Environmental impact assessment

S
ENCAP EA-ESD Course: Basic Concepts
for EIA. Visit www.encapafrica.org
1
What is EIA ?
 EIA is intended as a proactive, preventative
approach to environmental management and
protection.
 It provides a framework a information basis for
on activities affecting the environment.
History of EIA
 EIA was first introduced in the USA within the
framework of the National Environmental Policy
Act(NEPA) in 1969.
 It is become law on January 1,1971.
3
EIA In India
The Ministry of Environment and Forest, Govt. of
India has been assigned the responsibility for
carrying out Environmental Impact Assessment
of developmental projects and various sectors.
4
The Ministry initiated EIA with the river valley
projects had during 1978-79.
The notification of EIA of developmental projects was
issue in 1994 and amended later in 1977 and 2000.
The EIA developmental projects has been done on
the basis of “Executive Order” issuing the provisions
of the Environment (Protection)Act,1986.
The Projects Covered
 Industry and Mining- Irrigation and power.
 Transport and Communication.
5
The coverage of the project generally includes:
Required public clearance from
the public investment board.
Required international funding.
Project referred from state govt.
or administrative Ministries.
Project in sensitive areas.
Projects on which there are public
complaints.
The Philosophy
 Impact assessment is designed as a preventive
measure.
 It should give environmental consideration equal
weight with technical and economic aspects.
6
Environmental Impact Statement(EIS)
The developmental projects are required to prepare an
environmental Impact Statement (EIS) covering the
following:
7
Effect on land including land degradation and
subsistence.
Flora and fauna and lose of biological diversity.
Noise pollution and vibrations.
Risk analysis and digester management.
Recycling and the reduction of waste.
Efficient use of input.
Review: Definition of EIA
Environmental
Impact Assessment is
A formal process for identifying:
•likely effects of activities or
projects on the
ENVIRONMENT, and on
human health and welfare.
•means and measures to
mitigate & monitor these
impacts

