M&E Monthly Report – May 2009


                           Monthly Repor t – May 2009
                          MONITORING and EVALUATION Unit
                          AMERICAN RED CROSS – TRP- INDONESIA


 A. REPORT SUMMARY


         •    Revision of program log-frames, M&E Plans and M&E tools/checklists for CBFA,
              SOCMOB, AHI, YRC was completed, where as initial meeting with other
              programs teams were held for the same.

         •    PSP End line Survey’s field work completed, report is due in June.

         •    Presentation outlining the findings of YRC baseline survey was developed and
              shared with Bangkok for review.

         •    ToR for AHI end line survey to be conducted later in October November was
              drafted and shared with respective staff and Bangkok office for feedback.
         •    Methodology and questionnaire for the SOCMOB baselines surveys was finalised
              in coordination with Health and M&E TAs.
         •    CBFA data verification performed, report is still due.
         •    M&E team worked with Nancy on enumerators and supervisors training manuals.
         •    Filing system for M&E was introduced.

         •    Two new staff, Deputy M&E Manager an Sr. Database Officer joined the M&E
              unit.

         •    Priorities for the June include development of end line ToRs, and data verification
              of the PSP and ICBRR programs, inception of SOCMOB surveys in the field, and
              finalization of PSP end line survey report.



 B. DETAILED REPORT
The Monitoring & Evaluation Department continues to provide technical support to programme
departments in monitoring; reporting against the Log-frames, data verification and analysis. The
M&E department conducted the following major works during May 2009;


 1           Review of Log-frames, M&E Plans and M&E Tools/Checklist

A comprehensive review of the Log frame, M&E Plans and M&E tools/checklists of each program
was initiated in May with an Aim to finalise each M&E document before the end of June – start of
new fiscal year. A series of review meetings were held with each program team to achieve the
following

     •   Identification of AF indicators in log-frames
     •   Log frame Revisions,
     •   Synchronizing the Log-frame Indicators to M&E Framework



                                                                                                    1 of 4
M&E Monthly Report – May 2009


     •   Revisions and updating of the M&E plans in light of log-frame revisions
     •   Securitization of each indicators to check if proper monitoring/reporting tools is available
     •   Development of new and updating the existing tools as per the modified M&E plans

During the reporting period all documents for the health sector programs were finalized, log-frame
for OD was reviewed, and initial meeting with ICBRR, PSP and WATSAN were held. Once
revision are finalised, the updated log-frames will be sent to Bangkok office for approval.

The review meetings highlighted the need of data verification for different program, Data
verification of CBFA is reported separately.

 2        PSP End line Survey in Banda Aceh and Aceh Basar

PSP End line Survey in Banda Aceh and Aceh Basar districts that started in April was completed
in the reporting period. An analysis plan was developed with the help of PSP program manager
and TA. The first draft of the report is expected to be received in the first week of June.


 3        Support to Youth Red
Data entry and analysis of the base line data of Youth Red Cross (YRC) was completed in April. A
presentation based on the survey findings was developed and shared with health TA in Bangkok.
The feedback received is currently being incorporated. Once finalised, this presentation will serve
as the formal report of the survey which will be used to compare the end line results towards the
end of the program.
M&E Officer had conducted half day socialization session for PMI representative on a newly
developed monitoring sheet. It was decided that an entry program will be developed by the DB
officer. This program will be shared with the respective branches coupled with the training.


 4        AHI End Line ToR
ToR for the end line survey of the AHI program was drafted and shared with health TA and
respective program staff for feedback. This feedback will be incorporated before getting it
approved by the Management. The survey is scheduled for October-November 2009. A
conference call with potential consultant (TANGO) is scheduled for June 17th.


 5        SOCMOB Base Line Surveys
After much deliberation, it was decided to go ahead with the SOCMOB baseline surveys. A
methodology was developed with the support of Bangkok (Health and M&E TAs). Questionnaire
for the TB, Dengue and Malaria surveys were drafted and shared with Bangkok for feedback.


