SlideShare une entreprise Scribd logo
1  sur  3
Télécharger pour lire hors ligne
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 401
Challenges in the Implementation of Smart City Projects in Bhopal
Shravya Rao
MBA final Year Student of construction Management, Department of Project and construction management, MIT Art Design
and Technology University, Pune, Maharashtra, India. Shravya.rao@outlook.com .
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract – This research project gives the study of the factors
that are responsible for the delaying of the implementation of
the smart city projects in Bhopal.
The research project encompasses all the stakeholders
involved in the smart city mission projects in Bhopal and tries
to find out the risk factors that will majorly affect the delay in
the implementation of the projects through the perspective of
all the stakeholders.
The research was carried out in Bhopal the respondents
included government employees, private parties(buildersand
contractors).
The questionnaire was based on the success and risk factors in
the implementation of the projects and then the co-relation
was done on these factors, whichgavetherelationshipsamong
success, and risk factors, which are significantly related.
1. INTRODUCTION
India is trying to emulate the world’s trend in urbanization
with the rapid growth in its economy and its growing
population and increased the flux of people toward cities
require services to enhance its cities.
In this backdrop, the Government of India started
contemplating to introduce a program,whichmayhelpthem
initiate this process. In this concept, the Honorable Prime
Minister of India launched the national flagshipmissions,the
Smart City mission (SCM) on 25th June 2015. The objective
of the mission was to provide core infrastructure and a
decent quality of life to residents and provide smart
solutions, which are clean and sustainable.
Bhopal was selected in Phase-1 selection criteria in which
first 20 cities were selected under SCM plan. After which the
Government of Madhya PradeshformedtheBHOPALSMART
CITY CORPORATION.
SCM Bhopal has achieved the targets such as successfully
implementing public bicycle sharing and development of
Bhopal plus app but on many aspects and it islaggingbehind
(especially when providing core infrastructure) in many
other project implementation.
The implementation of demonetization and GST have also
played a significant role in which largely affected theprivate
partners and created hindrance in the implementation
process.
The projects related toroadconstructionwaspushedbehind
fifteen to twenty percent due to the removal of
encroachment in order to acquire the land.
2. METHODOLOGY
The questionnaire we prepared contains qualitative as well
as for quantitating questions that will give data that will be
analyzed to interpret the results. Through the questionnaire
and surveys, we will aim to gain our responses from three
stakeholders involved in smart city project – government
employees, private builders andcitizensoftheBhopal.There
is three sets of the questionnaire with respect to three
stakeholders, which will help us gain the data to gauge the
magnitude of variouschallenges.Thequestionnaireissentto
the stakeholders using Google forms.
2.1 Aim: A Study on Challenges in the Implementation of
Smart City Projects in Bhopal
2.2 Objectives: The purpose of the study is to identify the
challenges that are impeding the implementation of Smart
City projects in Bhopal. This study focuses on finding out
the risk factors in the project from the stakeholder
perspective, which results in delaying of the projects. The
study aims to establish the relationship between various
risk factors and how these risk factors can be mitigated at
various levels to keep the projects on a scheduled timeline.
3. ANALYSIS AND RESULTS
Co-relation of risk factors
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 402
Challenges-when projects are not in sync with
timeline
Success Factors - when projects are in sync with the
timelines
4. RECOMMENDATIONS
Recommendations Smart City Mission projectsshallhave
a definite policy structure with respect to tendering process,
solution availability, and post-implementation audit there
should be a paradigm shiftinthepolicymakingprocessbythe
government in order to have an efficient implementation of
the projects
1- There should be strict timelines given to the states by the
central government in order to complete the projects
2- State level smart city corporations shall not absorb
employees from other departments of state government
related to BMC, city planning, and urban development
department, fresh employees shall be hired through
tendering process with the optimum technical
knowledge with respect to projects and shall be given
implementation powers
3- Solution availability shall not be a tender driven process
rather it should be a clearance driven process
4- Models shall be defined for the construction along with a
10% overlay of financial overlay or budget shall be fixed
and then call for the tender.
5- The fallback arrangement is a policy-driven matter a
contingency plan shall be a part of the policy.
6- The government should try to minimize the risks of the
private parties, which will influence more private parties to
join the projects hence more funds.
7- The post-implementation audit has to be the third party,
which is independent of the government. Ex- NHAI quality
control consultant is a third party in their every project who
is independent of the implementing body.
CONCLUSIONS
Major Findings
1. Clear cut lack of a precise master plan and lack of
technical know-how, the government staff of BMC (Bhopal
Municipal Corporation) and of the city planning department
have been absorbed by the Bhopal smartcitycorporation ltd
there is hardly any input from outside.
2. Without a precise master plan,planningandexecution are
taking a toll, with right master plan proper budgets can be
formed and on the basis of that funds can be transferred at
the right time without any frequent changes in it.
3. Lack of awareness among the citizens and lack of
awareness among their representatives to support the area
of their constituencyfortheredevelopment.SivajiNagar was
selected first for Area Based Development (ABD) but due to
lack of support from people of the area, T.T Nagar was
selected for ABD plan, which delayed the process.
4. The major projects that need to be implemented first are
delayed due to change of area because even if the land
acquisition is permitted by the government-achieving Right
of way (ROW) especially the removal of encroachmenttakes
a lot of time and at times it escalates political pressures.
5. There are no set guidelines by the GOI for the completion
of the projects even when the money will be allocated to the
states for the coming 5 years.
6. In many projects, the consultants are hired from outside
to enhance the planning process but the implementation
power is exercised by the BMC with the same staff that lacks
technical expertise.
7. The post-implementation audit of the government shall
be in such a way that it ensures the end-user, unlike the
audits that have beenmadeinSwachBharatAbhiyaanwhere
toilets were made in the tune of thousands withoutensuring
any proper end – use.
8 The risk factors according to the private parties are
a. Financial and partnership
b. Governance
c. Clearances
d. Building permits
Out of these risk factors, financial andpartnership riskswere
found to be on the higher side. While the clearances and
building permits posted a little risk.
9 Success factors
a. Timely execution
b. Significant occupancy
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 403
The success of timely execution of the project isfoundout be
very low whereas the success of significant occupancy is
very high
10 Considering the ratings received for risks and success
factors the Availability of funds is greatly affected and more
than 50 % of the surveyors rated the availability of funds on
the lower side.
REFERENCES
[1] Daewoo Nam and Theresa A. Pardo Center for
Technology in Government University at Albany,
State University of New York, U. S.
[2] http://smartcities.gov.in/content/
[3] https://cio.economictimes.indiatimes.com/news/in
ternet-of-things/hpe-to-help-bhopal-smartcity-
development-corporation-for-its-cloud-based-iccc-
in-madhya-pradesh/61359562
[4] https://cio.economictimes.indiatimes.com/news/in
ternet-of-things/hpe-to-help-bhopal-smartcity-
development-corporation-for-its-cloud-based-iccc-
in-madhya-pradesh/61359562
[5] https://www.hindustantimes.com/bhopal/work-
on-smart-city-projects-in-first-list-moves-at-asnail-
s-pace-in-mp/story-
hYbvB3MGuy2Tbpwl7CepkL.html
[6] http://indianexpress.com/article/india/bhopal-
500-gps-enabled-german-bicycles-50-stationsin-
citys-smart-project-4488527/
[7] http://smartbhopal.city/project
Author
Miss Shravya Rao
Student of MBA in
construction Management
MIT Art Design &
Technology University
Pune.

