AYAMAN RASHAD, WSL - KAMEL ELSAYED, WSDE
GULF OF SUEZ PETROLEUM Co. GUPCO
FOR THE FIRST TIME IN GUPCO
Coiled-Tubing Conveyed Perforation
Coiled-Tubing Conveyed Perforation
SAQQARA GS323-A1
SD RIG-141 TEAM
ON-SITE TEAM
Ayman Rashad, WSL
Mohamed Saeed, NWSL
Kamel Elsayed, WSDE
Hazem Mosaad, WSDE
Ahmed Elbohoty, DIST. ENG.
Mohamed Mohareb, CTU
Alaa Refaee, TCP
Mohamed Salah, WTL
Tarek Ahmed Ali, SOE
A. ELBELTAGY, CTU
A. SHAWKY, CTU
CAIRO TEAM
CONTENTS
1. Why CTCP
1. BHA Assembly
2. Firing Head
2. Job Preparation:
1. Acid Pickling For Ct
2. GR/CCL Correlation Run
3. Safe Handling procedures
4. Dummy Run
3. Shooting:
1. Procedures
2. Perforation Runs
3. Firing Charts
4. Lessons Learned – Depth Counter
1. Why : Coiled-Tubing Conveyed Perforation CTCP ?
THE CHALLENGE
GS323-A1 history:
- Clean-out the hole with Baker Taper mill / Motor assembly.
- Clean-out with Halliburton Coil-sweep® assembly.
- RIH w/ slick line … stopped @ 14,670 ft. (target perforating depth 14,800 ft.)
- RIH w/ E-line dummy gun … stopped @ 14,633 ft.
- Due to high angle (68° @ PBTD), It seems that the hole can’t get cleaned enough to run E-
line perforation.
- That’s where CTCP came into action … due to the snubbing capability of CT, that can push
the gun assy. To the required depth.
Conveying perforating guns to the zone of interest with coiled tubing has been effectively used
for many years in a variety of applications. Benefits include faster run-in times when compared
to conventional methods. And the guns can be detonated either with wireline or a pressure-
activated firing head. Some of the applications include:
Perforating in Underbalanced Conditions:
• Underbalanced Perforation allows increased flow from the formation, which helps clean the
perforations and helps reduce near-wellbore damage.
High Angle / Horizontal Well Perforating:
• Coiled tubing conveyed perforating could be deployed in horizontal portions of the well
where conventional methods of perforating are impractical or impossible.
Coiled Tubing Used as the Production String:
• The coiled tubing that conveys the perforating guns can also be used as the production
tubing after well completion.
1. Coiled-Tubing Conveyed Perforation CTCP Capabilities
1.1. CT BHA
1.1. Bottom Hole Assembly (BHA)
A standard coiled-tubing BHA consists of :
1. Coil Connector
2. Dual flapper check valves DFCV
3. Hydraulic disconnect mechanism
4. Circulating sub, with rupture disc
5. Equalizer sub with pressure bleed ports,
6. “Ball Drop Type” firing head
7. Perforating gun
1.1. Bottom Hole Assembly (BHA)
1. Coil Connector
• It is used for attaching a tool string to the end of the coiled tubing. When
installed correctly, provide strong sealed connection to the coiled tubing. a
fishing neck, utilize O-ring seals to seal off the coiled tubing in order to
maintain pressure integrity for the tool string (thread: CS-Hydril)
2. Dual flapper check valve
• It is normally run directly below the coiled tubing connector in CTU operations
and at the top of the BHA in snubbing operations.
• It is run as a well control measure to prevent wellbore pressure from entering
the work string.
• The Back Pressure Valve is a flapper type valve that allows flow down the
tubing, but stops flow coming back up the tubing.
• The Back Pressure Valve has two flappers and flapper seals.
1.1. Bottom Hole Assembly (BHA)
3. Hydraulic Disconnect
• Releases the tubing from other downhole tools run below. It is activated
by a ball and tubing pressure. The hydraulic disconnect is used as an
emergency safety joint.
• Another main application; the assembly allows mechanical packers, bridge
plugs, and tubing hangers to be run, set, and released from coiled tubing.
4. Circulating sub with Rupture disk
• is designed to allow a circulation path from tubing to annulus. it is a ball
actuated and is normally run below the hydraulic disconnect and above
the down hole motor.
• Pumping a ball which will shift the piston sleeve, exposing circulation
ports (depending on number of shear pins and rating).
• Rupture disk : when the bottom hole assembly becomes plugged,
increased pressure from the surface will rupture the disc and allow
circulation of an actuation ball. (rupture disk up to 5,000 Psi)
1.1. Bottom Hole Assembly (BHA)
5. Equalizer sub with pressure bleed ports,
• Vented cross-over
• Normally the vent is too small that can allow
building-up pressure against ball seat and shear it.
• BUT
• In case the gun didn’t fire after dropping the firing
ball and had to POH to surface without firing, then
there will be trapped pressure inside the coil and the
ball seat can shear any time now, this vent works to
vent the trapped pressure slowly to avoid miss fire at
surface.
1.1. Bottom Hole Assembly (BHA)
It’s all about the firing head
1.2. Firing head
1.2. Firing Head
The Hydraulic-Actuator Firing (HAF) Head is a pressure-balanced tool that automatically fills the
tubing string while it is running in the well. A stainless steel (or Ceramic) ball is dropped from
the surface and circulated into position. Pressure applied to the tubing string actuates the HAF.
Operation
A stainless steel (or Ceramic) ball is dropped from the surface or is circulated downhole into the
hammer piston. Pressure applied to the tubing string shears the retaining pins and forces the
hammer piston into the firing pin. The firing pin detonates the initiator, which starts the
detonation of the perforating assembly. Circulation is regained as soon as the firing pin has
been sheared.
Features and Benefits:
• Allows packerless completions
