		DEFINITION  Payment scale imposed by  supplier towards the consumers. Supplier  Peninsular Malaysia –  TNB Sarawak 		  –  SESCO Sabah			  -   SESB
TYPES OF COSTS    Suppliers had to cover two types of costs to produce electricity                        Variable Costs  Fuel Cost, Generation Plants equipment spare parts etc  Fixed Costs Generation Plant Construction, distribution and transmission, emolument, insurance etc
 TARIFF CLASSIFICATION Three main classification 1.Equal  Rate Tariff 2. Two Part Tariff 3.  Block Tariff
EQUAL RATE TARIFF This tariff is divided into two type of payment.  		1. Payment for lighting and fans.  		2.Payment for power from socket outlet. Is using two split meters. It is rarely  use  nowadays.
EQUAL RATE TARIFF DIAGRAM lamp switch Meter  kwh supply power
EXAMPLE  EQUAL RATE TARIFF A  user use 100 units to light the lamps and 200 units of electricity from  the socket outlet. This is equal rate tariff, so 20cents for each units of energy used in lighting and 25cents for each units of electric power from the socket outlet. Calculate the total energy used for the house in that month.     For lighting: 100 units x 20cents = RM20.00     For Power: 200 units x 25cents = RM50.00     Total payment = RM70.00  
TWO PARTS TARIFF This tariff is divided into two type of payment. 1.Payment for Maximum Demand. Permanent   usage of energy for each month is called Maximum Demand. Its measured by kW.  2.Payment for the rest usage of energy.
TWO PARTS TARIFF DIAGRAM METER KWH MAXIMUM DEMAND SUPPLY POWER  & LAMP SWITCH
EXAMPLE  TWO PART TARIFF     A factory used 200 additional units and the maximum demand for the month is 4kW. How much will be paid by the consumer if RM12.00 for each kW maximum demand and 7cents for additional units used for that month? 	For Maximum demand: 4kW x RM12.00 = RM48.00   	For Additional Units: 200 units x 7cents = RM14.00    	Total payment = RM62.00
BLOCK TARIFF    This tariff is divided into three scales.     Only one power meter is used.     First scale for any usage of power under certain         units. Second scale for any usage above first units.     Third scale for any usage above second units.
BLOCK TARIFF DIAGRAM METER KWH SUPPLY POWER  & LAMP SWITCH
EXAMPLE  BLOCK TARIFF A house used 300 units of electricity in that month. Block tariff is used where first 100 units is charged 25cents a unit, 50 secondary units is charged 20 cents a unit and the rest units is charged 23cents a unit. How much is needed to pay the bill? 	1st 100 units = 100 x 25 cents = RM25.00 	2nd 50 units = 50 x 20cents = RM10.00 	3rd 150 units = 150 x 23cents = RM34.50   			 Total payment = RM69.50    
TARIFF RATES Tariff RatesPrint this page  “Domestic Consumer” means a consumer occupying a private dwelling, which is not used as a hotel, boarding house or used for the purpose of carrying out any form of business, trade, professional activities or services. TARIFF CATEGORYUNITTariff A –  Domestic Tariff   For Monthly Consumption Between 0-400 kWh/month    For the first 200 kWh (1 - 200 kWh) per month sen/kWh 21.8  For the next 200 kWh (201 -400 kWh) per month sen/kWh 33.4  The minimum monthly charge is RM3.00   For Monthly Consumption More Than 400 kWh/month    For the first 500kWh (1-500kWh) per month sen/kWh 28.6  For the next 100 kWh (501-600kWh) per month sen/kWh 37.8  For the next 100 kWh (601-700kWh) per month sen/kWh 38.7  For the next 100 kWh (701-800kWh) per month sen/kWh 39.7  For the next 100 kWh (801-900kWh) per month sen/kWh 41.7  For the next kWh (901 kWh onwards) per month sen/kWh 44.6  The minimum monthly charge is RM3.00  
Tariff B - Low Voltage Commercial Tariff    	For Overall Monthly Consumption Between 0-200 kWh/month   	 For all kWh sen/kWh 37.0        The minimum monthly charge is RM7.20     For Overall Monthly Consumption More Than 200 kWh/month         For all kWh (From 1kWh onwards) sen/kWh 39.7        The minimum monthly charge is RM7.20   Tariff C1 - Medium Voltage General Commercial Tariff   	 For each kilowatt of maximum demand per month RM/kW23.93        For all kWh sen/kWh 28.8      The minimum monthly charge is RM600.00    Tariff C2 - Medium Voltage Peak/Off-Peak Commercial Tariff   	 For each kilowatt of maximum demand per month during the peak period        RM/Kw 35.60        For all kWh during the peak period sen/kWh 28.8        For all kWh during the off-peak period sen/kWh 17.7        The minimum monthly charge is RM600.00
EXERCISE
How much will be paid by PnArduniwati
TARIFF SYSTEM FEATURES Obtain a reasonable return to the supplier Appropriate and acceptable to the various types of users. Easily understood by all levels of users Suppliers will have little benefit with affordable  rates paid by consumers
Factors that influence the cost of raising Diversity factor = the max. number of user    				    request / max. load at station Load factor 	= average demand/max demand 				= energy produced in one period/                                      max. demand x at the same time     			    period Plant capacity factor  = average demand /                                                installed  capacity
LOAD CURVE Graphic records to show the demand for power at all times in a period of time.  Its shows the view provided an overview of the load time at that time
The information can be obtained from the load curve Area under the curve gives the total energy produced in that period. The ratio of area under the curve and the total are of the square containing the curve ( refer to the max. load), giving a load factor for the period. Curve gives the max. peak demand at the station at the same period. Area under the curve period of time in hours = average demand during that period. * Max request- the max load imposed on a power station in one period ( day, week, month or year
EXAMPLEPower station to generate electricity as a request under the load
Draw an curve load and find : Station maximum demand Total generation Average load Load factor
RESULT Maximum demand =  11000 kw Total generation = area under the graph  	(3500 x 6) + ( 11000x6) + (4500x4) + (10000x4) + (6000x4)  	= 21000 + 66000 + 18000 +40000 + 24000 	= 169000kwh Average load	 = total gen. / period 			    	= 169000 / 24 			   	= 7041.7 kw Load factor  	 = average load/max demand 				= 7041.7 / 11000 = 0.64 @ 64%