 6        CBFA/ICBRR Base Line Survey
Final analysis and reporting was outsourced to another US based consultant. Analysis plan for this
survey report was developed in coordination with the Health and DM Delegate. The report is no
expected in June.


 7        CBFA Data Verification




                                                                                                  2 of 4
M&E Monthly Report – May 2009

A verification visit to of CBFA program was performed in the Banda Aceh PMI branch. Three visits
to PMI branch were made to collect the required information. Verification report is still awaited as it
requires inputs form the CBFA M&E officer who was away on RnR and field visit. Data verification
field visit was also used to socialise the PMI on modified volunteers and RKD members HH visit
reporting tool.


 8         FILING SYSTEM for M&E
A filing system was introduced in the M&E unit. The system will ensure that all documents relating
to upcoming surveys and evaluation are properly filed. M&E officer will take lead on this.


 9         Nancy’s Visit and Work on Enumerator Training Manual
M&E Delegate and Deputy M&E manager worked with regional curriculum advisor in reviewing the
Enumerators training manual. Initial discussion on the Supervisors training was also held, the
detailed feedback will be provided in the coming month.


 10        MISC
Several issues were discussed with the Sr. M&E Advisor (Gabriel) during his visit to Indonesia in
June Following is summary of main points

1. TRP M&E Calendar was updated and shared with the key staff.
2. Methodology and timeline for the end lines and evaluation were also discussed. After
      discussion with Michael, WATSAN end lines were pushed further on January/February to
      allow the program to do most of the work.
3.    WATSAN had planned separate end line for urban and rural. Same was the case for final
      evaluation. I and Gabriel thought of combining them in to one end line and one evaluation.
      Michael will update us after consulting the team.
4.    M&E Delegate will try to draft most of the ToRs (even if they are in draft format) for all of
      the end line and evaluation before I leave for my RnR by the 10th of July. Programs finishing
      by Dec 09 are obviously the priority.
5.    WATSAN log frame revision was also discussed. Since Yohannes is on home leave, it was
      agreed that we will update the log frame in country and then we’ll send this to BKK for their
      comments/approval.
6.    Login for Knowledge management Website was discussed; anyone recommended by
      the deleation can get the access. It was agreed that M&E delegate will coordinate this.
7.    Gail will support us in data verification as well the end lines. Gabriel and Gail are sharing the
      work for the end lines whereas Gabriel will be responsible of all the final evaluations of TRP.
      Gabriel will have the approval authority for all end lines and evaluations (Consultants, ToRs,
      Methodology, Instruments, Final Reports etc).
8.    Gail (Regional M&E Advisor) was requested to visit Indonesia in the first week of
      August to help M&E team data verifications.
9.    Gabriel offered to come to Indonesia to Provide Support during my home leave in
      December/January.
10.   Hiring of Enumerators for End lines: It was agreed that we should not hire volunteer who
      worked on our project as enumerators for the end line/final evaluations to maintain neutrality.
      Other enumerators can however be hired on ARC contracts provided that they are directly
      managed by the consultant.


 C. STAFFING



                                                                                                  3 of 4
M&E Monthly Report – May 2009

Two new staff, Deputy M&E Manager and Sr. Database Officer joined the M&E unit bringing the
total strength of M&E Unit to 4 staff members including one M&E office and M&E Delegate.
Another post of Sr. M&E Officer is still vacant.


