Ashland City Schools Bond Issue The Vision: Address the facility needs of the Ashland City Schools for the next fifty years at a minimal cost.
Ashland City Schools Bond Issue ,[object Object],The Ohio School Facilities Commission (OSFC) presented the district with initial Master Plan options. Five plans were presented with a variety of school configuration, building and renovation options. Plans ranged in cost from as high as $108 million to as low as $87 million. After a series of architect-led community engagement interviews and open meetings, a Revised Master Plan option was locally developed.
Ashland City Schools Bond Issue The Ashland City Schools Board of Education (BOE) adopted a Revised Master Plan in May 2010: ,[object Object],by renovating the existing High School – grades 5/6 and 7/8 will be in separate academic wings. ,[object Object]
Address Elementary School Needs (Grades K-4).
When State Money is Received, Build a New Elementary School and a New Auditorium.Cost – $60 million ($40 million local share)
Ashland City Schools Bond Issue The BOE voted in December 2010 to place a Bond Issue on the May 3, 2011 ballot. The Bond Issue will be for 4.8 mills (includes .5 mill building maintenance fund as required by the state). The Bond Issue is a property tax increase:
Ashland City Schools Bond Issue PHASE 1:Paid for entirely by local funds raised by the Bond Issue. Work would begin with the passage of the Bond Issue.
Ashland City Schools Bond Issue PHASE 2: When state funds are received Phase 2 of the plan will be implemented without any additional taxpayer dollars.
Ashland City Schools Bond Issue ABOUT STATE FUNDS The Ohio School Facilities Commission (OSFC) has been operating the Classroom Facilities Assistance Program since 1997 putting over $5.4 billion into 154 districts across Ohio. Ashland is slated to receive state funds equal to 39% of the OSFC qualified project costs. While certain project costs (purchasing land, building a new auditorium, and some of the renovations) are not co-funded by the state, the district stands to receive roughly $20 million from the state to apply to the overall project cost.
Ashland City Schools Bond Issue ABOUT STATE FUNDS State funds are expected to arrive in 2012 or 2013. At that time funds will be needed to build the new auditorium, the new elementary school, and to demolish the Middle School, Montgomery, Lincoln, and Osborn. If for some reason the state offer does not come until after 2013, the project elements dependent on that funding would simply be delayed until the funds are received.
Ashland City Schools Bond Issue CONSTRUCTION TIMELINE ,[object Object]
The Class of 2015 will be the first graduating class.
Great way to celebrate the 200th anniversary of the City of Ashland.,[object Object]
Only costs $7 million more to get a new high school and a renovated middle school:,[object Object]
Allows for our new High School to have upgraded facilities with up-to-date labs, better technology, and improved instructional space to better prepare young people for life and careers.
Better for all kids!,[object Object]
Cost-effective site development
Lack of interference in a neighborhood
Controlled traffic corridor under ODOT study for improvement
No perfect location,[object Object]
A renewal levy is scheduled to be up for voter approval in 2012 – no new taxes.
Possibility for new operating levy in 2014 or 2015 based on State of Ohio projections.,[object Object]
Air conditioning
Air exchange
Decreased costs
Fewer buildings to maintain
More energy efficient buildings (20% savings projected)

More Related Content

Similar to ACS Bond Issue 2011

Bond Factsheet Dec 1
Bond Factsheet Dec 1Bond Factsheet Dec 1
Bond Factsheet Dec 1
Ed Petersen
 
Gov education reform_plan
Gov education reform_planGov education reform_plan
Gov education reform_plan
Nimil Jain
 
Lansing Pathway Absentee Voter Postcard Proof
Lansing Pathway Absentee Voter Postcard ProofLansing Pathway Absentee Voter Postcard Proof
Lansing Pathway Absentee Voter Postcard Proof
Katherine Oates Erickson
 
2007-2008_AccountabilityReport
2007-2008_AccountabilityReport2007-2008_AccountabilityReport
2007-2008_AccountabilityReport
Christine Marson
 

Similar to ACS Bond Issue 2011 (20)

Board survey powerpoint 1 27-14 revised
Board survey powerpoint 1 27-14 revisedBoard survey powerpoint 1 27-14 revised
Board survey powerpoint 1 27-14 revised
 
Bond Factsheet Dec 1
Bond Factsheet Dec 1Bond Factsheet Dec 1
Bond Factsheet Dec 1
 
Gov education reform_plan
Gov education reform_planGov education reform_plan
Gov education reform_plan
 
Gov education reform_plan
Gov education reform_planGov education reform_plan
Gov education reform_plan
 
Town Meeting Presentation June 7, 2010
Town Meeting Presentation June 7, 2010Town Meeting Presentation June 7, 2010
Town Meeting Presentation June 7, 2010
 
Community Presentation Measure Q
Community Presentation Measure QCommunity Presentation Measure Q
Community Presentation Measure Q
 
Cleveland Cluster Proposal Hs Redesign 120209
Cleveland Cluster Proposal Hs Redesign 120209Cleveland Cluster Proposal Hs Redesign 120209
Cleveland Cluster Proposal Hs Redesign 120209
 
CUSDWatch Presentation To The City Of Dana Point
CUSDWatch Presentation To The City Of Dana PointCUSDWatch Presentation To The City Of Dana Point
CUSDWatch Presentation To The City Of Dana Point
 
Lansing Pathway Absentee Voter Postcard Proof
Lansing Pathway Absentee Voter Postcard ProofLansing Pathway Absentee Voter Postcard Proof
Lansing Pathway Absentee Voter Postcard Proof
 
