Introduction
• A PRINCE2 based Methodology
• To read the book from the OGC publication “Managing
  Successful Projects with PRINCE2” which is officially
  published by TSO.
Key Success Factors
•   Solid Requirements
•   Controlled Project Environment
•   Good Data Architect with Business Sense
•   Higher Degree of Delegated Powers given to
    Project Sponsor
PRINCE2 project management method suggests
that projects should be broken down into
stages and these sub-processes dictate how
each individual stage should be controlled.
Project Methodology

DP                                                    CS
      SU

 IP               Project Team Organization      SB
      CP                Project Scope
                                                           MP
                         Project Plan

                 Quality Management Strategy
                Risk Management Strategy
                Change Management Strategy
             Communication Management Strategy
Project Processes
                    SU   IP                 DP
Project Start-Up




                                        M
                         IP   SB   CS       DP
  Requirement                           P
    Analysis




                                        M
                              SB   CS       DP
Data Architecture                       P
 Development




                                        M
                              SB   CS       DP
    Report
                                        P
 Development




                                        M
                              SB   CS       DP
  Training and
                                        P
   Handover




                                        M
                              CP   CS       DP
                                        P
 Project Closure
Customized PRINCE2 7 Processes
      Start-Up a Project
      • During Pre-Sales Stage, we receive a Project Mandate on Scope and Requirements. We then conduct Proof-of-Concept
      • If the deal is closed, Project Plan, Project Approach, Project Brief should be prepared before IP
 SU


      Initiate a Project
      • Stage Plan, PID, Product Description should be prepared
      • Project Team Organization must be confirmed
 IP


      Direct a Project
      • Project Board Members (Project Sponsor, Senior Supplier, Senior User) should be accountable for this process
      • Participate in PSC Meeting
 DP   • Make decision on all milestones and Stage Clearance Confirmation




      Control Project Stages
      •   Project Manager should be accountable for this process
 CS   •
      •
          Regular Highlight Report
          Exception Report
      •   Issue Logging (Change, Risk or Concern…)
      •   Define Work Package (Action Plan) for each Task within the Stage


      Manage Product Delivery
      • Team Manager should be accountable for this process
 M    • Monitor and Execute the Work Package (Action Plan) until the required tasks are completed
 P    • Decide Team Plan on completing the required Tasks




      Manage Stage Boundaries
      • Project Manager should be accountable for this process
      • End Stage Report must be prepared for Project Board ‘s approval (DP)
 SB


      Close a Project
      • End Project Report must be prepared by Project Manager for Project Board ‘s approval (DP)
 CP
PM Processes vs Methodology
• People tend to confuse Processes and Methodology. A set of
  Project Management Processes is not a Methodology.
  Methodology is about how to execute the Processes
• PMI offers processes for project management. PRINCE2 from
  the UK offers a full methodology, with stage gates, work
  authorization forms, and so on.
• Processes to me is a Toolbox. They consists of best practice
  inputs, outputs, and tools/techniques for the various elements
  of managing projects
• Methodology is a basic foundation that enables Project
  Managers can easily apply on all related Projects
Project Organization

                                   Top
                                Management



Project      Senior      Senior          Project   Senior User
Board       Supplier    Technical        Sponsor




           Project                                   User
           Manager                                 Assurance




            Team
           Manager



          Development
             Team
           Members
Responsibilities of Project Board

                               Be
                           accountable
               Ensure
                                          Provide
              effective
                                           unified
            communicatio
                                          direction
                  n




    Support the
                            Duties &                   Delegate
      project
                           Behaviours                 effectively
     manager




