What is KAIZEN ?
KAI = CHANGE
ZEN = GOOD (For the Better)
KAIZEN = CONTINUAL IMPROVEMENT
The starting point of KAIZEN® is to recognize that whatever we
are doing, can be improved. Some Japanese managers
challenge their subordinates by saying "You should regard
how you currently do your job as the worst way to do it." In
order to improve you must first perceive the need for change,
then recognize the problems and work to solve them
Hierarchy of KAIZEN
[Policy Deployment / hoshin-kanri]
TQM (Total Quality management)
TPM (Total Productive maintenance)
JIT (Just-In-Time)
Improvement of QCD (Quality, Cost, Delivery)
QC Circles (small group activities)
Suggestions systems
Top management policy and Strategy
Management directed KAIZEN
Gemba KAIZEN (Shop Floor KAIZEN)
Top down
Bottom up
What is Management?
Innovation
KAIZEN
Maintenance
Top
Management
Middle
Management
Supervisors
Workers
KAIZEN – Road Map to World-Class
TQM
TPM
JIT
World
Class Order Entry system – Producing as many as
Need in the same sequence
Integration of JIT and IT
Electronic Kanban
Upstream management …involving R&D and
engineering
Supplier management… supplier involvement in JIT-KAIZEN
Leveling… adding flexibility to to production scheduling
Pull system… Allowing no advance advance production
Flow production… Lead Time Reduction (MUDA of conveyance,
inventory, excess manpower)
Autonomous maintenance
TAKT Time… Producing only what customers ordered
Phase 0 1 2 3
KAIZEN – High Level
Principles
 Management Full Commitment
 FLOW provides us with crucial keys for KAIZEN
 Forecasting = Gambling
 Improvement is important, but CONTINUAL improvement is
much more (“…the DNA of Toyota…”).
 Setting improvements’ priorities.
 Do better with your EXISTING resources (Taiichi Ohno-Toyota:
“…before you recruit additional people or buy additional
equipment, do KAIZEN…”)
 Go to GEMBA…
Go to GEMBA…
GEM= Real
BA = Place
GEMBA=Real Place
GEMBA
Support
Functions
Customer
Expectations
Customer
Satisfaction
Added value processes / DATA
The 5 GEMBA Principles
1. When an abnormality occurs, go to Gemba first (Colombo…)
2. Check with Gembutsu (machine, material, failures, rejects.
unsafe conditions, etc) – in other words - Taste…
3. Take temporary countermeasures on the spot
4. Remove root cause
5. Standardize to prevent trouble
My Wish (Hiromi Omoto): “Managers in charge of
process planning, equipment layout and equipment
design always go to visit GEMBA, feel the breathing of
operators and machines, with their body”
House of Gemba Management
Profit
Management
Q C D
Quality
& Safety
Management
Cost
Management
Delivery
Logistics
Management
Workers’
Operations
Information Equipment
Products’
& Materials
Standardization
5S (Good housekeeping)
Muda Elimination
Moral enhancement
QC circles
Team-work
Self-discipline
Suggestions
7 - Muda List
1. Muda of over-production.
2. Muda of waiting.
3. Muda of transport.
4. Muda of processing.
5. Muda of inventory.
6. Muda of motion.
7. Muda of repair / rejects.
5S
 SEIRI - Separate out all that is unnecessary and
eliminate it.
 SEITON - Those things found to be necessary are put in
order so that they lie ready for use when needed.
 SEISO - Clean workplace, equipment and prevent
defects.
 SEIKETSU - Standardize
Make cleaning and checking routine
 SHITSUKE - Discipline and training
Personal cleanliness
Apply Kaizen to the previous
4 steps
(Sort)
(Straighten)
(Shine)
(Standardize)
(Sustain)
More Terminologies…
 Kanban
 Poka-Yoke (fail-safe)
 Jidohka – Autonomation
 Heijunka – Leveling (Mixed product line)
 Andon – Visual problems’ sign (lights and
music…)
Few observations
 QUALITY comes always FIRST (Lead-Time comes after…)
 QUALITY and all other Kaizen principles are built into the
process from step1, through real CONCURRENT
ENGINEERING
 KAIZEN (Continues Improvement) is part of the CULTURE
 Each employee knows his role – he is responsible for his domain
– “It’s mine…”
 Total discipline and absolute commitment from all employees
 “100% Robotics, of which 70% are mechanical robots…”
 Japanese – Obedience / Loyalty / Self-Discipline / Patience
 Western - Creativity / Entrepreneurship / Improvisation / Impatience
Different Culture…
So…What can we learn..?
Few more points to think about:
 Can we (managers and employees) consider the way we are
currently do our job as the worst way to do it?
 Do we have real and absolute management commitment for
Quality and Continues Improvement and Change?
 Do we really “encourage” our suppliers to supply us Perfect
Quality? Do we have the right suppliers base for doing so?
 Can we build a “Kaizen culture and atmosphere” which will
encourage all employees to “flood” us with improvement
suggestions?
 Do we Gamble (forecast…)?
 Do we “Go to Gemba”? Enough? All of us? (New Ops. Org.)
So…What can we learn..?
And…Few more… :
 Do we 5S?… 4S?… 3?
 Do the recent changes we have made will lead us to a real
operational “Quantum Leap” (like Yazaki)?
 Do we “Flow”? Have we minimized the Flow?
 Do we have (enough) standard processes?
 Have we implemented (enough) visual management (Andon)?
 Have we eliminated enough MUDA?
 Are we using the Poka-Yoke (fail-safe) approach? Do we need
it?
 Are we using Jidohka (Autonomation)? Do we need it?
Domo Arigato!!!
Thank You!!!