• Makes actuation easily observable
• Is useful in coiled tubing-conveyed completions, deviated wells, and through-tubing
perforation
• Is reusable
The type used for GS323-A1 job
Circulating Ports
Hammer
Ball Seat
Firing Pin
HTI
High Temperature
Initiator
PAI: Polymer
Alignment Insert
Prima
Chord
BDB
Firing ball
(Ceramic/steel)
1.2. Firing Head
BDB
5/8” Ceramic Firing Ball
Circulating Port
Ball seat Shear
pins
Shear pin for
hammer
O-ring
O-ring
1.2. Firing Head : Ball Seat
Alignment pin
(NOT to be
sheared)
Alignment pin
(to be sheared)
Alignment groove
1.2. Firing Head : Firing Pin
All this part needs
to be equalized
1.2. Firing Head : Relief Ports
Relief Ports
These many ports serve as
relief/equalize in the area
between the hammer and the
firing pin … as if there is any
trapped pressure in this area, will
slow the hammer and thus firing
power will NOT be transmitted
completely to the firing pin …
which may not be enough to
shear the firing pin .. Causing miss
fire.
1.2. Firing Head : Circulating ports
After shooting, the ball seat
moves down and reopens the
circulating ports and circulation
is regained.
This is the most reliable
indication for successful firing.
Circulating Ports
FIRING HEAD CONNECTOR TO GUN
PAI: POLYMER
ALIGNMENT INSERT
1.2. Firing Head : Bi-directional Booster
BDB : Bi-directional
Booster
ACMI XO between Gun and Firing Head with O-rings to
prevent fluids from entering the gun
Firing Head
2. JOB PREPARATION
2.1. ACID PICKLING
Acid pickling:
• Is used to clean-up the inside of coiled-tubing.
• It removes mud/gel, rust, scale, and any grease from the ID of the tubing.
• pumping of acid and/or proppant will loosen debris from walls of tube, and will sweep the
materials out of the coil (take return to production header).
• Protecting the firing head mechanism from any malfunction or miss-fire.
• Also prevent sweeping this scale into the perforations, creating severe impairment for
production.
Recipe:
• Fresh water
• Acid 31.5%
• Fe1A Acetic acid
• Fe-2 Cetric acid
• HAIOS - corrosion inhibitor
You’re going to need:
• Raw HCL acid (31.5% conc.)
• Acid mixing tank (30 bbl. cap.)
• Diaphragm pump (for mixing)
• Pump rubber goods must be able to tolerate acid.
Acid mixing tank
(mixing by circulating from the tank
and to it again, not with hopper)
Raw Acid tank
2.1. ACID PICKLING
2.2. SET-CORE GR/CCL CORRELATION RUN
MU SETCORE GR/CCl BHA as follows:
• 2.25" COIL CONNECTOR.
• 2.25" DFCV.
• 2.25" HYDRAULIC DISCONNECT.
• X-OVER (1-1/4" CS HYDRIL BOX x 1" CS HYDRIL PIN)
• 1.75" CIRC SUB.
• X-OVER (1" CS HYDRIL BOX x 1-11/16" SUCKER ROD BOX)
• 1.69" BATTERY HOUSING.
• 1.69" MPL
• 1.69" CCL.
• 1.69" GR.
• 1.69" PULL PLUG
• Measure and report BHA before RIH
• SETCORE GR/CCL is a Memory recording device, it doesn’t send data real time to surface.
• It records using downhole battery so it shouldn’t be connected until about to RIH (battery 23
HRs working time).
• SETCORE has its own digital depth counter, which is connected on CT depth wheel, and CT
reads only the manual / mechanical depth readings.
• SETCORE GR/CCL doesn’t have an ID to circulate through, so there should be a circulating
sub on top of it.
2.2. SET-CORE GR/CCL CORRELATION RUN
Battery
CCL
GR
Memory
XO
2.2. SET-CORE GR/CCL CORRELATION RUN
CT digital counter
CT mechanical
counter
SETCORE
digital counter
2.2. SET-CORE GR/CCL CORRELATION RUN
Procedures:
• RIH, Stop while RIH @ 1,000 ft. for 5 min and @ 2,000 ft. for 5 min as per SETCORE
recommendations
• RIH, stop while RIH @ marker pup joints, flag coil
• RIH, stop while RIH GR peaks, flag coil
• RIH with CT till wet tag BTM, flag coil
• POH 50 ft. and confirm tag again and flag coil
• POH to surface (check coil flag depths while POH)
Notes:
• For any flag … be sure string under tension
• Circ. through string while @ 0.25-0.5 BPM
• Stop at pup joints top depths and GR peaks & flag coil while string under tension (as
marks for correlation).
• Don’t exceed 50 fpm running speed (reduce speed at any expected obstruction” SSSV, X/O,
GLM’s, nipples, … etc.)
• Check WT each 1000 ft. (PU at least 25 / 50 ft. to establish good readings. Record pickup and
slack off weights vs. depth)
• Do not exceed 1000 lb. slack of weight at any time.
Securing the gun with Nylon
slings and two long tag lines, lift
same towards RF.
1
Make up Hall 2” safety clamp
below dummy firing head in the
specified place as per Hall rep.
instructions
Install air tagger wire below
safety clamp and start PU assy.
inside V door with tandem lifting
technique (lifting plan, one
banks man, clear communication
between driller, crane operator)
to get assy. in vertical position
using air tagger
2
2.3. Handling procedures
Firing Pin
Dummy Firing Head
“Used here as
protector only”
C-plate
4-1/16” 10K flange
(Halliburton CT riser)
Land it smoothly on the
Hall. CT flange &
Remove the wire sling.
DON’T
Don’t forget to change the
ring gasket of CTU flange
before landing the gun.
4-1/16” 10K flange > BX155
3
Wire sling
Remove the dummy firing
head, install the active one,
connect same to CT by with
pipe wrench to connect
same to coil, PU gun assy.,
release safety clamp
4
Coiled-Tubing
Firing head
GUN
C-plate
Close CT flange, pressure
test riser to 500 PSI only for
10 Minutes ( to avoid
shearing ball seat by
mistake), normally pressure
test riser to 3,000 Psi
5
After test in OK, open swab,
LMV & wing manual valves.
Use hand pump to open
UMV, SSSV & wing valves.
6
• P/U dummy string as explained before.
• Make pressure tests as usual
• Wash down W/ min rate (0.5 BPM / 600 PSI which come first) till tag bottom @ 14840 ft
