DRAGLINE
•   Walking draglines are for many years the most
    popular machine for opencast mining due to their
    flexibility, utility and availability.
•   their low operating costs for waste mining
•   Draglines are deployed wherever there is scope for
    side casting Overburden above coal seam into the
    de-coaled area.
•   It is very cost effective technology- cost of OB
    removal is cheaper than shovel dumper technology.
•   There are two draglines working at RGOC-I and RG
    OC-III with bucket size of 24 Cum and 30.6 Cum
    respectively.
•   Both these draglines are performing very well.
•   The bucket is maneuvered by means of a number of
    ropes and chains.


                            ISN
DRAGLINE
The dragline is a typical combined cyclic excavator and
   material carrier since it both excavates material and
   dumps it without the use of trucks or conveyor
   belts. The dragline sits above the waste or
   overburden block, usually 50m or so wide, on the
   highwall side and excavates the material in front of
   itself, to dump it on the low-wall or spoil side of the
   strip to uncover the coal seam below it.




                             ISN
OPERATION OF DRAGLINE
In a typical cycle of excavation, the bucket is positioned
above the material to be excavated.
The bucket is then lowered and the dragrope is then drawn so
that the bucket is dragged along the surface of the material.
The bucket is then lifted by using the hoist rope.
A swing operation is then performed to move the bucket to
the place where the material is to be dumped.
The dragrope is then released causing the bucket to tilt and
empty. This is called a dump operation.
It is a independent machine unlike a shovel.
A 30 cum Dragline can handle 40 Lakh cum of OB per annum.
The dragline works on the immediate OB bench above coal
and the benches from the surface to the Dragline are normally
handled by Shovel & Dumper combination. Hence adequate
capacity of Shovel & Dumper ISN capacity should be provided to
prevent idling of the Dragline.
OPERATION OF DRAGLINE
The Dragline has a long boom with a bucket capacity ranging
from 15 to 50 cum.
It can swing in 360 degrees, after dragging the loose material
below its level.
It swings normally between 90 to 120 degrees and side cast
the material in to the de-coaled area.
The nomenclature of the Dragline usually called as 24/99
which means 24 cum of bucket capacity and 96 m is the boom
length.
The same Dragline can have about 32 cum of bucket capacity
if the boom length of 71 m. normally
the Draglines is electrically driven with 6.6 KV power with 2
main motors of 1750 HP each. These motors inturn drive the
Generators and the Generators drive DC motors
Normally there are 7 DC motors for different operations like
                              ISN
marching, dragging, hoisting, swinging etc.,
DRAGLINE BUCKET




       ISN
LINE DIAGRAM OF DRAGLINE




             ISN
LINE DIAGRAM OF DRAGLINE




             ISN
APPLICATION OF DRAGLINE
1.   Gradients flatter than 1 in 6 (if gradient is more the
     dumped OB will slide towards the coal face and
     particularly in rainy season the extraction of coal
     become dangerous)
2.   Seams should be free of faults & other geological
     disturbances
3.   Deposits with Larger Strike length (>2 km) so that
     frequent shifting of the Dragline from one end to
     another can be reduced.
4.   Present cost of the Dragline is above 100 Cr and the
     life of the Dragline is 1.50 Lakh hours hence, the
     property should be large enough ensuring the life of
     about 25 yr or more.
5.   A hilly property is not suitable
                              ISN
6.   Property should have atleast 15 years life
DRAGLINE – Methods of Working
– Simple casing method with or without
  rehandling.
– Extended bench method.
– Horse shoe /Spoil Bank/Across Pit
  method.
– Continuous bench two pass method.
– Tandem dragline working i.e., two
  draglines working together, one dealing
  with part of the material dumped by the
  other.
                    ISN
Simple Casting
This is simple method of Dragline working. In this method the Dragline is sited
on immediate OB bench above Coal and removes the OB and dumps it in the
de-coaled area of previous cut.
The width of the cut normally less than 40 m so that re-handling of the OB will
be negligible. The method is extremely suitable for singly thin seam mining.