               Ensure                      Facilitate
              effective                     cross-
              decision-                   functional
               making                    integration
                             Commit
                            resources
Responsibilities of Project Sponsor
• The key responsibility associated with the Sponsor is
  making sure that the project remains focused toward
  its objectives, ultimately delivering the outputs (or
  products) necessary for generating the outcomes that
  will enable the expected benefits to be realized. As
  well as this, the Sponsor is responsible for assuring
  value for money on the project, by implementing an
  approach that is cost-conscious, weighing the
  demands of the business, user, and supplier against
  one another. This role is ultimately accountable for
  the success of the project and has the veto on any
  decision making.
Responsibilities of Senior User
• The ‘user’ stakeholder interest encompasses all who will
  operate, support and maintain the products that the project
  creates, as well as those who will use the project’s products
  to realize the expected benefits. The Senior User, who will
  usually be a high-level manager from the customer
  organization, is responsible for making sure that the needs of
  the users are clearly and fully defined, for committing user
  resources, liaising between the user and the project team,
  and ensuring that the outcome meets the users’ needs,
  conforming to the Business Case with regard to ease of use,
  functions, and quality requirements.
Responsibilities of Senior Technical
• Can commit Technical Resource that needed
  for BI Project Implementation
• This role normally will be the IT Manager
Responsibilities of Senior Supplier
• It is vital that those who design, build and
  deliver the products requested by the user
  should also be represented on the Project
  Board. The Senior Supplier role has been defined
  to represent these groups. It is the Senior
  Supplier’s responsibility to ensure that products
  are delivered in conformance with the user’s
  specification, and the Senior Supplier must
  therefore have the authority to commit the
  required supplier resources to the project.
Responsibilities of Project Manager
• Is responsible for day-to-day management of
  the project and will delegate responsibility
  for the creation of products to the team
  manager or specialist team members
  themselves.
Responsibilities of Team Manager
• The Team Manager will perform the daily
  management of the team
• Lead the Technical Team to implement
  solutions according to the requirements and
  the instructions of Project Manager
• Provide Technical Solutions to Project
  Manager
Steps to Actual Project Start
Process Model Timeline
PRINCE2 Processes By Definition
Starting up a Project (SU)
• It is a pre-project process that designed to ensure all pre-requisites for IP
  are in place. The process expects the existence of a Project Mandate
  which defines Project Scope, Requirements and Goals. Starting up a
  Project should be very short.
• Appoint the Project Team
• Create the Initiation Stage Plan.
Initiating a Project (IP)
• Agree whether or not there is sufficient justification to proceed with
  the project
• Establish a Project Approach on which to proceed
• Document and confirm that an acceptable Business Case exists for the
  project
• Ensure a firm and accepted Foundation to the project prior to
  commencement of the work
• Agree to the commitment of resources throughout each stage of the
  project
• Enable and encourage the Project Board to take ownership of the
  project
• Provide the baseline for the decision-making processes required
  during the project’s life
• Ensure that the investment of time and effort required by the project
  is made wisely, taking account of the risks to the project
Directing a Project (DP)

• Directing a Project runs from the start-up of the project
  until its closure.
• This process is aimed at the Project Board.
• The Project Board manages and monitors via reports and
  controls through a number of decision points.
Controlling a Stage (CS)
• Project Manager should stay on course and reacts to unexpected
  events
• Project Manager’s day-to-day management of the project
• Authorizing work to be done
• Gathering progress information about that work
• Watching for changes
• Reviewing the situation
• Reporting on Progress, Exception, Issue…
• Taking any necessary Corrective Action.
• This process covers these activities, together with the on-going work
  of risk management and change control.
Managing Product Delivery (MP)
 • Make sure the Work Package to the Team Manager is effectively
   authorised and agreed
 • Make sure the Work Package is conformed to the requirements
 • Assess Work Progress and Forecasts regularly
 • Ensure completed products meet quality criteria
 • Obtain approval for the completed products.
Managing a Stage Boundary (SB)
• Assure the Project Board that all deliverables planned in the current
  Stage Plan have been completed as defined
• Provide the information needed for the Project Board to assess the
  continuing viability of the project
• Provide the Project Board with information needed to approve the
  current stage’s completion and authorise the start of the next stage,
  together with its delegated tolerance level
• Record any measurements or lessons which can help later stages of
  this project and/or other projects.
Closing a Project (CP)
• Check the extent to which the objectives or aims set out in the Project
  Initiation Document (PID) have been met
• Confirm the extent of the fulfillment of the Project Initiation
  Document (PID) and the Customer’s satisfaction with the deliverables
• Obtain formal acceptance of the deliverables
• Ensure to what extent all expected products have been handed over
  and accepted by the Customer
• Confirm that maintenance and operation arrangements are in place
  (where appropriate)
• Make any recommendations for follow-on actions
• Capture lessons resulting from the project and complete the Lessons
  Learned Report
• Prepare an End Project Report
• Notify the host organisation of the intention to disband the project
  organisation and resources.
Thank You !