ORKB (60 fpm), observe return and confirm well is full through sample point.
• Correlate coil depth according to last run with GR-CCL.
• POH to surface (70 fpm) w/ pump out w/ min rate (0.5 bpm).
2.4. Dummy Run
3. SHOOTING
PROCEDURES :
• L/D Dummy Run assy.
• Flush coil with 5/8” ceramic ball.
• PU & MU TCP live gun assy. #1 as explained before.
• Pressure test pump lines/reel/hook up connection against tree swab valve to 500 psi for 10
min with water, bleed off to zero (500 Psi only to avoid accidentally activating the firing head)
• Pressure test DFCV to 500 psi for 10 min, bleed off to zero, open tree swab valve and LMV.
• Wash down W/ min rate (0.5 BPM, 500 Psi which comes first, 40 fpm max, monitor pressure)
till gun in depth.
• Confirm gun in depth / check flag marks / set core GR/CCL correlation and string under
tension
• Record wellhead pressure and PU WT before firing.
• Confirm circ. free before drop ball.
• Drop 5/8” ceramic ball from coil Tbg reel port.
• Pump ball with maximum 500 Psi until land ball in place.
• Raise up pressure on stages to 3000 psi to activate firing head and monitor firing indications.
3.1. Perforation Runs
FIRING INDICATIONS:
1. Sudden pressure drop from 3000 psi to normal circulating pressure.
2. Instantaneous change in WT on martin decker.
3. Instantaneous increase in well head pressure.
4. Return will stop when ball in place, then back again once firing where ball opened
circulating path again.
5. Possible sound indication.
6. Possible oil in return.
• POH while pump out to surface (0.5 BPM, 40 fpm max, monitor pressure & confirm full
return) .
• Confirm BHA above tree, Close tree vertical valves.
• Bleed off pressure in riser to zero (on 100 psi stages, coil tbg pressure must be monitored
to ensure it is also being bleed off simultaneously with the riser pressure).
• Disconnect BOP, confirm gun is 100% fired or not.
• L/D TCP live gun assy #1.
3.1. Perforation Runs
• In Case the pressure in the CT does not bleed off simultaneously with the riser
• the guns must be run back to perforating depth and the CT pressure must be increased
until circulation is regained, either by the guns firing or bursting the rupture disc in motor
head assembly.
• Once circulation has been regained then a ball should be pumped down to open the
circulating sleeve in the motor assembly to increase the flow area before starting out of
hole.
• If it becomes necessary to run back to bottom and circulation cannot be established
between CT and annulus the operation should be halted until a path forward is agreed
upon by the customer and Halliburton management. TCP Global advisor should be
contacted immediately.
Contingency plan
• Safety Precautions for POOH:
• Circulation between the CT and annulus must be established and verified by TCP Eng. And
CT supervisor.
• While POOH and every 1000 ft. the coil must be stopped and circulation between the CT
and the annulus must be re-established and verified.
• At 200 ft. below surface circulation between the CT and the annulus must be re-
established and verified.
• when guns reached at surface in the riser and after closing the x-mass tree
• All personal should be cleared from within a 100 ft. radius from riser.
• To ensure there is no trapped pressure above firing head, the coil pressure should be
bleed off through the annulus. Begin bleeding the pressure in riser off slowly in
increments of 100 psi. the CT pressure must be monitored to ensure it is also being bleed
off simultaneously with the riser pressure.
Contingency plan
Guns sent to rig
Pressure profile for HAFH Jobs.
• When pumping down a ball to activate a HAFH, different pressure profiles may occur
depending upon many parameters including the sequence of the pumping operation and
the type of fluid being pumped.
• If the fluid being used to pump a ball down - hole is a liquid the expected pressure profile
should be similar to the diagram below
ACTUAL : 1st Firing Run
ACTUAL : 2nd Firing Run
Fired gun
After
Before
Gun swelling at shots positions
Issue #1
• RIH w/ SETCORE GR-CCL to 80 ft., found HALL mechanical depth counter & SETCORE
digital depth Encoder not reading, POH to surface, found SETCORE digital depth
encoder setting bolts touch Hall mechanical wheels stopping them from move, Re-
adjust bolts, all ok, POH to surface to re zero Depth counter.
Conclusion: before RIH, make sure that depth counter wheel is free to rotate without any
obstacle.
Issue #2
• RIH w/ SETCORE GR/CCL on coil Tbg, had tag w/ 1,000 lb. @ 13,456 ft. ORKB (1,384
ft. shallower than expected PBTD @ 14,840 FT ORKB based on depth counter)
• Download SETCORE logging data, correlate depth Using GR-CCL log dated mar, 30,
2010, correlated Tag depth @ 14,890 ft ORKB > Tag is confirmed correctly.
• Check OD of wheels for both counters, found Changed counter OD (4.17") and
installed counter OD (3.82")
Conclusion: make sure that depth counter wheel is of standard dimensions.
4. Lessons learned : Depth counter Issues
Counter wheel … make sure this is of
standard size and is completely free to rotate
4. Lessons learned : Depth counter Issues
• Best Practices for Hydraulic Actuator Firing Head Global Distribution Rev IADC
• Halliburton Perforating_Solutions_catalog
• coiled tubing- admarine 2
• PARADIGM® INDUSTRIES
References
KAMEL ELSAYED
DRILLING ENGINEER
SD RIG-141 TEAM
KAMELS@GUPCO.NET
0122 910 2341
THANKS FOR YOUR TIME
DON’T HESITATE TO CONTACT FOT ANY QUESTIONS
AYMAN RASHAD
WELLSITE LEADER
SD RIG-141 TEAM
RASHADAA@GUPCO.NET
010 65 717 313

