1. Kevin G. Gagne PE
Project Manager
* denotes projects completed with other firms Design with community in mind
Kevin Gagne is a civil engineer with diversified experience in highway, municipal roadway and low-impact site projects as
well as environmental permitting. He is an expert in Autodesk Civil 3D customization, Subbassembly Composer and 3D
modeling, and an experienced teacher/trainer.
EDUCATION
B.S., Civil Engineering, Merrimack College, North
Andover, Massachusetts, 1995
REGISTRATIONS
Professional Engineer #41513, Commonwealth of
Massachusetts
Professional Engineer #13283, State of New Hampshire
PROJECT EXPERIENCE
Airport Landside Infrastructure
Norwood Memorial Airport, Norwood, Massachusetts
Taxiway civil design, grading. Constructionofnew helipad.
Floodplain restorationstudy.
Terminal Area Roadways, East Boston, Massachusetts
Designfor massive roadway systemimprovements to serve
Logan International Airportterminals. Estimated $80million
of roadway improvements and structures. Developed grading
plans for temporary detour roads, design work on
constructionphasing plans.
Bicycle and Pedestrian Paths
Laconia Riverwalk Development Plan, Laconia, New
Hampshire (Project Manager/Project Engineer)
Conducted field reconnaissance, public workshopsand client
meetingsthatculminated in the completionof the “Laconia
Riverwalk Development Plan”. Drew onproficiency with Low
ImpactDesignprinciples and projects in environmentally
sensitive areas to build public consensusduring Public
Informational Meetings.The final consensus Development
Plan is a master concept and implementationplan for a multi-
million dollar multi-phased recreational path that will be
financed in part by future TaxincrementFinance District
income.
Merrimack River Greenway, Concord, New Hampshire
(Project Manager/Project Engineer)
Field w ork, graphics, plansand report for a feasibility study
for this 13 mile multi-use trail through Concord, NHalong the
Merrimack River. The Concord segment will be a key link in
the proposed statewide trail connecting Salem, NH to
Lebanon, NH and beyond.
Conservation Cluster Subdivision, Carlisle, Massachusetts
Worked with Carlisle Trails Committee to inventory existing
trails and to integrate new trails into subdivisionplans with
sustainable Bio-Retention Best Management Practices.
Coordinated with abutters to determine appropriate trail
locations and to provide adequate buffers while achieving
trails connection.
South County BicycleFacility, Narragansett, South
Kingstown, Rhode Island
Designhorizontal and vertical alignment, drainage,general
plans, profiles, and crosssections, distributionof quantities,
engineer’s estimate, and contract bookfor 7.5-mile multi-use
recreational trail.
Commercial
Building Renovations for Commercial Lobster Facility,
Boston, Massachusetts
Application/plans for BostonWater and Sewer Commission
connectionpermit.
Tempel Lane Extension, Regeneron Site/Civil
Development, East Greenbush, NY
2. Kevin G. Gagne PE
Project Manager
* denotes projects completed with other firms
Lead designer and Civil 3D modeler for a new town roadway
/ Regeneron Pharmaceuticals campusaccess corridor.
Regeneronis currently developing a 98-acre parcel for
constructionof a new campus that will include a new
w arehouse, office,quality control laboratory building and
additional manufacturing capacity. Improved efficiency in
plan productionthrough the modeling of proposed municipal
w ater, sewer, stormwater, and private gas,telephone, cable
/internet (fiber optic) services as Civil 3D pipe
networks. Coordinated the planproductionfor the
replacement ofan existing single lane bridge and a retention
pond dam as partofthe overall road extension project.
Drainage and Stormwater Planning & Design
Sweetwater Brook Drainage, Stoneham, Massachusetts
(Project Engineer)
Project Engineer, assisted with hydrologic and hydraulic
evaluationof mainstem of Sweetwater Brook storm drainage
system, 1 mile ofopenchannel, 1.2 miles of closed conduit.
Calculated anticipated stormwater runoffratesfor multiple
storm events; modeled existing facilitiesto identify system
capacities and deficiencies; developed improvement
alternativesleading to recommendations for phased
improvements programto correct deficiencies and reduce
occurrence ofstormwater flooding at several areas in
w atershed.
Golf Courses
Storm Drainage, Stoneham, Massachusetts
Designwetand dry ponds for drainage improvement project
at Bear Hill Golf Course. Review and approve shopdrawings,
constructioninspection.