Environment is
broadly interpreted:
physical, biological,
and social.
9
What is an impact?
The impact of an activity is
a deviation (a change)
from the baseline situation
that is caused by the
activity.
To measure an impact, you
must know what the
baseline situation is.
!
The baseline
situation is the
existing
environmental
situation or
condition in the
absence of the
activity.
10
The baseline situation
In characterizing the
baseline situation,
many environmental
components MAY be
of interest
Water Quantity, quality, reliability,
accessibility
Soils Erosion, crop productivity,
fallow periods, salinity,
nutrient concentrations
Flora Composition and density of
natural vegetation,
productivity, key species
Fauna Populations, habitat
Special Key species
ecosystems
Env Health Disease vectors, pathogens
The components of
interest are those that
are likely to be affected
by our activity—or
upon which our activity
depends for its
success
11
The baseline situation
The baseline situation is
not simply a “snapshot.”
Describing the baseline
situation requires describing
both the normal variability in
environmental components &
current trends in these
components.
time
Watertable
This chart of
groundwater levels
shows both variability
and a trend over time.
Both are part of the
groundwater baseline
situation.
12
! It is ESSENTIAL in EIA
to focus on the most
significant impacts.
Don’t waste effort & time
analyzing and discussing
impacts that are less
important.
Specifically,
The EIA Process
Fig. Generalized EIA process Flow-Chart 13
14
The EIA process
• Scoping
• Evaluate baseline situation
• Identify & choose alternatives
• Identify and characterize potential
impacts of proposed activity and
each alternative
• Develop mitigation and monitoring
• Communicate and document
Phase I:
Initial inquiries
Phase II:
Full EIA study
(if needed)
Our focus!
•Understand
proposed activities
•Screening
•Conduct preliminary
assessment (if
needed)
15
Phase 1 of the EIA Process
Screen the
activity
Based on the
nature of the
activity what
level of
environmental
review is
indicated?
Conduct a
Preliminary
Assessment
A rapid,
simplified EIA
study using
simple tools
(e.g. the
USAID IEE)
ACTIVITY IS
OF MODERATE
OR UNKNOWN
RISK
SIGNIFICANT
ADVERSE
IMPACTS
POSSIBLE
SIGNIFICANT
ADVERSE
IMPACTS
VERY UNLIKELY
ACTIVITY IS LOW
RISK (Of its nature,
very unlikely to have
significant adverse
impacts)
ACTIVITY IS
HIGH RISK (Of its
nature, likely to have
significant adverse
impacts)
Phase IIPhase IUnderstand
proposed
activity
Why is the
activity being
proposed?
What is being
proposed?
BEGIN
FULL EIA
STUDY
STOP
the EIA
process
16
Phase 1 of the EIA process:
Understand the proposed activity
Understand
the proposed
activities
Why is the
activity being
proposed?
What is being
proposed?
Once we understand the development
objective, we must fully understand
WHAT is being proposed.
This includes associated actions!
PRIMARY ACTIVITY:
construction of diversion dam &
irrigation canal
ASSOCIATED ACTIONS:
• Survey
• negotiate land tenure
• construct borrow pit
• Establish construction camp
• construct temporary
diversion structure
• dispose of soil, debris
17
Phase 1 of the EIA process:
Screen the activity
Screen each
activity
Based on the
nature of the
activity, what
level of
environmental
analysis is
indicated?
SCREENING is the process of asking
a very basic set of questions about
the nature of activity like at what level
EIA required.
 EIA process kicks off with project
screening.
 Development bank also screen
projects presented for financing to
decide whether an EIA is required
using there set criteria.
18
Phase 1 of the EIA process:
Screen the activity
Screen each
activity
Based on the
nature of the
activity, what
level of
environmental
analysis is
indicated?
screening classifies the activity into
a RISK CATEGORY:
VERY LOW RISK
VERY HIGH RISK
MODERATE OR
UNKNOWN RISK
EIA process ends
Do full EIA study
Do preliminary
assessment
The outcome of the
screening process
determines the next step
in the EIA process
19
Phase 1 of the EIA process:
The Preliminary Assessment
Conduct a
Preliminary
Assessment
A rapid,
simplified EIA
study using
simple tools
(e.g. the
USAID IEE)
For each activity it covers, a
preliminary assessment has 3
possible findings:
•The project is very unlikely to have
significant adverse impacts. (EIA
process ends)
•With specified mitigation and
monitoring, the project is unlikely to
have significant adverse impacts
•The project is likely to have
significant adverse impacts (full EIA
study is required)
20
We only proceed to
Phase II of the EIA process
if
Phase I indicates that
a FULL EIA STUDY
is required
!
Most small-scale activities do
not require a full EIA study!
21
Phase 2 of the EIA process:
The Full EIA study
The full EIA study has
very similar objectives
and structure to a
preliminary
assessment.
However, the full EIA
study differs in
important ways:
A formal scoping process
precedes the study to ID
issues to be addressed
Analysis of environmental
impacts is much more
detailed
Alternatives* must be
formally defined. The
impacts of each
alternative must be
identified & evaluated,
and the results compared.
Public participation is
usually required.
A professional EIA team
is usually required.
!
!
!
!
22
Phase 2 of the EIA process:
The Full EIA study
 Scoping.
 Evaluate baseline situation (Impact analysis)
 Identify and characterize potential impacts of proposed activity and
each alternative.
 Develop mitigation and monitoring.
 Reporting.
 Compare alternatives.
 Decision making.
Basic steps of the full EIA study
23
Phase 2 of the EIA process:
The Full EIA study
24
Phase 2 of the EIA process:
The Full EIA study
25
In summary,
The full EIA study is a far
more significant effort than
the preliminary assessment.

It is reserved for activities for
which screening or the
preliminary assessment
shows that significant
impacts are likely.
Phase 2 of the EIA process:
The Full EIA study
26
1 sur 26

Recommandé

EIA par
EIAEIA
EIAMithun Ray
1.2K vues15 diapositives
ENVIRONMENT IMPACT ASSESSMENT par
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
2K vues32 diapositives
Environmental Impact Assessment par
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrateek Bansal
5.7K vues13 diapositives
Environmental Impact Assessment and Environmental Audit- Unit III par
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
39.7K vues71 diapositives
Environmental impact assessment (EIA) par
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)School of planning and architecture
128.7K vues25 diapositives
Eia - environmental impact assessment par
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessmentParth Patel
7.9K vues29 diapositives

Contenu connexe

Tendances

Environmental impact assessment methodology par
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodologyJustin Joy
14.3K vues19 diapositives
EIA par
EIAEIA
EIABimal Antony
9.1K vues21 diapositives
Environmental Impact Assessment(EIA) par
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Deepika Verma
22K vues25 diapositives
Environmental Impact Assessment par
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
15K vues40 diapositives
Environmental impact assessment par
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentNanyang Technological University, Singapore
7.5K vues30 diapositives
EIA Methods par
EIA MethodsEIA Methods
EIA MethodsSOUBAM INDRAKUMAR SINGH
138.9K vues39 diapositives