 D. PLAN FOR THE NEXT Month
Priorities for the next month includes
        • Data verification for the PSP and ICBRR.
        • Training for SOCMOB baseline enumerators will conducted in the first half of June
        • Review of the remaining and log-frames and M&E tools
        • ToR development for PSP and ICBRR, finalization of AHI ToR, and development of
            another one for ICBRR case study collection.
        • Sr. DB officer will mainly work on the DB development for the ICBRR program.
        • New staff will be socialised on PDP system




End
Produced by
_________________________________________
Shahzad Tahir
Monitoring & Evaluation Delegate




                                                                                          4 of 4

Contenu connexe

Tendances

Permohonan pertambahan waktu
Permohonan pertambahan waktuPermohonan pertambahan waktu
Permohonan pertambahan waktukikibbid
 
Referensi BinaMarga
Referensi BinaMargaReferensi BinaMarga
Referensi BinaMargajono_tri_m
 
SOP Pekerjaan Konstruksi
SOP Pekerjaan KonstruksiSOP Pekerjaan Konstruksi
SOP Pekerjaan KonstruksiJocky Nahor
 
Pengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa Pemerintah
Pengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa PemerintahPengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa Pemerintah
Pengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa Pemerintahpublicprocurementinstitute
 
12. draf perjanjian pelatihan kerja dan ikatan dinas
12. draf perjanjian pelatihan kerja dan ikatan dinas12. draf perjanjian pelatihan kerja dan ikatan dinas
12. draf perjanjian pelatihan kerja dan ikatan dinaslegalakses636
 
4 Sumber Daya Sebuah Proyek
4 Sumber Daya Sebuah Proyek4 Sumber Daya Sebuah Proyek
4 Sumber Daya Sebuah ProyekSimon Patabang
 
BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)
BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)
BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)Rahmat Navis
 
Surat Keterangan On The Job Training
Surat Keterangan On The Job TrainingSurat Keterangan On The Job Training
Surat Keterangan On The Job TrainingCombat Dirgantara
 
SOP GA - Standar Operasional Prosedur General Affair
SOP GA - Standar Operasional Prosedur General AffairSOP GA - Standar Operasional Prosedur General Affair
SOP GA - Standar Operasional Prosedur General AffairAswel Darussamin
 
LAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REV
LAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REVLAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REV
LAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REVGUNTUR UMBORO, S.S.
 
10.1. perjanjian sewa menyewa
10.1. perjanjian sewa menyewa10.1. perjanjian sewa menyewa
10.1. perjanjian sewa menyewaDenny Hotspot
 
262 hps jasa_konsultan_edit_1
262 hps jasa_konsultan_edit_1262 hps jasa_konsultan_edit_1
262 hps jasa_konsultan_edit_1feri hadiansyah
 
Contoh-Service-Level-Agreement
Contoh-Service-Level-AgreementContoh-Service-Level-Agreement
Contoh-Service-Level-Agreementkalimaslingshot
 
Surat permohonan-uang-muka
Surat permohonan-uang-mukaSurat permohonan-uang-muka
Surat permohonan-uang-mukaAyu Agripina
 
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...GLC
 

Tendances (20)

Permohonan pertambahan waktu
Permohonan pertambahan waktuPermohonan pertambahan waktu
Permohonan pertambahan waktu
 
Referensi BinaMarga
Referensi BinaMargaReferensi BinaMarga
Referensi BinaMarga
 
SOP Pekerjaan Konstruksi
SOP Pekerjaan KonstruksiSOP Pekerjaan Konstruksi
SOP Pekerjaan Konstruksi
 
Pengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa Pemerintah
Pengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa PemerintahPengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa Pemerintah
Pengadaan Langsung dan Swakelola Pengadaan Barang dan Jasa Pemerintah
 
12. draf perjanjian pelatihan kerja dan ikatan dinas
12. draf perjanjian pelatihan kerja dan ikatan dinas12. draf perjanjian pelatihan kerja dan ikatan dinas
12. draf perjanjian pelatihan kerja dan ikatan dinas
 
4 Sumber Daya Sebuah Proyek
4 Sumber Daya Sebuah Proyek4 Sumber Daya Sebuah Proyek
4 Sumber Daya Sebuah Proyek
 
BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)
BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)
BERITA ACARA PENYELESAIAN PEKERJAAN (PARSIAL)
 
Form penilaian security
Form penilaian securityForm penilaian security
Form penilaian security
 
