Ce diaporama a bien été signalé.
Nous utilisons votre profil LinkedIn et vos données d’activité pour vous proposer des publicités personnalisées et pertinentes. Vous pouvez changer vos préférences de publicités à tout moment.

Sunrise Solutions Inc.

Workforce housing, modular buildings, emergency responder shelters, for anywhere in the world.

  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

Sunrise Solutions Inc.

  1. 1. CAPABILITITES AND PAST PERFORMANCE HISTORY BASE CAMPS EMERGENCY RESPONSE TEAMS MEDICAL FACILITIES WATER TREATMENT CONSTRUCTION SERVICES WWW.SUNRISESOLUTIONS.ORG The Sunrise Solutions Group
  2. 2. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA WORLDWIDE SOLUTIONS Company contacts: Bruce R. Wagner, Sr. , Chief Executive Officer Office: 251-660-8582 Email: brw01@aol.com Cell: 251-421-6047 Kenneth Ronsisvalle Operations Program Director Office: 251-660-8582 Email: kronsisvalle@gmail.com Cell: 205-919-3699 flexible solutions for your business needs www.sunrisesolutions.org Represented by: Jeff Pollard Phone: 225-288-8282 Email: ssibuildings@gmail.com
  3. 3. Modular Systems & Design/Build Programs Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA Core Competencies •Modular & Flexible Design Solutions – For Any Climate, Any Conditions, Worldwide Turnkey Design, Engineering & Build Solutions for: Medical Facilities, Educational Facilities, Commercial Facilities, Housing Facilities, industrial Facilities •Full 24/7 Deployable Camps – Design, Construction, Management and Operations & Maintenance Providing: Billeting, Food Preparation & Service and All Support Svcs (Housekeeping, Maintenance, Admin, Security, etc.) •Rapidly Deployable Structures & Life Support Solutions – Any Climate & Conditions Soft (temporary) & Hard (semi-permanent to permanent) Wall Base Camp Solutions •Infrastructure Solutions – For Any Climate & Conditions, Worldwide Fresh Water, Wastewater, Power & Communications Combining the specialized capabilities of: SUNRISE SOLUTIONS / COGIM INT’L – Design & Manufacture of Modular, Prefabricated Structures CALETHON CONSTRUCTION – Austere Locations & Extreme Conditions Construction Projects CLEARBROOK, LLC – Water Purification & Wastewater Treatment Systems RAPID DEPLOYMENT, INC. – Rapidly Deployed Base Camp Management, Operations & Maintenance SUNRISE CONSTRUCTORS – General Construction Services FLO-CONCEPTS INTERNATIONAL (FCI) – Design & Fabrication of Industrial Flow Systems www.sunrisesolutions.org
  4. 4. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA The Sunrise Modular System Structures Are: •Rapidly Deployable for ANY emergency appli- cation •Geographic Applications – May be constructed in ANY Location, ANYWHERE in the World, regard- less of climate or conditions •Climate Adaptability – May be designed & fabricated to withstand the harshest conditions to achieve desired or required interior climate conditions, regardless of the weather outside •Wind & Snow Loads – Units may be designed & fabricated to meet any wind, snow, seismic or other meteorological conditions standards / requirements. •Expandable – May be joined with other modules or units to increase useable sq footage to meet any size need: Modules are available in 8’ x 20’ or 10’ x 20’ dimensions (the size determination for this Solicita- tion is: 10’ x 20’ = 200 sq ft / module which will be joined to one another in groups of 4 to provide 800 sq ft per unit) •Stackable both in storage and erected status – Flat-packed units may be double stacked so that 1600 sq ft of useable space may be stored in a 200 sq ft area •Flat-Pack Transportable in a 4-module (200 sq ft / module - 800 sq ft / total) unit, containing all erec- tion materials and assembly components (including plumbing & electrical components, if ordered) •Transportable Intact, if they have already been fully erected •Engineered & constructed to be disassembled and returned to flat-pack system for storage and sub- sequent reuse •Easily Adaptable for use in any infrastructure application including: Habitation, Offices, Kitchen, Din- ing, MWR, Medical, Public use, Storage, Classroom and Meeting room areas, etc. •Configurable in virtually any size and shape desired or required •Designed & built for durability and use in any environment, anywhere in the world •Sturdy enough to provide a long useful life even after multiple deployments •Easily assembled on site for timely use & occupancy •Transportable via any intermodal method including: Air, Over the road, Rail and Sea in either 20’ or 40’ lengths www.sunrisesolutions.org
  5. 5. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA Rapidly Deployable / Design & Engineering www.sunrisesolutions.org
  6. 6. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA Fast-track Design / Build Modular Hospital Full Service hospital Including:  55 Private Rooms  4 Operating Rooms + Labor and Delivery  Full Service Emergency and Trauma Center  Post Operation Recovery  Intensive care Unit  Examination, Diagnosis, Labs, Sterilization, Rehabilitation Facilities www.sunrisesolutions.org
