2.
PVD takes the lead in soil consolidation
• Drain developed with more than 30 years of
experience in soil consolidation
• Approx. 300 mio linear metres of PVD
installed worldwide
• PVDwork backed-up by extensive
studies and testing by renowned institutes
(e.g. Delft Geotechnics, Geosytec)
3.
Functions
• Forms a path for excess pore-water created by
the overburden, water is drained off to the
surface resulting in a stale subgrade on which
construction can take place.
• Reduces consolidation time of soft soils
significantly, which result in substantial cost
savings
4.
PVD
• 10 cm wide with a solid polymer core covered on
both sides with a strong & permeable filter fabric
• Outer filter fabricate bonded to the core over its
entire surface to form a homogeneous
geocomposite product
• Unique patented hydraulically-designed core for
maximum water flow capacity
5.
PVD
Fully bonded composite:
Unique combination of patented, hydraulically
designed core structure bonded to nonwoven
filter layers over the entire surface
6.
• `
Reduction of Consolidation Time
Reduction of
consolidation time from
more than 15 years to
about 1 year
7.
PVD Benefits
High performance
Easy to handle
Durable
8.
High Performance
High performance
• Nonwoven layers deliver
– Optimal filtration
– Permeability
– Strength
• PVD tensile strength increased by 25%
• Suitable for use in all soil types
9.
Easy To Handle
• Roll length increase to 300 meters reduces
number of connections on site
• 30% Volume reduction resulting in less storage
spaced on site
• New pachaging allows faster unloading of
container
10.
Durable
• Thermal bonding of filter to the entire surface
of core structure ensures that the filter is kept
taut across the flow channels
• Filter cannot tear or become separated from
the core when passing over the pulleys at the
rig top or during soil consolidation
11.
INSTALLATION
• A purpose-built installation rig mounted on a
hydraulic excavator is usually used to install
PVD.
• The Height of rig is equal to the istallation
depth of PVD.
12.
PVD INSTALLATION
• PVD Install into the mandrel
• Mandrel section have oval shape
Il semblerait que vous ayez déjà ajouté cette diapositive à .
Créer un clipboard
Vous avez clippé votre première diapositive !
En clippant ainsi les diapos qui vous intéressent, vous pourrez les revoir plus tard. Personnalisez le nom d’un clipboard pour mettre de côté vos diapositives.
Créer un clipboard
Partager ce SlideShare
Vous avez les pubs en horreur?
Obtenez SlideShare sans publicité
Bénéficiez d'un accès à des millions de présentations, documents, e-books, de livres audio, de magazines et bien plus encore, sans la moindre publicité.
Offre spéciale pour les lecteurs de SlideShare
Juste pour vous: Essai GRATUIT de 60 jours dans la plus grande bibliothèque numérique du monde.
La famille SlideShare vient de s'agrandir. Profitez de l'accès à des millions de livres numériques, livres audio, magazines et bien plus encore sur Scribd.
Apparemment, vous utilisez un bloqueur de publicités qui est en cours d'exécution. En ajoutant SlideShare à la liste blanche de votre bloqueur de publicités, vous soutenez notre communauté de créateurs de contenu.
Vous détestez les publicités?
Nous avons mis à jour notre politique de confidentialité.
Nous avons mis à jour notre politique de confidentialité pour nous conformer à l'évolution des réglementations mondiales en matière de confidentialité et pour vous informer de la manière dont nous utilisons vos données de façon limitée.
Vous pouvez consulter les détails ci-dessous. En cliquant sur Accepter, vous acceptez la politique de confidentialité mise à jour.