Contenu connexe

Tendances

Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101shailsood
 
John marinaro pm_process
John marinaro pm_processJohn marinaro pm_process
John marinaro pm_processNASAPMC
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication ManagementAhmad Maharma, PMP,RMP
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOKsundong
 
Bechtel project planning example
Bechtel project planning exampleBechtel project planning example
Bechtel project planning exampleasfandiyar
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management frameworkstefanhenry
 
5 pasos exitosos para menejo proyectos
5 pasos exitosos para menejo proyectos5 pasos exitosos para menejo proyectos
5 pasos exitosos para menejo proyectosduniat
 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overviewguokejing
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management DashboardsBob Prieto
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jimNASAPMC
 
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition   chapter 6 - Project Time Management Pmbok 4th edition   chapter 6 - Project Time Management
Pmbok 4th edition chapter 6 - Project Time Management Ahmad Maharma, PMP,RMP
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepComputer Aid, Inc
 
Program Mgmt Overview
Program Mgmt OverviewProgram Mgmt Overview
Program Mgmt Overviewsmcasas
 
e-Learning project initiation template
e-Learning project initiation templatee-Learning project initiation template
e-Learning project initiation templateSaffron Interactive
 
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition   chapter 11 - Project Risk ManagementPmbok 4th edition   chapter 11 - Project Risk Management
Pmbok 4th edition chapter 11 - Project Risk ManagementAhmad Maharma, PMP,RMP
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 

Tendances (20)

Best Practices Frameworks 101
Best Practices Frameworks 101Best Practices Frameworks 101
Best Practices Frameworks 101
 
John marinaro pm_process
John marinaro pm_processJohn marinaro pm_process
John marinaro pm_process
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication Management
 
T355
T355T355
T355
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOK
 
Bechtel project planning example
Bechtel project planning exampleBechtel project planning example
Bechtel project planning example
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management framework
 
Intro2 Pm
Intro2 PmIntro2 Pm
Intro2 Pm
 
5 pasos exitosos para menejo proyectos
5 pasos exitosos para menejo proyectos5 pasos exitosos para menejo proyectos
5 pasos exitosos para menejo proyectos
 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overview
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management Dashboards
 
Epm 2010
Epm 2010Epm 2010
Epm 2010
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jim
 
Pmbok 4th edition chapter 6 - Project Time Management
Pmbok 4th edition   chapter 6 - Project Time Management Pmbok 4th edition   chapter 6 - Project Time Management
Pmbok 4th edition chapter 6 - Project Time Management
 
Taking the Creep Out of Scope Creep
Taking the Creep Out of Scope CreepTaking the Creep Out of Scope Creep
Taking the Creep Out of Scope Creep
 
T355 p iweb
T355 p iwebT355 p iweb
T355 p iweb
 
Program Mgmt Overview
Program Mgmt OverviewProgram Mgmt Overview
Program Mgmt Overview
 
e-Learning project initiation template
e-Learning project initiation templatee-Learning project initiation template
e-Learning project initiation template
 
Pmbok 4th edition chapter 11 - Project Risk Management
Pmbok 4th edition   chapter 11 - Project Risk ManagementPmbok 4th edition   chapter 11 - Project Risk Management
Pmbok 4th edition chapter 11 - Project Risk Management
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 