More Related Content

What's hot

3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)Mubarik Rao
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssdElsayed Amer
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellheadElsayed Amer
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technologyakpp01
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentationamrhaggag
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1Elsayed Amer
 
Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)majeed talal
 
140717 artificial lift
140717 artificial lift140717 artificial lift
140717 artificial liftAli Okasha
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_PresentationMuhammad Hassaan
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well ControlM.T.H Group
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1Elsayed Amer
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a WellFarida Ismayilova
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 

What's hot (20)

3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Tubing string
Tubing stringTubing string
Tubing string
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technology
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
 
Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)
 
140717 artificial lift
140717 artificial lift140717 artificial lift
140717 artificial lift
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Well test-procedures-manual
Well test-procedures-manualWell test-procedures-manual
Well test-procedures-manual
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 

Viewers also liked

02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementingKamel Elsayed
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationJames Craig
 
Tech drilling-coil tubing
Tech drilling-coil tubingTech drilling-coil tubing
Tech drilling-coil tubingTito Pétro Fac
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...tmhsweb
 
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo Petroleum
 
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...HPHT Wells Summit
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkAbdul Rahim
 
1252 program
1252 program1252 program
1252 programDao Tuan
 
summer presentation (Sultan)
summer presentation (Sultan)summer presentation (Sultan)
summer presentation (Sultan)sultan bamukhair
 
Move one rig movement presentation
Move one rig movement presentationMove one rig movement presentation
Move one rig movement presentationMove One
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT OperationsHPHT Wells Summit
 

Viewers also liked (20)

02 wireline
02 wireline02 wireline
02 wireline
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 
Tech drilling-coil tubing
Tech drilling-coil tubingTech drilling-coil tubing
Tech drilling-coil tubing
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
Resume
ResumeResume
Resume
 
OFS1
OFS1OFS1
OFS1
 
ADN-ECO
ADN-ECOADN-ECO
ADN-ECO
 
Alaa Osama CV
Alaa Osama CVAlaa Osama CV
Alaa Osama CV
 
CV TMM
CV TMMCV TMM
CV TMM
 
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
 
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well &...
 
