This is the Department of Trade and Industry Sales Promotion Permit Application Process. More information about the policy and my perspective on it at http://digitalfilipinoclub.blogspot.com/2011/08/forming-group-dti-online-sales.html
2. APPLICATION SALES PROMOTION
PERMIT APPLICATION
Evaluate SP Application
Payment of Fees
Approval
Releasing of SP
Permit
3. APPLICATION
Applicant submits duly
accomplished Application
Evaluate SP Application Form and supporting
documents.
Payment of Fees Sales Promo Application
could be:
Approval • Premium
• Discount
• Raffle
Releasing of SP • Redemption
• Game
Permit
• Contest
• Multi-scheme
4. APPLICATION
Applicant submits duly
accomplished Application
Evaluate SP Application Form and supporting
• Filled-up Sales Promotion documents.
Application form for the
particular scheme of Fees
Payment signed Sales Promo Application could
by the sponsor be:
• Lay-out of proposed promo
collaterals, such as topper
Approval • Premium
board, poster, print ad,
• Discount
banner, streamer, radio
• Raffle
script, TV spiel, etc.
• Redemption
• Detailed mechanicsof SP
Releasing • Game
• Process flow Permit
chart (for
• Contest
system based promo)
• Multi-scheme
5. APPLICATION
Evaluate SP Application Applicant submits duly
• Copy of Agreement with
• Filled-up Sales Promotion accomplished Application Form
other sponsor/co-sponsors
Application form for the and supporting documents.
Payment of Fees
• Control measures (for
particular scheme signed
byraffle, sponsor and
both contest, games ) Sales Promo Application could
• Copy of permit from other
advertising agency be:
Approval
government agencies
• lay-out of proposed promo
collaterals, suchPesticide
Fertilizer and as topper • Premium
board, poster, for fertilizer and
Authority – print ad, • Discount
Pesticide products SP
Releasing of
banner, streamer, radio • Raffle
script, TI-NCR –Permit
D etc. ICC Certificate for • Redemption
• detailed mechanics covered by
imported products • Game
mandatory products • Contest
DTI-BPS – PS Certificate for • Multi-scheme
locally manufactured products
covered by mandatory
standards
6. APPLICATION
• Copy ational
N of Agreement with
Evaluate SP Application
• Filled-up Sales Promotion Applicant submits duly
Applicationcompany the
sponsor form for
Telecommunication accomplished Application Form
particular scheme text / call by
Commission – signed
• Control measures (for rate and supporting documents.
raffle, cell Payment of by
both sponsor and advertising
or contest, games )
phone promo
Fees
agency of permit from other
• Copy TelCo. Sales Promo Application could
government agencies sheet
• lay-out of proposed promo
• Sample score / tally be:
collaterals, suchPesticide
( Fertilizer andApproval
for contest/games)
as topper
board, poster, for fertilizer and
Authority – print ad, • Premium
Pesticide products
banner, streamer, radio • Discount
script,TI-NCRReleasing of SP
D etc. – ICC Certificate for • Raffle
• detailed mechanics covered by
imported products • Redemption
Permit
mandatory products • Game
DTI-BPS – PS Certificate for • Contest
locally manufactured products • Multi-scheme
covered by mandatory
standards
7. APPLICATION Applicant submits duly
accomplished Application
Form and supporting
Evaluate SP Application documents. Check the
following:
Payment of Fees 1. Sales Promotion
Application is filed before
the start of implementation.
If not, return to client for
Approval revision of duration.
2. The application is covered
Releasing of SP by the Sales Promotion
Permit Law, under R.A. 7394, DAO
#2 S 1993, and DAO # s
2010, if not, inform client. If
the client request for a
written reply, prepare letter
response
8. APPLICATION
Applicant submits duly
accomplished Application Form
Evaluate SP Application and supporting documents.
Check the following:
Payment of Fees 1. Sales Promotion Application
The Sales promotions Permit
is filed before the start of
Application must be filed
before the start of the implementation. If not,
return to client for revision
duration Approval
of duration.