Contenu connexe

Similaire à IRJET- Challenges in the Implementation of Smart City Projects in Bhopal

Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...IRJET Journal
 
Exploring the adoption of building information
Exploring the adoption of building informationExploring the adoption of building information
Exploring the adoption of building informationeSAT Publishing House
 
IRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIAIRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIAIRJET Journal
 
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...IRJET Journal
 
Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...eSAT Journals
 
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of BhopalIRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of BhopalIRJET Journal
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET Journal
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...IRJET Journal
 
Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...IRJET Journal
 
Critical review and analysis of Gujrera act [2016] and its implication and sa...
Critical review and analysis of Gujrera act [2016] and its implication and sa...Critical review and analysis of Gujrera act [2016] and its implication and sa...
Critical review and analysis of Gujrera act [2016] and its implication and sa...IRJET Journal
 
IRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll PlazaIRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll PlazaIRJET Journal
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET Journal
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET Journal
 
IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...
IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...
IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...IRJET Journal
 
Public Private Partnership in Civil Engineering
Public Private Partnership in Civil EngineeringPublic Private Partnership in Civil Engineering
Public Private Partnership in Civil Engineeringvivatechijri
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET Journal
 

Similaire à IRJET- Challenges in the Implementation of Smart City Projects in Bhopal (20)

Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
Study of Different Public-Private Partnership (PPP) Model for the Road Infras...
 