More Related Content

What's hot

1.10 types of tariff
1.10 types of tariff1.10 types of tariff
1.10 types of tariffW3Edify
 
BK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training ReportBK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training Reportavijit1996
 
Combined operation of power plants
Combined operation of power plantsCombined operation of power plants
Combined operation of power plantsNishkam Dhiman
 
POWER GENERATION OF THERMAL POWER PLANT
POWER GENERATION OF THERMAL POWER PLANTPOWER GENERATION OF THERMAL POWER PLANT
POWER GENERATION OF THERMAL POWER PLANTsathish sak
 
Distribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltageDistribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltageGaddafi Sani
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Avirup Ghosh
 
What is a regulatory asset
What is a regulatory assetWhat is a regulatory asset
What is a regulatory assetAmit Kumar
 
Basics of AC transmission
Basics of AC transmissionBasics of AC transmission
Basics of AC transmissionSonuKumarBairwa
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantVivek Pathak
 
Boiling water reactorbapi
Boiling water reactorbapiBoiling water reactorbapi
Boiling water reactorbapiB.k. Das
 
Superconducting magnetic energy storage
Superconducting magnetic energy storageSuperconducting magnetic energy storage
Superconducting magnetic energy storageToshon Tanvir Ahmed
 
Calculating the efficiency and regulation of transformer using matlab
Calculating the efficiency and regulation of transformer using matlabCalculating the efficiency and regulation of transformer using matlab
Calculating the efficiency and regulation of transformer using matlabMafaz Ahmed
 

