Abang Azrin 0319073 
Chua Jia Cheng 0315160 
Goh Jeng Jhieh 0315080 
Jake Sia Chyi Sern 0314396 
Kellyann Hiew 0319532 
Rachel Ernesta 0317966
*Exchange of information through electronic and 
electrical means over a significant distance 
*Consists of transmitter and receiver devices 
*Data is transmitted in the form of electrical signals 
(carrier waves) 
*Modulated into either analog or digital signals for 
transmitting the information 
*Telegraph, telephones, radio, fiber optics, 
satellites and the internet
Needs to be very well planned 
Certified & qualified professionals needed 
M&E must collaborate 
Process and design issues resolved, avoiding amendments 
after completion
Telecom rooms 
• Main Telecom room (MTR) 
• Mobile Service room 
• Rooftop Service room 
• Floor Telecom closet (FTC) 
Has to be vertically aligned and linked by a shared 
containment system 
Easily accesible for maintenance 
Secure from unauthorized entry
Telecom rooms must not be in close proximity to: 
• Heat 
• Moisture 
• High voltages 
• Corrosive atmospheric & environmental conditions 
• Radio frequency 
• Electro magnetic interference 
•Wet areas (showers, washroom, garbage area)
Smoke detectors(connected to building management system) 
Emergency lighting 
Containment openings sealed fire retardant material 
Free from contaminants and pollutants 
Handheld fire extinguishers 
Walls and ceilings painted with anti-dust & anti-static 
coating
Solid wood or steel 
Outward opening with automated hinges 
Fire retardant 
Labeled with a sign
Cable tray covers installed 
Cables free from sharp edges & earth bonded 
Cable trays must be easily accessible 
Cable trays in accessible public areas must be covered
Provisions made for connections to: 
• Public phones 
• ATM machines 
• Retail kiosks 
Fibre optics connections are installed from MTR -> Business 
consolidation cabinet
*A system is a set of interacting or interdependent 
components forming an integrated whole. 
*Some system has structure. 
*Some system has behaviour. 
*Some system has interconnectivity. 
*Almost EVERYTHING on earth has its own system.
1. What makes a good telecommunication system 
2. Consideration of choosing telecommunication 
system 
3. Component of telecommunication system 
A) Telecommunication space and pathway 
B) Telecommunication cable system
What defines as good? 
Lets go through some comparison.
VS
*Able to reduce toll charges. 
*Enhancing the productivity and efficiency. 
*Phone location can be move. 
*Flexible, scalable, and customizable.
*Cost. Cost is always most important. 
*Accessibility. It must be easy to use. 
*Suitability. Different people different wife.
*Telecommunications Spaces keep 
telecommunications equipment and terminations of 
telecommunications cables. 
*Telecommunications pathways transport the cables. 
*There is at least a telecommunications room (TR) 
at each floor. 
*The pathways carries telecommunications cables 
from the TR to the vicinity of the area served
*Horizontal cabling of the telecommunication 
cabling system consists of two or more cables that 
are connect to each work area from a TR. 
*Each cable is terminated at the cross-connection 
field in the TR. 
*It can transmit both voice and data applications.
*Fiber Optics is a cable consisting of glass threads 
which uses light to transfer information.
*Large bandwidth 
*Light weight & small diameter 
*Resistance to electromagnetic interference 
*Long-distance signal transmission 
*Cheaper than copper
*Vulnerable to physical damage 
*High installation costs 
*Special test equipment is required
*The Santander banco group is the client of the 
project. 
* Founded in 1857 in Latin America 
*Santander bank has several headquarters across the 
world which includes the United Kingdom, Latin 
America and Europe. 
*The client wanted to demolish the already existing 
14 story building to replace with the 860ft tower for 
their new branch in Miami florida.
*The building is a proposed 860ft building and yet to be 
constructed. 
* The building was designed by kohn Pedersen fox 
associates 
*The design was made upon winning a competition to 
design the building. 
* Kohn Pedersen fox is a well renowned award winning 
architectural firm and very reputable for incorporate 
sustainability within their designs. 
*The awards include 
•City Heritage Award for Building Conservation-Sixty 
London 
•AIA New York Design AwardGa Mashie
*In a high rise multi store building there should be 
•Uniformity the continuous dominant signal 
•Of good quality. 
*In order to achieve and ensure good wireless 
coverage and traffic load management of the 
occupant’s usage, several features and technologies 
were proposed to be incorporated within the design 
of the building.
*Multi conductor copper backbone riser cable was 
used as well as an OM4 type glass fibre optic cable 
for better transmission. 
* These cables and single mode fibre stretched from 
the data centre to each IDF rooms respectively 
along the length of the high rise building. 
*the internet based security system is a system that 
will enable each tenant to manage their own 
independent office space with further control by 
the building management of the Santander building
*The building contains a 1,100sf data centre located 
on the ground floor. 
*It designed to ANSI/TIA/EIA-942 telecommunication 
infrastructure standard for data centre in the 
United States. 
*The data centre is used to house equipment such as 
servers, to manage data and other it related 
operation of the building.
*The horizontal cabling is made of Cat 6+ fibre. 
* Category 6+ made up of larger copper conductor. 
* This allows it to transmit a stronger signal as well 
as a faster signal to the receiver compared to the 
lower standard of cabling. 
*The tenant floors include raised access floor to 
cater for the horizontal cabling to the IDF closet 
per floor and to the additional tenant IDF closets in 
their lease space. 
*The tenant may choose to have their own 
telecommunication services and/or lease intra-building 
fibre links between office levels.
*Internet based security system 
*It is a system that will enable each tenant to 
manage their own independent office space with 
further control by the building management of the 
Santander building
*Private Automatic Branch Exchange 
*Call centers and other large organizations 
*Single access number to provide several lines to 
outside callers 
*External lines to internal callers 
*Automated telephone switching system
*Through the various applications, communication can 
be achieved as a result. 
*Telecommunication systems in a high rise building 
differs from a low rise building by having a much more 
complex design and it requires transmission to a longer 
range compared to other buildings. 
*Effectiveness depends on: 
*Applications are up to standards. 
*The quality of the materials and cabling 
*Good management will allow the system less of 
maintenance throughout the life span of the building. 
*The rooms are to be kept in a required temperature 
and follow fire safety requirement.