Maintenance Facilities
Salt and Maintenance Shed Site Plan Development,
Statewide
Responsible for development and implementation oftechnical
and logistical plansto developnearly 60 existing conditions
base plansfor highway maintenance siteslocated throughout
the State.
Marine & Port Facilities
Statewide Public Boat Access Program, Various Projects
(Project Manager / Project Engineer)
Has developed a comprehensive knowledge ofAccessProgram
requirements and constructionpractices while coordinating
the project efforts ofsurvey, environmental and other
subconsultants along with multi-disciplined Stantec staff.
Responsible for low impact designand environmental
permitting for projects involving new boating and car- top
kayak/canoe access sites, site parking and boat ramp
improvements, boat rampupgrades and replacements, site
accessibility improvements, pond dredging and accessible
fishing pier project and other multi-use boating and fishing
sites environmentally sensitive areas. Actively involved in the
public presentation ofengineering designissuesthrough the
use of graphics and PowerPoint materials during “Public Open
House” process.
Military Infrastructure
USARC Parking Lots, Massachusetts, Rhode Island,
Connecticut
Site and grading plans, parking lot layouts, drainage system
layouts and calculations, designreport, engineer’s estimates
at various Army Reserve Centers for Military Equipment
Parking (MEP) and Privately-Owned Vehicles (POV).
Building Demolition/Site Preparation for Base Exchange,
Hanscom AFB, Massachusetts
Building demolitionplans (in Microstation).
Underground Gas Piping, Portsmouth Naval Shipyard,
Portsmouth, New Hampshire
Research and verificationof existing utilities to lay out and
profile proposed gas line.
Building Demolition/Site Preparation for Base Exchange,
Hanscom AFB, Massachusetts
Production/design using Microstationfor building demolition
plans.
Pembroke Readiness Center, New Hampshire National
Guard, Pembroke, New Hampshire
Civil 3D modeling and site designfor 60% clientsubmission.
3. Kevin G. Gagne PE
Project Manager
* denotes projects completed with other firms
Municipal
On-Call Peer Review Services, Farmington, New
Hampshire
Performed peer reviews for site and subdivisionproposals to
ensure that projects meet Town Standards. Field inspections of
subdivision constructionto reportto the Board regarding the
status of compliance with approved plans. Compiled Data and
field notes into professional quality deliverables within
aggressive timeframes to meet town’sneeds. Communicated
frequently with townrepresentatives during the performance
of tasksto discussassumptions and deadlines, as well as to
address issuesas they arose. Represented the Townof
Farmingtonin dealingswith the Developer, subcontractors
and residents.
On-Call Peer Review Services, Saco, Maine
Performed peer reviews for Site Plan and Subdivision
applications to ensure that projects meetTownStandards.
Review stafffield inspectionreports and developer surety
estimatesand draw requests.
Subdivision Plans &Septic Systems, Easton,
Massachusetts
General subdivisionaccess road layout and grading, septic
systemdesign.
Ductbank System for Department of Facilities,
Cambridge, Massachusetts
Profile and layoutofapproximately 1,700 feet of concrete
encased ductbank, Cambridge. Appear before Pole and
Conduit Commission to obtainstreet-cutpermit.
Parks & Recreation
Gilson Pond Campground Design (Project Engineer)
Project Engineer, designed first NH State Park campground to
be added to State Park Systemin over 40years. Unique
campground, located in MonadnockState Park (home of
most-climbed mountainin North America) employed some
innovative designapproaches. Tasksinclude survey ofnearly
60 acres ofwooded terrain, designof access and looproads,
parking areas for hikers and campers, locationof40
campsites,drainage, water and electrical utilities, tollbooth,
shower/store facility locating and layout, coordinationof
septic systemdesign. Extensive fieldwork performed to ensure
that proposed campsites would incorporate and preserve
natural environmental features. The end resulthas been an
intensely popular, rustic campground with character
consistent with vision ofPark Manager, Client, and State Park
Master Plan. The GilsonPond Campground has been
recognized as a “…gem through and through” in Lafe Low’s
book Best Tent Camping: New England: Your Car-Camping
Guide to Scenic Beauty, the Sounds of Nature, and an Escape
from Civilization.
Post-Secondary Education
Site Design for Engineering Science Center, Hanover,
New Hampshire (Project Engineer)
Project Engineer, site designfor new student classroomand
laboratory building onhistoric Ivy League campus. Tasks
included permitting; obtaining TownSite PlanApproval;
roadway and parking layout and design; grading, drainage,
w ater, sewer, propane, electrical utility relocations;
coordinationfor multidisciplined project.
