 2,485,854 2,485,854 710,244 3 OSBL 1,128,000 7.13% 225,600 394,800 394,800 112,800 4 VEHICLES 313,000 1.98% 78,250 78,250 78,250 78,250 5 TOOLS & OFFICE EQUIPMENT 405,500 2.56% 101,375 101,375 101,375 101,375 TOTAL A 13,771,440 87.01% 1,837,500 332,250 2,709,963 3,944,529 3,649,779 1,297,419 B PRE-OPERATING : OFFICES EXPENSES 250,000 1.58% 37,500 37,500 50,000 50,000 37,500 37,500 CONSULTAN FEE 100,000 0.63% 15,000 15,000 20,000 20,000 15,000 15,000 DESIGNING FEE 152,040 0.96% 22,806 22,806 30,408 30,408 22,806 22,806 EXPATRIATE (+ 1 MONTH) 136,836 0.86% 20,525 20,525 27,367 27,367 20,525 20,525 TOTAL B 638,876 4.04% 95,831 95,831 127,775 127,775 95,831 95,831 TOTAL BEFORE IDC (A+B) 14,410,316 91.04% 1,933,331 428,081 2,837,738 4,072,304 3,745,610 1,393,250 C OTHERS : Interest During Construction 1,226,501 7.75% 47,367 61,537 135,520 243,242 346,172 392,663 MANAGEMENT FEE 50,436 0.32% 50,436 COMMITMENT FEE 140,942 0.89% 43,669 42,171 32,239 17,986 4,876 0 TOTAL C 1,417,879 8.96% 141,472 103,709 167,759 261,228 351,048 392,663 GRAND TOTAL 15,828,195 100.00% 2,074,804 531,790 3,005,497 4,333,532 4,096,658 1,785,913 D PORTION OF INVESTMENT : I BY BANK LOAN INVESTMENT 10,087,221 70.00% 1,353,332 299,657 1,986,417 2,850,613 2,621,927 975,275 I. D. C. 1,226,501 47,367 61,537 135,520 243,242 346,172 392,663 TOTAL BANK LOAN 11,313,722 1,400,699 361,194 2,121,937 3,093,855 2,968,099 1,367,938 II BY EQUITY : INVESTMENT 4,323,095 30.00% 579,999 128,424 851,321 1,221,691 1,123,683 417,975 MANAGEMENT FEE 50,436 0.50% 50,436 COMMITMENT FEE 140,942 0.50% 43,669 42,171 32,239 17,986 4,876 0 TOTAL EQUITY 4,514,473 674,105 170,596 883,561 1,239,677 1,128,559 417,975 TOTAL BANK LOAN + EQUITY 15,828,195 2,074,804 531,790 3,005,497 4,333,532 4,096,658 1,785,913 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 7. MARK-UP INVESTMENT 100.00% Main Menu MARK-UP PRODUCTION 100.00% MARK-UP PRICE 100.00% MARK-UP RAW MATERIAL 100.00% MARK UP SALES QUATITY 100.00% NAME OF PROJECT Steel Fabrication Co. ltd. COMPUTER FILE NAME Steel START YEAR YEAR 0 YEAR 1 YEAR 2 MARK-UP REINVESTMENT COST 10.00% 100.00% 110.00% MARK-UP/DOWN SALES PRICE 5.00% 100.00% 105.00% MARK-UP/DOWN RAW MATERIALS COST 5.00% 100.00% 105.00% MARK-UP COST : - FACTORY OVERHEAD 10.00% 100.00% 110.00% - SELLING EXPENSES 10.00% 100.00% 110.00% - GENERAL ADM. EXPENSES 10.00% 100.00% 110.00% - LABOUR COST 15.00% 100.00% 115.00% PRODUCTION SCHEDULE (MT/YEAR) 80.00% 90.00% PORTION OF LOAN : INTEREST INVESTMENT 70.00% INVESTMENT : 14.00% WORKING CAPITAL 0.00% WORKING CAPITAL : 16.00% INVENTORIES : RAW MATERIALS : FIRST OF THE YEAR MTH END OF THE YEAR 1.00 MTH 8.33% GOODS IN PROCESS : FIRST OF THE YEAR MTH END OF THE YEAR 0.03 MTH 0.25% FINISHED GOODS : FIRST OF THE YEAR MTH 0.00% END OF THE YEAR 0.50 MTH 4.17% CASH REQUIREMENT 3.00 MTH 25.00% ACCOUNTS PAYABLE PORTION A/P ACCOUNTS RECEIVABLE : IMPORT 0.0 MTH 0.00% 0.00% EXPORT 0.00 LOCAL 2.0 MTH 100.00% 16.67% LOCAL 2.00 YEAR 0 YEAR 1 YEAR 2 MARK-UP PRICE (Rp 000/MT) : FERROS : - LOCAL MARKET 800 800 840 - EXPORT MARKET 0 0 0 RAW MATERIALS