  7. 7. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA Fast-track Design / Build Modular Hospital Modular Structure Interior Finishes www.sunrisesolutions.org
  8. 8. Civil, Staging and Camp Facilities Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org  Site Design & Layout  Site Preparation Services  Civil Construction Services  Materials & Equipment Staging  Facilities Operations Mgmt
  9. 9. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org The SunriseModTilt system is a Engineered Structural Application (ESA) that can be applied to almost any construction project. The ModTilt system is a very simple process and utilizes the combination of two very old and successful methods of construction. Concrete tilt wall method Light weight heavy gauge metal (LWHG) stud wall method The panels are framed with LWHG studs and track and can be pre-fabricated in a plant or cast on- site on the building slab. Then a 2″ thick concrete skin is added to the face of the wall panel. The steel is attached to the concrete by tabs that are punched out of the side flange of the studs and track, as recommended by the structural engineer. The panels do not use rebar but use wire mats to secure each section to the other. The resulting product is a structurally sound building panel that contains a finished outside surface with a studded inside face, ready for the desired finish-out. The exterior of the system can be cast with feature strips or any decorative reveals to meet the Owners desires. ModTilt System
  10. 10. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org The SunriseModTilt system offers what most other methods cannot…. Speed, Efficiency and Cost Savings. We can achieve this because of the simple way the system works.  Our system is lighter and capable of spreading the weight load along the entire length of the wall, thus allowing us to reduce the amount of concrete and steel within the footings and slab.  Panels can be cast onsite with a 48 hour erection time or they can be precast offsite and dropped shipped when needed.  Panels can be welded directly to each other or to structural members for quick and efficient installation.  ModTilt floor systems attach directly to the wall system giving higher support and stability, along with ease and speed.  The larger the project the more time efficient ModTilt is; capable of saving up-to a 50% time savings.  Having the ability to pre-cast the exterior finish, ModTilt saves on both costs and time. A simple power wash and most walls are complete.  ModTilt is ENERGY EFFICIENT; the combination of our concrete skin and rigid insulation gives the ModTilt system a higher energy rating than standard stick building methods. ModTilt System
  11. 11. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org The SunriseModTilt system…. Giving you the power to create and build any design…. ModTilt System
  12. 12. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Sunrise offers a reliable and comprehensive source for turn‐key Residential, Shelter & Responder Life Support Facilities. With ready assets staged in multiple locations we are capable of supporting the population for the facilities & services program being considered, or more persons, if/when necessary. We offer a single solution to temporary life support facilities. We provide trouble free support so private industry & government project owners may concentrate on accomplishing the mission and providing exceptional human support services during or after sudden and uncertain circumstances. Sunrise field teams consist of highly experienced professionals who understand the sensitivity and needs of individuals and first responders, service providers, support personnel and residential support patrons. In‐House, In‐Field and On‐Site Management will provide for immediate local emergency contacts, emergency and nonemergency response, clear communication of all procedures and a safe & secure habitat for all occupants & staff. Our provided services encompass all aspects of life support such as billeting, cots with regular mattresses (as directed), linens, flooring, climate controls, power, water & manifold water distribution, wastewater man- agement systems & disposal (in compliance with EPA and local codes & regulations), showers, toilets, sinks, laundry, recreational facilities & equipment, medical care, educational area support, administrative services support, legal proceedings support facilities, security services, EMT services and all support equipment, management and staff. Should there be any additional requirement(s) / deliverables added to an established scope of work, Sunrise is always prepared to respond as needed, at the project owner’s request. Rapid Deployment and our team members are committed to providing facilities, services and indi- vidual support items for a contract using local labor and vendors to the maximum amount availa- ble. Every effort is made to maximize local economic impact. All personnel are vetted according to requirements of the Contract. Emergency Response Base Camps