Well head replacement
Well head replacementWell head replacement
Well head replacement
 
Rig 106
Rig 106Rig 106
Rig 106
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-Link
 
1252 program
1252 program1252 program
1252 program
 
summer presentation (Sultan)
summer presentation (Sultan)summer presentation (Sultan)
summer presentation (Sultan)
 
Move one rig movement presentation
Move one rig movement presentationMove one rig movement presentation
Move one rig movement presentation
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
Challenges in rig moving by captain zarir irani
Challenges in rig moving by captain zarir iraniChallenges in rig moving by captain zarir irani
Challenges in rig moving by captain zarir irani
 

Similar to Coiled Tubing Conveyed Perforations

Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptxHayder Al Ali
 
Best practices day one pm new
Best practices day one pm newBest practices day one pm new
Best practices day one pm newAhmed Radwan
 
2d poster about coring procedure
2d poster about coring procedure2d poster about coring procedure
2d poster about coring procedureDr. Arzu Javadova
 
Drill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly DesignDrill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly Designrahul827662
 
driling lecture 3.pdf
driling lecture 3.pdfdriling lecture 3.pdf
driling lecture 3.pdfnasastore
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptssuserea7ebc
 
Fundamentals of mechanical seals
Fundamentals of mechanical sealsFundamentals of mechanical seals
Fundamentals of mechanical sealsPrem Baboo
 
Product Manual_EasyTank_February24 (1).pdf
Product Manual_EasyTank_February24 (1).pdfProduct Manual_EasyTank_February24 (1).pdf
Product Manual_EasyTank_February24 (1).pdfjohnhackwood1
 
Report steffones
Report steffonesReport steffones
Report steffonesSteffones K
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdfDrilling Manual
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007yudi05
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Ramez Abdalla, M.Sc
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 

Similar to Coiled Tubing Conveyed Perforations (20)

Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
Best practices day one pm new
Best practices day one pm newBest practices day one pm new
Best practices day one pm new
 
BOP
BOPBOP
BOP
 
2d poster about coring procedure
2d poster about coring procedure2d poster about coring procedure
2d poster about coring procedure
 
Drill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly DesignDrill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly Design
 
Wen_Design.ppt
Wen_Design.pptWen_Design.ppt
Wen_Design.ppt
 
driling lecture 3.pdf
driling lecture 3.pdfdriling lecture 3.pdf
driling lecture 3.pdf
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
Fundamentals of mechanical seals
Fundamentals of mechanical sealsFundamentals of mechanical seals
Fundamentals of mechanical seals
 
Product Manual_EasyTank_February24 (1).pdf
Product Manual_EasyTank_February24 (1).pdfProduct Manual_EasyTank_February24 (1).pdf
Product Manual_EasyTank_February24 (1).pdf
 
8vo ingles
8vo ingles8vo ingles
8vo ingles
 
Report steffones
Report steffonesReport steffones
Report steffones
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
 
Pump_IOM_N1.pptx
Pump_IOM_N1.pptxPump_IOM_N1.pptx
Pump_IOM_N1.pptx
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 