COST (Rp 000/MT) FERROS : 625 625 656 PRODUCTION SCHEDULE (MT/YEAR) 60,000 48,000 54,000 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 8. PRODUCTION EFFICIENCY MARKET PORTION (%): LOCAL MARKET 100.00% 100.00% EXPORT MARKET 0.00% 0.00% MARKET PORTION (MT/YEAR): - LOCAL MARKET 48,000 54,000 - EXPORT MARKET 0 0 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 9. Rp 000 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 121.00% 133.10% 146.41% 161.05% 177.16% 194.87% 214.36% 235.79% 110.25% 115.76% 121.55% 127.63% 134.01% 140.71% 147.75% 155.13% 110.25% 115.76% 121.55% 127.63% 134.01% 140.71% 147.75% 155.13% 121.00% 133.10% 146.41% 161.05% 177.16% 194.87% 214.36% 235.79% 121.00% 133.10% 146.41% 161.05% 177.16% 194.87% 214.36% 235.79% 121.00% 133.10% 146.41% 161.05% 177.16% 194.87% 214.36% 235.79% 132.25% 152.09% 174.90% 201.14% 231.31% 266.00% 305.90% 351.79% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% IN Rp 000 1,000 CEIVABLE : MTH 0.00% MTH 16.67% YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 882 926 972 1,021 1,072 1,126 1,182 1,241 0 0 0 0 0 0 0 0 689 724 760 798 838 879 923 970 60,000 60,000 60,000 60,000 60,000 60,000 60,000 60,000 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 10. 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 60,000 60,000 60,000 60,000 60,000 60,000 60,000 60,000 0 0 0 0 0 0 0 0 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 11. APPENDIX-3 Steel Fabrication Co. ltd. PROFIT & LOSS PROJECTION Rp 000 ITEMS (%) YEAR 0 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 SALES : SALES OF PRODUCTS 100.00% 34,400,000 42,415,800 49,511,070 52,232,040 54,843,642 57,585,824 60,465,115 63,488,371 66,662,790 69,995,929 COST OF GOODS SOLD 87.46% 30,483,900 37,106,118 43,099,376 45,445,850 47,752,665 50,264,394 52,840,186 55,555,816 58,423,844 61,454,122 GROSS PROFIT 12.54% 3,916,100 5,309,682 6,411,694 6,786,190 7,090,977 7,321,430 7,624,929 7,932,555 8,238,945 8,541,808 GEN & ADM. EXPENSE 1.84% 553,074 623,361 702,925 793,028 895,114 1,010,825 1,142,038 1,290,891 1,459,827 1,651,634 GEN & ADM. DEPRECIATION 0.17% 71,850 71,850 71,850 71,850 71,850 115,715 115,715 115,715 115,715 115,715 AMORTIZATION 0.37% 411,351 411,351 411,351 411,351 411,351 0 0 0 0 0 OPERATING INCOME 10.16% 2,879,825 4,203,120 5,225,569 5,509,961 5,712,663 6,194,890 6,367,176 6,525,948 6,663,403 6,774,458 INTEREST EXPENSE : - LONG TERM LOAN 0.91% 1,552,253 1,321,837 1,040,986 736,267 363,614 0 0 0 0 0 - SHORT TERM LOAN 0.75% 714,721 877,545 876,073 716,073 556,073 396,073 0 0 0 0 EARNING BEFORE TAX 8.50% 612,851 2,003,738 3,308,510 4,057,621 4,792,976 5,798,817 6,367,176 6,525,948 6,663,403 6,774,458 INCOME TAX 3.01% 0 0 1,090,748 1,522,547 1,885,335 1,995,622 2,348,783 2,493,454 2,595,102 2,667,481 NET PROFIT/LOSS 5.49% 612,851 2,003,738 2,217,762 2,535,074 2,907,641 3,803,195 4,018,393 4,032,494 4,068,301 4,106,977 DIVIDEND 0.00% 0 0 0 0 0 0 0 0 0 0 RETAINED EARNINGS 24.75% 612,851 2,616,590 4,834,351 7,369,425 10,277,066 14,080,261 18,098,654 22,131,148 26,199,450 30,306,427 