SlideShare a Scribd company logo
1 of 7
Download to read offline
Work station series for solar water heating control system




             CONTENT

Ⅰ   General information……………………………………1

Ⅱ   Product description……………………………………2

Ⅲ   System description ……………………………………3

Ⅳ   Installation………………………………………………4

Ⅴ   Packing list………………………………………………5
Work station series for solar water heating control system

Ⅰ General information
 1 About this manual
    This manual book describes the installation, functions and operation rules of our pump station

     series for solar water heating control system. When install with other applications on this system,

     such as solar collector, and storage, please follow the instruction of correlative suppliers. The

     installation, electrical connection, adjustment and maintenance should be carried out by a

     qualified specialist.

 2 Safety rules
   - The product can’t be installed in the room where easily inflammable and explosive mixtures (e.g.

     gas or oil) are present or may occur.

   - The product can’t be installed in the location which exceeds its allowable environment condition.

   - The operation should be carried out by a qualified specialist.

   - Before connecting the electrical wire, make sure that the power supply matches the required

     parameter.

 3 Liability waivers
   - Improper installation or operation can cause damages to material and persons. The manufacturer

     cannot monitor the compliance with these instructions or the circumstances and methods used

     for installation, operation, utilization and maintenance of this device. Damage by mishandling or

     improper installation on costumer site is immediately leading to warranty exclusion.

   - As faults can never be excluded, we don’t offer a guarantee for the completeness of the drawings

     and texts of this manual, they only represent some examples. They can only be used on own risk.

     No liability is assumed for incorrect, incomplete or false information and the resulting damages.

   - The manufacturer preserves the right to put changes to product, technical date or installation and

     operation instructions without prior notice.

 4 Equip the controller
   - The product is suggested to equip the controllers, such as SPI, SPII, SPIII series.




                                                    1
Work station series for solar water heating control system

Ⅱ Product description

  1 Components




    NO.            Component                           Function description

     1    Non-return valve             Avoid the medium flow back

     2    Thermometer                  Display the current temperature of flow pipe

     3    Auto air-exhausted valve     Exhaust the air in the pipeline

     4    Air-medium separate valve    Separate the air from the medium in the pipeline

     5    Filling and venting valve    Fill or vent the medium

     6    Safety valve                 Keep the system pressure in a safe state

     7    Pressure gauge               Display the current system pressure

     8    Thermometer                    Display the current temperature of return pipe

     9    Non-return valve             Avoid the medium flow back
                                       WILO Star RS 15/6 or 25/6 (110V or 220V)
     10   WILO pump
                                       Control the temperature difference circulation
     11   Pump speed adjust switch     Adjust the pump speed with three levels

     12   Flow balancing valve         Adjust to balance the flow rate

     13   Expansion vessel connector   Connect the expansion vessel

     14   Flow meter                   Display the current flow state; adjust the flow rate



                                             2
Work station series for solar water heating control system

  2 Main technical data
     u Dimension: 520×290×170mm

     u System design pressure: 1 MPa

     u Safety valve respond pressure: 0.6 MPa

     u WILO pump model: SR25/6, SR15/6 (For choice)

     u Screw coupling: 3/4〞

     u Material: Brass

     u Thermal insulation material: EPP

     u Range of environment temperature: -10~50℃

     u Wae poe t nga e I4
         tr rtci rd :P 0
                o




Ⅲ System description




                                          3
Work station series for solar water heating control system

Ⅳ Installation
  1. Open the package carton and take out the work station carefully.
  2. Determine the mounting position of the work station, considering the mounting place for
     expansion vessel.
  3. Drill the holes for dowels, put the dowels into the holes, fixed the work station on the wall using
     fastening screws. See picture




  Note: The station must be vertically installed. The following are the fault locations.




  4. The installation of controller is as following steps.




  5. Use two wrenches to connect the pipes. See picture.




                                                    4
Work station series for solar water heating control system
  6. Install a filling and venting valve to fill and vent medium, and to wash the pipeline. It should be
     installed in the lowest part of the whole system. See the picture.

   Note: When filling the medium, close the valve on the middle, and open the rest two valves at the
         same time. Fill the medium from the left valve. When there is medium venting from the right
         side, it means the medium has been filled up.
        Then if you want to reach a certain pressure for the system, close the right valve. When the
         pressure has reached the desired valve on the pressure gauge, close the left valve, and
         open the middle valve at the same time. The whole process is finished.