More Related Content

What's hot

Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Nekumi Kida
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Ritesh Ambadkar
 
Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Ridhwan Zakaria
 
Building services report
Building services report Building services report
Building services report Soh Shing
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
Building services 2 assignment
Building services 2 assignmentBuilding services 2 assignment
Building services 2 assignmentShao Xun Sean Thun
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case StudyBolin Loong
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services AssignmentErik Ong
 
Ducted distribution of services
Ducted distribution of servicesDucted distribution of services
Ducted distribution of servicesNoorule Inie Osman
 
Building services-power-point
Building services-power-pointBuilding services-power-point
Building services-power-pointJeanne Hoo
 
BUILDING SERVICES-II (ELECTRICAL)
BUILDING SERVICES-II (ELECTRICAL)BUILDING SERVICES-II (ELECTRICAL)
BUILDING SERVICES-II (ELECTRICAL)Kethees Waran
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1Izam Lukman
 
Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Lovie Tey
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional BuildingKashish Duggal
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)Manoj Mawle
 
Electrical system design of garden project at belhaven (10 Storey High Rise B...
Electrical system design of garden project at belhaven (10 Storey High Rise B...Electrical system design of garden project at belhaven (10 Storey High Rise B...
Electrical system design of garden project at belhaven (10 Storey High Rise B...Nithya Susan Varghese
 
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Ong Seng Peng Jeff
 

What's hot (20)

Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
 
Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)Intelligent Building (Dayabumi Complex)
Intelligent Building (Dayabumi Complex)
 
Building services report
Building services report Building services report
Building services report
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Building services 2 assignment
Building services 2 assignmentBuilding services 2 assignment
Building services 2 assignment
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
 
Ducted distribution of services
Ducted distribution of servicesDucted distribution of services
Ducted distribution of services
 
Building services-power-point
Building services-power-pointBuilding services-power-point
Building services-power-point
 
Building Services
Building ServicesBuilding Services
Building Services
 
BUILDING SERVICES-II (ELECTRICAL)
BUILDING SERVICES-II (ELECTRICAL)BUILDING SERVICES-II (ELECTRICAL)
BUILDING SERVICES-II (ELECTRICAL)
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1
 
Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus //
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional Building
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
 
Electrical system design of garden project at belhaven (10 Storey High Rise B...
Electrical system design of garden project at belhaven (10 Storey High Rise B...Electrical system design of garden project at belhaven (10 Storey High Rise B...
Electrical system design of garden project at belhaven (10 Storey High Rise B...
 