General Rule on Duration –
2. The application is covered
Sales promotion campaigns
Releasing of SP
shall have duration of not by the Sales Promotion Law,
Permit under R.A. 7394 & DAO #2
more than a year, extendible
Series 0f 1993, DAO # 2 s
to a maximum of six (06)
2010 if not, inform client. If
months, except for discount
the client request for a
which is three (03) months
inclusive of the extension. written reply, prepare letter
response
However, in case of closing
out sales, the period shall be
six (06) months
9. APPLICATION
3.Applicant submits duly
Area coverage:
accomplished Application
• Form and supporting
Single city / municipality /
Evaluate SP Application documents.
province
• 2 or more cities/
1. Check if Sales Promotion
municipalities/ province
Payment of Fees within a singleis filed before
Application region
NCR start of
the
or implementation. If not,
in several regions
Approval including NCR for
return to client
revision of duration.
• More than one region
excluding NCR
Releasing of SP 2. Check whether application
Permit 4. Salescovered by the Sales
is Promotion scheme:
Promotion Law, under
• Discount
• Premium & DAO #2
R.A. 7394
• Raffle 0f 1993, if not,
Series
• Contest client. If the client
inform
• Redemption a written reply,
request for
• Game prepare letter response
• Multi scheme
10. APPLICATION
3.Applicant submits duly
Area coverage:
accomplished Application
• Form and supporting
Single city / municipality /
Evaluate SP Application documents.
province
• 2 or more cities/
1. Check if Sales Promotion
municipalities/ province
Where to filePayment of Fees
sales promotion
within a singleis filed before
Application region
applications:
the start of
• NCR or in several regions
implementation. If not,
including NCR
• Single city/municipality/ return to client for
• More than one region
province - the Approval shall
application revision of duration.
excluding NCR
be filed at the Department’s
provincial office in that
Releasing of SP 2. Check whether application
4. Sales Promotion scheme:
province, or, in the absence
is covered by the Sales
• Discount
Permit
thereof, at the Department’s Promotion Law, under
• Premium
regional office which has
• Raffle 7394 & DAO #2
R.A.
jurisdiction over the said
• Contest 0f 1993, if not,
Series
province.
inform client. If the client
• Redemption
• 2 or more cities/municipalities/
• Gamerequest for a written reply,
province within a single region - prepare letter response
the application shall filed at the
Department’s regional office
which has jurisdiction over said
provinces
11. APPLICATION
3.Applicant submits duly
Area coverage:
accomplished Application
• Form and supporting
Single city / municipality /
Evaluate SP Application documents.
province
• 2 or more cities/
1. Check if Sales Promotion
municipalities/ province
Where to fileCapital Region or in
• National sales Payment of Fees
promotion
within a singleis filed before
Application region
applications, if it involves: NCR -
several regions including
• NCR start of
the or in several
the application shall be filed at
implementation. If not,
regions
the Department’s regional office
• Single city/municipality/ province
Approval including NCR for
return to client
- in the National Capital Region
the application shall be filed at revision of duration.
• More than one region
(NCR)
the Department’s provincial office
excluding NCR
in that province, or, in the 2. Check whether application
absence thereof,region but of SP
• More than one Releasing
at the
4. Salescovered by the Sales
is Promotion scheme:
excluding NCR - the office
Department’s regionalPermitapplication Promotion Law, under
• Discount
which hasfiled at the Department’s
shall be jurisdiction over the
• Premium & DAO #2
R.A. 7394
said province. where the main
regional office
• Raffle 0f 1993, if not,
Series
• 2 office or cities/municipalities/
or more the coordinating office
• Contest client. If the client
inform
of the sponsors is located,
province within a single region -
• Redemption a written reply,
request for
the applicationnearest to the areas
whichever is shall filed at the prepare letter response
• Game
Department’s regional sales
to be covered by the office
• Multi-scheme
promotion campaign.
which has jurisdiction over said
provinces
12. APPLICATION 5. Application form, the duly Sales
Applicant submits
3. Check area coverage of
applicable requirements vis-à-
accomplished Application
Promotion:
visForm and supporting
the sales promotion
Evaluate SP Application mechanics & attachments /
• documents. municipality
Single city /
submitted. If complete, issue
province
an order of payment for the
• 2 or moreif Sales Promotion
1. Check cities/
Payment of Fees application fee. If not, return
municipalities/ is filed before
Application province
the within start of region
documents, issue a
the a single
compliance sheet with regions
• NCR or in several all the
implementation. If not,
requirementsto client for revision
including NCR must be
return which
Approval compliedduration. region get
of with in order to
• More than one
an order of payment for the
excluding NCR
permitCheck whether application
2. fee.