What's hot (20)

Ac to Dc converter
Ac to Dc converterAc to Dc converter
Ac to Dc converter
 
Electric power grid
Electric power gridElectric power grid
Electric power grid
 
1.10 types of tariff
1.10 types of tariff1.10 types of tariff
1.10 types of tariff
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
BK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training ReportBK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training Report
 
Combined operation of power plants
Combined operation of power plantsCombined operation of power plants
Combined operation of power plants
 
POWER GENERATION OF THERMAL POWER PLANT
POWER GENERATION OF THERMAL POWER PLANTPOWER GENERATION OF THERMAL POWER PLANT
POWER GENERATION OF THERMAL POWER PLANT
 
Distribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltageDistribution network reconfiguration for loss reduction and voltage
Distribution network reconfiguration for loss reduction and voltage
 
The cost of power generation
The cost of power generationThe cost of power generation
The cost of power generation
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
What is a regulatory asset
What is a regulatory assetWhat is a regulatory asset
What is a regulatory asset
 
Basics of AC transmission
Basics of AC transmissionBasics of AC transmission
Basics of AC transmission
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Vivek harmonics
Vivek harmonicsVivek harmonics
Vivek harmonics
 
Boiling water reactorbapi
Boiling water reactorbapiBoiling water reactorbapi
Boiling water reactorbapi
 
Solar energy storage
Solar energy storageSolar energy storage
Solar energy storage
 
Superconducting magnetic energy storage
Superconducting magnetic energy storageSuperconducting magnetic energy storage
Superconducting magnetic energy storage
 
Overcurrent Protection
Overcurrent ProtectionOvercurrent Protection
Overcurrent Protection
 
Calculating the efficiency and regulation of transformer using matlab
Calculating the efficiency and regulation of transformer using matlabCalculating the efficiency and regulation of transformer using matlab
Calculating the efficiency and regulation of transformer using matlab
 

Viewers also liked

Nairobi-City-Scenarios
Nairobi-City-ScenariosNairobi-City-Scenarios
Nairobi-City-Scenariosvictor omondi
 
Effect of supplier relationship management practices on corporate performance...
Effect of supplier relationship management practices on corporate performance...Effect of supplier relationship management practices on corporate performance...
Effect of supplier relationship management practices on corporate performance...Gabriel Lubale
 
Old mutual kenya. Financial management and planning
Old mutual kenya. Financial management and planning   Old mutual kenya. Financial management and planning
Old mutual kenya. Financial management and planning Skillet Tony
 
Applied Six Sigma - Home Energy Savings
Applied Six Sigma - Home Energy SavingsApplied Six Sigma - Home Energy Savings
Applied Six Sigma - Home Energy Savingsejkoehler07
 
Energy Efficiency: A kenya power perspective
Energy Efficiency: A kenya power perspectiveEnergy Efficiency: A kenya power perspective
Energy Efficiency: A kenya power perspectiveACX
 
Billing software
Billing softwareBilling software
Billing softwareVarun Jain
 
electronic bill payment and presentment
electronic bill payment and presentmentelectronic bill payment and presentment
electronic bill payment and presentmenttejinderubs
 
A research proposal on the Impacts of Microfinance in Kenya
A research proposal on the Impacts of Microfinance in KenyaA research proposal on the Impacts of Microfinance in Kenya
A research proposal on the Impacts of Microfinance in KenyaFred Mmbololo
 
Consumer Insights: Finding and Guarding the Treasure Trove
Consumer Insights: Finding and Guarding the Treasure TroveConsumer Insights: Finding and Guarding the Treasure Trove
Consumer Insights: Finding and Guarding the Treasure TroveCapgemini
 
Electrical bill & audit
Electrical bill & auditElectrical bill & audit
Electrical bill & auditvigyanashram
 

Viewers also liked (10)

Nairobi-City-Scenarios
Nairobi-City-ScenariosNairobi-City-Scenarios
Nairobi-City-Scenarios
 
Effect of supplier relationship management practices on corporate performance...
Effect of supplier relationship management practices on corporate performance...Effect of supplier relationship management practices on corporate performance...
Effect of supplier relationship management practices on corporate performance...
 