Tendances(20)

Environmental impact assessment methodology par Justin Joy
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
Justin Joy14.3K vues
Environmental Impact Assessment(EIA) par Deepika Verma
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
Deepika Verma22K vues
Environmental Impact Assessment par Nigel Gardner
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Nigel Gardner77.4K vues
Seminar on Environmental Impact Assessment par ashwinpand90
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
ashwinpand9015.7K vues
Environment management Tools : EIA & Environmetal Audit par KANTHARAJAN GANESAN
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
EIA an introduction - Case study wrt Coastal development & Aquaculture par KANTHARAJAN GANESAN
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
Cost benefit analysis (environmental impact assessment) par puspa latha
Cost benefit analysis (environmental impact assessment)Cost benefit analysis (environmental impact assessment)
Cost benefit analysis (environmental impact assessment)
puspa latha15.3K vues
Unit 7 eia and sd par Kumar
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
Kumar 19.3K vues
ENVIRONMENTAL IMPACT ASSESSMENT - EIA par Sakthivel R
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
Sakthivel R3.8K vues
Environmental impact assessment concept par Intan Ayuna
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
Intan Ayuna5.5K vues
Impact prediction, evaluation and mitigation in eia par Mizanur R. Shohel
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia

En vedette

environmental impact assessment par
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
70.2K vues28 diapositives
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor... par
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Mr.Allah Dad Khan
1.8K vues46 diapositives
Environmental Audit and Environmental Impact Assessment par
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEffah Effervescence
12.4K vues32 diapositives
13 environmental impact assessment par
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessmentPrabha Panth
5.8K vues16 diapositives
Environmental impact assessment par
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentJini Rajendran
18.5K vues34 diapositives
Planning and environmental impact assessment (EIA) par
Planning and environmental impact assessment (EIA)Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)tesdev
2.4K vues31 diapositives

En vedette(20)

environmental impact assessment par Pramoda Raj
environmental impact assessment environmental impact assessment
environmental impact assessment
Pramoda Raj70.2K vues
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor... par Mr.Allah Dad Khan
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Mr.Allah Dad Khan1.8K vues
Environmental Audit and Environmental Impact Assessment par Effah Effervescence
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
Effah Effervescence12.4K vues
13 environmental impact assessment par Prabha Panth
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
Prabha Panth5.8K vues
Environmental impact assessment par Jini Rajendran
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Jini Rajendran18.5K vues
Planning and environmental impact assessment (EIA) par tesdev
Planning and environmental impact assessment (EIA)Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)
tesdev2.4K vues
Imelda Winters Presentation Environmental Impact Assessment par Imelda Winters
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters1.7K vues
Environmental impact assessment and life cycle assessment and their role in s... par Arvind Kumar
Environmental impact assessment and life cycle assessment and their role in s...Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...
Arvind Kumar9.4K vues
Methods of eia(environmental impact assessment) par Akhil Chibber
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
Akhil Chibber8.1K vues
Developing Guidelines for Public Participation on Environmental Impact Assess... par Ethical Sector
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
Ethical Sector4.4K vues
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep... par Arvind Kumar
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Arvind Kumar3.8K vues
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis... par Arvind Kumar
Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
Arvind Kumar2.1K vues
Deep learning an Introduction with Competitive Landscape par Shivaji Dutta
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive Landscape
Shivaji Dutta737 vues
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기 par NAVER Engineering
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
NAVER Engineering23.1K vues
Pytorch for tf_developers par Abdul Muneer
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developers
Abdul Muneer1.2K vues
Environmental Impact Assessment - University of Winnipeg par John Gunter
Environmental Impact Assessment - University of WinnipegEnvironmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of Winnipeg
John Gunter1.6K vues

Similaire à Environmental impact assessment

4th EIA PROCESS.pptx par
4th EIA PROCESS.pptx4th EIA PROCESS.pptx
4th EIA PROCESS.pptxAbdiwali Abdullahi
14 vues23 diapositives
Eia basic concepts_15_dec05 par
Eia basic concepts_15_dec05Eia basic concepts_15_dec05
Eia basic concepts_15_dec05Shimalsh
4.9K vues26 diapositives
Environmental impact assessment and importance of effective application in ba... par
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...MdHaque78
200 vues33 diapositives
Environment impact assessment par
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentPramoda Raj
2.5K vues4 diapositives
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... par
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
235 vues27 diapositives
Environment impact assessment par
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentVinod Burdak
129.2K vues21 diapositives