Releasing of SP 6. 4. Check for amendments,
Requestcovered byPromotion
is the Sales the Sales
Permit check Promotion Law, under R.A.
the changes applied for:
scheme:
• - Extension, if the promotion 0f
Discount DAO #2 Series
7394 &
• period hasifalready lapsed,
Premium not, inform client. If
1993,
application shouldn’t be
• received nor approved. for a
Raffle client request
the
• - Duration reply, prepare letter
written
Contest
response
• - Mechanics
Redemption
• - Prizes
Game
- Raffle date/venue
- Coverage
13. APPLICATION 5. Application form, the
Applicant submits duly
3. Check area coverage of vis-à-
applicable requirements Sales
accomplished Application
Promotion:
vis the sales promotion
Form and supporting
Evaluate SP Application mechanics & attachments
documents. municipality /
• submitted. If/ complete, issue
Single city
province payment for the
an1. Check if Sales Promotion
order of
Changes on Approved Promotions • application fee. If not, return
2 or more cities/
which have not yet started, ifof Fees
Payment letter municipalities/ is filed before
Application province
the documents, issue a
request states that no advertising within start of region
the a single
compliance sheet with all the
implementation. If not,
material or collateral has been released • requirementsseveralmust be
NCR or in which regions
and that revisions shall be incorporated
Approval including to client for revision
return NCR
complied with in order to get
in the advertising material or collateral More duration. region
of than one
• an order of payment for the
to be released, check the submitted permit fee. NCR
excluding
2. Check whether application
advertising material for consistency.
Releasing of SP 6. Request for amendments,
is covered by the Sales
4. Check the Sales Promotion
Permit check the changes applied for:
Promotion Law, under R.A.
Changes on Approved Promotions scheme:
- Extension, if the promotion
which have already started, if proposed • period has already#2 Series 0f
Discount DAO lapsed,
7394 &
changes in the letter request will be • applicationif shouldn’t be client. If
Premium not, inform
1993,
beneficial to consumers who have • received client request for a
the
Raffle
already participated in the promotion, Contest reply, prepare letter
written
• nor approved.
response
• - Redemption
Duration
otherwise application shall not be
approved. • - Game
Mechanics
- Prizes
- Raffle date/venue
- Coverage
14. 5. Application form, the
APPLICATION Applicant submits duly
applicable requirements of Sales
3. Check area coverage vis-à-
visaccomplished Application
Promotion:
the sales promotion
mechanics &supporting
Form and attachments
Evaluate SP Application • documents. municipality /
Single city /
submitted. If complete, issue
province
an order of payment for the
Extensionon Approved -Promotions
Changes of duration Not more than 6 • 2 or moreif Sales Promotion
1. Check cities/
application fee. If not, return
months, except for discounts whichFees
which have not yet Payment of if shall
started, check the municipalities/ is filed before
Application province
documents, issue a
not exceed 3 months that no advertising
letter request states including the original within start of region
the a sheet
compliance single with all the
duration (closing out sale been released implementation. If not,
• NCR or in several regions
material or collateral has maximum of 6 requirements which must be
months) revisions shall be incorporated
and that Approval complied with in order torevision
including to client for get
return NCR
an order duration. region
of than one
• More of payment for the
- Deadline for submission ofor collateral
in the advertising material entries - Shall
excluding NCR
permit fee.
be at least one day before submitted
to be released, check the the determination
6. Request for whether application
2. Check amendments,
advertising material for consistency. of
Encoding/Signing
of winners unless, otherwise, the one day check is covered byapplied for:
the changes the Sales
4. Check the Sales Promotion
period is impracticable Permit - scheme: if the promotion R.A.