Coiled Tubing Conveyed Perforations

  • 1. AYAMAN RASHAD, WSL - KAMEL ELSAYED, WSDE GULF OF SUEZ PETROLEUM Co. GUPCO FOR THE FIRST TIME IN GUPCO Coiled-Tubing Conveyed Perforation
  • 2. Coiled-Tubing Conveyed Perforation SAQQARA GS323-A1 SD RIG-141 TEAM ON-SITE TEAM Ayman Rashad, WSL Mohamed Saeed, NWSL Kamel Elsayed, WSDE Hazem Mosaad, WSDE Ahmed Elbohoty, DIST. ENG. Mohamed Mohareb, CTU Alaa Refaee, TCP Mohamed Salah, WTL Tarek Ahmed Ali, SOE A. ELBELTAGY, CTU A. SHAWKY, CTU CAIRO TEAM
  • 3. CONTENTS 1. Why CTCP 1. BHA Assembly 2. Firing Head 2. Job Preparation: 1. Acid Pickling For Ct 2. GR/CCL Correlation Run 3. Safe Handling procedures 4. Dummy Run 3. Shooting: 1. Procedures 2. Perforation Runs 3. Firing Charts 4. Lessons Learned – Depth Counter
  • 4. 1. Why : Coiled-Tubing Conveyed Perforation CTCP ? THE CHALLENGE GS323-A1 history: - Clean-out the hole with Baker Taper mill / Motor assembly. - Clean-out with Halliburton Coil-sweep® assembly. - RIH w/ slick line … stopped @ 14,670 ft. (target perforating depth 14,800 ft.) - RIH w/ E-line dummy gun … stopped @ 14,633 ft. - Due to high angle (68° @ PBTD), It seems that the hole can’t get cleaned enough to run E- line perforation. - That’s where CTCP came into action … due to the snubbing capability of CT, that can push the gun assy. To the required depth.
  • 5. Conveying perforating guns to the zone of interest with coiled tubing has been effectively used for many years in a variety of applications. Benefits include faster run-in times when compared to conventional methods. And the guns can be detonated either with wireline or a pressure- activated firing head. Some of the applications include: Perforating in Underbalanced Conditions: • Underbalanced Perforation allows increased flow from the formation, which helps clean the perforations and helps reduce near-wellbore damage. High Angle / Horizontal Well Perforating: • Coiled tubing conveyed perforating could be deployed in horizontal portions of the well where conventional methods of perforating are impractical or impossible. Coiled Tubing Used as the Production String: • The coiled tubing that conveys the perforating guns can also be used as the production tubing after well completion. 1. Coiled-Tubing Conveyed Perforation CTCP Capabilities
  • 7. 1.1. Bottom Hole Assembly (BHA) A standard coiled-tubing BHA consists of : 1. Coil Connector 2. Dual flapper check valves DFCV 3. Hydraulic disconnect mechanism 4. Circulating sub, with rupture disc 5. Equalizer sub with pressure bleed ports, 6. “Ball Drop Type” firing head 7. Perforating gun
  • 8. 1.1. Bottom Hole Assembly (BHA)
  • 9. 1. Coil Connector • It is used for attaching a tool string to the end of the coiled tubing. When installed correctly, provide strong sealed connection to the coiled tubing. a fishing neck, utilize O-ring seals to seal off the coiled tubing in order to maintain pressure integrity for the tool string (thread: CS-Hydril) 2. Dual flapper check valve • It is normally run directly below the coiled tubing connector in CTU operations and at the top of the BHA in snubbing operations. • It is run as a well control measure to prevent wellbore pressure from entering the work string. • The Back Pressure Valve is a flapper type valve that allows flow down the tubing, but stops flow coming back up the tubing. • The Back Pressure Valve has two flappers and flapper seals. 1.1. Bottom Hole Assembly (BHA)
  • 10. 3. Hydraulic Disconnect • Releases the tubing from other downhole tools run below. It is activated by a ball and tubing pressure. The hydraulic disconnect is used as an emergency safety joint. • Another main application; the assembly allows mechanical packers, bridge plugs, and tubing hangers to be run, set, and released from coiled tubing. 4. Circulating sub with Rupture disk • is designed to allow a circulation path from tubing to annulus. it is a ball actuated and is normally run below the hydraulic disconnect and above the down hole motor. • Pumping a ball which will shift the piston sleeve, exposing circulation ports (depending on number of shear pins and rating). • Rupture disk : when the bottom hole assembly becomes plugged, increased pressure from the surface will rupture the disc and allow circulation of an actuation ball. (rupture disk up to 5,000 Psi) 1.1. Bottom Hole Assembly (BHA)
  • 11. 5. Equalizer sub with pressure bleed ports, • Vented cross-over • Normally the vent is too small that can allow building-up pressure against ball seat and shear it. • BUT • In case the gun didn’t fire after dropping the firing ball and had to POH to surface without firing, then there will be trapped pressure inside the coil and the ball seat can shear any time now, this vent works to vent the trapped pressure slowly to avoid miss fire at surface. 1.1. Bottom Hole Assembly (BHA)
  • 12. It’s all about the firing head 1.2. Firing head
  • 13. 1.2. Firing Head The Hydraulic-Actuator Firing (HAF) Head is a pressure-balanced tool that automatically fills the tubing string while it is running in the well. A stainless steel (or Ceramic) ball is dropped from the surface and circulated into position. Pressure applied to the tubing string actuates the HAF. Operation A stainless steel (or Ceramic) ball is dropped from the surface or is circulated downhole into the hammer piston. Pressure applied to the tubing string shears the retaining pins and forces the hammer piston into the firing pin. The firing pin detonates the initiator, which starts the detonation of the perforating assembly. Circulation is regained as soon as the firing pin has been sheared. Features and Benefits: • Allows packerless completions • Makes actuation easily observable • Is useful in coiled tubing-conveyed completions, deviated wells, and through-tubing perforation • Is reusable