Old mutual kenya. Financial management and planning
Old mutual kenya. Financial management and planning   Old mutual kenya. Financial management and planning
Old mutual kenya. Financial management and planning
 
Applied Six Sigma - Home Energy Savings
Applied Six Sigma - Home Energy SavingsApplied Six Sigma - Home Energy Savings
Applied Six Sigma - Home Energy Savings
 
Energy Efficiency: A kenya power perspective
Energy Efficiency: A kenya power perspectiveEnergy Efficiency: A kenya power perspective
Energy Efficiency: A kenya power perspective
 
Billing software
Billing softwareBilling software
Billing software
 
electronic bill payment and presentment
electronic bill payment and presentmentelectronic bill payment and presentment
electronic bill payment and presentment
 
A research proposal on the Impacts of Microfinance in Kenya
A research proposal on the Impacts of Microfinance in KenyaA research proposal on the Impacts of Microfinance in Kenya
A research proposal on the Impacts of Microfinance in Kenya
 
Consumer Insights: Finding and Guarding the Treasure Trove
Consumer Insights: Finding and Guarding the Treasure TroveConsumer Insights: Finding and Guarding the Treasure Trove
Consumer Insights: Finding and Guarding the Treasure Trove
 
Electrical bill & audit
Electrical bill & auditElectrical bill & audit
Electrical bill & audit
 

Similar to Tariff

Tariff & power factor
Tariff & power factorTariff & power factor
Tariff & power factormustazha
 
MECH3422_1516_07_eleE432424243243432ct01.pdf
MECH3422_1516_07_eleE432424243243432ct01.pdfMECH3422_1516_07_eleE432424243243432ct01.pdf
MECH3422_1516_07_eleE432424243243432ct01.pdfnv5projectshk
 
Energy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plantsEnergy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plantsBalamurugan Subburaj
 
types of tariffs, advantage of tariff, how tariff work,.pdf
types of tariffs, advantage of tariff, how tariff work,.pdftypes of tariffs, advantage of tariff, how tariff work,.pdf
types of tariffs, advantage of tariff, how tariff work,.pdfArnabChakraborty499766
 
How_to_Calculate_Power_Factor.pdf
How_to_Calculate_Power_Factor.pdfHow_to_Calculate_Power_Factor.pdf
How_to_Calculate_Power_Factor.pdfssuserfc7e251
 
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptx
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptxLecture-on-DISTRIBUTION-SYSTEM-edited.pptx
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptxFelcherLayugan
 
10801621067_Azizul Islam.pdf
10801621067_Azizul Islam.pdf10801621067_Azizul Islam.pdf
10801621067_Azizul Islam.pdfAzizulIslam64
 
10801621061_Yuvraj.pdf
10801621061_Yuvraj.pdf10801621061_Yuvraj.pdf
10801621061_Yuvraj.pdfAzizulIslam91
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Power System Operation
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Marcep Inc.
 
electricitytarriftypes-180204133528.pptx
electricitytarriftypes-180204133528.pptxelectricitytarriftypes-180204133528.pptx
electricitytarriftypes-180204133528.pptxdivyabrahma1
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziIEEEP Karachi
 
Unit_5_Tariff_&_Power_Factor_Improvement.pdf
Unit_5_Tariff_&_Power_Factor_Improvement.pdfUnit_5_Tariff_&_Power_Factor_Improvement.pdf
Unit_5_Tariff_&_Power_Factor_Improvement.pdfhomanathmore
 