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 12. APPENDIX-6A Main Menu Steel Fabrication Co. ltd. DETAIL OF REPAYMENT SCHEDULE INTEREST BEGINNING Repayment Repayment 360 DATE 14.00% BALANCE 90 30-MAR-96 395,980 11,313,722 0 91 30-JUN-96 400,380 11,313,722 750,000 92 30-SEP-96 377,946 10,563,722 0 92 30-DEC-96 377,946 1,552,253 10,563,722 750,000 1,500,000 90 30-MAR-97 343,480 9,813,722 0 92 30-JUN-97 351,113 9,813,722 1,000,000 92 30-SEP-97 315,335 8,813,722 0 91 30-DEC-97 311,908 1,321,837 8,813,722 1,000,000 2,000,000 91 30-MAR-98 276,519 7,813,722 0 92 30-JUN-98 279,558 7,813,722 1,000,000 92 30-SEP-98 243,780 6,813,722 0 91 30-DEC-98 241,130 1,040,986 6,813,722 1,000,000 2,000,000 90 30-MAR-99 203,480 5,813,722 0 92 30-JUN-99 208,002 5,813,722 1,250,000 92 30-SEP-99 163,280 4,563,722 0 91 30-DEC-99 161,505 736,267 4,563,722 1,250,000 2,500,000 90 30-MAR-00 115,980 3,313,722 0 92 30-JUN-00 118,558 3,313,722 1,500,000 92 30-SEP-00 64,891 1,813,722 0 91 30-DEC-00 64,186 363,614 1,813,722 1,813,722 3,313,722 90 30-MAR-01 0 0 0 92 30-JUN-01 0 0 0 92 30-SEP-01 0 0 0 91 30-DEC-01 0 0 0 0 0 91 30-MAR-02 0 0 0 92 30-JUN-02 0 0 0 92 30-SEP-02 0 0 0 91 30-DEC-02 0 0 0 0 0 90 30-MAR-03 0 0 0 92 30-JUN-03 0 0 0 92 30-SEP-03 0 0 0 91 30-DEC-03 0 0 0 0 0 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 13. ENDING BALANCE 11,313,722 10,563,722 10,563,722 9,813,722 9,813,722 8,813,722 8,813,722 7,813,722 7,813,722 6,813,722 6,813,722 5,813,722 5,813,722 4,563,722 4,563,722 3,313,722 3,313,722 1,813,722 1,813,722 0 0 0 0 0 0 0 0 0 0 0 0 0 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 14. Main Menu APPENDIX-7A Steel Fabrication Co. ltd. INTEREST DURING CONSTRUCTION (IDC) Cash Total Accumulation Interest PERIOD Withdrawl Loan Balance Loan Rate 70.00% 14.00% 10,087,221 YEAR-I Q-1 1,933,331 1,353,332 8,733,889 1,353,332 47,367 Q-2 428,081 299,657 8,434,232 1,652,989 57,855 Q-3 2,837,738 1,986,417 6,447,816 3,639,406 127,379 Q-4 4,072,304 2,850,613 3,597,203 6,490,019 227,151 YEAR-II Q-1 3,745,610 2,621,927 975,275 9,111,946 318,918 Q-2 1,393,250 975,275 0 10,087,221 353,053 Q-3 Q-4 YEAR-III Q-1 Q-2 14,410,316 10,087,221 32,334,912 1,131,722 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 15. Accumulation Interest Interest from IDC Interest 12.16% 47,367 47,367 105,221 3,683 61,537 232,600 8,141 135,520 459,751 16,091 243,242 778,669 27,253 346,172 1,131,722 39,610 392,663 2,755,330 94,779 1,226,501 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 16. APPENDIX-9A Main Menu Steel Fabrication Co. ltd. DEPRECIATION SCHEDULE WITH "double declining balance method" FOR INCOME TAX Live Time DESCRIPTION METHOD RATE (YEARS) DEPRECIATION : CLASS 1 REDUCING VALUE 100% WITHIN 4 CLASS 2 REDUCING VALUE 50% WITHIN 4 CLASS 3 REDUCING VALUE 25% WITHIN 4-8 CLASS 4 REDUCING VALUE 10% WITHIN BULIDINGS STRAIGH LINE 5% - AMORTIZATION REDUCING VALUE 50% 4 ITEMS YEAR 0 YEAR 1 YEAR 2 SALVAGE FACTORY DEPRECIATION: LAND IMPROVEMENT 4,224 18,750 14,063 BUILDINGS COST 1,473,750 147,375 147,375 I. S. B. L. 399,963 1,775,610 1,331,708 O. S. B. L. 1,102 564,000 282,000 VEHICLES 16,058 156,500 78,250 TOOLS & OFFICE EQUIPMENT 20,804 202,750 101,375 TOTAL 1,308 0 2,864,985 1,954,770 AMORT. FOR EXPANSION & DEFER. CH. PREOPERATING EXPENSES 35,977 159,719 119,789 I D C + MGT & COMT FEE 79,846 354,470 265,852 TOTAL 115,823 0 514,189 385,642 TOTAL DEPRECIATION & AMORTIZATION 0 3,379,174 2,340,412 Part of Book "A to Z Entrepreneur in Parctice" Writer: Harmaizar Zaharuddin