Budgeting as a vehicle for accomplishing priorities sps 2 16 09b
Budgeting as a vehicle for accomplishing priorities sps 2 16 09bBudgeting as a vehicle for accomplishing priorities sps 2 16 09b
Budgeting as a vehicle for accomplishing priorities sps 2 16 09b
 
District Status
District StatusDistrict Status
District Status
 
Salem School 021009
Salem School 021009Salem School 021009
Salem School 021009
 
School Facilities Funding in California - a time of transition and change
School Facilities Funding in California - a time of transition and changeSchool Facilities Funding in California - a time of transition and change
School Facilities Funding in California - a time of transition and change
 
2007-2008_AccountabilityReport
2007-2008_AccountabilityReport2007-2008_AccountabilityReport
2007-2008_AccountabilityReport
 
CUSDWatch Presentation to the City of Aliso Viejo
CUSDWatch Presentation to the City of Aliso ViejoCUSDWatch Presentation to the City of Aliso Viejo
CUSDWatch Presentation to the City of Aliso Viejo
 
Massachusetts state school aid overview
Massachusetts state school aid overviewMassachusetts state school aid overview
Massachusetts state school aid overview
 
The Results of a Decade of Neglect
The Results of a Decade of NeglectThe Results of a Decade of Neglect
The Results of a Decade of Neglect
 
Communities of Excellence - Idaho CSP Summary Slides 12 5-18.2
Communities of Excellence - Idaho CSP Summary Slides   12 5-18.2Communities of Excellence - Idaho CSP Summary Slides   12 5-18.2
Communities of Excellence - Idaho CSP Summary Slides 12 5-18.2
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings Recommendations
 
Spring 2009 Finance Presentation For Pt As V2
Spring 2009 Finance Presentation For Pt As V2Spring 2009 Finance Presentation For Pt As V2
Spring 2009 Finance Presentation For Pt As V2
 

Recently uploaded

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 

ACS Bond Issue 2011

  • 1.
  • 2. Ashland City Schools Bond Issue The Vision: Address the facility needs of the Ashland City Schools for the next fifty years at a minimal cost.
  • 3.
  • 4.
  • 5. Address Elementary School Needs (Grades K-4).
  • 6. When State Money is Received, Build a New Elementary School and a New Auditorium.Cost – $60 million ($40 million local share)
  • 7. Ashland City Schools Bond Issue The BOE voted in December 2010 to place a Bond Issue on the May 3, 2011 ballot. The Bond Issue will be for 4.8 mills (includes .5 mill building maintenance fund as required by the state). The Bond Issue is a property tax increase:
  • 8. Ashland City Schools Bond Issue PHASE 1:Paid for entirely by local funds raised by the Bond Issue. Work would begin with the passage of the Bond Issue.
  • 9. Ashland City Schools Bond Issue PHASE 2: When state funds are received Phase 2 of the plan will be implemented without any additional taxpayer dollars.
  • 10. Ashland City Schools Bond Issue ABOUT STATE FUNDS The Ohio School Facilities Commission (OSFC) has been operating the Classroom Facilities Assistance Program since 1997 putting over $5.4 billion into 154 districts across Ohio. Ashland is slated to receive state funds equal to 39% of the OSFC qualified project costs. While certain project costs (purchasing land, building a new auditorium, and some of the renovations) are not co-funded by the state, the district stands to receive roughly $20 million from the state to apply to the overall project cost.
  • 11. Ashland City Schools Bond Issue ABOUT STATE FUNDS State funds are expected to arrive in 2012 or 2013. At that time funds will be needed to build the new auditorium, the new elementary school, and to demolish the Middle School, Montgomery, Lincoln, and Osborn. If for some reason the state offer does not come until after 2013, the project elements dependent on that funding would simply be delayed until the funds are received.
  • 12.
  • 13. The Class of 2015 will be the first graduating class.
  • 14.
  • 15.
  • 16. Allows for our new High School to have upgraded facilities with up-to-date labs, better technology, and improved instructional space to better prepare young people for life and careers.
  • 17.
  • 19. Lack of interference in a neighborhood
  • 20. Controlled traffic corridor under ODOT study for improvement
  • 21.
  • 22. A renewal levy is scheduled to be up for voter approval in 2012 – no new taxes.
  • 23.
  • 28. More energy efficient buildings (20% savings projected)
  • 29.
  • 30. Ashland City Schools Bond Issue Mason High School
  • 31. Ashland City Schools Bond Issue for us as a community to act on this greatly needed project that will surely improve the future of both Ashland City Schools and our community. In 2009, 60 individuals came together to discuss the top needs for Ashland County in order for us to continue to move forward. The #1 issue that came from that planning process was the need for updated school facilities.
  • 32.
  • 33.
  • 34.
  • 35. No buildings have been built in the last 50 years.
  • 36.
  • 37.
  • 38.
  • 41.
  • 42. 39% coming from the State of Ohio.
  • 43. Current low interest rates and construction costs.
  • 44.
  • 45. Building a New High School (Grades 9-12).DON’T JUST VOTE YES… BECOME AN ADVOCATE!
  • 46. Ashland City Schools Bond Issue ADDITIONAL INFORMATION For additional information about the Plan or the Bond Issue, visit: www.itstimeashland.com or contact any BOE member.
  • 47. Paid for by the Citizens for Ashland City Schools, Tim Rowsey, Treasurer. 1020 Cleveland Ave., Ashland, OH 44805