                                      ISN
ISN
ISN
ISN
Simple Casting




      ISN
BALANCING DIAGRAM




        ISN
ISN
ISN
BALANCING DIAGRAM OF
    WEST SECTION




         ISN
ISN
Extended Bench Method
• As the name is suggested, the Dragline bench is
  extended by dumping a part of OB by dragline into de-
  coal area and the space is levelled by dozing and the
  same Dragline can be sited in 2nd position on the
  dumped and dozzed OB.
• This enables the distance between 1st and 2nd position to
  be more when compared with simple casting method.
• The increasing distance increases the capability of the
  Dragline to dump OB further away in de-coaled area, so
  that sliding of OB on to the coal bench is to be minimized.
• A Dragline has to do more re handling now. This method
  is suitable for exposing relatively thicker seams.

                            ISN
ISN
ISN
ISN
ISN
Extended Bench Method




S.No      D/L      Excavating       Cut         Area m2    Dump
        Position                                 (solid)
 1        P-1        1st Dig    D’A’B’CFF’RST   480+19     YRQOU
                                                   2

                                 ISN
Extended Bench Method with cast Blast




                 ISN
Spoil Bank Method
• The method is adapted when there are 2 seams
  and having parting between 10 to 12 m.
• In the first position, the Dragline exposes the top
  seam by side casting the OB above the top
  seam.
• The side casting material is dozed and leveled.
• After extraction of the top seam the parting OB is
  loosened by blasting and the Dragline is placed
  on the already side casted leveled material and
  the remaining parting OB of above bottom seam
  is removed by the dragline and side casted
  exposing the bottom seam.
                         ISN
Spoil Bank Method




       ISN
ISN
Spoil Bank Method




  D/L      Operational   Excavation       Cut         Area m2     Dump
Position    position                                   (solid)
26M/81     Main Bench     1st Dig      ABCDEFGH       280+904     MPQRIS
  R        Position                                                 ’SU
           (MBP)
           Spoil Bench    1st Dig         IJKL          332
           Position
           (SBP)
                         Rehandle       ISN
                                      QPIS’ST+VV’N   513+17+152   MNOVW
                                            N’                    W’X’XY
Continuous Bench Two pass Method




               ISN
Tandem Working of Draglines
• In this method 2 Draglines are put into in
  tandem operation one above the other
  with a minimum horizontal distance of 100
  m between them. This method is adopted
  where the coal seam thickness is more
  than 30 m and to handle the OB bench of
  60 m above the coal seam.


                     ISN
Tandem Working of Draglines




   Dragline      Cut        Dump      Area m2
                                       (solid)      D/L 10/70 is
    10/70       ABCD         abcd      285.0
                                                 150-200m ahead of
    20/90       CDEF        kmnofci    570.0
                (Dig)
                                                     D/L 20/90
              Ijkl (R.H.)               9.6
              Ebf (R.H.)    ISN         1.0
Variables with Draglines

•Swing and boom angle of a dragline.
•Increase or decrease of bucket size (within
limits) with consequent decrease or increase of
boom length.
•Cut width and height of dragline bench.
•Method of use of dragline/draglines.
•More than one position of a dragline.
•Adopting cast-blasting to the desired extent.

                       ISN
Technical specifications of Dragline
             (24 x 96)
   - Boom length             : 74 - 95 m
   - Boom angle              : 30°- 38°
   - Bucket Capacity (nominal): 26 - 34 cu m
   - Dump height             : 38 - 40 m
   - Digging depth           : 44.3 - 53.4 m
   - Operating radius        : 64.6 - 88.2 m
   - Walking speed           : 0.24 kmph
   - Bearing Pressure        : 0.95 kg/cm2



                        ISN
SPECIFICATIONS OF OC-I DRAGLINE

    MAKE                        Ranson & Rapier
    Bucket Capacity             M3           24
    Annual capacity             mm3        3.31
    Boom Length                 Mtrs       95.6
    Operating Radius            Mtrs         88
    Dumping Height              Mtrs       39.6
    Base Dia                    Mtrs         16
    Shoe Length                 Mtrs         17
    Shoe Width                  Mtrs        2.8
    Movement of Machine         Mtrs        2.2
    Weight of Machine           Tonnes    2000
    Total H.P                   H.P.      3500
                          ISN
ISN

More Related Content

What's hot (20)

Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Power shovel
Power shovelPower shovel
Power shovel
 
Dragline
DraglineDragline
Dragline
 
Bulldozers
BulldozersBulldozers
Bulldozers
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Mine waste dump
Mine waste dumpMine waste dump
Mine waste dump
 