  • 17. COME TAX Rp 000 OSBL, VEHICLE, F&F ISBL YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 10,547 7,910 5,933 4,449 3,337 2,503 1,877 1,408 147,375 147,375 147,375 147,375 147,375 147,375 147,375 147,375 998,781 749,085 561,814 421,361 316,020 237,015 177,761 133,321 141,000 70,500 35,250 17,625 8,813 4,406 2,203 1,102 39,125 19,563 9,781 256,935 128,468 64,234 32,117 16,058 50,688 25,344 12,672 332,867 166,433 83,217 41,608 20,804 1,387,515 1,019,777 772,825 1,180,612 770,446 538,750 402,942 320,068 89,842 67,381 50,536 37,902 28,427 21,320 15,990 11,992 199,389 149,542 112,156 84,117 63,088 47,316 35,487 26,615 289,231 216,923 162,693 122,019 91,515 68,636 51,477 38,608 1,676,746 1,236,700 935,517 1,302,632 861,961 607,386 454,419 358,676 Part of Book "A to Z Entrepreneur in Parctice" Writer: Harmaizar Zaharuddin
  • 18. ATTENTION! Income tax (Pajak Penghasilan) dihitung berdasarkan kondisi lapangan yang sebenarnya, dalam penyajia laporan keuangan dibuat 2 laporan Laba - Rugi, yaitu: - APPENDIX-3, untuk para pemegang saham, yang menggambarkan tahun pertama dan seterusnya lebih - APPENDIX-3A, untuk laporan pajak, yang menggambarkan tahun ke-1 rugi, dan selanjutnya keuntunga Perbedaannya pada perhitungan DEPRECIATION & AMORTIZATION Main Menu APPENDIX-3A Steel Fabrication Co. ltd. PROFIT & LOSS PROJECTION (Estimated Taxex with Double Declining Balance Depreciation Method) ITEMS YEAR 0 YEAR 1 YEAR 2 EARNING BEFORE TAX 0 612,851 2,003,738 DEPRECIATION WITH "STRAIGH LINE METHOD : FACTORY DEPRECIATION 0 1,046,019 1,046,019 GEN. & ADM DEPRECIATION 0 71,850 71,850 AMORTIZATION 0 411,351 411,351 --------------- ----------------- ------------------- 0 2,142,071 3,532,958 DEPRECIATION "DOUBLE DECLINING BALANCE" : TOTAL DEPRE. & AMORTIZATION (3,379,174) (2,340,412) --------------- ----------------- ------------------- EARNING BEFORE TAX (1,237,102) 1,192,547 INCOME TAXES 0 0 --------------- ----------------- ------------------- NET PROFIT 0 (1,237,102) 1,192,547 RETAINED EARNING 0 (1,237,102) (44,556) Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 19. narnya, dalam penyajian ma dan seterusnya lebih menguntungkan selanjutnya keuntungan lebih kecil Depreciation Method) Rp 000 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 3,308,510 4,057,621 4,792,976 5,798,817 6,367,176 6,525,948 6,663,403 1,046,019 1,046,019 1,046,019 1,089,884 1,089,884 1,089,884 1,089,884 71,850 71,850 71,850 115,715 115,715 115,715 115,715 411,351 411,351 411,351 0 0 0 0 ------------------ ------------------ ----------------- ----------------- ------------------ ------------------ ------------------- 4,837,730 5,586,841 6,322,196 