Relocation of Thayer Drive/Wheelock Street, Hanover,
New Hampshire (Project Engineer)
Project Engineer, roadway relocation to support construction
of new Dartmouth College parking garage.
Power
115 kV Power Transmission Line, Southern Energy New
England, Cambridge, Massachusetts (Project Engineer)
Route studies, designand permitting for ductbank systemfor
a proposed power transmission line.
4. Kevin G. Gagne PE
Project Manager
* denotes projects completed with other firms
Roadways
Strafford Square Intersection Improvements, Rochester,
New Hampshire
Lead forfinal designcomponent of major intersection
reconstructionproject. Developed grading and Civil 3D model
for transformationof an existing stop controlled intersection
into a modern multi-lane roundabout, while also relocating
the aerial utilities in the projectcorridorunderground.
Mascoma River Greenway, Lebanon, New Hampshire
Project Engineer for the Central Segment of the City of
Lebanon’s planned Mascoma River Greenway. The project, is
a 2-mile sectionofnew rail trail, including improvements to 4
bridges. Designed all elements in Civil 3D and automated
quantity takeoff by designing and developing custom
subassemblies specifically for the project.
Mechanic Street, Lebanon, New Hampshire
Project Engineer designing roadway and accessibility
improvements for 1.5 milesoftwo lane urbanroadway
utilizing Complete Streets methodology.
Slayton Hill Road, Lebanon, New Hampshire
Lead civil designfor emergency roadway reconstruction
project in Lebanon. Investigated the causesofextensive storm
damage along a 2-mile section ofrural roadway resulting
from back to back rain events in 2013. Designed elements to
restore access and provide drainage and resiliency upgrades.
Participated in Public Informational Meetings and abutter site
w alksto understand the issuesand build consensus for
proposed work.
Dulac Street Roadway Reconstruction, Lebanon, New
Hampshire
Civil 3D designfor Street Roadway Reconstructionproject in
Lebanon, NH. Designed improvements to reconstruct the
roadway and enhance the resiliency of the corridor in
response to catastrophic storm damage.
I-95/I-93/University AvenueInterchanges and I-95
Widening. Project, Massachusetts
Led design modeling and Civil 3D customizationfor the
project. Mentored staff in Civil 3D design workflows. Using
Subassembly Composer, created modular retaining wall
subassemblies to improve the way our civil and structural
engineers collaborate together. Saved countlesshours on
producing developed wall elevations, reducing manual
drafting on cross sections, automating earthwork and
materials take offwith visual checks and balancesto satisfy
concerns for reliability/accuracy of the data.
Broad Street Parkway Project, Nashua, New Hampshire
Led Civil 3D modeling effort for the new $36 milliontwo-mile
long, two-lane urbanarterial roadway. Participated in
drainage design, grading BMP’s and integrating into overall
designmodel. Responsible for developing and implementing
designworkflows and training staff.
NH Route 104 and Route 25 Corridor Studies: Bristol,
New Hampton, Meredith, Center Harbor and
Moultonborough, New Hampshire (Project
Manager/Project Engineer)
In 2007 and 2008, the Lakes Region Planning Commission
(LRPC) conducted corridor studies for State routes104 and 25,
w hich comprise a primary east-westconnector thatis critical
to the region. LRPC’s intent for the studies was to assess
current conditions and future traffic demand related to
potential land uses and development, identify potential safety
improvements and outline future strategies related to corridor
preservationand accessmanagementalong the corridor.
Responsible for organizing and conducting field
reconnaissance to identify and prioritize problem areas based
on issues of public safety. Managed efforts ofproduction staff
to developeffective graphics and coordinated with traffic
engineer/planner to prepare supporting technical
memorandum geared towards the generationoflocal,
community-level support for the future safety improvements
projects.
5. Kevin G. Gagne PE
Project Manager
* denotes projects completed with other firms
Bennington Village Safety Improvements, Bennington,
New Hampshire (Project Manager/Project Engineer)
Project Manager/Project Engineer for Municipally Managed
TE Program project in a National Register Listed historic
village area. Designed sidewalk, roadway and drainage
improvements in anarea constrained by rightofway,
topography, and historic features. Assisted the Town in their
successful exemption fromthe Comprehensive Shoreland
Protection Act, and their successful TE grant applicationfor
Phase II. Successfully designed and bid Phase II project which
is currently under construction.
