Image Update

                                       GEAE Account


Project Leader:   Brian Boyce Jr.                          Master Black Belt:
                                                           Steven Bonacorsi
                  Customer Engineer/ Certified Greenbelt
Start Date:
                  April 30, 2002
Six Sigma in Action
                                                                                                                                       Image Updates
Customer Profile – 18,000-Seat Aircraft Engine Manufacturing and Service Company
Business Problem & Impact                                                                                                    Process Capability – Before (0 Sigma)
All PC Equipment issued to GEAE end-users is preloaded
by GE ITS with a standard image. These images are
updated & maintained by GEAE. All released images must
be replicated to the GE ITS servers so they can be loaded
on end-user equipment. The current process could take as
long as one week with extensive administration involvement.
Measure & Analyze
Data Collection: The time it took to transfer an image was
measured at 34.78 Hours. The existing process sigma was 0.
Root Causes: No notification by GEAE Image Group and no                                                                Pr o c e s s Ca p a b ility A n a ly s is f o r Cy c le Time
clear process documentation were identified as the main root                                                                 Process Capability – After (Over 6 Sigma)
causes.                                             P roc es s D at a
                                                                                                                                                                                                                   U SL

Improve & Control                                              US L
                                                               T arget
                                                                                           17. 0000
                                                                                                       *
                                                                                                                                                                                                                            W it

Robocopy program implemented and scheduledean run daily
                                                   M
                                                        to     LS L
                                                                          0. 3888
                                                                                                       *                                                                                                                    O ve

with automatic e-mail notification. Team set up to ple N
                                                   S am receive e- 40
                                                   S t D ev (W it hin) 0. 000000
mail notification and will be alerted if update didS tnot voccur.
                                                       D ev (O erall)  0. 147566

Cycletime Improved to 0.39 Hours!
                                                                P ot ent ial (W it hin) C apabilit y

Results/Benefits                                               Cp
                                                               CP U                     7. 47E + 16
                                                                                                       *


Eliminated administration cost due to process automation.      CP L                               *
                                               C pk    7. 47E + 16
All equipment now issued to end users with current images.                                                 0.0.30
                                                                                                           0.1040
                                                                                                            0.1550
                                                                                                            0.2055
                                                                                                             05 45
                                                                                                             0.35
                                                                                                              0.
                                                                                                              0.
                                                                                                               25
                                                               C pm                                    *

                                                                      O v erall C apabilit y                     O bs erv ed P erf orm anc e             E x p. "W it hin" P erf orm anc e         E x p. "O v erall" P erf orm an


                          A Total Savings of US $11K Annually! Pp
                                                               PPU
                                                               PPL
                                                                                               37. 52
                                                                                                       *


                                                                                                       *
                                                                                                             P P M < LS L
                                                                                                             P P M > US L
                                                                                                             P P M T ot al
                                                                                                                                                   *
                                                                                                                                               0. 00
                                                                                                                                               0. 00
                                                                                                                                                       P P M < LS L
                                                                                                                                                       P P M > US L
                                                                                                                                                       P P M T ot al
                                                                                                                                                                                       0. 00
                                                                                                                                                                                       0. 00
                                                                                                                                                                                             *   P P M < LS L
                                                                                                                                                                                                 P P M > US L
                                                                                                                                                                                                 P P M T ot al

More Related Content

Similar to Serrver Imaging Six Sigma Case Study

Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudySteven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudySteven Bonacorsi
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudyKevin Egan
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudySteven Bonacorsi
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeCCT International
 
Splunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopSplunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopMarc Serieys
 
Zimmerman.mary
Zimmerman.maryZimmerman.mary
Zimmerman.maryNASAPMC
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudySteven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudySteven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudySteven Bonacorsi
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudyKevin Egan
 
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...IRJET Journal
 
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksDeep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksGuatemala User Group
 