Promotion Law, under
Extension,
Changes on Approved Promotions
- which have /already started,of winner/s -
Draw date determination check if Discount DAO #2 Series 0f
7394 &
• period has already lapsed,
proposed changes in the letter request
Not more than 2 weeks from the last day of • application shouldn’t be client. If
Premium not, inform
1993, if
Releasing of SP received client request for a
• Raffle the
will be beneficial to consumers who
the deadline of submission of entries
have already participated Permit
in the • norContest reply, prepare letter
approved.
written
- Duration
response
promotion, otherwise application shall
- Prizes - There must be additional prize for • - Mechanics
Redemption
not be approved.
additional winner • - Prizes
Game
- Raffle date/venue
- Coverage
15. APPLICATION
5. Application form, the
applicable requirements vis-à-
Applicant submits duly
3. Check area coverage of Sales
vis the sales promotion
Evaluate SP Application accomplished Application
Promotion:
mechanics &supporting
Form and attachments
submitted. If complete, issue
• documents. municipality /
Single city /
an order of payment for the
province
Requirements for approval of extension of Sales application fee. If not, return
• 2 or moreif Sales Promotion
1. Check cities/
Promotion: the documents, issue a before
Payment of Fees municipalities/ is filed
Application province
1. Letter request for extension filed at least 3 compliance sheet with all the
day prior to expiration of the promo within start of region
the a single
requirements which must be
implementation. If not,
duration: • NCR or in several regions
complied with in order torevision
get
2. Extension must not exceed 6 months,
Approval including to client for
return NCR
an order duration. for the
of of payment
except when it is a discount scheme • More than one region
3. For schemes involving determination of
permit fee.
excluding NCR
winners such as raffles, contest, games or 6. Request for whether application
2. Check amendments,
redemption, allocate additional prize for
Releasing of SP check is covered byapplied for:
the changes the Sales
4. Check the Sales Promotion
additional winner/s. - Extension, if the promotion R.A.
Promotion Law, under
Permit
4. Proposed copy of announcement on all scheme: already lapsed,
period has
changes such as duration, deadline for • application DAO #2 Series 0f
7394 &
Discount shouldn’t be
submission of entry, draw dates/ • received nor approved. client. If
Premium not, inform
1993, if
determination of winners, redemption Raffle client request for a
the
• - Duration
period and additional prizes with fact of • - Mechanics reply, prepare letter
written
Contest
approval (all items with changes to be • - Prizesresponse
Redemption
marked with * and
• - Raffle date/venue
Game
5. “ *Approved by DTI NCR ” which is the fact - Coverage
of approval must be indicated to show
that all changes were approved by DTI
NCR.
16. APPLICATION
5. Application form, the duly Sales
Applicant submits
3. Check area coverage of
accomplished Application
Promotion:
applicable requirements vis-à-
visForm and supporting
the sales promotion
Evaluate SP Application • documents. municipality
mechanics & attachments /
Single city /
province
submitted. If complete, issue
Requirements for approval of extension of Sales • 2 or moreif Sales Promotion
1. Check cities/
an order of payment for the
Requirements for approval of changes
Promotion: Promotionof Fees
Payment municipalities/ is filed before
Application province
application fee. If not, return
on Sales previously
1. Letter request for extension filed at least 1 the within start of region
the a single
documents, issue a
approved but not yet started: implementation. If not,
day prior to expiration of the promo compliance sheet with regions
• NCR or in several all the
duration:
Approval requirementsto client for revision
return which
including NCR must be
1. Extension must not exceed 6 months,
Letter request for the approval of
2. compliedduration. region get
of with in order to
• More than one
changes.
except when it is a discount scheme
excluding NCR
an order of payment for the
3. 2. For schemes involvingbe implemented
Changes must not determination of
winners such as raffles,issued by DTI or permitCheck whether application
2. fee.
unless approval is contest, games
Releasing of SP is covered by the Sales
redemption, allocate additional prize for 6. 4. Check the amendments,
Request for Sales Promotion
NCR Permit
additional winner/s. check Promotion Law, under R.A.