Scraper
ScraperScraper
Scraper
 
Aerial ropeway
Aerial ropewayAerial ropeway
Aerial ropeway
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
Roof supports in coal mines
Roof supports in coal minesRoof supports in coal mines
Roof supports in coal mines
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface mines
 
Surface miner
Surface minerSurface miner
Surface miner
 
Bucket wheel excavator
Bucket wheel excavatorBucket wheel excavator
Bucket wheel excavator
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
Ripper
RipperRipper
Ripper
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
Tunneling
TunnelingTunneling
Tunneling
 

Viewers also liked

Drilling in mining
Drilling in miningDrilling in mining
Drilling in miningEder Reyes
 
M.tech seminar
M.tech seminarM.tech seminar
M.tech seminarvartika07
 
Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine Hayat GOUDJIL
 
Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)Adel Nehaoua
 
Design optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element MethodDesign optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element MethodIjripublishers Ijri
 
Prestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upPrestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upAyaz Malik
 

Viewers also liked (10)

Drilling in mining
Drilling in miningDrilling in mining
Drilling in mining
 
M.tech seminar
M.tech seminarM.tech seminar
M.tech seminar
 
Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine Projet urbain sur Bardo Constantine
Projet urbain sur Bardo Constantine
 
Atelier projet urbain
Atelier  projet urbain Atelier  projet urbain
Atelier projet urbain
 
Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)Catalogue de dimensionnement des chaussees neuves (fascicule1)
Catalogue de dimensionnement des chaussees neuves (fascicule1)
 
Thesis_3_10
Thesis_3_10Thesis_3_10
Thesis_3_10
 
13 21 (1)
13 21 (1)13 21 (1)
13 21 (1)
 
Design optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element MethodDesign optimization of excavator bucket using Finite Element Method
Design optimization of excavator bucket using Finite Element Method
 
Prestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take upPrestress loss due to friction & anchorage take up
Prestress loss due to friction & anchorage take up
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 

Similar to Working of dragline

Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxEmmanuelTokpahII
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallurohinibjn
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentationrajkumar_sm
 
Troughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt ConveyorTroughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt ConveyorMAKAUT
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Mining Methods
Mining MethodsMining Methods
Mining MethodsVR M
 
Modelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment DesignModelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment DesignInnovation Centre WA
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavatorVivek Kumar
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavatorParth Desani
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSSuyash Awasthi
 
Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh dsSATYANARAYANA I
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.pptDagmawiGenanaw
 

Similar to Working of dragline (20)

Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptx
 
PDF document lecture 3.pdf
PDF document lecture 3.pdfPDF document lecture 3.pdf
PDF document lecture 3.pdf
 
Design of earth dam at gorukallu
Design of earth dam at gorukalluDesign of earth dam at gorukallu
Design of earth dam at gorukallu
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 
Troughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt ConveyorTroughed Belt Conveyor & Flat Belt Conveyor
Troughed Belt Conveyor & Flat Belt Conveyor
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Miningmethods 1228473621975095-9
Miningmethods 1228473621975095-9Miningmethods 1228473621975095-9
Miningmethods 1228473621975095-9
 
Mining Methods
Mining MethodsMining Methods
Mining Methods
 
Modelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment DesignModelling Granular and Fluid Flows in Equipment Design
Modelling Granular and Fluid Flows in Equipment Design
 
Ch2 before
Ch2 beforeCh2 before
Ch2 before
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
Dragline exclavator
Dragline exclavatorDragline exclavator
Dragline exclavator
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavator
 
Sizing
SizingSizing
Sizing
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
 
Semimechanization sdls&lh ds
Semimechanization sdls&lh dsSemimechanization sdls&lh ds
Semimechanization sdls&lh ds
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
Selection of viable ug technology
Selection of viable ug technologySelection of viable ug technology
Selection of viable ug technology
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 

More from SATYANARAYANA I

More from SATYANARAYANA I (12)

Chap9 anrep1314
Chap9 anrep1314Chap9 anrep1314
Chap9 anrep1314
 
Basics of drilling 4
Basics of drilling 4Basics of drilling 4
Basics of drilling 4
 
Basics of drilling 3
Basics of drilling 3Basics of drilling 3
Basics of drilling 3
 
Basics of drilling 2
Basics of drilling 2Basics of drilling 2
Basics of drilling 2
 
Basics of drilling 5
Basics of drilling 5Basics of drilling 5
Basics of drilling 5
 