GSM Based wireless energy meter/sanjeet-1308143
GSM Based wireless energy meter/sanjeet-1308143GSM Based wireless energy meter/sanjeet-1308143
GSM Based wireless energy meter/sanjeet-1308143sanjeet kumar
 
Energy efficiency in electrical system and Energy Tariffs in Nepal
Energy efficiency in electrical system and Energy Tariffs in NepalEnergy efficiency in electrical system and Energy Tariffs in Nepal
Energy efficiency in electrical system and Energy Tariffs in Nepaleecfncci
 
Different methods of tariff
Different methods of tariffDifferent methods of tariff
Different methods of tariffNayan Gije
 

Similar to Tariff (20)

Tariff & power factor
Tariff & power factorTariff & power factor
Tariff & power factor
 
MECH3422_1516_07_eleE432424243243432ct01.pdf
MECH3422_1516_07_eleE432424243243432ct01.pdfMECH3422_1516_07_eleE432424243243432ct01.pdf
MECH3422_1516_07_eleE432424243243432ct01.pdf
 
Energy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plantsEnergy, economic and environmental issues of power plants
Energy, economic and environmental issues of power plants
 
types of tariffs, advantage of tariff, how tariff work,.pdf
types of tariffs, advantage of tariff, how tariff work,.pdftypes of tariffs, advantage of tariff, how tariff work,.pdf
types of tariffs, advantage of tariff, how tariff work,.pdf
 
Solar for Homeowners - April 2009
Solar for Homeowners - April 2009Solar for Homeowners - April 2009
Solar for Homeowners - April 2009
 
How_to_Calculate_Power_Factor.pdf
How_to_Calculate_Power_Factor.pdfHow_to_Calculate_Power_Factor.pdf
How_to_Calculate_Power_Factor.pdf
 
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptx
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptxLecture-on-DISTRIBUTION-SYSTEM-edited.pptx
Lecture-on-DISTRIBUTION-SYSTEM-edited.pptx
 
10801621067_Azizul Islam.pdf
10801621067_Azizul Islam.pdf10801621067_Azizul Islam.pdf
10801621067_Azizul Islam.pdf
 
CHAP 3.4 - TARIFF.pdf
CHAP 3.4 - TARIFF.pdfCHAP 3.4 - TARIFF.pdf
CHAP 3.4 - TARIFF.pdf
 
10801621061_Yuvraj.pdf
10801621061_Yuvraj.pdf10801621061_Yuvraj.pdf
10801621061_Yuvraj.pdf
 
ECONOMICS OF POWER GENERATION- TARIFF METHODS
ECONOMICS OF POWER GENERATION-  TARIFF METHODSECONOMICS OF POWER GENERATION-  TARIFF METHODS
ECONOMICS OF POWER GENERATION- TARIFF METHODS
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design
 
Tariff.pdf
Tariff.pdfTariff.pdf
Tariff.pdf
 
electricitytarriftypes-180204133528.pptx
electricitytarriftypes-180204133528.pptxelectricitytarriftypes-180204133528.pptx
electricitytarriftypes-180204133528.pptx
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz Qazi
 
Unit_5_Tariff_&_Power_Factor_Improvement.pdf
Unit_5_Tariff_&_Power_Factor_Improvement.pdfUnit_5_Tariff_&_Power_Factor_Improvement.pdf
Unit_5_Tariff_&_Power_Factor_Improvement.pdf
 
GSM Based wireless energy meter/sanjeet-1308143
GSM Based wireless energy meter/sanjeet-1308143GSM Based wireless energy meter/sanjeet-1308143
GSM Based wireless energy meter/sanjeet-1308143
 
Energy efficiency in electrical system and Energy Tariffs in Nepal
Energy efficiency in electrical system and Energy Tariffs in NepalEnergy efficiency in electrical system and Energy Tariffs in Nepal
Energy efficiency in electrical system and Energy Tariffs in Nepal
 
Different methods of tariff
Different methods of tariffDifferent methods of tariff
Different methods of tariff
 