Similaire à Environmental impact assessment(20)

Eia basic concepts_15_dec05 par Shimalsh
Eia basic concepts_15_dec05Eia basic concepts_15_dec05
Eia basic concepts_15_dec05
Shimalsh4.9K vues
Environmental impact assessment and importance of effective application in ba... par MdHaque78
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...
MdHaque78200 vues
Environment impact assessment par Pramoda Raj
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
Pramoda Raj2.5K vues
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... par Abraham Ncunge
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
Abraham Ncunge235 vues
Environment impact assessment par Vinod Burdak
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
Vinod Burdak129.2K vues
EIA Concept Process Core Skills.pdf par Hoshyar Rasul
EIA Concept Process Core Skills.pdfEIA Concept Process Core Skills.pdf
EIA Concept Process Core Skills.pdf
Hoshyar Rasul2 vues
Envirornment Impact Assessment par RJ
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact Assessment
RJ525 vues
Environment impact Assessment (EIA) in Uganda par kayondo alex
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
kayondo alex4.2K vues
EIA_Basic_Concepts 2019.ppt par mejoh1
EIA_Basic_Concepts 2019.pptEIA_Basic_Concepts 2019.ppt
EIA_Basic_Concepts 2019.ppt
mejoh113 vues
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) par Angom Baleshwor
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
Angom Baleshwor525 vues
Environment Impact Assessment: Significance, Process And Problems par inventionjournals
Environment Impact Assessment: Significance, Process And ProblemsEnvironment Impact Assessment: Significance, Process And Problems
Environment Impact Assessment: Significance, Process And Problems
What is an Environmental Clearance Certificate and How to Obtain It.pdf par PranshuSharma18498
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdf

Dernier

Smart Grids par
Smart GridsSmart Grids
Smart GridsDr. Salem Baidas
14 vues30 diapositives
Sustainable Tourism par
Sustainable TourismSustainable Tourism
Sustainable TourismDr. Salem Baidas
13 vues20 diapositives
IPCC Working Group II par
IPCC Working Group II IPCC Working Group II
IPCC Working Group II ipcc-media
38 vues15 diapositives
Exploring human-Nature Futures par
Exploring human-Nature FuturesExploring human-Nature Futures
Exploring human-Nature FuturesGlobal Landscapes Forum (GLF)
34 vues13 diapositives
Challenges facing green technology as one of the drivers towards sustainabili... par
Challenges facing green technology as one of the drivers towards sustainabili...Challenges facing green technology as one of the drivers towards sustainabili...
Challenges facing green technology as one of the drivers towards sustainabili...SantoshShahi1
6 vues72 diapositives
Sustainable IT par
Sustainable ITSustainable IT
Sustainable ITDr. Salem Baidas
6 vues20 diapositives

Dernier(20)

IPCC Working Group II par ipcc-media
IPCC Working Group II IPCC Working Group II
IPCC Working Group II
ipcc-media38 vues
Challenges facing green technology as one of the drivers towards sustainabili... par SantoshShahi1
Challenges facing green technology as one of the drivers towards sustainabili...Challenges facing green technology as one of the drivers towards sustainabili...
Challenges facing green technology as one of the drivers towards sustainabili...
SantoshShahi16 vues
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7 par ipcc-media
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7 Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7
Insights from AR6 WGIII on energy system mitigation, in AR6 and Towards AR7
ipcc-media68 vues
Energy System Transitions in the context of sustainable development: Findings... par ipcc-media
Energy System Transitions in the context of sustainable development: Findings...Energy System Transitions in the context of sustainable development: Findings...
Energy System Transitions in the context of sustainable development: Findings...
ipcc-media52 vues
Where is global warming in relation to the long-term temperature goal? par ipcc-media
Where is global warming in relation to the long-term temperature goal?Where is global warming in relation to the long-term temperature goal?
Where is global warming in relation to the long-term temperature goal?
ipcc-media28 vues
Low emissions development opportunities in food systems par CIFOR-ICRAF
Low emissions  development  opportunities in  food systemsLow emissions  development  opportunities in  food systems
Low emissions development opportunities in food systems
CIFOR-ICRAF5 vues
Climate Change, Biodiversity & Health - IPBES Perspectives par ipcc-media
Climate Change, Biodiversity & Health - IPBES PerspectivesClimate Change, Biodiversity & Health - IPBES Perspectives
Climate Change, Biodiversity & Health - IPBES Perspectives
ipcc-media62 vues
Physical Science Challenges for AR7 par ipcc-media
Physical Science Challenges for AR7Physical Science Challenges for AR7
Physical Science Challenges for AR7
ipcc-media262 vues
Citizen science of the Great Barrier Reef and Coral Sea Expedition par Dr Adam Smith
Citizen science of the Great Barrier Reef and Coral Sea ExpeditionCitizen science of the Great Barrier Reef and Coral Sea Expedition
Citizen science of the Great Barrier Reef and Coral Sea Expedition
Dr Adam Smith46 vues
Arkan. İngilis dili sərbəst iş.pptx par ArkanAdisli
Arkan. İngilis dili sərbəst iş.pptxArkan. İngilis dili sərbəst iş.pptx
Arkan. İngilis dili sərbəst iş.pptx
ArkanAdisli19 vues