Laporan Bulanan HRD
Laporan Bulanan HRDLaporan Bulanan HRD
Laporan Bulanan HRD
 
Surat Keterangan On The Job Training
Surat Keterangan On The Job TrainingSurat Keterangan On The Job Training
Surat Keterangan On The Job Training
 
Form permintaan tenaga kerja
Form permintaan tenaga kerjaForm permintaan tenaga kerja
Form permintaan tenaga kerja
 
SOP GA - Standar Operasional Prosedur General Affair
SOP GA - Standar Operasional Prosedur General AffairSOP GA - Standar Operasional Prosedur General Affair
SOP GA - Standar Operasional Prosedur General Affair
 
LAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REV
LAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REVLAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REV
LAP KINERJA PT GLOBAL ARROW SITE TOPB DES-13 REV
 
Form 9 undangan
Form 9 undanganForm 9 undangan
Form 9 undangan
 
10.1. perjanjian sewa menyewa
10.1. perjanjian sewa menyewa10.1. perjanjian sewa menyewa
10.1. perjanjian sewa menyewa
 
262 hps jasa_konsultan_edit_1
262 hps jasa_konsultan_edit_1262 hps jasa_konsultan_edit_1
262 hps jasa_konsultan_edit_1
 
SOP Review Fixed
SOP Review FixedSOP Review Fixed
SOP Review Fixed
 
Contoh-Service-Level-Agreement
Contoh-Service-Level-AgreementContoh-Service-Level-Agreement
Contoh-Service-Level-Agreement
 
Surat permohonan-uang-muka
Surat permohonan-uang-mukaSurat permohonan-uang-muka
Surat permohonan-uang-muka
 
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
 

En vedette

Monthly Safety Report September 2013
Monthly Safety Report September 2013Monthly Safety Report September 2013
Monthly Safety Report September 2013ChinaHarbour
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012ChinaHarbour
 
Monthly safety report 2012 11
Monthly safety report 2012 11Monthly safety report 2012 11
Monthly safety report 2012 11ChinaHarbour
 
Monthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_JunMonthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_JunChinaHarbour
 
Monthly safety report may 2012
Monthly safety report may 2012Monthly safety report may 2012
Monthly safety report may 2012ChinaHarbour
 
Contoh construction safety plan
Contoh construction safety planContoh construction safety plan
Contoh construction safety planEddhy Violent
 
Laporan kegiatan harian
Laporan kegiatan harianLaporan kegiatan harian
Laporan kegiatan harianguest726982d
 
Monthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_MayMonthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_MayChinaHarbour
 
Monthly safety report 2013 04
Monthly safety report 2013 04Monthly safety report 2013 04
Monthly safety report 2013 04ChinaHarbour
 
Monthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_JulMonthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_JulChinaHarbour
 
Monthly safety report 2012 06
Monthly safety report 2012 06Monthly safety report 2012 06
Monthly safety report 2012 06ChinaHarbour
 
Monthly safety report 2012 07_july
Monthly safety report 2012 07_julyMonthly safety report 2012 07_july
Monthly safety report 2012 07_julyChinaHarbour
 
Contoh Narrative text
Contoh Narrative textContoh Narrative text
Contoh Narrative textGaluh Musa
 
Visit Oxfordshire Groups Information
Visit Oxfordshire Groups InformationVisit Oxfordshire Groups Information
Visit Oxfordshire Groups Informationjoannebutler22
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)Herman Moral
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedureMohammed Alam
 
Ebook bosan kerja resign aja goukm.id
Ebook bosan kerja resign aja goukm.idEbook bosan kerja resign aja goukm.id
Ebook bosan kerja resign aja goukm.idAdang Nur MI
 

En vedette (20)

Monthly Safety Report September 2013
Monthly Safety Report September 2013Monthly Safety Report September 2013
Monthly Safety Report September 2013
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
Monthly safety report 2012 11
Monthly safety report 2012 11Monthly safety report 2012 11
Monthly safety report 2012 11
 
Safety officer (k3 officer)
Safety officer (k3 officer)Safety officer (k3 officer)
Safety officer (k3 officer)
 
Monthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_JunMonthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_Jun
 
Monthly safety report may 2012
Monthly safety report may 2012Monthly safety report may 2012
Monthly safety report may 2012
 
Contoh construction safety plan
Contoh construction safety planContoh construction safety plan
Contoh construction safety plan
 
Laporan kegiatan harian
Laporan kegiatan harianLaporan kegiatan harian
Laporan kegiatan harian
 
Monthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_MayMonthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_May
 
Monthly safety report 2013 04
Monthly safety report 2013 04Monthly safety report 2013 04
Monthly safety report 2013 04
 
Monthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_JulMonthly Safety Report 2013 07_Jul
Monthly Safety Report 2013 07_Jul
 
Monthly safety report 2012 06
Monthly safety report 2012 06Monthly safety report 2012 06
Monthly safety report 2012 06
 
Laporan k3
Laporan k3Laporan k3
Laporan k3
 
Monthly safety report 2012 07_july
Monthly safety report 2012 07_julyMonthly safety report 2012 07_july
Monthly safety report 2012 07_july
 
Contoh recout texs
Contoh recout texsContoh recout texs
Contoh recout texs
 
Contoh Narrative text
Contoh Narrative textContoh Narrative text
Contoh Narrative text
 
Visit Oxfordshire Groups Information
Visit Oxfordshire Groups InformationVisit Oxfordshire Groups Information
Visit Oxfordshire Groups Information
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure
 
Ebook bosan kerja resign aja goukm.id
Ebook bosan kerja resign aja goukm.idEbook bosan kerja resign aja goukm.id
Ebook bosan kerja resign aja goukm.id
 

Similaire à Contoh Monthly Reports

Basic understaning of m&e sang
Basic understaning of m&e sangBasic understaning of m&e sang
Basic understaning of m&e sangSang Sey
 
Process and outcome monitoring guildline sang
Process and outcome monitoring guildline  sangProcess and outcome monitoring guildline  sang
Process and outcome monitoring guildline sangSang Sey
 
Roles and Responsibilities of MMC
Roles and Responsibilities of MMCRoles and Responsibilities of MMC
Roles and Responsibilities of MMCPrabhakar Pandit
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Water-Services-Providers.ppt
Water-Services-Providers.pptWater-Services-Providers.ppt
Water-Services-Providers.pptMohsinAli822745
 
Annual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_finalAnnual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_finalGolam Kibria Madhurza
 
8-phe_monitoringgggggggggggggggggggggggg
8-phe_monitoringgggggggggggggggggggggggg8-phe_monitoringgggggggggggggggggggggggg
8-phe_monitoringggggggggggggggggggggggggAhmadMasoomJamshidi
 
SBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation ManualSBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation ManualZeeshan Shahid
 
Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah Nee
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalGerald Ogoko
 
Botswana's Integration of Data Quality Assurance into Standard Operating Proc...
Botswana's Integration of Data Quality Assurance into Standard Operating Proc...Botswana's Integration of Data Quality Assurance into Standard Operating Proc...
Botswana's Integration of Data Quality Assurance into Standard Operating Proc...MEASURE Evaluation
 
Bangkok M&E[1] Nigel
Bangkok M&E[1] NigelBangkok M&E[1] Nigel
Bangkok M&E[1] Nigelsakphouseth
 
Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...
Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...
Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...Oswar Mungkasa
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburDr. Md. Taibur Rahman
 

Similaire à Contoh Monthly Reports (20)

Basic understaning of m&e sang
Basic understaning of m&e sangBasic understaning of m&e sang
Basic understaning of m&e sang
 
Process and outcome monitoring guildline sang
Process and outcome monitoring guildline  sangProcess and outcome monitoring guildline  sang
Process and outcome monitoring guildline sang
 
Roles and Responsibilities of MMC
Roles and Responsibilities of MMCRoles and Responsibilities of MMC
Roles and Responsibilities of MMC
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
Water-Services-Providers.ppt
Water-Services-Providers.pptWater-Services-Providers.ppt
Water-Services-Providers.ppt
 
