SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT 1 [QSB 60104]
CONSTRUCTION TECHNOLOGY I [BLD 60104]
BUILDING MATERIALS [BLD 62003]
	
  
	
  
	
  
Title:
Technical site visit to Andes Construction site
% Of Assessment : 10% for each module
Assignment date : 26 June 2015
Submission date : 3 July 2015
	
  
	
  
	
  
	
  
MEASUREMENT 1 (QSB 60104)
Assessment Brief
This is a report on a site visit to a construction site incorporating the objectives of the site visit, the introduction of the
site and technical observations made on site including the learning outcomes of the site visit.
	
  
Learning Outcomes
	
  
• Understand the basics of the construction process.
• Understand the practical aspect of construction techniques in comparison to the theory aspect in books and its
application on site.
• Exposure to actual working environment on site including uncertainty circumstances e.g. weather.
• Ability to communicate with the construction team members on site and to see the importance of teamwork in
the building team.
• Witness the usage of construction equipment on site including mechanical plants.
• Explore and identify various types of building materials and technology on site.
• Awareness of the importance of safety on site and understanding of safety problems and site conditions.
• Recognize the items measurable for sub-structure and reinforced concrete frame works.
CONSTRUCTION TECHNOLOGY (BLD 60104)
Assignment Brief
The site visit will give exposure to students where they will be able to describe, explain and understand the method
and process of construction in accordance to the sequence of work on site. For this report, students are required to:
	
  
a) Identify and explain the type of foundation involved in the particular site together with its advantages and
disadvantages.
	
  
	
  
	
  
	
  
BUILDING MATERIALS (BLD 62003)
Assignment Brief
The site visit will give exposure to students on the real life construction on site in which students will be able to
explore, recognize and understand the building materials used for construction. For this report, students are required
to:
	
  
a) Different building elements may use different type of reinforced concrete grade. Identify the grade of
reinforced concrete used for the construction of the following building elements: (i) column, (ii) beam; (iii)
slab and (iv) foundation. Students need to explain on the advantages and disadvantages of the identified
reinforced concrete.
	
  
	
  
	
  
	
  
	
  
Assessment Criteria (10 marks for each module)
	
  
Breakdown of marks are:
Objective of the site visit = 1 mark
Content/technical observations = 6 marks
Photos & descriptions = 2 mark
Learning outcomes/ Conclusion= 1 mark

Contenu connexe

Tendances

site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1KhangWei Chin
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1Zi Shan
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology Ikaiwenyeo
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportXinYee Khoo
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015Joyce HweeMin
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORTWan Nee
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 

Tendances (20)

Site report
Site reportSite report
Site report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Construction site
Construction siteConstruction site
Construction site
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Objective of site visit
Objective of site visitObjective of site visit
Objective of site visit
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Site report
Site reportSite report
Site report
 

Similaire à Assignment brief for site report .pdf

INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MWan Nee
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015jordanlim96
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015KhangWei Chin
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportKai Yun Pang
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Est
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Lam Wee
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Darrentqn
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Louise Foong
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Areeb Amirullah
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Nicole Thain
 
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016Sheng Zhe
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Lam Wee
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Lin Hui
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Felix Vong
 
CT2 Individual Assignment Brief
CT2 Individual Assignment BriefCT2 Individual Assignment Brief
CT2 Individual Assignment BriefKhangWei Chin
 
Assignment 1 - Sketching / Drawing
Assignment 1 - Sketching / DrawingAssignment 1 - Sketching / Drawing
Assignment 1 - Sketching / DrawingKai Yun Pang
 
CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8Est
 

Similaire à Assignment brief for site report .pdf (20)

Site Report
Site ReportSite Report
Site Report
 
INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM M
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Assignment 1 - Site Visit Report
Assignment 1 - Site Visit ReportAssignment 1 - Site Visit Report
Assignment 1 - Site Visit Report
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015
 
CT2 Individual Assignment Brief
CT2 Individual Assignment BriefCT2 Individual Assignment Brief
CT2 Individual Assignment Brief
 
Assignment 1 - Sketching / Drawing
Assignment 1 - Sketching / DrawingAssignment 1 - Sketching / Drawing
Assignment 1 - Sketching / Drawing
 
CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8CT3 Individual assignment brief-2016-8
CT3 Individual assignment brief-2016-8
 