  • 14. The type used for GS323-A1 job
  • 15. Circulating Ports Hammer Ball Seat Firing Pin HTI High Temperature Initiator PAI: Polymer Alignment Insert Prima Chord BDB Firing ball (Ceramic/steel) 1.2. Firing Head BDB
  • 16. 5/8” Ceramic Firing Ball Circulating Port Ball seat Shear pins Shear pin for hammer O-ring O-ring 1.2. Firing Head : Ball Seat
  • 17. Alignment pin (NOT to be sheared) Alignment pin (to be sheared) Alignment groove 1.2. Firing Head : Firing Pin
  • 18. All this part needs to be equalized 1.2. Firing Head : Relief Ports Relief Ports These many ports serve as relief/equalize in the area between the hammer and the firing pin … as if there is any trapped pressure in this area, will slow the hammer and thus firing power will NOT be transmitted completely to the firing pin … which may not be enough to shear the firing pin .. Causing miss fire.
  • 19. 1.2. Firing Head : Circulating ports After shooting, the ball seat moves down and reopens the circulating ports and circulation is regained. This is the most reliable indication for successful firing. Circulating Ports
  • 20. FIRING HEAD CONNECTOR TO GUN PAI: POLYMER ALIGNMENT INSERT 1.2. Firing Head : Bi-directional Booster BDB : Bi-directional Booster
  • 21. ACMI XO between Gun and Firing Head with O-rings to prevent fluids from entering the gun Firing Head
  • 23. 2.1. ACID PICKLING Acid pickling: • Is used to clean-up the inside of coiled-tubing. • It removes mud/gel, rust, scale, and any grease from the ID of the tubing. • pumping of acid and/or proppant will loosen debris from walls of tube, and will sweep the materials out of the coil (take return to production header). • Protecting the firing head mechanism from any malfunction or miss-fire. • Also prevent sweeping this scale into the perforations, creating severe impairment for production. Recipe: • Fresh water • Acid 31.5% • Fe1A Acetic acid • Fe-2 Cetric acid • HAIOS - corrosion inhibitor You’re going to need: • Raw HCL acid (31.5% conc.) • Acid mixing tank (30 bbl. cap.) • Diaphragm pump (for mixing) • Pump rubber goods must be able to tolerate acid.
  • 24. Acid mixing tank (mixing by circulating from the tank and to it again, not with hopper) Raw Acid tank 2.1. ACID PICKLING
  • 25. 2.2. SET-CORE GR/CCL CORRELATION RUN MU SETCORE GR/CCl BHA as follows: • 2.25" COIL CONNECTOR. • 2.25" DFCV. • 2.25" HYDRAULIC DISCONNECT. • X-OVER (1-1/4" CS HYDRIL BOX x 1" CS HYDRIL PIN) • 1.75" CIRC SUB. • X-OVER (1" CS HYDRIL BOX x 1-11/16" SUCKER ROD BOX) • 1.69" BATTERY HOUSING. • 1.69" MPL • 1.69" CCL. • 1.69" GR. • 1.69" PULL PLUG • Measure and report BHA before RIH • SETCORE GR/CCL is a Memory recording device, it doesn’t send data real time to surface. • It records using downhole battery so it shouldn’t be connected until about to RIH (battery 23 HRs working time). • SETCORE has its own digital depth counter, which is connected on CT depth wheel, and CT reads only the manual / mechanical depth readings. • SETCORE GR/CCL doesn’t have an ID to circulate through, so there should be a circulating sub on top of it.
  • 26. 2.2. SET-CORE GR/CCL CORRELATION RUN Battery CCL GR Memory XO
  • 27. 2.2. SET-CORE GR/CCL CORRELATION RUN CT digital counter CT mechanical counter SETCORE digital counter
  • 28. 2.2. SET-CORE GR/CCL CORRELATION RUN Procedures: • RIH, Stop while RIH @ 1,000 ft. for 5 min and @ 2,000 ft. for 5 min as per SETCORE recommendations • RIH, stop while RIH @ marker pup joints, flag coil • RIH, stop while RIH GR peaks, flag coil • RIH with CT till wet tag BTM, flag coil • POH 50 ft. and confirm tag again and flag coil • POH to surface (check coil flag depths while POH) Notes: • For any flag … be sure string under tension • Circ. through string while @ 0.25-0.5 BPM • Stop at pup joints top depths and GR peaks & flag coil while string under tension (as marks for correlation). • Don’t exceed 50 fpm running speed (reduce speed at any expected obstruction” SSSV, X/O, GLM’s, nipples, … etc.) • Check WT each 1000 ft. (PU at least 25 / 50 ft. to establish good readings. Record pickup and slack off weights vs. depth) • Do not exceed 1000 lb. slack of weight at any time.
  • 29. Securing the gun with Nylon slings and two long tag lines, lift same towards RF. 1 Make up Hall 2” safety clamp below dummy firing head in the specified place as per Hall rep. instructions Install air tagger wire below safety clamp and start PU assy. inside V door with tandem lifting technique (lifting plan, one banks man, clear communication between driller, crane operator) to get assy. in vertical position using air tagger 2 2.3. Handling procedures
  • 30. Firing Pin Dummy Firing Head “Used here as protector only” C-plate 4-1/16” 10K flange (Halliburton CT riser) Land it smoothly on the Hall. CT flange & Remove the wire sling. DON’T Don’t forget to change the ring gasket of CTU flange before landing the gun. 4-1/16” 10K flange > BX155 3 Wire sling
  • 31. Remove the dummy firing head, install the active one, connect same to CT by with pipe wrench to connect same to coil, PU gun assy., release safety clamp 4 Coiled-Tubing Firing head GUN C-plate Close CT flange, pressure test riser to 500 PSI only for 10 Minutes ( to avoid shearing ball seat by mistake), normally pressure test riser to 3,000 Psi 5 After test in OK, open swab, LMV & wing manual valves. Use hand pump to open UMV, SSSV & wing valves. 6