NEXT generation enterprise applications
NEXT generation enterprise applicationsNEXT generation enterprise applications
NEXT generation enterprise applicationsDr. Jimmy Schwarzkopf
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrixHakeem-Ur- Rehman
 

Similar to Serrver Imaging Six Sigma Case Study (20)

Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Deploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case StudyDeploy Image Cycle Time Six Sigma Case Study
Deploy Image Cycle Time Six Sigma Case Study
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
 
Web Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case StudyWeb Page Load Cycle Time Six Sigma Case Study
Web Page Load Cycle Time Six Sigma Case Study
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
Splunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI WorkshopSplunk 4 Ninja ITSI Workshop
Splunk 4 Ninja ITSI Workshop
 
Zimmerman.mary
Zimmerman.maryZimmerman.mary
Zimmerman.mary
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
System X - About Benchmarks
System X - About BenchmarksSystem X - About Benchmarks
System X - About Benchmarks
 
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
Comparative Analysis of P-I, I-P, PID and Fuzzy Controllers for Speed Control...
 
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and TricksDeep Dive: More Oracle Data Pump Performance Tips and Tricks
Deep Dive: More Oracle Data Pump Performance Tips and Tricks
 
NEXT generation enterprise applications
NEXT generation enterprise applicationsNEXT generation enterprise applications
NEXT generation enterprise applications
 
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix3. project charter, check sheet, pareto analysis & c&e diagram & matrix
3. project charter, check sheet, pareto analysis & c&e diagram & matrix
 
Moving Early Stage Technologies
Moving Early Stage TechnologiesMoving Early Stage Technologies
Moving Early Stage Technologies
 

More from Kevin Egan

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureKevin Egan
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyKevin Egan
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case StudyKevin Egan
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

More from Kevin Egan (10)

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall Brochure
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case Study
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Serrver Imaging Six Sigma Case Study

  • 1. Image Update GEAE Account Project Leader: Brian Boyce Jr. Master Black Belt: Steven Bonacorsi Customer Engineer/ Certified Greenbelt Start Date: April 30, 2002
  • 2. Six Sigma in Action Image Updates Customer Profile – 18,000-Seat Aircraft Engine Manufacturing and Service Company Business Problem & Impact Process Capability – Before (0 Sigma) All PC Equipment issued to GEAE end-users is preloaded by GE ITS with a standard image. These images are updated & maintained by GEAE. All released images must be replicated to the GE ITS servers so they can be loaded on end-user equipment. The current process could take as long as one week with extensive administration involvement. Measure & Analyze Data Collection: The time it took to transfer an image was measured at 34.78 Hours. The existing process sigma was 0. Root Causes: No notification by GEAE Image Group and no Pr o c e s s Ca p a b ility A n a ly s is f o r Cy c le Time clear process documentation were identified as the main root Process Capability – After (Over 6 Sigma) causes. P roc es s D at a U SL Improve & Control US L T arget 17. 0000 * W it Robocopy program implemented and scheduledean run daily M to LS L 0. 3888 * O ve with automatic e-mail notification. Team set up to ple N S am receive e- 40 S t D ev (W it hin) 0. 000000 mail notification and will be alerted if update didS tnot voccur. D ev (O erall) 0. 147566 Cycletime Improved to 0.39 Hours! P ot ent ial (W it hin) C apabilit y Results/Benefits Cp CP U 7. 47E + 16 * Eliminated administration cost due to process automation. CP L * C pk 7. 47E + 16 All equipment now issued to end users with current images. 0.0.30 0.1040 0.1550 0.2055 05 45 0.35 0. 0. 25 C pm * O v erall C apabilit y O bs erv ed P erf orm anc e E x p. "W it hin" P erf orm anc e E x p. "O v erall" P erf orm an A Total Savings of US $11K Annually! Pp PPU PPL 37. 52 * * P P M < LS L P P M > US L P P M T ot al * 0. 00 0. 00 P P M < LS L P P M > US L P P M T ot al 0. 00 0. 00 * P P M < LS L P P M > US L P P M T ot al