29. Capacity of 3 tonnes/day (increasing to 7 tonne/day)
30.
31. Waste to Energy (WTE) Technology Comparison Notes: 1 Allsopp, Costner and Johnston (2001). Incineration and Human Health. Greenpeace Research Laboratories. 2 Noriyuki, Toshimi, Hiroyuki, Yoshiyuki, Yasuaki and Mazumi, (2000). Operation Report of 220 ton/day Pyrolysis Gasification and Melting System for Municipal Solid Waste. Yame Seibu Clean Center-Mitsui Recycling 21. 3 Plasco Energy Group (2008). Presentation to the Environmental Protection Committee of Port Moody. 4 Lehder Environmental Services Ltd. (2008). Draft Effluent and Emission Calculations. Note: Elementa’s Dioxin and Furan emissions are approximately 1/35 and 1/41 (respectively) of the Ontario and EU Dioxin/Furan emission limits of 0.08 ng/m3 and 0.092 ng/m3 (respectively) and 1/4000 of California’s limit of 9 ng/m3.