More from Jamilah Abbas

Telecommunication system
Telecommunication systemTelecommunication system
Telecommunication systemJamilah Abbas
 
Power factor correction
Power factor correctionPower factor correction
Power factor correctionJamilah Abbas
 
What is power factor
What is power factorWhat is power factor
What is power factorJamilah Abbas
 
Power factor correction
Power factor correctionPower factor correction
Power factor correctionJamilah Abbas
 
Power factor correction
Power factor correctionPower factor correction
Power factor correctionJamilah Abbas
 

More from Jamilah Abbas (6)

Telecommunication system
Telecommunication systemTelecommunication system
Telecommunication system
 
Ac motors
Ac motorsAc motors
Ac motors
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
What is power factor
What is power factorWhat is power factor
What is power factor
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 

Recently uploaded

Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckHajeJanKamps
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptseri bangash
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content MarketingChuck Aikens
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsFEXLE
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfsuperbizness1227
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdfzukhrafshabbir
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon investment
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Associationseri bangash
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.FelixPerez547899
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)linciy03
 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateRedSeer
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024Adnet Communications
 
What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?Pristine Rings
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfCIOLOOKIndia
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.smalmahmud11
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptxrdishurana
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsSlidesAI
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridHolger Mueller
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corp.
 

Recently uploaded (20)

Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdf
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small Businesses
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdf
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 