Plus de Jıa Yıı

Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2 Jıa Yıı
 
Assignment brief for site report
Assignment brief for site report Assignment brief for site report
Assignment brief for site report Jıa Yıı
 
Epc slides part 2
Epc slides part 2Epc slides part 2
Epc slides part 2Jıa Yıı
 
Epc slides (part1)
Epc slides (part1)Epc slides (part1)
Epc slides (part1)Jıa Yıı
 
Statistics report
Statistics reportStatistics report
Statistics reportJıa Yıı
 
Circle & sphere
Circle & sphereCircle & sphere
Circle & sphereJıa Yıı
 
English research report
English research reportEnglish research report
English research reportJıa Yıı
 
CL FINAL PROJECT REPORT
CL FINAL PROJECT REPORTCL FINAL PROJECT REPORT
CL FINAL PROJECT REPORTJıa Yıı
 
Ici final project report
Ici final project reportIci final project report
Ici final project reportJıa Yıı
 

Plus de Jıa Yıı (18)

Ct
CtCt
Ct
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Assignment brief for site report
Assignment brief for site report Assignment brief for site report
Assignment brief for site report
 
Psy final (1)
Psy final (1)Psy final (1)
Psy final (1)
 
Psy 2
Psy 2Psy 2
Psy 2
 
Psy 1
Psy 1Psy 1
Psy 1
 
Epc slides part 2
Epc slides part 2Epc slides part 2
Epc slides part 2
 
Epc slides (part1)
Epc slides (part1)Epc slides (part1)
Epc slides (part1)
 
Economics
EconomicsEconomics
Economics
 
Acc
Acc Acc
Acc
 
Statistics report
Statistics reportStatistics report
Statistics report
 
Circle & sphere
Circle & sphereCircle & sphere
Circle & sphere
 
Final slides
Final slidesFinal slides
Final slides
 
English research report
English research reportEnglish research report
English research report
 
James bond
James bondJames bond
James bond
 
CL FINAL PROJECT REPORT
CL FINAL PROJECT REPORTCL FINAL PROJECT REPORT
CL FINAL PROJECT REPORT
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
x town report
x town reportx town report
x town report
 

Assignment brief for site report .pdf

  • 1.     SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT 1 [QSB 60104] CONSTRUCTION TECHNOLOGY I [BLD 60104] BUILDING MATERIALS [BLD 62003]       Title: Technical site visit to Andes Construction site % Of Assessment : 10% for each module Assignment date : 26 June 2015 Submission date : 3 July 2015         MEASUREMENT 1 (QSB 60104) Assessment Brief This is a report on a site visit to a construction site incorporating the objectives of the site visit, the introduction of the site and technical observations made on site including the learning outcomes of the site visit.   Learning Outcomes   • Understand the basics of the construction process. • Understand the practical aspect of construction techniques in comparison to the theory aspect in books and its application on site. • Exposure to actual working environment on site including uncertainty circumstances e.g. weather. • Ability to communicate with the construction team members on site and to see the importance of teamwork in the building team. • Witness the usage of construction equipment on site including mechanical plants. • Explore and identify various types of building materials and technology on site. • Awareness of the importance of safety on site and understanding of safety problems and site conditions. • Recognize the items measurable for sub-structure and reinforced concrete frame works.
  • 2. CONSTRUCTION TECHNOLOGY (BLD 60104) Assignment Brief The site visit will give exposure to students where they will be able to describe, explain and understand the method and process of construction in accordance to the sequence of work on site. For this report, students are required to:   a) Identify and explain the type of foundation involved in the particular site together with its advantages and disadvantages.         BUILDING MATERIALS (BLD 62003) Assignment Brief The site visit will give exposure to students on the real life construction on site in which students will be able to explore, recognize and understand the building materials used for construction. For this report, students are required to:   a) Different building elements may use different type of reinforced concrete grade. Identify the grade of reinforced concrete used for the construction of the following building elements: (i) column, (ii) beam; (iii) slab and (iv) foundation. Students need to explain on the advantages and disadvantages of the identified reinforced concrete.           Assessment Criteria (10 marks for each module)   Breakdown of marks are: Objective of the site visit = 1 mark Content/technical observations = 6 marks Photos & descriptions = 2 mark Learning outcomes/ Conclusion= 1 mark