Annual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_finalAnnual Progress Implementation Report (APIR) 2018 finalization workshop_final
Annual Progress Implementation Report (APIR) 2018 finalization workshop_final
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 
8-phe_monitoringgggggggggggggggggggggggg
8-phe_monitoringgggggggggggggggggggggggg8-phe_monitoringgggggggggggggggggggggggg
8-phe_monitoringgggggggggggggggggggggggg
 
SBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation ManualSBEP Monitoring & Evaluation Manual
SBEP Monitoring & Evaluation Manual
 
Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016Sarah_Nee_Ingram_CV_2016
Sarah_Nee_Ingram_CV_2016
 
8 phe monitoring
8 phe monitoring8 phe monitoring
8 phe monitoring
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314final
 
Botswana's Integration of Data Quality Assurance into Standard Operating Proc...
Botswana's Integration of Data Quality Assurance into Standard Operating Proc...Botswana's Integration of Data Quality Assurance into Standard Operating Proc...
Botswana's Integration of Data Quality Assurance into Standard Operating Proc...
 
Selma_CV1
Selma_CV1Selma_CV1
Selma_CV1
 
Building country M&E capacity to manage for and report on results - Nigel Brett
Building country M&E capacity to manage for and report on results - Nigel BrettBuilding country M&E capacity to manage for and report on results - Nigel Brett
Building country M&E capacity to manage for and report on results - Nigel Brett
 
Bangkok M&E[1] Nigel
Bangkok M&E[1] NigelBangkok M&E[1] Nigel
Bangkok M&E[1] Nigel
 
Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...
Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...
Planning Mid-Term Expenditure Framework (MTEF) and Performance Based Budgetin...
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
M&e services
M&e servicesM&e services
M&e services
 

Plus de irwansyah.yahya

Contoh: P R O G R A M L O G I C
Contoh: P R O G R A M  L O G I CContoh: P R O G R A M  L O G I C
Contoh: P R O G R A M L O G I Cirwansyah.yahya
 
Monitoring Evaluation And Reporting
Monitoring  Evaluation And  ReportingMonitoring  Evaluation And  Reporting
Monitoring Evaluation And Reportingirwansyah.yahya
 
Contoh Monthly Fact Sheet
Contoh Monthly Fact SheetContoh Monthly Fact Sheet
Contoh Monthly Fact Sheetirwansyah.yahya
 
Presentasi Persiapan Enum & Supervisor
Presentasi  Persiapan  Enum &  SupervisorPresentasi  Persiapan  Enum &  Supervisor
Presentasi Persiapan Enum & Supervisorirwansyah.yahya
 
M& E Tools For Training
M& E  Tools  For  TrainingM& E  Tools  For  Training
M& E Tools For Trainingirwansyah.yahya
 
Monitoring And Evaluation Slide For Workshop
Monitoring  And  Evaluation  Slide For  WorkshopMonitoring  And  Evaluation  Slide For  Workshop
Monitoring And Evaluation Slide For Workshopirwansyah.yahya
 

Plus de irwansyah.yahya (8)

Contoh: P R O G R A M L O G I C
Contoh: P R O G R A M  L O G I CContoh: P R O G R A M  L O G I C
Contoh: P R O G R A M L O G I C
 
Monitoring Evaluation And Reporting
Monitoring  Evaluation And  ReportingMonitoring  Evaluation And  Reporting
Monitoring Evaluation And Reporting
 
Lesson Learn
Lesson  LearnLesson  Learn
Lesson Learn
 
Contoh Monthly Fact Sheet
Contoh Monthly Fact SheetContoh Monthly Fact Sheet
Contoh Monthly Fact Sheet
 
Presentasi Persiapan Enum & Supervisor
Presentasi  Persiapan  Enum &  SupervisorPresentasi  Persiapan  Enum &  Supervisor
Presentasi Persiapan Enum & Supervisor
 