Working of icc bwe-rock breaker
Working of icc bwe-rock breakerWorking of icc bwe-rock breaker
Working of icc bwe-rock breaker
 
Scraper ripper-grader-dozer
Scraper ripper-grader-dozerScraper ripper-grader-dozer
Scraper ripper-grader-dozer
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
 
Basics of openpit mining
Basics of openpit miningBasics of openpit mining
Basics of openpit mining
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
Extraction of developed pillars
Extraction of developed pillarsExtraction of developed pillars
Extraction of developed pillars
 
Differnt technologies in oc mines
Differnt technologies in oc minesDiffernt technologies in oc mines
Differnt technologies in oc mines
 

Recently uploaded

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 

Recently uploaded (20)

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 

Working of dragline

  • 1. WORKING OF DRAGLINE I. Satyanarayana, M.Tech,MBA,MCA Dy. Manager, Project Planning, SCCL, isnindian@gmail.com, visit at www.slideshare.net/isnindian ISN
  • 2. ISN
  • 3. DRAGLINE • Walking draglines are for many years the most popular machine for opencast mining due to their flexibility, utility and availability. • their low operating costs for waste mining • Draglines are deployed wherever there is scope for side casting Overburden above coal seam into the de-coaled area. • It is very cost effective technology- cost of OB removal is cheaper than shovel dumper technology. • There are two draglines working at RGOC-I and RG OC-III with bucket size of 24 Cum and 30.6 Cum respectively. • Both these draglines are performing very well. • The bucket is maneuvered by means of a number of ropes and chains. ISN
  • 4. DRAGLINE The dragline is a typical combined cyclic excavator and material carrier since it both excavates material and dumps it without the use of trucks or conveyor belts. The dragline sits above the waste or overburden block, usually 50m or so wide, on the highwall side and excavates the material in front of itself, to dump it on the low-wall or spoil side of the strip to uncover the coal seam below it. ISN
  • 5. OPERATION OF DRAGLINE In a typical cycle of excavation, the bucket is positioned above the material to be excavated. The bucket is then lowered and the dragrope is then drawn so that the bucket is dragged along the surface of the material. The bucket is then lifted by using the hoist rope. A swing operation is then performed to move the bucket to the place where the material is to be dumped. The dragrope is then released causing the bucket to tilt and empty. This is called a dump operation. It is a independent machine unlike a shovel. A 30 cum Dragline can handle 40 Lakh cum of OB per annum. The dragline works on the immediate OB bench above coal and the benches from the surface to the Dragline are normally handled by Shovel & Dumper combination. Hence adequate capacity of Shovel & Dumper ISN capacity should be provided to prevent idling of the Dragline.
  • 6. OPERATION OF DRAGLINE The Dragline has a long boom with a bucket capacity ranging from 15 to 50 cum. It can swing in 360 degrees, after dragging the loose material below its level. It swings normally between 90 to 120 degrees and side cast the material in to the de-coaled area. The nomenclature of the Dragline usually called as 24/99 which means 24 cum of bucket capacity and 96 m is the boom length. The same Dragline can have about 32 cum of bucket capacity if the boom length of 71 m. normally the Draglines is electrically driven with 6.6 KV power with 2 main motors of 1750 HP each. These motors inturn drive the Generators and the Generators drive DC motors Normally there are 7 DC motors for different operations like ISN marching, dragging, hoisting, swinging etc.,
  • 8. LINE DIAGRAM OF DRAGLINE ISN
  • 9. LINE DIAGRAM OF DRAGLINE ISN
  • 10. APPLICATION OF DRAGLINE 1. Gradients flatter than 1 in 6 (if gradient is more the dumped OB will slide towards the coal face and particularly in rainy season the extraction of coal become dangerous) 2. Seams should be free of faults & other geological disturbances 3. Deposits with Larger Strike length (>2 km) so that frequent shifting of the Dragline from one end to another can be reduced. 4. Present cost of the Dragline is above 100 Cr and the life of the Dragline is 1.50 Lakh hours hence, the property should be large enough ensuring the life of about 25 yr or more. 5. A hilly property is not suitable ISN 6. Property should have atleast 15 years life