Contenu connexe

Tendances (20)

Kaizen
KaizenKaizen
Kaizen
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Kaizen training
Kaizen trainingKaizen training
Kaizen training
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen Victor Pan
Kaizen Victor PanKaizen Victor Pan
Kaizen Victor Pan
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Kaizen Poster
Kaizen PosterKaizen Poster
Kaizen Poster
 
Presentation about kaizen
Presentation about kaizenPresentation about kaizen
Presentation about kaizen
 
Kaizen bcic
Kaizen bcicKaizen bcic
Kaizen bcic
 
Kizen
KizenKizen
Kizen
 
Kaizen final ppt
Kaizen final pptKaizen final ppt
Kaizen final ppt
 
KAIZEN Technique
KAIZEN TechniqueKAIZEN Technique
KAIZEN Technique
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
Kaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewKaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_preview
 
Kaizen
Kaizen Kaizen
Kaizen
 

En vedette

WCM Roadmap Versions 3 3 And 4 0
WCM Roadmap Versions 3 3 And 4 0WCM Roadmap Versions 3 3 And 4 0
WCM Roadmap Versions 3 3 And 4 0Alfresco Software
 
SGS Academy-Lean Six Sigma Green Beltt
SGS Academy-Lean Six Sigma Green BelttSGS Academy-Lean Six Sigma Green Beltt
SGS Academy-Lean Six Sigma Green BelttSGS Portugal
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar PresentationOrange Slides
 
Bike washer casestudy_v3
Bike washer casestudy_v3Bike washer casestudy_v3
Bike washer casestudy_v3juliakuznetsov
 
Bike washer casestudy_v3_minfilesize
Bike washer casestudy_v3_minfilesizeBike washer casestudy_v3_minfilesize
Bike washer casestudy_v3_minfilesizejuliakuznetsov
 
What Is Kaizen
What Is KaizenWhat Is Kaizen
What Is KaizenREDJR
 
Whole Product Roadmap Case Study
Whole Product Roadmap Case StudyWhole Product Roadmap Case Study
Whole Product Roadmap Case StudyBruce Pharr
 
Total quality management
Total quality managementTotal quality management
Total quality managementRaiyan Hossain
 
8D _ Problem Solving
8D _ Problem Solving 8D _ Problem Solving
8D _ Problem Solving Senthil kumar
 
Fmcg beverage brand case study
Fmcg beverage brand case studyFmcg beverage brand case study
Fmcg beverage brand case studyDigiWhirl
 
Seven Types Of Waste: Setting Priorities For Improvement Discussion
Seven Types Of Waste: Setting Priorities For Improvement DiscussionSeven Types Of Waste: Setting Priorities For Improvement Discussion
Seven Types Of Waste: Setting Priorities For Improvement DiscussionKathy McShea
 

En vedette (19)