En vedette

DBT_projektledning 2015 09-07
DBT_projektledning 2015 09-07DBT_projektledning 2015 09-07
DBT_projektledning 2015 09-07Jan Bidner
 
TC16_Fostering_a_Successful_Tableau_Deployment
TC16_Fostering_a_Successful_Tableau_DeploymentTC16_Fostering_a_Successful_Tableau_Deployment
TC16_Fostering_a_Successful_Tableau_DeploymentErin Gengo
 
Business Intelligence Project
Business Intelligence ProjectBusiness Intelligence Project
Business Intelligence Projectfgaragozlo
 
Relationship Between IP and a Business Plan
Relationship Between IP and a Business PlanRelationship Between IP and a Business Plan
Relationship Between IP and a Business PlanAkeem Famuyiwa
 
Tarifas macimas transporte interdepartamental
Tarifas macimas transporte interdepartamentalTarifas macimas transporte interdepartamental
Tarifas macimas transporte interdepartamentalErbol Digital
 
Business intelligence implementation case study
Business intelligence implementation case studyBusiness intelligence implementation case study
Business intelligence implementation case studyJennie Chen, CTP
 
Pillars of Product Management
Pillars of Product ManagementPillars of Product Management
Pillars of Product ManagementTom Burky MIExpE
 
7 startup business plan traps
7 startup business plan traps7 startup business plan traps
7 startup business plan trapsWilliam Keyser
 
Startup Business Plan: Keys to a Successful Launch
Startup Business Plan: Keys to a Successful Launch Startup Business Plan: Keys to a Successful Launch
Startup Business Plan: Keys to a Successful Launch BusinessPlanTemplate
 
Chapter 6 - business plan power point presentation 1
Chapter 6  - business plan power point presentation 1Chapter 6  - business plan power point presentation 1
Chapter 6 - business plan power point presentation 1gerbs1010
 
Business Plan Template
Business Plan TemplateBusiness Plan Template
Business Plan TemplateLotus Yon
 
Business project 1 - business plan slides
Business project 1 - business plan slidesBusiness project 1 - business plan slides
Business project 1 - business plan slidesSheng Zhe
 
Bus dev plan
Bus dev planBus dev plan
Bus dev planitaboogie
 
Business plan for startup business
Business plan for startup businessBusiness plan for startup business
Business plan for startup businessGuru Prasad
 
100 day digital marketing plan
100 day digital marketing plan100 day digital marketing plan
100 day digital marketing planWyatt Cavalier
 
The Business of APIs: Your 100-Day API Business Plan
The Business of APIs: Your 100-Day API Business PlanThe Business of APIs: Your 100-Day API Business Plan
The Business of APIs: Your 100-Day API Business PlanApigee | Google Cloud
 
Sample 1 business plan startup_company_hybridarch
Sample 1 business plan startup_company_hybridarchSample 1 business plan startup_company_hybridarch
Sample 1 business plan startup_company_hybridarchViva Vish
 

En vedette (20)

DBT_projektledning 2015 09-07
DBT_projektledning 2015 09-07DBT_projektledning 2015 09-07
DBT_projektledning 2015 09-07
 
TC16_Fostering_a_Successful_Tableau_Deployment
TC16_Fostering_a_Successful_Tableau_DeploymentTC16_Fostering_a_Successful_Tableau_Deployment
TC16_Fostering_a_Successful_Tableau_Deployment
 
Business Intelligence Project
Business Intelligence ProjectBusiness Intelligence Project
Business Intelligence Project
 
Relationship Between IP and a Business Plan
Relationship Between IP and a Business PlanRelationship Between IP and a Business Plan
Relationship Between IP and a Business Plan
 
Tarifas macimas transporte interdepartamental
Tarifas macimas transporte interdepartamentalTarifas macimas transporte interdepartamental
Tarifas macimas transporte interdepartamental
 