Environmental impact assessment

  • 1. ENCAP EA-ESD Course: Basic Concepts for EIA. Visit www.encapafrica.org 1
  • 2. What is EIA ?  EIA is intended as a proactive, preventative approach to environmental management and protection.  It provides a framework a information basis for on activities affecting the environment.
  • 3. History of EIA  EIA was first introduced in the USA within the framework of the National Environmental Policy Act(NEPA) in 1969.  It is become law on January 1,1971. 3
  • 4. EIA In India The Ministry of Environment and Forest, Govt. of India has been assigned the responsibility for carrying out Environmental Impact Assessment of developmental projects and various sectors. 4 The Ministry initiated EIA with the river valley projects had during 1978-79. The notification of EIA of developmental projects was issue in 1994 and amended later in 1977 and 2000. The EIA developmental projects has been done on the basis of “Executive Order” issuing the provisions of the Environment (Protection)Act,1986.
  • 5. The Projects Covered  Industry and Mining- Irrigation and power.  Transport and Communication. 5 The coverage of the project generally includes: Required public clearance from the public investment board. Required international funding. Project referred from state govt. or administrative Ministries. Project in sensitive areas. Projects on which there are public complaints.
  • 6. The Philosophy  Impact assessment is designed as a preventive measure.  It should give environmental consideration equal weight with technical and economic aspects. 6
  • 7. Environmental Impact Statement(EIS) The developmental projects are required to prepare an environmental Impact Statement (EIS) covering the following: 7 Effect on land including land degradation and subsistence. Flora and fauna and lose of biological diversity. Noise pollution and vibrations. Risk analysis and digester management. Recycling and the reduction of waste. Efficient use of input.
  • 8. Review: Definition of EIA Environmental Impact Assessment is A formal process for identifying: •likely effects of activities or projects on the ENVIRONMENT, and on human health and welfare. •means and measures to mitigate & monitor these impacts  Environment is broadly interpreted: physical, biological, and social.
  • 9. 9 What is an impact? The impact of an activity is a deviation (a change) from the baseline situation that is caused by the activity. To measure an impact, you must know what the baseline situation is. ! The baseline situation is the existing environmental situation or condition in the absence of the activity.
  • 10. 10 The baseline situation In characterizing the baseline situation, many environmental components MAY be of interest Water Quantity, quality, reliability, accessibility Soils Erosion, crop productivity, fallow periods, salinity, nutrient concentrations Flora Composition and density of natural vegetation, productivity, key species Fauna Populations, habitat Special Key species ecosystems Env Health Disease vectors, pathogens The components of interest are those that are likely to be affected by our activity—or upon which our activity depends for its success
  • 11. 11 The baseline situation The baseline situation is not simply a “snapshot.” Describing the baseline situation requires describing both the normal variability in environmental components & current trends in these components. time Watertable This chart of groundwater levels shows both variability and a trend over time. Both are part of the groundwater baseline situation.
  • 12. 12 ! It is ESSENTIAL in EIA to focus on the most significant impacts. Don’t waste effort & time analyzing and discussing impacts that are less important. Specifically,
  • 13. The EIA Process Fig. Generalized EIA process Flow-Chart 13
  • 14. 14 The EIA process • Scoping • Evaluate baseline situation • Identify & choose alternatives • Identify and characterize potential impacts of proposed activity and each alternative • Develop mitigation and monitoring • Communicate and document Phase I: Initial inquiries Phase II: Full EIA study (if needed) Our focus! •Understand proposed activities •Screening •Conduct preliminary assessment (if needed)
  • 15. 15 Phase 1 of the EIA Process Screen the activity Based on the nature of the activity what level of environmental review is indicated? Conduct a Preliminary Assessment A rapid, simplified EIA study using simple tools (e.g. the USAID IEE) ACTIVITY IS OF MODERATE OR UNKNOWN RISK SIGNIFICANT ADVERSE IMPACTS POSSIBLE SIGNIFICANT ADVERSE IMPACTS VERY UNLIKELY ACTIVITY IS LOW RISK (Of its nature, very unlikely to have significant adverse impacts) ACTIVITY IS HIGH RISK (Of its nature, likely to have significant adverse impacts) Phase IIPhase IUnderstand proposed activity Why is the activity being proposed? What is being proposed? BEGIN FULL EIA STUDY STOP the EIA process