scheme:
the changes applied for:
3. Letter must indicate that no
4. Proposed copy of announcement on all • - Extension, if the promotion 0f
Discount DAO #2 Series
7394 &
changes such as duration, deadline for has
advertising material or collateral
• period hasifalready lapsed,
Premium not, inform client. If
1993,
been released with previously
submission of entry, draw dates/ • application shouldn’t be a
Raffle client request for
the
approved mechanics and revisions
determination of winners, redemption
• received norreply, prepare letter
Contest approved.
written
shall be incorporated in all
period and additional prizes with fact of - Duration
response
approval (all items with changes to be • - Mechanics
Redemption
advertising materials or collaterals to
marked with * and • - Prizes
Game
be released..
5.• *Approved by DTI NCR ”approved the DTI
“ That all changes were which is by fact - Raffle date/venue
ofNCR.
approval must be indicated to show - Coverage
that
17. APPLICATION
5. Application form, the duly Sales
Applicant submits
3. Check area coverage of
accomplished Application
Promotion:
applicable requirements vis-à-
Evaluate SP Application visForm and supporting
the sales promotion
• documents. municipality
mechanics & attachments /
Single city /
province
submitted. If complete, issue
• 2 or moreif Sales Promotion
1. Check cities/
an order of payment for the
Requirements for approval of extension of Sales
Payment of Fees municipalities/ is filed before
Application province
application fee. If not, return
Promotion: for approval of changes for on-
Requirements
1. Letter request forapproval of changes 1
the within start of region
the a single
documents, issue a
Requirements Promotion
going Sales for extension filed at least on implementation. If not,
Sales Promotion previously approved compliance sheet with regions
day prior to expiration of the promo • NCR or in several all the
duration: yetrequest for the approval of
Approval
1. Letter started: requirementsto client for revision
return which
including NCR must be
but not
2. Extension must not exceed 6 months,
changes compliedduration. region get
of with in order to
• More than one
1. Letter request for the approval of
exceptChangesis a discount implemented
2. when it must not be scheme excluding NCR
an order of payment for the
changes. involving determination of
3. For schemes approval is issued by DTI
unless permitCheck whether application
2. fee.
2. winners such as raffles, contest, games or
Changes Releasingbe implemented
NCR
must not of SP is covered by the Sales
unless approval is issued by DTI to 6. 4. Check the amendments, R.A.
redemption,changes that are beneficialNCR
allocate additional prize for
Request for Sales Promotion
3. Only Permit check Promotion Law, under
scheme:
the changes applied for:
3. additional winner/s. be that no
Letter must indicate approved.
consumers will
4. Proposed copy as announcement on all • - Discount DAO promotion 0f
Extension, if the #2 Series
7394 &
Changes of well or collateral
advertising materialas the fact of has
changes such as duration, deadline for
approval shall bepreviously
published, • period has already lapsed, client. If
Premium not, inform
1993, if
been released with
submission of entry, advertised at least
announced or draw dates/ • application shouldn’t be for a
Raffle client request
the
approved mechanics and revisions received
determination of winners, redemption
twice before such change is
shall andincorporated in with fact of
be additional prizes all • Contest reply, prepare letter
written
periodeffected in the same manner and nor approved.
response
• - Duration
Redemption
advertising materials or collaterals to
approval (all items withsales promotion
medium that the changes to be • - Mechanics
Game
be released..
marked with * and announced,
was originally
5. “ *Approved by DTI NCR ” which is the fact - Prizes
published or advertised.
of approval must be indicated to show - Raffle date/venue
that all changes were approved by DTI - Coverage
NCR.
18. APPLICATION
5. Application form, the duly Sales
Applicant submits
3. Check area coverage of
7. applicable requirements vis-à-
There shall be noApplication
accomplished
Promotion:
cancellation supporting
visForm and promotion
the sales
Evaluate SP Application of documents. municipality
ongoing sales promotion
mechanics & attachments /
• Single city /
submitted. If complete,from an
except upon approval issue
province
the2 Department. for the
orderor moreif Sales Promotion
• 1. of payment
Check cities/
Payment of Fees municipalities/ is filed before
Application province
application fee. If not, return
Grounds for the cancellation of
ongoingthe start of implementation.
the within a promotion:
sale single region
documents, issue a
• NCR not, in severalclient for
If or return to all the
compliance sheet with regions
- requirementsNCRduration.