Business plan 100 mn$
Business  plan  100 mn$Business  plan  100 mn$
Business plan 100 mn$
 
Business intelligence implementation case study
Business intelligence implementation case studyBusiness intelligence implementation case study
Business intelligence implementation case study
 
Pillars of Product Management
Pillars of Product ManagementPillars of Product Management
Pillars of Product Management
 
7 startup business plan traps
7 startup business plan traps7 startup business plan traps
7 startup business plan traps
 
Startup Business Plan: Keys to a Successful Launch
Startup Business Plan: Keys to a Successful Launch Startup Business Plan: Keys to a Successful Launch
Startup Business Plan: Keys to a Successful Launch
 
Chapter 6 - business plan power point presentation 1
Chapter 6  - business plan power point presentation 1Chapter 6  - business plan power point presentation 1
Chapter 6 - business plan power point presentation 1
 
Business Plan Template
Business Plan TemplateBusiness Plan Template
Business Plan Template
 
Business project 1 - business plan slides
Business project 1 - business plan slidesBusiness project 1 - business plan slides
Business project 1 - business plan slides
 
Business plan 1
Business plan 1Business plan 1
Business plan 1
 
Bus dev plan
Bus dev planBus dev plan
Bus dev plan
 
Business plan for startup business
Business plan for startup businessBusiness plan for startup business
Business plan for startup business
 
Business Plan 3
Business Plan 3Business Plan 3
Business Plan 3
 
100 day digital marketing plan
100 day digital marketing plan100 day digital marketing plan
100 day digital marketing plan
 
The Business of APIs: Your 100-Day API Business Plan
The Business of APIs: Your 100-Day API Business PlanThe Business of APIs: Your 100-Day API Business Plan
The Business of APIs: Your 100-Day API Business Plan
 
Sample 1 business plan startup_company_hybridarch
Sample 1 business plan startup_company_hybridarchSample 1 business plan startup_company_hybridarch
Sample 1 business plan startup_company_hybridarch
 

Similaire à IM04 - BI Project Management

CSCP Project Management Procedures
CSCP Project Management ProceduresCSCP Project Management Procedures
CSCP Project Management ProceduresKaleb Mulat
 
Introduction to project management
Introduction to project management Introduction to project management
Introduction to project management ervissmakaj
 
Project management
Project managementProject management
Project managementSameer Kumar
 
Creating value from Software Development though Project management
Creating value from Software Development though Project managementCreating value from Software Development though Project management
Creating value from Software Development though Project managementCharles Muzonzini
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTJohn Macasio
 
Jiby\'s Resume
Jiby\'s ResumeJiby\'s Resume
Jiby\'s Resumejibymanuel
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9John Streit
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change AgentSoftServe
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPSoftServe
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adbTa Ngoc
 
Project management professional (PMP)
Project management professional (PMP)Project management professional (PMP)
Project management professional (PMP)Saad Al Jabri
 

Similaire à IM04 - BI Project Management (20)

CSCP Project Management Procedures
CSCP Project Management ProceduresCSCP Project Management Procedures
CSCP Project Management Procedures
 
Introduction to project management
Introduction to project management Introduction to project management
Introduction to project management
 
Project management
Project managementProject management
Project management
 
Creating value from Software Development though Project management
Creating value from Software Development though Project managementCreating value from Software Development though Project management
Creating value from Software Development though Project management
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
Jiby\'s Resume
Jiby\'s ResumeJiby\'s Resume
Jiby\'s Resume
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change Agent
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
 
Profile Meyyappan CV
Profile Meyyappan CVProfile Meyyappan CV
Profile Meyyappan CV
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
 
Project management professional (PMP)
Project management professional (PMP)Project management professional (PMP)
Project management professional (PMP)
 
bingsusu.pptx
bingsusu.pptxbingsusu.pptx
bingsusu.pptx
 
Pmo
PmoPmo
Pmo
 

Dernier

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 

Dernier (20)