  13. 13. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Below are a few examples of our relevant experience:  Successfully completing two simultaneously operated base camps for FEMA in response to the disaster areas affected by Hurricane Ike (Ford Park and Orange County Airport)  Completion of four (4) responder support camps of 2000 Persons each (8000 persons total) for the State of New Jersey in response to Hurricane Sandy.  Successful execution of one (1) fully winterized Responder Support Camp in Minot, North Dakota for FEMA. Emergency Response Base Camps
  14. 14. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org relevant experience: (cont’d)  Hurricane Katrina, LA base camps Emergency Response Base Camps
  15. 15. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Our resources include complete design, engineering and construction of wastewater systems and management, potable water production and delivery, emergency disaster recovery and response requirements, civil construction and engineer- ing, utility services installation and connections, project management and plant operations and maintenance. OUR TECHNOLOGIES Our FAST products and technology are available in many sizes; from single home applications to thousands of homes on a single system. Systems are designed for use above ground or for subsurface applications. FAST is also used aboard ships or platforms for above water projects. The units are used aboard US Navy vessels in- cluding the newest aircraft carrier in the US fleet, the George Hubbell W. Bush. Containerized units have been selected by other US agencies for use in emergency housing and other military and civilian post war applications. The containerized FAST Unit systems have provided a model for the development of new regula- tion and specifications for Portable Wastewater Treatment Equipment used in above round ap- plications worldwide. We realize the growing need to proved new solutions to old problems. The FAST technology is a patented innovative application of proven science. The system utilizes components that are universally adaptable and based on reliable technological principles. Our engineering department develops wastewater treatment solutions for the client based on DPD requirements, site conditions and resource availability. From large scale treatment plants to austere base camp environments, we manufacture systems capable of handling or providing mil- lions of gallons a day. Our corrosion resistant, skid mounted and containerized Desalination/RO systems with proprietary multi-media formulations and adaptable connections are designed to make our equipment and the distribution of treated water simple and reliable. The FAST system may be applied to a wide variety of uses including commercial, industrial, private and municipal. Our systems may be augmented with additional support systems and components including: pumping/lift stations, sewer systems, grit removal systems, screen filters, sludge processing/ handling, chlorination, UV and de-nitrifications systems,; just to name a few and they are virtually maintenance free. Water Treatment and Purification
  16. 16. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Water Treatment Systems
  17. 17. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Water Treatment and Management Systems Modular Systems May Grow as Demand Grows Scalable Systems are Sized for Design Flow
  18. 18. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Water Purification Systems  Reverse Osmosis Water Purification Systems, Engineering, Assembly and Installation  High Density Water Filtration Systems Manufactured to meet any purification Capable of purifying water from any source
  19. 19. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Lined Piping and Flow Management Systems Specialized Lined Piping Design and Fabrication  Chemically Inert Lined Piping Systems  Rotational Molded Lining Systems  Chemical Plant Piping Plant Piping joints and Fittings Manifold Distribution Piping Chemical Transfer Hoses Vessel Components—Dip pipes and spargers
  20. 20. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA www.sunrisesolutions.org Products & Services