7,004,416 7,572,776 7,731,548 7,869,002 (1,676,746) (1,236,700) (935,517) (1,302,632) (861,961) (607,386) (454,419) ------------------ ------------------ ----------------- ----------------- ------------------ ------------------ ------------------- 3,160,983 4,350,141 5,386,678 5,701,785 6,710,815 7,124,162 7,414,583 1,090,748 1,522,547 1,885,335 1,995,622 2,348,783 2,493,454 2,595,102 ------------------ ------------------ ----------------- ----------------- ------------------ ------------------ ------------------- 2,070,235 2,827,594 3,501,343 3,706,163 4,362,032 4,630,708 4,819,481 2,025,680 4,853,273 8,354,617 12,060,779 16,422,811 21,053,519 25,873,000 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 20. YEAR 10 6,774,458 1,089,884 115,715 0 ------------------ 7,980,057 (358,676) ------------------ 7,621,382 2,667,481 ------------------ 4,953,901 30,826,901 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 21. APPENDIX-13 Main Menu Steel Fabrication Co. ltd. INTERNAL RATE OF RETURN ITEMS YEAR 0 YEAR 1 YEAR 2 YEAR 3 IRR ON EBIT (NET PROFIT) INVESTMENT (EQUITY + L/T LOAN) (15,828,195) 0 0 0 WORKING CAP. (EQUITY + S/T LOAN) (4,467,005) (1,517,650) (990,799) NET PROFIT 612,851 2,003,738 2,217,762 DEPRECIATION & AMORTIZATION 1,457,370 1,457,370 1,457,370 INTEREST EXPENSE 2,266,974 2,199,381 1,917,059 INCOME TAX 0 0 1,090,748 SALVAGE VALUE TOTAL IRR -194.05% (15,828,195) (129,809) 4,142,839 5,692,139 -- --------------- --------------- --------- --------------- Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 22. YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,535,074 2,907,641 3,803,195 4,018,393 4,032,494 4,068,301 4,106,977 1,457,370 1,457,370 1,089,884 1,089,884 1,089,884 1,089,884 1,089,884 1,452,340 919,687 396,073 0 0 0 0 1,522,547 1,885,335 1,995,622 2,348,783 2,493,454 2,595,102 2,667,481 3,311,250 6,967,331 7,170,033 7,284,774 7,457,060 7,615,833 7,753,287 11,175,592 Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 23. APPENDIX-14 Main Menu Steel Fabrication Co. ltd. SENSITIVITY ANALYSIS Sales IRR -194.05% Raw Material IRR -194.05% Production IRR Price Cost Cost -5.00% -5.93% -5.00% 49.16% -5.00% 29.52% -4.00% 2.86% -4.00% 45.58% -4.00% 29.32% -3.00% 10.08% -3.00% 41.89% -3.00% 29.11% -2.00% 16.27% -2.00% 36.47% -2.00% 28.90% -1.00% 21.85% -1.00% 32.56% -1.00% 27.93% 0.00% 27.71% 0.00% 27.71% 0.00% 27.71% 1.00% 33.31% 1.00% 22.60% 1.00% 27.50% 2.00% 39.66% 2.00% 17.95% 2.00% 27.28% 3.00% 44.28% 3.00% 12.52% 3.00% 27.05% 4.00% 48.82% 4.00% 6.52% 4.00% 26.83% 5.00% 53.31% 5.00% -0.37% 5.00% 26.61% 6.00% 57.75% 6.00% -9.34% 6.00% 26.37% 7.00% 62.16% 7.00% -24.12% 7.00% 26.14% Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 24. Sales -194.05% Quanitity IRR -194.05% Investment IRR -194.05% (MTPA) Cost 70.00% 14.35% -5.00% 29.11% 72.50% 15.69% -4.00% 28.83% 75.00% 16.84% -3.00% 28.54% 77.50% 17.95% -2.00% 28.26% 80.00% 19.05% -1.00% 27.98% 82.50% 20.11% 0.00% 27.71% 85.00% 21.15% 1.00% 27.45% 87.50% 22.31% 2.00% 27.18% 90.00% 23.58% 3.00% 26.92% 92.50% 24.74% 4.00% 26.67% 95.00% 25.85% 5.00% 