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

IM04 - BI Project Management

  • 1. IM04: MANAGING BUSINESS INTELLIGENCE PROJECTS SUCCESSFUL Presented by Kelvin Chan
  • 2. Introduction • A PRINCE2 based Methodology • To read the book from the OGC publication “Managing Successful Projects with PRINCE2” which is officially published by TSO.
  • 3. Key Success Factors • Solid Requirements • Controlled Project Environment • Good Data Architect with Business Sense • Higher Degree of Delegated Powers given to Project Sponsor
  • 4. PRINCE2 project management method suggests that projects should be broken down into stages and these sub-processes dictate how each individual stage should be controlled.
  • 5. Project Methodology DP CS SU IP Project Team Organization SB CP Project Scope MP Project Plan Quality Management Strategy Risk Management Strategy Change Management Strategy Communication Management Strategy
  • 6. Project Processes SU IP DP Project Start-Up M IP SB CS DP Requirement P Analysis M SB CS DP Data Architecture P Development M SB CS DP Report P Development M SB CS DP Training and P Handover M CP CS DP P Project Closure
  • 7. Customized PRINCE2 7 Processes Start-Up a Project • During Pre-Sales Stage, we receive a Project Mandate on Scope and Requirements. We then conduct Proof-of-Concept • If the deal is closed, Project Plan, Project Approach, Project Brief should be prepared before IP SU Initiate a Project • Stage Plan, PID, Product Description should be prepared • Project Team Organization must be confirmed IP Direct a Project • Project Board Members (Project Sponsor, Senior Supplier, Senior User) should be accountable for this process • Participate in PSC Meeting DP • Make decision on all milestones and Stage Clearance Confirmation Control Project Stages • Project Manager should be accountable for this process CS • • Regular Highlight Report Exception Report • Issue Logging (Change, Risk or Concern…) • Define Work Package (Action Plan) for each Task within the Stage Manage Product Delivery • Team Manager should be accountable for this process M • Monitor and Execute the Work Package (Action Plan) until the required tasks are completed P • Decide Team Plan on completing the required Tasks Manage Stage Boundaries • Project Manager should be accountable for this process • End Stage Report must be prepared for Project Board ‘s approval (DP) SB Close a Project • End Project Report must be prepared by Project Manager for Project Board ‘s approval (DP) CP
  • 8. PM Processes vs Methodology • People tend to confuse Processes and Methodology. A set of Project Management Processes is not a Methodology. Methodology is about how to execute the Processes • PMI offers processes for project management. PRINCE2 from the UK offers a full methodology, with stage gates, work authorization forms, and so on. • Processes to me is a Toolbox. They consists of best practice inputs, outputs, and tools/techniques for the various elements of managing projects • Methodology is a basic foundation that enables Project Managers can easily apply on all related Projects
  • 9. Project Organization Top Management Project Senior Senior Project Senior User Board Supplier Technical Sponsor Project User Manager Assurance Team Manager Development Team Members
  • 10. Responsibilities of Project Board Be accountable Ensure Provide effective unified communicatio direction n Support the Duties & Delegate project Behaviours effectively manager Ensure Facilitate effective cross- decision- functional making integration Commit resources
  • 11. Responsibilities of Project Sponsor • The key responsibility associated with the Sponsor is making sure that the project remains focused toward its objectives, ultimately delivering the outputs (or products) necessary for generating the outcomes that will enable the expected benefits to be realized. As well as this, the Sponsor is responsible for assuring value for money on the project, by implementing an approach that is cost-conscious, weighing the demands of the business, user, and supplier against one another. This role is ultimately accountable for the success of the project and has the veto on any decision making.
  • 12. Responsibilities of Senior User • The ‘user’ stakeholder interest encompasses all who will operate, support and maintain the products that the project creates, as well as those who will use the project’s products to realize the expected benefits. The Senior User, who will usually be a high-level manager from the customer organization, is responsible for making sure that the needs of the users are clearly and fully defined, for committing user resources, liaising between the user and the project team, and ensuring that the outcome meets the users’ needs, conforming to the Business Case with regard to ease of use, functions, and quality requirements.