Chocorua Village Safety Improvements, Tamworth, New
Hampshire (Project Manager / Project Engineer)
Project Manager / Project Engineer for Municipally Managed
TE Program project in a National Register-Eligible historic
village area. Evaluated and designed traffic calming,
intersection improvements, pedestrianand vehicular
circulationand safety improvements onRoute 16 through the
historic Chocorua Village area of Tamworth. Coordinated
project wide survey, traffic, structural, historic preservation,
environmental and landscaping for the context sensitive
design. Successfully obtained a Watershed Improvement
Grant from NHDES onbehalf ofthe Town for the design and
constructionof a “bio-retentionarea”. This Low Impact
systemwasintegrated with anNHDOT-standard closed
drainage system onthe site of a recently demolished building.
Route 101 Traffic Calming, Dublin, New Hampshire
(Project Manager / Project Engineer)
Project Manager / Project Engineer for Municipally Managed
TE Program project in the DublinVillage area (listed onthe
National Register of Historic Places). Conducted the first
phase of the project as a NHDOT Context Sensitive Solutions
Pilot Project to study alternatives and create a Master
Improvements Plan forthe Route 101 corridor through Dublin
TownCenter. Coordinated efforts of engineers,surveyors,
landscape historian/architect, preservationconsultant and
traffic calming specialists as well as public and private
agencies and interestgroups to bring the firstphase through
the design and bidding process. Played anintegral role in the
Town’s successful acquisitionofboth a Safe Route’sto School
Grant, and a TE Grant for Phase II. Successfully designed and
permitted Phase II which is currently outto bid for
construction.
Site Utility Relocation and Roadway / Intersection
Improvements, Hanover, New Hampshire (Project
Engineer)
Responsible as Project Engineer for coordinationofsurvey
and designofcivil/site elements in support of Campus
improvements including a new 5-level parking garage, new
Engineering Science Center building facility, intersectionand
roadway relocation, signalization, roadway widening and
utility relocations.
Streetscape Improvements, Marblehead, Massachusetts
(Civil Engineer)
Approximately ½- mile of streetscape improvements in
historic downtownin coordination with a project to place
overhead utilities underground. Includesdrainage, extensions
to municipal drainage system, roadway reconstruction, on-
street parking improvements, signand pavement markings
and traffic calming measures.
CA/T, Logan Airport Interchange, Boston, Massachusetts
Responded to RFIs, graded infield areas coordinated efforts
w ith drainage subcontractor, electrical ductbank profile and
layout to resolve utility conflicts, profile detail blast wall,
designmodificationsto allow fire access to ramps.
Roadway Reconstruction and Sidewalk Improvements,
Chelsea, Malden, Melrose, Marblehead, Fitchburg,
Massachusetts
Urbandesign, sidewalk and roadway reconstruction, and
drainage improvements. Handicap rampdesign to meetADA
requirements, variance applications as required.
Water Main Replacement, Drainage and Roadway
Reconstruction of Prescott Street, Chelsea,
Massachusetts
Roadway reconstructionand sidewalk designto meet ADA
requirements.
I-495/Marston Street Interchange, Lawrence,
Massachusetts
Layout and designof temporary bypassroads,construction
staging and traffic safety/mitigation plansfor intricate
network of bridge/rampimprovements.
6. Kevin G. Gagne PE
Project Manager
* denotes projects completed with other firms
Pearl Street and Eaton Street, Gardner, Massachusetts
General civil design and costestimation forroadway and
sidewalk reconstruction/realignment and signalization
projects. Developed cost estimates.
North Street Reconstruction, Fitchburg, Massachusetts
Civil design, as part ofas-needed services contract; prepared
drainage calculations, grading plans, engineer’sestimates.
Transit
Logan Express, Framingham, Massachusetts
Layout and designof underground sanitary and drainage
piping network for new parking garage, coordinationwith
mechanical and civil-site elements of project.
Workplace/Office
General Electric Co., Aircraft Engines Division, Lynn,
Massachusetts (Assistant to Wastewater Manager)
Oversaw installation ofwaterreuse/recycling facilities.
Managed bidding and award processfor environmental
services projects. Conducted daily/weekly hazardous waste
audits to ensure DEP and EPAcompliance, compiled
evaluationreports.