  • 32. • P/U dummy string as explained before. • Make pressure tests as usual • Wash down W/ min rate (0.5 BPM / 600 PSI which come first) till tag bottom @ 14840 ft ORKB (60 fpm), observe return and confirm well is full through sample point. • Correlate coil depth according to last run with GR-CCL. • POH to surface (70 fpm) w/ pump out w/ min rate (0.5 bpm). 2.4. Dummy Run
  • 33.
  • 35. PROCEDURES : • L/D Dummy Run assy. • Flush coil with 5/8” ceramic ball. • PU & MU TCP live gun assy. #1 as explained before. • Pressure test pump lines/reel/hook up connection against tree swab valve to 500 psi for 10 min with water, bleed off to zero (500 Psi only to avoid accidentally activating the firing head) • Pressure test DFCV to 500 psi for 10 min, bleed off to zero, open tree swab valve and LMV. • Wash down W/ min rate (0.5 BPM, 500 Psi which comes first, 40 fpm max, monitor pressure) till gun in depth. • Confirm gun in depth / check flag marks / set core GR/CCL correlation and string under tension • Record wellhead pressure and PU WT before firing. • Confirm circ. free before drop ball. • Drop 5/8” ceramic ball from coil Tbg reel port. • Pump ball with maximum 500 Psi until land ball in place. • Raise up pressure on stages to 3000 psi to activate firing head and monitor firing indications. 3.1. Perforation Runs
  • 36. FIRING INDICATIONS: 1. Sudden pressure drop from 3000 psi to normal circulating pressure. 2. Instantaneous change in WT on martin decker. 3. Instantaneous increase in well head pressure. 4. Return will stop when ball in place, then back again once firing where ball opened circulating path again. 5. Possible sound indication. 6. Possible oil in return. • POH while pump out to surface (0.5 BPM, 40 fpm max, monitor pressure & confirm full return) . • Confirm BHA above tree, Close tree vertical valves. • Bleed off pressure in riser to zero (on 100 psi stages, coil tbg pressure must be monitored to ensure it is also being bleed off simultaneously with the riser pressure). • Disconnect BOP, confirm gun is 100% fired or not. • L/D TCP live gun assy #1. 3.1. Perforation Runs
  • 37. • In Case the pressure in the CT does not bleed off simultaneously with the riser • the guns must be run back to perforating depth and the CT pressure must be increased until circulation is regained, either by the guns firing or bursting the rupture disc in motor head assembly. • Once circulation has been regained then a ball should be pumped down to open the circulating sleeve in the motor assembly to increase the flow area before starting out of hole. • If it becomes necessary to run back to bottom and circulation cannot be established between CT and annulus the operation should be halted until a path forward is agreed upon by the customer and Halliburton management. TCP Global advisor should be contacted immediately. Contingency plan
  • 38. • Safety Precautions for POOH: • Circulation between the CT and annulus must be established and verified by TCP Eng. And CT supervisor. • While POOH and every 1000 ft. the coil must be stopped and circulation between the CT and the annulus must be re-established and verified. • At 200 ft. below surface circulation between the CT and the annulus must be re- established and verified. • when guns reached at surface in the riser and after closing the x-mass tree • All personal should be cleared from within a 100 ft. radius from riser. • To ensure there is no trapped pressure above firing head, the coil pressure should be bleed off through the annulus. Begin bleeding the pressure in riser off slowly in increments of 100 psi. the CT pressure must be monitored to ensure it is also being bleed off simultaneously with the riser pressure. Contingency plan
  • 40.
  • 41.
  • 42. Pressure profile for HAFH Jobs. • When pumping down a ball to activate a HAFH, different pressure profiles may occur depending upon many parameters including the sequence of the pumping operation and the type of fluid being pumped. • If the fluid being used to pump a ball down - hole is a liquid the expected pressure profile should be similar to the diagram below
  • 43. ACTUAL : 1st Firing Run
  • 44. ACTUAL : 2nd Firing Run
  • 46. Issue #1 • RIH w/ SETCORE GR-CCL to 80 ft., found HALL mechanical depth counter & SETCORE digital depth Encoder not reading, POH to surface, found SETCORE digital depth encoder setting bolts touch Hall mechanical wheels stopping them from move, Re- adjust bolts, all ok, POH to surface to re zero Depth counter. Conclusion: before RIH, make sure that depth counter wheel is free to rotate without any obstacle. Issue #2 • RIH w/ SETCORE GR/CCL on coil Tbg, had tag w/ 1,000 lb. @ 13,456 ft. ORKB (1,384 ft. shallower than expected PBTD @ 14,840 FT ORKB based on depth counter) • Download SETCORE logging data, correlate depth Using GR-CCL log dated mar, 30, 2010, correlated Tag depth @ 14,890 ft ORKB > Tag is confirmed correctly. • Check OD of wheels for both counters, found Changed counter OD (4.17") and installed counter OD (3.82") Conclusion: make sure that depth counter wheel is of standard dimensions. 4. Lessons learned : Depth counter Issues
  • 47. Counter wheel … make sure this is of standard size and is completely free to rotate 4. Lessons learned : Depth counter Issues
  • 48. • Best Practices for Hydraulic Actuator Firing Head Global Distribution Rev IADC • Halliburton Perforating_Solutions_catalog • coiled tubing- admarine 2 • PARADIGM® INDUSTRIES References
  • 49. KAMEL ELSAYED DRILLING ENGINEER SD RIG-141 TEAM KAMELS@GUPCO.NET 0122 910 2341 THANKS FOR YOUR TIME DON’T HESITATE TO CONTACT FOT ANY QUESTIONS AYMAN RASHAD WELLSITE LEADER SD RIG-141 TEAM RASHADAA@GUPCO.NET 010 65 717 313