  • 13. Responsibilities of Senior Technical • Can commit Technical Resource that needed for BI Project Implementation • This role normally will be the IT Manager
  • 14. Responsibilities of Senior Supplier • It is vital that those who design, build and deliver the products requested by the user should also be represented on the Project Board. The Senior Supplier role has been defined to represent these groups. It is the Senior Supplier’s responsibility to ensure that products are delivered in conformance with the user’s specification, and the Senior Supplier must therefore have the authority to commit the required supplier resources to the project.
  • 15. Responsibilities of Project Manager • Is responsible for day-to-day management of the project and will delegate responsibility for the creation of products to the team manager or specialist team members themselves.
  • 16. Responsibilities of Team Manager • The Team Manager will perform the daily management of the team • Lead the Technical Team to implement solutions according to the requirements and the instructions of Project Manager • Provide Technical Solutions to Project Manager
  • 17. Steps to Actual Project Start
  • 19. PRINCE2 Processes By Definition
  • 20. Starting up a Project (SU) • It is a pre-project process that designed to ensure all pre-requisites for IP are in place. The process expects the existence of a Project Mandate which defines Project Scope, Requirements and Goals. Starting up a Project should be very short. • Appoint the Project Team • Create the Initiation Stage Plan.
  • 21. Initiating a Project (IP) • Agree whether or not there is sufficient justification to proceed with the project • Establish a Project Approach on which to proceed • Document and confirm that an acceptable Business Case exists for the project • Ensure a firm and accepted Foundation to the project prior to commencement of the work • Agree to the commitment of resources throughout each stage of the project • Enable and encourage the Project Board to take ownership of the project • Provide the baseline for the decision-making processes required during the project’s life • Ensure that the investment of time and effort required by the project is made wisely, taking account of the risks to the project
  • 22. Directing a Project (DP) • Directing a Project runs from the start-up of the project until its closure. • This process is aimed at the Project Board. • The Project Board manages and monitors via reports and controls through a number of decision points.
  • 23. Controlling a Stage (CS) • Project Manager should stay on course and reacts to unexpected events • Project Manager’s day-to-day management of the project • Authorizing work to be done • Gathering progress information about that work • Watching for changes • Reviewing the situation • Reporting on Progress, Exception, Issue… • Taking any necessary Corrective Action. • This process covers these activities, together with the on-going work of risk management and change control.
  • 24. Managing Product Delivery (MP) • Make sure the Work Package to the Team Manager is effectively authorised and agreed • Make sure the Work Package is conformed to the requirements • Assess Work Progress and Forecasts regularly • Ensure completed products meet quality criteria • Obtain approval for the completed products.
  • 25. Managing a Stage Boundary (SB) • Assure the Project Board that all deliverables planned in the current Stage Plan have been completed as defined • Provide the information needed for the Project Board to assess the continuing viability of the project • Provide the Project Board with information needed to approve the current stage’s completion and authorise the start of the next stage, together with its delegated tolerance level • Record any measurements or lessons which can help later stages of this project and/or other projects.
  • 26. Closing a Project (CP) • Check the extent to which the objectives or aims set out in the Project Initiation Document (PID) have been met • Confirm the extent of the fulfillment of the Project Initiation Document (PID) and the Customer’s satisfaction with the deliverables • Obtain formal acceptance of the deliverables • Ensure to what extent all expected products have been handed over and accepted by the Customer • Confirm that maintenance and operation arrangements are in place (where appropriate) • Make any recommendations for follow-on actions • Capture lessons resulting from the project and complete the Lessons Learned Report • Prepare an End Project Report • Notify the host organisation of the intention to disband the project organisation and resources.