  • 16. 16 Phase 1 of the EIA process: Understand the proposed activity Understand the proposed activities Why is the activity being proposed? What is being proposed? Once we understand the development objective, we must fully understand WHAT is being proposed. This includes associated actions! PRIMARY ACTIVITY: construction of diversion dam & irrigation canal ASSOCIATED ACTIONS: • Survey • negotiate land tenure • construct borrow pit • Establish construction camp • construct temporary diversion structure • dispose of soil, debris
  • 17. 17 Phase 1 of the EIA process: Screen the activity Screen each activity Based on the nature of the activity, what level of environmental analysis is indicated? SCREENING is the process of asking a very basic set of questions about the nature of activity like at what level EIA required.  EIA process kicks off with project screening.  Development bank also screen projects presented for financing to decide whether an EIA is required using there set criteria.
  • 18. 18 Phase 1 of the EIA process: Screen the activity Screen each activity Based on the nature of the activity, what level of environmental analysis is indicated? screening classifies the activity into a RISK CATEGORY: VERY LOW RISK VERY HIGH RISK MODERATE OR UNKNOWN RISK EIA process ends Do full EIA study Do preliminary assessment The outcome of the screening process determines the next step in the EIA process
  • 19. 19 Phase 1 of the EIA process: The Preliminary Assessment Conduct a Preliminary Assessment A rapid, simplified EIA study using simple tools (e.g. the USAID IEE) For each activity it covers, a preliminary assessment has 3 possible findings: •The project is very unlikely to have significant adverse impacts. (EIA process ends) •With specified mitigation and monitoring, the project is unlikely to have significant adverse impacts •The project is likely to have significant adverse impacts (full EIA study is required)
  • 20. 20 We only proceed to Phase II of the EIA process if Phase I indicates that a FULL EIA STUDY is required ! Most small-scale activities do not require a full EIA study!
  • 21. 21 Phase 2 of the EIA process: The Full EIA study The full EIA study has very similar objectives and structure to a preliminary assessment. However, the full EIA study differs in important ways: A formal scoping process precedes the study to ID issues to be addressed Analysis of environmental impacts is much more detailed Alternatives* must be formally defined. The impacts of each alternative must be identified & evaluated, and the results compared. Public participation is usually required. A professional EIA team is usually required. ! ! ! !
  • 22. 22 Phase 2 of the EIA process: The Full EIA study  Scoping.  Evaluate baseline situation (Impact analysis)  Identify and characterize potential impacts of proposed activity and each alternative.  Develop mitigation and monitoring.  Reporting.  Compare alternatives.  Decision making. Basic steps of the full EIA study
  • 23. 23 Phase 2 of the EIA process: The Full EIA study
  • 24. 24 Phase 2 of the EIA process: The Full EIA study
  • 25. 25 In summary, The full EIA study is a far more significant effort than the preliminary assessment.  It is reserved for activities for which screening or the preliminary assessment shows that significant impacts are likely. Phase 2 of the EIA process: The Full EIA study
  • 26. 26

Notes de l'éditeur

  1. Aspects of the environment: Physical: soil & water resources, air quality Biological: fauna, flora, ecosystem Social: human health and welfare, culture, religion, and local values Or: Economical, social and eco-systemic
  2. For example, an ecotourism activity might depend on water level in watering holes---but this environmental component is not in fact affected by your activity.
  3. Note that the difference between ACTIVITIES and ACTIONS is discussed in
  4. Are these questions indicative of low-risk or high-risk activities
  5. The purpose of a Full EIA study is not to find that impacts will not be significant. Its purpose is to allow an informed decision to be made about which significant environmental impacts may be acceptable to obtain a particular development objective. The preliminary assessment cannot serve this function.