  21. 21. Completed Projects (partial list) Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA RUMAILA, Iraq 502 Man Camp in the Rumaila field, Iraq Agency/Client: SAIPEM Iraq Branch Project Description: IT TAKES over an hour to drive the length of Rumaila oilfield in southern Iraq. The view is dreary—scrubland and rusting war relics—but the prospects enormous. When Rumaila’s deposits were discovered, it was the second‐biggest oilfield in the Middle East, if measured together with its adjacent sister field at West Qurna. Other big fields, at Majnoon and Nahr Umar, are nearby, clustered to the west and south of the Zagros Mountains, in Iran. For three decades, thanks to wars and economic sanctions, Iraq’s fields have struggled along, badly run, produc- ing far less than they should have. But change is taking place. Several Multinationals signed a technical services con- tract for Rumaila recently. The new drilling rigs are moving in and Life Support Facilities are being built close to the oil- field, complete with sporting facilities such as football pitch. With such potential around it and Iraq’s only port on its doorstep, the city of Basra stands to become a wealthy oil hub. SAIPEM has identified the need for a first installation of Life Support Accommodation & Office Facilities for its own and its contractor’s personnel working in the Basra region in Iraq. This Offer addresses these requirements following the indications and specifications included in the tender documentation received on November 9th 2010. Dollar Value of Contract: Confidential www.sunrisesolutions.org
  22. 22. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA ZUBAIR, Iraq 550 Man Camp in the Zubair field, Iraq Agency/Client: SAIPEM/ SAJER for ENI Iraq BV Project Description: CALETHON / CC&S was awarded this contract to provide detailed design, procurement, manufacturing, installation, commissioning & start‐up of all facilities including packing and transport to installation site of all materials. The facility includes the following: a) Management suite : 2 Units ( 2 room /1 person for each unit) b) Staff and Contractor senior accommodation : 53 Units for 2 people for each unit (106 people) 8 meters long and 3.66 meters wide C) Staff : 16 Units for 3 persons each unit (48 people) 12 meters long and 3.66 meters wide d) Security and Contractor accommodation units : 65 Units for 6 people each unit ( 390 people ) 12 meters long and 3.66 meters wide Kitchen and Messing complex suitable for 150 people Mosque Type ‐75 people Nr. 1 Camp Boss Office Nr. 1 Gate House 1 ‐ 16 meters long and 3 meters wide Nr. 1 Gate House 2 ‐ 8 meters long and 6 meters wide Nr. 3 Guard Houses Nr. 2 Expatriates/ Security Recreation & Sitting Hall + Gym Nr.1 Medical Clinic Nr. 1 Laundry Nr.1 Maintenance Workshop room Nr. 1 Armoury room Nr.1 ICT Room Nr. 1 Control Room Nr.1 HSE Building Nr. 1 Dog House Nr.11 ICT Shelter Nr. 1 Cold Store Nr. 1 Food Storage Nr. 1 Toilet Nr. 2 Eni Office Building: Dimension 43,92x12,20 (1.071,65 m2) Nr. 1 Security Office Building: Dimension 12,20x7,32 (89,30 m2) Dollar Value of Contract: Confidential www.sunrisesolutions.org
  23. 23. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA COB, Basra, Iraq 100 Man Camp within the Contingency Operating Base (COB), Basra, Iraq Agency/Client: ENI Iraq BV Project Description: Provision of a 100‐Man Life Support Facility on a rental basis for ENI Iraq BV. Supply included office and recreation facilities, with full Operation, Maintenance, Catering & Service. The contract initiated in May 2010 and successfully ended in May 2011. Value of Contract: Confidential UK Ministry Of Defense Camps – Al Amara & Shaibah, Iraq Military Compound Structures – Base Camps Agency/Client Company Name: Defense Estates – Commercial Team Description of Work Performed: We served as the prime contractor for an $8M firm‐fixed price contract with the UK Ministry of Defense (MoD), providing design and construction for facilities additions at two military camps in Al Amara and Shaibah Iraq for the British Army. The existing camps were originally built under military direction from disassembled camps in the Balkans and required improvements. To complete the overall contract goal of renovating two existing mili- tary camps in Iraq, the group managed between four and six simultaneous projects while working under aus- tere conditions. We designed and constructed lodging, laundry, kitchen, and dining facilities; waste manage- ment systems; and water and power supply with distribution capabilities. Kitchens were designed and built to feed1,000 people four meals per day. Laundry facilities were built to serve 1,000 people with a 48‐hour turna- round. Dollar Value of Contract: approx. $12,800,000 Air Force Base Camps – Basra, Nasiriya, Tallil, Iraq Military Compound Structures – Base Camps Agency/Client Company Name: Coalition Forces Description of Work Performed: This project was for the Delivery and Construction of three (3) separate camp facilities in Iraq for the coalition forces in Iraq. The group delivered 500 units and the camp accommodated 1000 personnel with full range of services. The Camp included: Living Quarters, Kitchen & Dining Facilities, MWR, Laundry, Administration, Secu- rity, communications & Storage areas, etc. required to maintain & sustain the 1000 personnel capacity. The fa- cilities were built in Iraq during an extremely hostile, high security alert period. Movement of materials and manpower required significant force protection and secured access. Local procurement and subcontracting was a major challenge. This project was delivered on time and to the Contracting Agency’s specifications and cost. The project included the provision of full Operations, Maintenance & Service. Dollar Value of Contract: $15,000,000 www.sunrisesolutions.org