Final judgment of insolvency
revision
including which must be
Approval of the sponsor/s from a court
compliedthan one region get an
• More with in order to
of proper jurisdiction application
excludingwhether
2. Check NCR
order of payment for the permit
- The occurrence of by the Sales
a fortuitous
fee. is covered
Releasing of SP event that will make it under
6. impossible foramendments, R.A.
Promotion Law,
4. Check the Sales Promotion
Request for all sponsors to
Permit check 7394 & DAO theSeries 0f
the changes #2
scheme:
continue to deliver applied for:
• - Discount if the inform client. If
Extension, not, promotion
1993, if
products or services which has
• period has already lapsed,for a
Premium request
the client
to be purchased for in order for
• application reply, the
to written
participate in prepare letter
one Raffle shouldn’t be received
• norContest
approved.
response
promotion; Provided that all
- Duration
• - Mechanics
Redemption
those that have won in the
promotion before the
• - Prizes
Game
cancellation was approved
- Raffle date/venue
shall be paid their prizes.
- Coverage
19. APPLICATION
If all requisites are complied with,
issue an order of payment for
Evaluate SP Application the permit fee
Application Fee
Payment of Fees
1. Beauty Contest (national in
scope, sponsored & promoted
Approval by manufacturing enterprises)
– Php 2,000.00
2. Home Solicitation
- NCR only or in several regions
Releasing of SP including Metro Manila or
Permit nationwide - Php 750.00
- More than one region but
excluding Metro Manila -
Php 750.00
20. 3. Sales promotions (other than
APPLICATION Beauty Contest and Home
If all requisites are complied with,
Solicitation Sales), the Permit
issue an order of payment for
fees for the conduct of sales
Evaluate SP Application the permit fee
promotion schemes shall be
as follows:
Application Fee
Payment of Fees 1. Beauty Contest (national in
Based on sponsored &Coverage
scope, Geographic promoted
by NCR only or in several
- manufacturing enterprises)
regions including Metro
– Php 2,000.00
Approval Manila or nationwide –
2. Home Solicitation
Php 1,000.00
- NCR only or in several regions
-including Metro Manila but
More than one region or
Releasing of SP nationwide Metro Manila -
excluding - Php 750.00
Permit Php 750.00
- More than one region but
excluding Metro Manila -
-Php 750.00
Several provinces/cities/
municipalities within a
single region - Php 500.00
21. - Single province/city/
APPLICATION
municipality - Php 250.00
- Several provinces / cities
If all requisites are within a single
municipalities complied with,
Based onan Php of payment for
issue - order 500.00
region the Amount of Prizes
Evaluate SP Application the permit fee
- Single province / city/
Amount of prizes - Php 250.00
municipality Application fee
Application Fee
3. Sales promotions (other than
Payment of Fees 1. to Php 50,000.00 and Homein
Up Beauty Contest (national
Beauty Contest Php 250.00
50,001.00 -sponsored & the500.00
scope, 150,000.00
Solicitation Sales), promoted
Permit
150,001.00 - 300,000.00 enterprises)
by manufacturing 1,000.00
fees for the conduct of sales
Approval 300,001.00 2,000.00
–promotion schemes shall be
Php - 500,000.00 2,000.00
2. Home Solicitation
500,001.00 - 1,000,000.00 3,000.00
as follows:
Over NCR only or in several regions
- 1,000,000.00
- NCR only or in several5,000.00
including Metro Manila or
regions including Metro
Releasing of SP nationwide - Php 750.00
Note:. The amount of fees shall be in
Manila or nationwide –
Permit - accordance with the schedule
More than one region but
Php 1,000.00
enumerated one region or-in
excluding Metro Manila
- More than hereunder but
Php 750.00
accordance Metro Manila -
excluding with geographical
coverage areas, whichever is
Php 750.00
higher
22. APPLICATION
5. -Amendment Fee
- Several provinces / cities
Several provinces/cities/
If all municipalities within aain
municipalities complied with,
requisites are within
- Minor changes (change single
regionan Php -of payment for
issue -region 500.00 shall
single order Php
draw date and venue) 500.00
Evaluate SP Application the permit fee
- -be subject to Php100.00
Single province/city/
Single province / city/
application fee- Php 250.00
municipality - Php
municipality
Application Fee and other than
3.- For extension
Sales promotions (other
Payment of Fees 1. changesContest and Homein
Beauty Contest (national
Beauty requiring re-
Note:. The amount of fees shall
scope,accordance & subject
be in sponsored with Permit
Solicitation Sales), promoted
evaluation shall be the the
by manufacturing enterprises)
to Php 300.00 processing
schedule enumerated sales
fees for the conduct of
Approval –fee 2,000.00 accordance
Php
hereunder or in
promotion schemes shall be
2. Homegeographical coverage
with Solicitation
as follows:
- areas,only or in several regions
NCR
• For NCR whichever several
- applications in is higher.