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
Building Service Project 2 Year 2016 (Taylors University Lakeside Campus)
 

Viewers also liked (17)

Assign 2
Assign 2Assign 2
Assign 2
 
Presentation enbe final projects 1
Presentation enbe final projects 1Presentation enbe final projects 1
Presentation enbe final projects 1
 
Journal1
Journal1Journal1
Journal1
 
ENBE- Future City
ENBE- Future CityENBE- Future City
ENBE- Future City
 
Psychology presentation
Psychology presentationPsychology presentation
Psychology presentation
 
Business charity driveeee
Business charity driveeeeBusiness charity driveeee
Business charity driveeee
 
Group Component
Group ComponentGroup Component
Group Component
 
Journal2
Journal2Journal2
Journal2
 
Game Tournament
Game TournamentGame Tournament
Game Tournament
 
Company profile
Company profileCompany profile
Company profile
 
Site surveying
Site surveying Site surveying
Site surveying
 
Psychology report
Psychology reportPsychology report
Psychology report
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 Presentation
 
Building Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco ExtraBuilding Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco Extra
 
Accounts project
Accounts projectAccounts project
Accounts project
 
Magazine about QS
Magazine about QSMagazine about QS
Magazine about QS
 
The sponge
The spongeThe sponge
The sponge
 

Similar to Essential components of a high-rise telecom system

telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...
telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...
telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...Lokesh385032
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-finalkhaikeat16
 
Bs assignment sem2
Bs assignment sem2Bs assignment sem2
Bs assignment sem2tianji96
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services AssignmentErik Ong
 
Telecommunications
TelecommunicationsTelecommunications
TelecommunicationsAlisha Dash
 
Structured Cabling Solution - White Paper
Structured Cabling Solution - White PaperStructured Cabling Solution - White Paper
Structured Cabling Solution - White PaperSyed Firas
 
Brian-Schrand-5G-and-FTTH.pptx
Brian-Schrand-5G-and-FTTH.pptxBrian-Schrand-5G-and-FTTH.pptx
Brian-Schrand-5G-and-FTTH.pptxtaufik519205
 
Communication and network concepts
Communication and network conceptsCommunication and network concepts
Communication and network conceptsMohnish Sahu
 
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public SafetyWireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safetytelecom-wiring
 
Communication and Network Concepts
Communication and Network ConceptsCommunication and Network Concepts
Communication and Network ConceptsDev Chauhan
 
Net essentials6e ch4
Net essentials6e ch4Net essentials6e ch4
Net essentials6e ch4APSU
 
Transmission media on Client server and high speed network
Transmission media on Client server and high speed networkTransmission media on Client server and high speed network
Transmission media on Client server and high speed networkSatya P. Joshi
 
Presentation on different modes of data communication
Presentation on different modes of data communicationPresentation on different modes of data communication
Presentation on different modes of data communicationTafadzwa Gonera
 
MOBILE COMMERCE UNIT-III PPT.pptx
MOBILE COMMERCE UNIT-III PPT.pptxMOBILE COMMERCE UNIT-III PPT.pptx
MOBILE COMMERCE UNIT-III PPT.pptxmyakamjagadish
 
Chapter Two.pdf
Chapter Two.pdfChapter Two.pdf
Chapter Two.pdfMamushLeta
 
Structure cabling a basic approach
Structure cabling a basic approachStructure cabling a basic approach
Structure cabling a basic approachdhaneshkhurana016
 

Similar to Essential components of a high-rise telecom system (20)

telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...
telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...
telecommunicationforhighrisebuildingpresentation-141201084042-conversion-gate...
 
Bs assignment-final
Bs assignment-finalBs assignment-final
Bs assignment-final
 
Bs assignment sem2
Bs assignment sem2Bs assignment sem2
Bs assignment sem2
 
Building Services Assignment
Building Services AssignmentBuilding Services Assignment
Building Services Assignment
 
Telecommunications
TelecommunicationsTelecommunications
Telecommunications
 
Structured Cabling Solution - White Paper
Structured Cabling Solution - White PaperStructured Cabling Solution - White Paper
Structured Cabling Solution - White Paper
 
Brian-Schrand-5G-and-FTTH.pptx
Brian-Schrand-5G-and-FTTH.pptxBrian-Schrand-5G-and-FTTH.pptx
Brian-Schrand-5G-and-FTTH.pptx
 