M& E Tools For Training
M& E  Tools  For  TrainingM& E  Tools  For  Training
M& E Tools For Training
 
Monitoring And Evaluation Slide For Workshop
Monitoring  And  Evaluation  Slide For  WorkshopMonitoring  And  Evaluation  Slide For  Workshop
Monitoring And Evaluation Slide For Workshop
 
Guidence M& E
Guidence  M& EGuidence  M& E
Guidence M& E
 

Contoh Monthly Reports

  • 1. M&E Monthly Report – May 2009 Monthly Repor t – May 2009 MONITORING and EVALUATION Unit AMERICAN RED CROSS – TRP- INDONESIA A. REPORT SUMMARY • Revision of program log-frames, M&E Plans and M&E tools/checklists for CBFA, SOCMOB, AHI, YRC was completed, where as initial meeting with other programs teams were held for the same. • PSP End line Survey’s field work completed, report is due in June. • Presentation outlining the findings of YRC baseline survey was developed and shared with Bangkok for review. • ToR for AHI end line survey to be conducted later in October November was drafted and shared with respective staff and Bangkok office for feedback. • Methodology and questionnaire for the SOCMOB baselines surveys was finalised in coordination with Health and M&E TAs. • CBFA data verification performed, report is still due. • M&E team worked with Nancy on enumerators and supervisors training manuals. • Filing system for M&E was introduced. • Two new staff, Deputy M&E Manager an Sr. Database Officer joined the M&E unit. • Priorities for the June include development of end line ToRs, and data verification of the PSP and ICBRR programs, inception of SOCMOB surveys in the field, and finalization of PSP end line survey report. B. DETAILED REPORT The Monitoring & Evaluation Department continues to provide technical support to programme departments in monitoring; reporting against the Log-frames, data verification and analysis. The M&E department conducted the following major works during May 2009; 1 Review of Log-frames, M&E Plans and M&E Tools/Checklist A comprehensive review of the Log frame, M&E Plans and M&E tools/checklists of each program was initiated in May with an Aim to finalise each M&E document before the end of June – start of new fiscal year. A series of review meetings were held with each program team to achieve the following • Identification of AF indicators in log-frames • Log frame Revisions, • Synchronizing the Log-frame Indicators to M&E Framework 1 of 4
  • 2. M&E Monthly Report – May 2009 • Revisions and updating of the M&E plans in light of log-frame revisions • Securitization of each indicators to check if proper monitoring/reporting tools is available • Development of new and updating the existing tools as per the modified M&E plans During the reporting period all documents for the health sector programs were finalized, log-frame for OD was reviewed, and initial meeting with ICBRR, PSP and WATSAN were held. Once revision are finalised, the updated log-frames will be sent to Bangkok office for approval. The review meetings highlighted the need of data verification for different program, Data verification of CBFA is reported separately. 2 PSP End line Survey in Banda Aceh and Aceh Basar PSP End line Survey in Banda Aceh and Aceh Basar districts that started in April was completed in the reporting period. An analysis plan was developed with the help of PSP program manager and TA. The first draft of the report is expected to be received in the first week of June. 3 Support to Youth Red Data entry and analysis of the base line data of Youth Red Cross (YRC) was completed in April. A presentation based on the survey findings was developed and shared with health TA in Bangkok. The feedback received is currently being incorporated. Once finalised, this presentation will serve as the formal report of the survey which will be used to compare the end line results towards the end of the program. M&E Officer had conducted half day socialization session for PMI representative on a newly developed monitoring sheet. It was decided that an entry program will be developed by the DB officer. This program will be shared with the respective branches coupled with the training. 4 AHI End Line ToR ToR for the end line survey of the AHI program was drafted and shared with health TA and respective program staff for feedback. This feedback will be incorporated before getting it approved by the Management. The survey is scheduled for October-November 2009. A conference call with potential consultant (TANGO) is scheduled for June 17th. 5 SOCMOB Base Line Surveys After much deliberation, it was decided to go ahead with the SOCMOB baseline surveys. A methodology was developed with the support of Bangkok (Health and M&E TAs). Questionnaire for the TB, Dengue and Malaria surveys were drafted and shared with Bangkok for feedback. 6 CBFA/ICBRR Base Line Survey Final analysis and reporting was outsourced to another US based consultant. Analysis plan for this survey report was developed in coordination with the Health and DM Delegate. The report is no expected in June. 7 CBFA Data Verification 2 of 4