Tariff

  • 2. TOPIC 2 - TARIFF
  • 3. DEFINITION Payment scale imposed by supplier towards the consumers. Supplier Peninsular Malaysia – TNB Sarawak – SESCO Sabah - SESB
  • 4. TYPES OF COSTS Suppliers had to cover two types of costs to produce electricity Variable Costs Fuel Cost, Generation Plants equipment spare parts etc  Fixed Costs Generation Plant Construction, distribution and transmission, emolument, insurance etc
  • 5.  TARIFF CLASSIFICATION Three main classification 1.Equal Rate Tariff 2. Two Part Tariff 3. Block Tariff
  • 6. EQUAL RATE TARIFF This tariff is divided into two type of payment. 1. Payment for lighting and fans. 2.Payment for power from socket outlet. Is using two split meters. It is rarely use nowadays.
  • 7. EQUAL RATE TARIFF DIAGRAM lamp switch Meter kwh supply power
  • 8. EXAMPLE EQUAL RATE TARIFF A user use 100 units to light the lamps and 200 units of electricity from the socket outlet. This is equal rate tariff, so 20cents for each units of energy used in lighting and 25cents for each units of electric power from the socket outlet. Calculate the total energy used for the house in that month. For lighting: 100 units x 20cents = RM20.00 For Power: 200 units x 25cents = RM50.00 Total payment = RM70.00  
  • 9. TWO PARTS TARIFF This tariff is divided into two type of payment. 1.Payment for Maximum Demand. Permanent usage of energy for each month is called Maximum Demand. Its measured by kW. 2.Payment for the rest usage of energy.
  • 10. TWO PARTS TARIFF DIAGRAM METER KWH MAXIMUM DEMAND SUPPLY POWER & LAMP SWITCH
  • 11. EXAMPLE TWO PART TARIFF A factory used 200 additional units and the maximum demand for the month is 4kW. How much will be paid by the consumer if RM12.00 for each kW maximum demand and 7cents for additional units used for that month? For Maximum demand: 4kW x RM12.00 = RM48.00   For Additional Units: 200 units x 7cents = RM14.00   Total payment = RM62.00
  • 12. BLOCK TARIFF This tariff is divided into three scales. Only one power meter is used. First scale for any usage of power under certain units. Second scale for any usage above first units. Third scale for any usage above second units.
  • 13. BLOCK TARIFF DIAGRAM METER KWH SUPPLY POWER & LAMP SWITCH
  • 14. EXAMPLE BLOCK TARIFF A house used 300 units of electricity in that month. Block tariff is used where first 100 units is charged 25cents a unit, 50 secondary units is charged 20 cents a unit and the rest units is charged 23cents a unit. How much is needed to pay the bill? 1st 100 units = 100 x 25 cents = RM25.00 2nd 50 units = 50 x 20cents = RM10.00 3rd 150 units = 150 x 23cents = RM34.50   Total payment = RM69.50    
  • 15. TARIFF RATES Tariff RatesPrint this page  “Domestic Consumer” means a consumer occupying a private dwelling, which is not used as a hotel, boarding house or used for the purpose of carrying out any form of business, trade, professional activities or services. TARIFF CATEGORYUNITTariff A – Domestic Tariff   For Monthly Consumption Between 0-400 kWh/month   For the first 200 kWh (1 - 200 kWh) per month sen/kWh 21.8 For the next 200 kWh (201 -400 kWh) per month sen/kWh 33.4 The minimum monthly charge is RM3.00   For Monthly Consumption More Than 400 kWh/month   For the first 500kWh (1-500kWh) per month sen/kWh 28.6 For the next 100 kWh (501-600kWh) per month sen/kWh 37.8 For the next 100 kWh (601-700kWh) per month sen/kWh 38.7 For the next 100 kWh (701-800kWh) per month sen/kWh 39.7 For the next 100 kWh (801-900kWh) per month sen/kWh 41.7 For the next kWh (901 kWh onwards) per month sen/kWh 44.6 The minimum monthly charge is RM3.00  
  • 16. Tariff B - Low Voltage Commercial Tariff   For Overall Monthly Consumption Between 0-200 kWh/month   For all kWh sen/kWh 37.0 The minimum monthly charge is RM7.20     For Overall Monthly Consumption More Than 200 kWh/month   For all kWh (From 1kWh onwards) sen/kWh 39.7 The minimum monthly charge is RM7.20  Tariff C1 - Medium Voltage General Commercial Tariff  For each kilowatt of maximum demand per month RM/kW23.93 For all kWh sen/kWh 28.8 The minimum monthly charge is RM600.00   Tariff C2 - Medium Voltage Peak/Off-Peak Commercial Tariff   For each kilowatt of maximum demand per month during the peak period RM/Kw 35.60 For all kWh during the peak period sen/kWh 28.8 For all kWh during the off-peak period sen/kWh 17.7 The minimum monthly charge is RM600.00
  • 18. How much will be paid by PnArduniwati
  • 19. TARIFF SYSTEM FEATURES Obtain a reasonable return to the supplier Appropriate and acceptable to the various types of users. Easily understood by all levels of users Suppliers will have little benefit with affordable rates paid by consumers
  • 20. Factors that influence the cost of raising Diversity factor = the max. number of user request / max. load at station Load factor = average demand/max demand = energy produced in one period/ max. demand x at the same time period Plant capacity factor = average demand / installed capacity
  • 21. LOAD CURVE Graphic records to show the demand for power at all times in a period of time. Its shows the view provided an overview of the load time at that time
  • 22. The information can be obtained from the load curve Area under the curve gives the total energy produced in that period. The ratio of area under the curve and the total are of the square containing the curve ( refer to the max. load), giving a load factor for the period. Curve gives the max. peak demand at the station at the same period. Area under the curve period of time in hours = average demand during that period. * Max request- the max load imposed on a power station in one period ( day, week, month or year
  • 23. EXAMPLEPower station to generate electricity as a request under the load
  • 24. Draw an curve load and find : Station maximum demand Total generation Average load Load factor
  • 25.
  • 26. RESULT Maximum demand = 11000 kw Total generation = area under the graph (3500 x 6) + ( 11000x6) + (4500x4) + (10000x4) + (6000x4) = 21000 + 66000 + 18000 +40000 + 24000 = 169000kwh Average load = total gen. / period = 169000 / 24 = 7041.7 kw Load factor = average load/max demand = 7041.7 / 11000 = 0.64 @ 64%