Technology Products
Technology ProductsTechnology Products
Technology Products
 
Communication and network concepts
Communication and network conceptsCommunication and network concepts
Communication and network concepts
 
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public SafetyWireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
Wireless Technology Innovation for in-Building Cellular, Wifi and Public Safety
 
1 2 3 4 5 g
1 2 3 4 5 g1 2 3 4 5 g
1 2 3 4 5 g
 
Communication and Network Concepts
Communication and Network ConceptsCommunication and Network Concepts
Communication and Network Concepts
 
Fiber applications
Fiber applicationsFiber applications
Fiber applications
 
Net essentials6e ch4
Net essentials6e ch4Net essentials6e ch4
Net essentials6e ch4
 
Bsnl
BsnlBsnl
Bsnl
 
Transmission media on Client server and high speed network
Transmission media on Client server and high speed networkTransmission media on Client server and high speed network
Transmission media on Client server and high speed network
 
Presentation on different modes of data communication
Presentation on different modes of data communicationPresentation on different modes of data communication
Presentation on different modes of data communication
 
MOBILE COMMERCE UNIT-III PPT.pptx
MOBILE COMMERCE UNIT-III PPT.pptxMOBILE COMMERCE UNIT-III PPT.pptx
MOBILE COMMERCE UNIT-III PPT.pptx
 
Chapter Two.pdf
Chapter Two.pdfChapter Two.pdf
Chapter Two.pdf
 
Structure cabling a basic approach
Structure cabling a basic approachStructure cabling a basic approach
Structure cabling a basic approach
 

More from Jäkê Čhŷį Śêrñ (16)

Meas 4-presentation
Meas 4-presentationMeas 4-presentation
Meas 4-presentation
 
Purpose
PurposePurpose
Purpose
 
Tender
TenderTender
Tender
 
Shd group-report
Shd group-reportShd group-report
Shd group-report
 
Sustainable housing development assignment
Sustainable housing development assignmentSustainable housing development assignment
Sustainable housing development assignment
 
Management science
Management scienceManagement science
Management science
 
Measurement 3 assignment
Measurement 3 assignmentMeasurement 3 assignment
Measurement 3 assignment
 
Building materials report 2
Building materials report 2Building materials report 2
Building materials report 2
 
Dulux paints
Dulux paintsDulux paints
Dulux paints
 
Building material report
Building material reportBuilding material report
Building material report
 
Assignment 2 edited
Assignment 2 editedAssignment 2 edited
Assignment 2 edited
 
Objective of site visit
Objective of site visitObjective of site visit
Objective of site visit
 