only or covering
including Metro Manila or
more than one scheme, each
Releasing of SP regions including Metro
scheme will be Php to–a
nationwide -subject 750.00
Manila or nationwide
Permit - More than one region but
separate processing fee.
Php 1,000.00
excluding Metro Manila -
- More than one region but
Php 750.00
excluding Metro Manila -
Php 750.00
23. APPLICATION
5. -Amendment Fee
- Several provinces / cities
Note: Several provinces/cities/
If all municipalities within aain
municipalities complied with,
requisites are within
- Minor changes (change single
draw date and -of payment for
regionan Php 500.00 shall
issue order Php
For single-region venue) 500.00
payments made by
Evaluate SP Application the permit fee
- -be subject to Php100.00
mistake; it province/city/
Single shall be
Single province / city/
application fee- Php 250.00
municipality - Php
municipality
refunded to the payor, not
Application Fee way of other than
3.- For extension and
Sales promotions (other
directly but by
Payment of Fees 1. changesContestof fees
crediting amount and Homein
Beauty Contest (national
Beauty requiring
Note:. The the mistake re- shall
scope,accordance & the the
be in sponsored promoted
payments to futurebe subject
evaluation shall with Permit
Solicitation Sales),
by manufacturing enterprises)
obligations of the payor to
to Php 300.00 application
schedule enumerated sales
fees for the conduct of
Approval –fee 2,000.00 accordance
Php
the same concerned shall be
hereunder or in
promotion schemes
2. Homegeographical coverage
with Solicitation
agency/office.
as follows:
For -applications in several
- areas,only or covering regions
NCR whichever is higher.
NCR only or in several
including Metro Manila or
more than one scheme, each
regions including Metro
Releasing of SP scheme will be subject 750.00
nationwide - Php to a
Manila or nationwide –
Permit - More than one region but
separate 1,000.00 based on
Php permit fee
excluding Metro Manila -
the schedule. one region but
- More than
Php 750.00
excluding Metro Manila -
Php 750.00
24. APPLICATION
Evaluate SP Application
1. Upon payment of the permit
fee, receive the documents,
Payment of Fees issue the permit number.
2. Permit #s shall be assigned
sequentially. For Area/
Approval
Provincial Offices, the Area
Code will be added as a prefix
as An-XXX, where n is the Area
Releasing of SP Code, and XXX is the
Permit sequential number.
25. APPLICATION
Evaluate SP Application
1. Upon payment of the permit
fee, receive the documents,
Payment of Fees issue the permit number.
2. Permit #s shall be assigned
sequentially. For Area/
Approval Provincial Offices, the Area
Code will be added as a prefix
as An-XXX, where n is the
Area Offices follow the ff. Area Codes: Area Code, and XXX is the
Releasing of SP sequential number.
A1 - Area 1 (Manila, PasayPermit
& Paranaque)
A2 - Area 2 (Makati, Muntinlupa, Las Pinas,
Pasig, Taguig & Pateros)
A3 - Area 3 (Quezon City, Mandaluyong,
San Juan & Marikina)
A4 - Area 4 (Caloocan, Malabon, Navotas &
Valenzuela)