  • 3. M&E Monthly Report – May 2009 A verification visit to of CBFA program was performed in the Banda Aceh PMI branch. Three visits to PMI branch were made to collect the required information. Verification report is still awaited as it requires inputs form the CBFA M&E officer who was away on RnR and field visit. Data verification field visit was also used to socialise the PMI on modified volunteers and RKD members HH visit reporting tool. 8 FILING SYSTEM for M&E A filing system was introduced in the M&E unit. The system will ensure that all documents relating to upcoming surveys and evaluation are properly filed. M&E officer will take lead on this. 9 Nancy’s Visit and Work on Enumerator Training Manual M&E Delegate and Deputy M&E manager worked with regional curriculum advisor in reviewing the Enumerators training manual. Initial discussion on the Supervisors training was also held, the detailed feedback will be provided in the coming month. 10 MISC Several issues were discussed with the Sr. M&E Advisor (Gabriel) during his visit to Indonesia in June Following is summary of main points 1. TRP M&E Calendar was updated and shared with the key staff. 2. Methodology and timeline for the end lines and evaluation were also discussed. After discussion with Michael, WATSAN end lines were pushed further on January/February to allow the program to do most of the work. 3. WATSAN had planned separate end line for urban and rural. Same was the case for final evaluation. I and Gabriel thought of combining them in to one end line and one evaluation. Michael will update us after consulting the team. 4. M&E Delegate will try to draft most of the ToRs (even if they are in draft format) for all of the end line and evaluation before I leave for my RnR by the 10th of July. Programs finishing by Dec 09 are obviously the priority. 5. WATSAN log frame revision was also discussed. Since Yohannes is on home leave, it was agreed that we will update the log frame in country and then we’ll send this to BKK for their comments/approval. 6. Login for Knowledge management Website was discussed; anyone recommended by the deleation can get the access. It was agreed that M&E delegate will coordinate this. 7. Gail will support us in data verification as well the end lines. Gabriel and Gail are sharing the work for the end lines whereas Gabriel will be responsible of all the final evaluations of TRP. Gabriel will have the approval authority for all end lines and evaluations (Consultants, ToRs, Methodology, Instruments, Final Reports etc). 8. Gail (Regional M&E Advisor) was requested to visit Indonesia in the first week of August to help M&E team data verifications. 9. Gabriel offered to come to Indonesia to Provide Support during my home leave in December/January. 10. Hiring of Enumerators for End lines: It was agreed that we should not hire volunteer who worked on our project as enumerators for the end line/final evaluations to maintain neutrality. Other enumerators can however be hired on ARC contracts provided that they are directly managed by the consultant. C. STAFFING 3 of 4
  • 4. M&E Monthly Report – May 2009 Two new staff, Deputy M&E Manager and Sr. Database Officer joined the M&E unit bringing the total strength of M&E Unit to 4 staff members including one M&E office and M&E Delegate. Another post of Sr. M&E Officer is still vacant. D. PLAN FOR THE NEXT Month Priorities for the next month includes • Data verification for the PSP and ICBRR. • Training for SOCMOB baseline enumerators will conducted in the first half of June • Review of the remaining and log-frames and M&E tools • ToR development for PSP and ICBRR, finalization of AHI ToR, and development of another one for ICBRR case study collection. • Sr. DB officer will mainly work on the DB development for the ICBRR program. • New staff will be socialised on PDP system End Produced by _________________________________________ Shahzad Tahir Monitoring & Evaluation Delegate 4 of 4