  • 11. DRAGLINE – Methods of Working – Simple casing method with or without rehandling. – Extended bench method. – Horse shoe /Spoil Bank/Across Pit method. – Continuous bench two pass method. – Tandem dragline working i.e., two draglines working together, one dealing with part of the material dumped by the other. ISN
  • 12. Simple Casting This is simple method of Dragline working. In this method the Dragline is sited on immediate OB bench above Coal and removes the OB and dumps it in the de-coaled area of previous cut. The width of the cut normally less than 40 m so that re-handling of the OB will be negligible. The method is extremely suitable for singly thin seam mining. ISN
  • 13. ISN
  • 14. ISN
  • 15. ISN
  • 18. ISN
  • 19. ISN
  • 20. BALANCING DIAGRAM OF WEST SECTION ISN
  • 21. ISN
  • 22. Extended Bench Method • As the name is suggested, the Dragline bench is extended by dumping a part of OB by dragline into de- coal area and the space is levelled by dozing and the same Dragline can be sited in 2nd position on the dumped and dozzed OB. • This enables the distance between 1st and 2nd position to be more when compared with simple casting method. • The increasing distance increases the capability of the Dragline to dump OB further away in de-coaled area, so that sliding of OB on to the coal bench is to be minimized. • A Dragline has to do more re handling now. This method is suitable for exposing relatively thicker seams. ISN
  • 23. ISN
  • 24. ISN
  • 25. ISN
  • 26. ISN
  • 27. Extended Bench Method S.No D/L Excavating Cut Area m2 Dump Position (solid) 1 P-1 1st Dig D’A’B’CFF’RST 480+19 YRQOU 2 ISN
  • 28. Extended Bench Method with cast Blast ISN
  • 29. Spoil Bank Method • The method is adapted when there are 2 seams and having parting between 10 to 12 m. • In the first position, the Dragline exposes the top seam by side casting the OB above the top seam. • The side casting material is dozed and leveled. • After extraction of the top seam the parting OB is loosened by blasting and the Dragline is placed on the already side casted leveled material and the remaining parting OB of above bottom seam is removed by the dragline and side casted exposing the bottom seam. ISN
  • 31. ISN
  • 32. Spoil Bank Method D/L Operational Excavation Cut Area m2 Dump Position position (solid) 26M/81 Main Bench 1st Dig ABCDEFGH 280+904 MPQRIS R Position ’SU (MBP) Spoil Bench 1st Dig IJKL 332 Position (SBP) Rehandle ISN QPIS’ST+VV’N 513+17+152 MNOVW N’ W’X’XY
  • 33. Continuous Bench Two pass Method ISN
  • 34. Tandem Working of Draglines • In this method 2 Draglines are put into in tandem operation one above the other with a minimum horizontal distance of 100 m between them. This method is adopted where the coal seam thickness is more than 30 m and to handle the OB bench of 60 m above the coal seam. ISN
  • 35. Tandem Working of Draglines Dragline Cut Dump Area m2 (solid) D/L 10/70 is 10/70 ABCD abcd 285.0 150-200m ahead of 20/90 CDEF kmnofci 570.0 (Dig) D/L 20/90 Ijkl (R.H.) 9.6 Ebf (R.H.) ISN 1.0
  • 36. Variables with Draglines •Swing and boom angle of a dragline. •Increase or decrease of bucket size (within limits) with consequent decrease or increase of boom length. •Cut width and height of dragline bench. •Method of use of dragline/draglines. •More than one position of a dragline. •Adopting cast-blasting to the desired extent. ISN
  • 37. Technical specifications of Dragline (24 x 96) - Boom length : 74 - 95 m - Boom angle : 30°- 38° - Bucket Capacity (nominal): 26 - 34 cu m - Dump height : 38 - 40 m - Digging depth : 44.3 - 53.4 m - Operating radius : 64.6 - 88.2 m - Walking speed : 0.24 kmph - Bearing Pressure : 0.95 kg/cm2 ISN
  • 38. SPECIFICATIONS OF OC-I DRAGLINE MAKE Ranson & Rapier Bucket Capacity M3 24 Annual capacity mm3 3.31 Boom Length Mtrs 95.6 Operating Radius Mtrs 88 Dumping Height Mtrs 39.6 Base Dia Mtrs 16 Shoe Length Mtrs 17 Shoe Width Mtrs 2.8 Movement of Machine Mtrs 2.2 Weight of Machine Tonnes 2000 Total H.P H.P. 3500 ISN