Exploring the adoption of building information
Exploring the adoption of building informationExploring the adoption of building information
Exploring the adoption of building information
 
IRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIAIRJET- Significance of Public Private Partnerships in INDIA
IRJET- Significance of Public Private Partnerships in INDIA
 
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...
A COMPARATIVE STUDY ON PPP AND BOT MODEL OF WORKING CAPITAL MANAGEMENT IN MET...
 
Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...Exploring the adoption of building information modelling (bim) in the malaysi...
Exploring the adoption of building information modelling (bim) in the malaysi...
 
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of BhopalIRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
 
Dzo Tour Presentation
Dzo Tour PresentationDzo Tour Presentation
Dzo Tour Presentation
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...
 
Critical review and analysis of Gujrera act [2016] and its implication and sa...
Critical review and analysis of Gujrera act [2016] and its implication and sa...Critical review and analysis of Gujrera act [2016] and its implication and sa...
Critical review and analysis of Gujrera act [2016] and its implication and sa...
 
IRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll PlazaIRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll Plaza
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
 
IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...
IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...
IRJET- Exploration of Business Opportunities for an Entrepreneur in Real Esta...
 
Smart republic 2018
Smart republic 2018Smart republic 2018
Smart republic 2018
 
Public Private Partnership in Civil Engineering
Public Private Partnership in Civil EngineeringPublic Private Partnership in Civil Engineering
Public Private Partnership in Civil Engineering
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
 

Plus de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Plus de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Dernier

Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 

Dernier (20)

Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 

IRJET- Challenges in the Implementation of Smart City Projects in Bhopal

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 401 Challenges in the Implementation of Smart City Projects in Bhopal Shravya Rao MBA final Year Student of construction Management, Department of Project and construction management, MIT Art Design and Technology University, Pune, Maharashtra, India. Shravya.rao@outlook.com . ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – This research project gives the study of the factors that are responsible for the delaying of the implementation of the smart city projects in Bhopal. The research project encompasses all the stakeholders involved in the smart city mission projects in Bhopal and tries to find out the risk factors that will majorly affect the delay in the implementation of the projects through the perspective of all the stakeholders. The research was carried out in Bhopal the respondents included government employees, private parties(buildersand contractors). The questionnaire was based on the success and risk factors in the implementation of the projects and then the co-relation was done on these factors, whichgavetherelationshipsamong success, and risk factors, which are significantly related. 1. INTRODUCTION India is trying to emulate the world’s trend in urbanization with the rapid growth in its economy and its growing population and increased the flux of people toward cities require services to enhance its cities. In this backdrop, the Government of India started contemplating to introduce a program,whichmayhelpthem initiate this process. In this concept, the Honorable Prime Minister of India launched the national flagshipmissions,the Smart City mission (SCM) on 25th June 2015. The objective of the mission was to provide core infrastructure and a decent quality of life to residents and provide smart solutions, which are clean and sustainable. Bhopal was selected in Phase-1 selection criteria in which first 20 cities were selected under SCM plan. After which the Government of Madhya PradeshformedtheBHOPALSMART CITY CORPORATION. SCM Bhopal has achieved the targets such as successfully implementing public bicycle sharing and development of Bhopal plus app but on many aspects and it islaggingbehind (especially when providing core infrastructure) in many other project implementation. The implementation of demonetization and GST have also played a significant role in which largely affected theprivate partners and created hindrance in the implementation process. The projects related toroadconstructionwaspushedbehind fifteen to twenty percent due to the removal of encroachment in order to acquire the land. 2. METHODOLOGY The questionnaire we prepared contains qualitative as well as for quantitating questions that will give data that will be analyzed to interpret the results. Through the questionnaire and surveys, we will aim to gain our responses from three stakeholders involved in smart city project – government employees, private builders andcitizensoftheBhopal.There is three sets of the questionnaire with respect to three stakeholders, which will help us gain the data to gauge the magnitude of variouschallenges.Thequestionnaireissentto the stakeholders using Google forms. 2.1 Aim: A Study on Challenges in the Implementation of Smart City Projects in Bhopal 2.2 Objectives: The purpose of the study is to identify the challenges that are impeding the implementation of Smart City projects in Bhopal. This study focuses on finding out the risk factors in the project from the stakeholder perspective, which results in delaying of the projects. The study aims to establish the relationship between various risk factors and how these risk factors can be mitigated at various levels to keep the projects on a scheduled timeline. 3. ANALYSIS AND RESULTS Co-relation of risk factors
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 402 Challenges-when projects are not in sync with timeline Success Factors - when projects are in sync with the timelines 4. RECOMMENDATIONS Recommendations Smart City Mission projectsshallhave a definite policy structure with respect to tendering process, solution availability, and post-implementation audit there should be a paradigm shiftinthepolicymakingprocessbythe government in order to have an efficient implementation of the projects 1- There should be strict timelines given to the states by the central government in order to complete the projects 2- State level smart city corporations shall not absorb employees from other departments of state government related to BMC, city planning, and urban development department, fresh employees shall be hired through tendering process with the optimum technical knowledge with respect to projects and shall be given implementation powers 3- Solution availability shall not be a tender driven process rather it should be a clearance driven process 4- Models shall be defined for the construction along with a 10% overlay of financial overlay or budget shall be fixed and then call for the tender. 5- The fallback arrangement is a policy-driven matter a contingency plan shall be a part of the policy. 6- The government should try to minimize the risks of the private parties, which will influence more private parties to join the projects hence more funds. 7- The post-implementation audit has to be the third party, which is independent of the government. Ex- NHAI quality control consultant is a third party in their every project who is independent of the implementing body. CONCLUSIONS Major Findings 1. Clear cut lack of a precise master plan and lack of technical know-how, the government staff of BMC (Bhopal Municipal Corporation) and of the city planning department have been absorbed by the Bhopal smartcitycorporation ltd there is hardly any input from outside. 2. Without a precise master plan,planningandexecution are taking a toll, with right master plan proper budgets can be formed and on the basis of that funds can be transferred at the right time without any frequent changes in it. 3. Lack of awareness among the citizens and lack of awareness among their representatives to support the area of their constituencyfortheredevelopment.SivajiNagar was selected first for Area Based Development (ABD) but due to lack of support from people of the area, T.T Nagar was selected for ABD plan, which delayed the process. 4. The major projects that need to be implemented first are delayed due to change of area because even if the land acquisition is permitted by the government-achieving Right of way (ROW) especially the removal of encroachmenttakes a lot of time and at times it escalates political pressures. 5. There are no set guidelines by the GOI for the completion of the projects even when the money will be allocated to the states for the coming 5 years. 6. In many projects, the consultants are hired from outside to enhance the planning process but the implementation power is exercised by the BMC with the same staff that lacks technical expertise. 7. The post-implementation audit of the government shall be in such a way that it ensures the end-user, unlike the audits that have beenmadeinSwachBharatAbhiyaanwhere toilets were made in the tune of thousands withoutensuring any proper end – use. 8 The risk factors according to the private parties are a. Financial and partnership b. Governance c. Clearances d. Building permits Out of these risk factors, financial andpartnership riskswere found to be on the higher side. While the clearances and building permits posted a little risk. 9 Success factors a. Timely execution b. Significant occupancy
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 403 The success of timely execution of the project isfoundout be very low whereas the success of significant occupancy is very high 10 Considering the ratings received for risks and success factors the Availability of funds is greatly affected and more than 50 % of the surveyors rated the availability of funds on the lower side. REFERENCES [1] Daewoo Nam and Theresa A. Pardo Center for Technology in Government University at Albany, State University of New York, U. S. [2] http://smartcities.gov.in/content/ [3] https://cio.economictimes.indiatimes.com/news/in ternet-of-things/hpe-to-help-bhopal-smartcity- development-corporation-for-its-cloud-based-iccc- in-madhya-pradesh/61359562 [4] https://cio.economictimes.indiatimes.com/news/in ternet-of-things/hpe-to-help-bhopal-smartcity- development-corporation-for-its-cloud-based-iccc- in-madhya-pradesh/61359562 [5] https://www.hindustantimes.com/bhopal/work- on-smart-city-projects-in-first-list-moves-at-asnail- s-pace-in-mp/story- hYbvB3MGuy2Tbpwl7CepkL.html [6] http://indianexpress.com/article/india/bhopal- 500-gps-enabled-german-bicycles-50-stationsin- citys-smart-project-4488527/ [7] http://smartbhopal.city/project Author Miss Shravya Rao Student of MBA in construction Management MIT Art Design & Technology University Pune.