26.41% 97.50% 26.79% 6.00% 26.16% 100.00% 27.71% 7.00% 25.91% Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 25. APPENDIX-0 Main Menu Steel Fabrication Co. ltd. SUMMARY INVESTMENT COST : SALES PRICE : BANK LOAN : FERROS : - INVESTMENT Rp 10,087,221 - LOCAL MARKET - I. D. C. Rp 1,226,501 RAW MATERIAL : EQUITY : FERROS - INVESTMENT Rp 4,323,095 NORMAL CAPACITY : - MANAGEMENT FEE Rp 50,436 FERROS - COMMITMENT FEE Rp 140,942 PRODUCTION EFFICIENCY 0,94% TOTAL INVESTMENT Rp 15,828,195 PORTION OF FUNDS : INTEREST RATE : BANK LOAN 70.00% INVESTMENT 14.00% EQUITY 30.00% WORKING CAPITAL 16.00% WORKING CAPITAL TURNOVER : ACCOUNTS RECEIVABLE : RAW MATERIALS 1.00 MONTH EXPORT 0 MONTH GOODS IN PROCESS 0.03 MONTH LOCAL 2 MONTH FINISHED GOODS 0.50 MONTH CASH REQUIREMENT 3.00 MONTH RATIOS : YEAR 0 YEAR 1 YEAR 2 GROSS PROFIT (% TO SALES) 11.38% 12.52% NET OPERATING INCOME (% TO SALES) 8.37% 9.91% NET INCOME AFTER TAX (% TO SALES) 1.78% 4.72% -- ---- ----- ----- --------- --------------- ----------- ----------------- ------------------ ------------------- ------------------- MATERIALS COST TO SALES 78.13% 78.13% ASSETS TURNOVER (SALES ON ASSETS) 141.42% 167.05% R.O.I. (EBIT ON ASSETS) 11.84% 16.55% R.O.E. (EFIT ON EQUITY) 11.95% 28.10% PAYBACK PERIOD (YEAR) (15,828,195) (11,419,149) (5,686,810) IRR -194.05% CURRENT ASSETS ON TOTAL ASSETS 41.22% 49.71% LIQUIDITY 106.84% 120.82% EQUITY ON ASSETS 21.08% 28.09% DEBT TO EQUITY 374.41% 256.05% DEBT TO TOTAL ASSETS 71.48% 78.92% 71.91% TOTAL CAPITALIZATION 71.48% 65.68% 52.28% Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 26. Rp 000 MARK-UP COST : REINVESTMENT COST 10.00% 800,000 Rp/MT SALES PRICE 5.00% RAW MATERIALS COST 5.00% 625,000 Rp/MT OTHER COSTS : - FACTORY OVERHEAD 10.00% 60,000 MTPA - SELLING EXPENSES 10.00% ENCY 0,94% ON 56,400 MTPA - GENERAL ADM. EXPENSES 10.00% - LABOUR COST 15.00% ACCOUNTS PAYABLE : IMPORT 0 MONTH LOCAL 2 MONTH YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 12.95% 12.99% 12.93% 12.71% 12.61% 12.49% 12.36% 10.55% 10.55% 10.42% 10.76% 10.53% 10.28% 10.00% 4.48% 4.85% 5.30% 6.60% 6.65% 6.35% 6.10% --------------- --------------- ----------------- ------------------ ------------------ ------------------ ------------------- 78.13% 78.13% 78.13% 78.13% 78.13% 78.13% 78.13% 186.23% 201.60% 220.58% 216.72% 195.12% 179.14% 166.87% 19.66% 21.27% 22.98% 23.31% 20.55% 18.41% 16.68% 23.72% 21.33% 19.66% 20.45% 17.77% 15.13% 13.25% (22,769) 5,493,865 10,850,412 15,098,128 20,322,121 25,560,214 30,834,115 57.72% 62.52% 67.09% 69.39% 77.64% 83.85% 88.69% 134.33% 151.22% 165.62% 231.14% 287.27% 337.92% 383.70% 35.16% 45.87% 59.49% 69.98% 72.97% 75.19% 76.88% 184.38% 118.01% 68.10% 42.90% 37.04% 33.00% 30.06% 64.84% 54.13% 40.51% 30.02% 27.03% 24.81% 23.12% 38.34% 21.80% 0.00% 0.00% 0.00% 0.00% 0.00% Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin
  • 27. YEAR 10 12.20% 9.68% 5.87% ------------------- 78.13% 157.24% 15.22% 11.79% 36,146,691 92.56% 424.98% 78.22% 27.84% 21.78% 0.00% Part of Book "A to Z Entrepreneur in Practice" Writer: Harmaizar Zaharuddin