Ⅴ Packing list

                   No.           Item             Specification          Quantity

                    1         Main part        5 0 9 ×1 0
                                                2 ×2 0 7 mm                1 pc

                    2        Fixed screw                                   1 bag

                    3          Manual                                      1 pc




                                                  5

More Related Content

Viewers also liked

Timi CV-Jan.2016
Timi CV-Jan.2016Timi CV-Jan.2016
Timi CV-Jan.2016
Timi Baer
 

Viewers also liked (9)

Timi CV-Jan.2016
Timi CV-Jan.2016Timi CV-Jan.2016
Timi CV-Jan.2016
 
계약제도 혁신을 통한 사회변화유도
계약제도 혁신을 통한 사회변화유도계약제도 혁신을 통한 사회변화유도
계약제도 혁신을 통한 사회변화유도
 
Nirmal Baba Ji : False allegations
Nirmal Baba Ji : False allegations Nirmal Baba Ji : False allegations
Nirmal Baba Ji : False allegations
 
Librepensamiento perpetuus (versión digitalizada, 2016)
Librepensamiento perpetuus (versión digitalizada, 2016)Librepensamiento perpetuus (versión digitalizada, 2016)
Librepensamiento perpetuus (versión digitalizada, 2016)
 
"Are You Afraid of the Semantic Web" by Sabin Corneliu Buraga @ eLiberatica 2007
"Are You Afraid of the Semantic Web" by Sabin Corneliu Buraga @ eLiberatica 2007"Are You Afraid of the Semantic Web" by Sabin Corneliu Buraga @ eLiberatica 2007
"Are You Afraid of the Semantic Web" by Sabin Corneliu Buraga @ eLiberatica 2007
 
"Open Source VoIP" by Daniel Constantin Mierla @ eLiberatica 2007
"Open Source VoIP" by Daniel Constantin Mierla @ eLiberatica 2007"Open Source VoIP" by Daniel Constantin Mierla @ eLiberatica 2007
"Open Source VoIP" by Daniel Constantin Mierla @ eLiberatica 2007
 
Imad CV 2016
Imad  CV 2016Imad  CV 2016
Imad CV 2016
 
Web App Framework at SwapSkills vol28
Web App Framework at SwapSkills vol28Web App Framework at SwapSkills vol28
Web App Framework at SwapSkills vol28
 
Introduction a taste of french
Introduction a taste of frenchIntroduction a taste of french
Introduction a taste of french
 

Similar to Solar Work Station SP328

bnt68 introduction
bnt68 introductionbnt68 introduction
bnt68 introduction
Mona Lisa
 
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptxPRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
holegajendra
 

Similar to Solar Work Station SP328 (20)

Sp106 manual+ultisolar new energy co ltd solar pump station solar water heate...
Sp106 manual+ultisolar new energy co ltd solar pump station solar water heate...Sp106 manual+ultisolar new energy co ltd solar pump station solar water heate...
Sp106 manual+ultisolar new energy co ltd solar pump station solar water heate...
 
Sr868c6 manual+ultisolar-new-energy-co-ltd-solar-water-heaters-controllers-wo...
Sr868c6 manual+ultisolar-new-energy-co-ltd-solar-water-heaters-controllers-wo...Sr868c6 manual+ultisolar-new-energy-co-ltd-solar-water-heaters-controllers-wo...
Sr868c6 manual+ultisolar-new-energy-co-ltd-solar-water-heaters-controllers-wo...
 
SP228 Ultisolar Solar Working Station Manual
SP228 Ultisolar Solar Working Station ManualSP228 Ultisolar Solar Working Station Manual
SP228 Ultisolar Solar Working Station Manual
 
SP228 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP228 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...SP228 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP228 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
 
SP226 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP226 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...SP226 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP226 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
 
SP118 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP118 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...SP118 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP118 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
 
Solar Work Station SP118
Solar Work Station SP118Solar Work Station SP118
Solar Work Station SP118
 
bnt68 introduction
bnt68 introductionbnt68 introduction
bnt68 introduction
 
089414 2
089414 2089414 2
089414 2
 
Principle of operation of the vtr regulator valve
Principle of operation of the vtr regulator valvePrinciple of operation of the vtr regulator valve
Principle of operation of the vtr regulator valve
 
Tre Mercati Fitting Instructions.
Tre Mercati Fitting Instructions.Tre Mercati Fitting Instructions.
Tre Mercati Fitting Instructions.
 
electric boiler user boiler.pdf
electric boiler user boiler.pdfelectric boiler user boiler.pdf
electric boiler user boiler.pdf
 
How to use Auto Smoke Detector AUTOOL SDT-206 Smoke Leak Detector
How to use Auto Smoke Detector AUTOOL SDT-206 Smoke Leak DetectorHow to use Auto Smoke Detector AUTOOL SDT-206 Smoke Leak Detector
How to use Auto Smoke Detector AUTOOL SDT-206 Smoke Leak Detector
 
Mori Seiki Maintenance Guide
Mori Seiki Maintenance GuideMori Seiki Maintenance Guide
Mori Seiki Maintenance Guide
 
helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)
 
Instrumentation & Control Lab Manual.pdf
Instrumentation & Control Lab Manual.pdfInstrumentation & Control Lab Manual.pdf
Instrumentation & Control Lab Manual.pdf
 
SP116 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP116 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...SP116 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
SP116 Manual+Ultisolar New Energy Co Ltd Solar Pump Station Solar Water Heate...
 