  24. 24. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA Adnan Palace and additional Site Camp ‐ Baghdad, Iraq Supply & construction of various Camp Facilities Agency/Client Company Name: The Sandi Group Project Description: Turn Key projects including various camps. Scope or work included design, construction and assembly of complete camps for approximately 2000 people with kitchens, dining, recreation and gymnasium and laundry facilities & Surveillance/Security System. The project included the provision of full Operation, Maintenance & Catering service. Dollar Value of Contract: $67,000,000 Baghdad Airport Airfield Complete Camp Facilities Agency/Client Company Name: Iraqi Intelligence Agency Description of Work Performed: Design, construction and assembly of complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc. for 500 persons The project included the provision of full Operation, Maintenance & Catering service. Dollar Value of Contract: $12,000,000 Camp Mero, Baghdad Iraq Complete Camp Facilities Agency/Client Company Name: KBR Description of Work Performed: Design, construction and assembly of Complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc. for KBR in the Baghdad area. Dollar Value of Contract: $ 6 ,229,160 Nasiriya , Iraq 4600 Man Camp Client/ Agency: The Military Coalition Design, construction and assembly of Complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc in Nasiriya some 300 km south of Baghdad. The project included full operation & maintenance service. Dollar Value of Contract: $16 700 000.00 Period of Performance: 2003 ‐ 2007 www.sunrisesolutions.org
  25. 25. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA ShattAl Arab, Iraq 40 Man Camp Client/ Agency: CIVPOL Iraq ‐ US State Department Design, construction and assembly of Complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc in the Shatt Al Arab area near Basra,. The project included full operation, maintenance & catering service. Dollar Value of Contract: $810 000.00 Period of Performance: 2005 ‐ 2006 Camp Victory, Iraq 48 Man Camp Client/ Agency: US Client ‐ Washington GROUP Camp Victory is the primary component of the Victory Base Complex (VBC) which occupies the area surrounding the Baghdad International Airport (BIAP). The Al‐Faw Palace, which serves as the headquarters for the Multi‐National Corps ‐ Iraq, is located on Camp Victory. Camp Victory itself lies approximately 5 kilometres from BIAP. The project included design, construction and assembly of Complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc in Camp Victory Basra The project included full operation, maintenance & catering service. Dollar Value of Contract: $638 500.00 Period of Performance: 2005 ‐ 2006 Tikrit, Iraq 64 Man Camp Client/ Agency: CIVPOL Iraq ‐ US State Department Design, construction and assembly of Complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc in Tikrit, Iraq some 160 km north of Baghdad. The project included full operation, maintenance & catering service. Dollar Value of Contract: $ 1 680 000 Period of Performance: 2004 ‐2006 Various Locations, Iraq Accommodation & Ablution units Client/ Agency: KBR Design, construction and assembly of 1070 accommodation & 300 ablution units for KBR in Iraq. The project included spare parts & maintenance service. Dollar Value of Contract: $7 050 000.00 Period of Performance: 2003 www.sunrisesolutions.org
  26. 26. Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA Existing Building in Habbaniyah, Iraq – Phase I Building Refurbishment Client/ Agency: ECCI The project included the full refurbishment of existing building. Dollar Value of Contract: $1 436 937.00 Period of Performance: 2005 Existing Building in Habbaniyah, Iraq Phase II Building Refurbishment Client/ Agency: ECCI The project included the full refurbishment of existing building. Dollar Value of Contract: $4 502 902.00 Period of Performance: 2005 Mosul, Iraq 120 Man Camp Client/ Agency: CIVPOL Iraq ‐ US State Department Design, construction and assembly of Complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc in Mosul, Northern Iraq. The project included the provision of full maintenance service. Dollar Value of Contract: $1 032 000.00 Period of Performance: 2005 ‐ 2006 Baqubah , Iraq 50 Man Camp Client/ Agency: CIVPOL Iraq ‐ US State Department Design, construction and assembly of Complete camping facilities including kitchens, dining, recreation, gymnasium, laundry, clinic, and pre‐fabricated housing etc in Baqubah, approx. 60 km North East of Baghdad Iraq. The project included full operation, maintenance & catering service. Dollar Value of Contract: $1 035 000.00 Period of Performance: 2005 ‐ 2006 www.sunrisesolutions.org
  27. 27. A Multi-Resource Group of Companies With Program Solutions To Meet Any Project Condition Anywhere In The World Sunrise Solutions, Inc. * 1521 Azalea Road * Mobile , Alabama * 36693 * USA 251 * 660 * 8582

×