Maths
MathsMaths
Maths
 
TJ 04
TJ 04TJ 04
TJ 04
 
IDJ 5
IDJ 5IDJ 5
IDJ 5
 
TJ 03
TJ 03TJ 03
TJ 03
 

Recently uploaded

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

Essential components of a high-rise telecom system

  • 1. Abang Azrin 0319073 Chua Jia Cheng 0315160 Goh Jeng Jhieh 0315080 Jake Sia Chyi Sern 0314396 Kellyann Hiew 0319532 Rachel Ernesta 0317966
  • 2.
  • 3. *Exchange of information through electronic and electrical means over a significant distance *Consists of transmitter and receiver devices *Data is transmitted in the form of electrical signals (carrier waves) *Modulated into either analog or digital signals for transmitting the information *Telegraph, telephones, radio, fiber optics, satellites and the internet
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Needs to be very well planned Certified & qualified professionals needed M&E must collaborate Process and design issues resolved, avoiding amendments after completion
  • 12. Telecom rooms • Main Telecom room (MTR) • Mobile Service room • Rooftop Service room • Floor Telecom closet (FTC) Has to be vertically aligned and linked by a shared containment system Easily accesible for maintenance Secure from unauthorized entry
  • 13. Telecom rooms must not be in close proximity to: • Heat • Moisture • High voltages • Corrosive atmospheric & environmental conditions • Radio frequency • Electro magnetic interference •Wet areas (showers, washroom, garbage area)
  • 14. Smoke detectors(connected to building management system) Emergency lighting Containment openings sealed fire retardant material Free from contaminants and pollutants Handheld fire extinguishers Walls and ceilings painted with anti-dust & anti-static coating
  • 15. Solid wood or steel Outward opening with automated hinges Fire retardant Labeled with a sign
  • 16. Cable tray covers installed Cables free from sharp edges & earth bonded Cable trays must be easily accessible Cable trays in accessible public areas must be covered
  • 17. Provisions made for connections to: • Public phones • ATM machines • Retail kiosks Fibre optics connections are installed from MTR -> Business consolidation cabinet
  • 18.
  • 19. *A system is a set of interacting or interdependent components forming an integrated whole. *Some system has structure. *Some system has behaviour. *Some system has interconnectivity. *Almost EVERYTHING on earth has its own system.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. 1. What makes a good telecommunication system 2. Consideration of choosing telecommunication system 3. Component of telecommunication system A) Telecommunication space and pathway B) Telecommunication cable system
  • 26. What defines as good? Lets go through some comparison.
  • 27.
  • 28. VS
  • 29. *Able to reduce toll charges. *Enhancing the productivity and efficiency. *Phone location can be move. *Flexible, scalable, and customizable.
  • 30. *Cost. Cost is always most important. *Accessibility. It must be easy to use. *Suitability. Different people different wife.
  • 31. *Telecommunications Spaces keep telecommunications equipment and terminations of telecommunications cables. *Telecommunications pathways transport the cables. *There is at least a telecommunications room (TR) at each floor. *The pathways carries telecommunications cables from the TR to the vicinity of the area served
  • 32.
  • 33. *Horizontal cabling of the telecommunication cabling system consists of two or more cables that are connect to each work area from a TR. *Each cable is terminated at the cross-connection field in the TR. *It can transmit both voice and data applications.
  • 34.
  • 35.
  • 36. *Fiber Optics is a cable consisting of glass threads which uses light to transfer information.
  • 37.
  • 38. *Large bandwidth *Light weight & small diameter *Resistance to electromagnetic interference *Long-distance signal transmission *Cheaper than copper
  • 39. *Vulnerable to physical damage *High installation costs *Special test equipment is required
  • 40.
  • 41. *The Santander banco group is the client of the project. * Founded in 1857 in Latin America *Santander bank has several headquarters across the world which includes the United Kingdom, Latin America and Europe. *The client wanted to demolish the already existing 14 story building to replace with the 860ft tower for their new branch in Miami florida.
  • 42. *The building is a proposed 860ft building and yet to be constructed. * The building was designed by kohn Pedersen fox associates *The design was made upon winning a competition to design the building. * Kohn Pedersen fox is a well renowned award winning architectural firm and very reputable for incorporate sustainability within their designs. *The awards include •City Heritage Award for Building Conservation-Sixty London •AIA New York Design AwardGa Mashie
  • 43. *In a high rise multi store building there should be •Uniformity the continuous dominant signal •Of good quality. *In order to achieve and ensure good wireless coverage and traffic load management of the occupant’s usage, several features and technologies were proposed to be incorporated within the design of the building.
  • 44. *Multi conductor copper backbone riser cable was used as well as an OM4 type glass fibre optic cable for better transmission. * These cables and single mode fibre stretched from the data centre to each IDF rooms respectively along the length of the high rise building. *the internet based security system is a system that will enable each tenant to manage their own independent office space with further control by the building management of the Santander building
  • 45. *The building contains a 1,100sf data centre located on the ground floor. *It designed to ANSI/TIA/EIA-942 telecommunication infrastructure standard for data centre in the United States. *The data centre is used to house equipment such as servers, to manage data and other it related operation of the building.
  • 46. *The horizontal cabling is made of Cat 6+ fibre. * Category 6+ made up of larger copper conductor. * This allows it to transmit a stronger signal as well as a faster signal to the receiver compared to the lower standard of cabling. *The tenant floors include raised access floor to cater for the horizontal cabling to the IDF closet per floor and to the additional tenant IDF closets in their lease space. *The tenant may choose to have their own telecommunication services and/or lease intra-building fibre links between office levels.
  • 47. *Internet based security system *It is a system that will enable each tenant to manage their own independent office space with further control by the building management of the Santander building
  • 48.
  • 49. *Private Automatic Branch Exchange *Call centers and other large organizations *Single access number to provide several lines to outside callers *External lines to internal callers *Automated telephone switching system
  • 50. *Through the various applications, communication can be achieved as a result. *Telecommunication systems in a high rise building differs from a low rise building by having a much more complex design and it requires transmission to a longer range compared to other buildings. *Effectiveness depends on: *Applications are up to standards. *The quality of the materials and cabling *Good management will allow the system less of maintenance throughout the life span of the building. *The rooms are to be kept in a required temperature and follow fire safety requirement.