SP118 Solar Working Station 2014 New Manual
SP118 Solar Working Station 2014 New ManualSP118 Solar Working Station 2014 New Manual
SP118 Solar Working Station 2014 New Manual
 
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptxPRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
 
caldeira elétrica montada na parede
caldeira elétrica montada na paredecaldeira elétrica montada na parede
caldeira elétrica montada na parede
 

Recently uploaded

zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Recently uploaded (20)

MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Expert Cross-Border Financial Planning Advisors
Expert Cross-Border Financial Planning AdvisorsExpert Cross-Border Financial Planning Advisors
Expert Cross-Border Financial Planning Advisors
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.docGuide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
Guide to Networking Essentials 8th Edition by Greg Tomsho solution manual.doc
 
Potato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdfPotato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdf
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
Aptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfAptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdf
 
stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learning
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptxExploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
 
Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptx
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrent
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)
 

Solar Work Station SP328

  • 1.
  • 2. Work station series for solar water heating control system CONTENT Ⅰ General information……………………………………1 Ⅱ Product description……………………………………2 Ⅲ System description ……………………………………3 Ⅳ Installation………………………………………………4 Ⅴ Packing list………………………………………………5
  • 3. Work station series for solar water heating control system Ⅰ General information 1 About this manual This manual book describes the installation, functions and operation rules of our pump station series for solar water heating control system. When install with other applications on this system, such as solar collector, and storage, please follow the instruction of correlative suppliers. The installation, electrical connection, adjustment and maintenance should be carried out by a qualified specialist. 2 Safety rules - The product can’t be installed in the room where easily inflammable and explosive mixtures (e.g. gas or oil) are present or may occur. - The product can’t be installed in the location which exceeds its allowable environment condition. - The operation should be carried out by a qualified specialist. - Before connecting the electrical wire, make sure that the power supply matches the required parameter. 3 Liability waivers - Improper installation or operation can cause damages to material and persons. The manufacturer cannot monitor the compliance with these instructions or the circumstances and methods used for installation, operation, utilization and maintenance of this device. Damage by mishandling or improper installation on costumer site is immediately leading to warranty exclusion. - As faults can never be excluded, we don’t offer a guarantee for the completeness of the drawings and texts of this manual, they only represent some examples. They can only be used on own risk. No liability is assumed for incorrect, incomplete or false information and the resulting damages. - The manufacturer preserves the right to put changes to product, technical date or installation and operation instructions without prior notice. 4 Equip the controller - The product is suggested to equip the controllers, such as SPI, SPII, SPIII series. 1
  • 4. Work station series for solar water heating control system Ⅱ Product description 1 Components NO. Component Function description 1 Non-return valve Avoid the medium flow back 2 Thermometer Display the current temperature of flow pipe 3 Auto air-exhausted valve Exhaust the air in the pipeline 4 Air-medium separate valve Separate the air from the medium in the pipeline 5 Filling and venting valve Fill or vent the medium 6 Safety valve Keep the system pressure in a safe state 7 Pressure gauge Display the current system pressure 8 Thermometer Display the current temperature of return pipe 9 Non-return valve Avoid the medium flow back WILO Star RS 15/6 or 25/6 (110V or 220V) 10 WILO pump Control the temperature difference circulation 11 Pump speed adjust switch Adjust the pump speed with three levels 12 Flow balancing valve Adjust to balance the flow rate 13 Expansion vessel connector Connect the expansion vessel 14 Flow meter Display the current flow state; adjust the flow rate 2
  • 5. Work station series for solar water heating control system 2 Main technical data u Dimension: 520×290×170mm u System design pressure: 1 MPa u Safety valve respond pressure: 0.6 MPa u WILO pump model: SR25/6, SR15/6 (For choice) u Screw coupling: 3/4〞 u Material: Brass u Thermal insulation material: EPP u Range of environment temperature: -10~50℃ u Wae poe t nga e I4 tr rtci rd :P 0 o Ⅲ System description 3
  • 6. Work station series for solar water heating control system Ⅳ Installation 1. Open the package carton and take out the work station carefully. 2. Determine the mounting position of the work station, considering the mounting place for expansion vessel. 3. Drill the holes for dowels, put the dowels into the holes, fixed the work station on the wall using fastening screws. See picture Note: The station must be vertically installed. The following are the fault locations. 4. The installation of controller is as following steps. 5. Use two wrenches to connect the pipes. See picture. 4
  • 7. Work station series for solar water heating control system 6. Install a filling and venting valve to fill and vent medium, and to wash the pipeline. It should be installed in the lowest part of the whole system. See the picture. Note: When filling the medium, close the valve on the middle, and open the rest two valves at the same time. Fill the medium from the left valve. When there is medium venting from the right side, it means the medium has been filled up. Then if you want to reach a certain pressure for the system, close the right valve. When the pressure has reached the desired valve on the pressure gauge, close the left valve, and open the middle valve at the same time. The whole process is finished. Ⅴ Packing list No. Item Specification Quantity 1 Main part 5 0 9 ×1 0 2 ×2 0 7 mm 1 pc 2 Fixed screw 1 bag 3 Manual 1 pc 5