WCM Roadmap Versions 3 3 And 4 0
WCM Roadmap Versions 3 3 And 4 0WCM Roadmap Versions 3 3 And 4 0
WCM Roadmap Versions 3 3 And 4 0
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
SGS Academy-Lean Six Sigma Green Beltt
SGS Academy-Lean Six Sigma Green BelttSGS Academy-Lean Six Sigma Green Beltt
SGS Academy-Lean Six Sigma Green Beltt
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
 
Kaizen Gemba
Kaizen GembaKaizen Gemba
Kaizen Gemba
 
Bike washer casestudy_v3
Bike washer casestudy_v3Bike washer casestudy_v3
Bike washer casestudy_v3
 
Bike washer casestudy_v3_minfilesize
Bike washer casestudy_v3_minfilesizeBike washer casestudy_v3_minfilesize
Bike washer casestudy_v3_minfilesize
 
Tps & lean
Tps & leanTps & lean
Tps & lean
 
What Is Kaizen
What Is KaizenWhat Is Kaizen
What Is Kaizen
 
Value Steam Mapping
Value Steam MappingValue Steam Mapping
Value Steam Mapping
 
Cursos - Gemba Consulting
Cursos - Gemba ConsultingCursos - Gemba Consulting
Cursos - Gemba Consulting
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Whole Product Roadmap Case Study
Whole Product Roadmap Case StudyWhole Product Roadmap Case Study
Whole Product Roadmap Case Study
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
8D _ Problem Solving
8D _ Problem Solving 8D _ Problem Solving
8D _ Problem Solving
 
Fmcg beverage brand case study
Fmcg beverage brand case studyFmcg beverage brand case study
Fmcg beverage brand case study
 
Case study - FMCG Company
Case study - FMCG CompanyCase study - FMCG Company
Case study - FMCG Company
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Seven Types Of Waste: Setting Priorities For Improvement Discussion
Seven Types Of Waste: Setting Priorities For Improvement DiscussionSeven Types Of Waste: Setting Priorities For Improvement Discussion
Seven Types Of Waste: Setting Priorities For Improvement Discussion
 

Similaire à Kaizen – road map to world class processes

Allied Quality Concept by Rahim Khoja
Allied Quality Concept by  Rahim KhojaAllied Quality Concept by  Rahim Khoja
Allied Quality Concept by Rahim KhojaRahim Khoja
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual ControlVarmahk
 
Toyota production way
Toyota production wayToyota production way
Toyota production wayPeter Bielik
 
Lean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh AroraLean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh AroraADD VALUE CONSULTING Inc
 
Toyota Raymond Kaizen Presentation 16 June 2008
Toyota Raymond Kaizen Presentation 16 June 2008Toyota Raymond Kaizen Presentation 16 June 2008
Toyota Raymond Kaizen Presentation 16 June 2008Mark Dawson
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgsfreelean
 
Lean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PMLean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PMProduct School
 
5S Visual Control 7QC tools
5S  Visual Control  7QC tools5S  Visual Control  7QC tools
5S Visual Control 7QC toolsVarmahk
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality ManagementSameer Omles
 
00 Why Change 22 Pgs
00 Why Change 22  Pgs00 Why Change 22  Pgs
00 Why Change 22 Pgsfreelean
 

Similaire à Kaizen – road map to world class processes (20)

Allied Quality Concept by Rahim Khoja
Allied Quality Concept by  Rahim KhojaAllied Quality Concept by  Rahim Khoja
Allied Quality Concept by Rahim Khoja
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 
Lean System
Lean SystemLean System
Lean System
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual Control
 
Toyota production way
Toyota production wayToyota production way
Toyota production way
 
Lean & kaizen
Lean & kaizenLean & kaizen
Lean & kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen philosopy
Kaizen philosopyKaizen philosopy
Kaizen philosopy
 
Lean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh AroraLean Manufacturing Training Course Basics - Nilesh Arora
Lean Manufacturing Training Course Basics - Nilesh Arora
 
Toyota Raymond Kaizen Presentation 16 June 2008
Toyota Raymond Kaizen Presentation 16 June 2008Toyota Raymond Kaizen Presentation 16 June 2008
Toyota Raymond Kaizen Presentation 16 June 2008
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs
 
The Toyota Way
The Toyota WayThe Toyota Way
The Toyota Way
 
Lean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PMLean for Product Managers by Amazon Sr PM
Lean for Product Managers by Amazon Sr PM
 
5S Visual Control 7QC tools
5S  Visual Control  7QC tools5S  Visual Control  7QC tools
5S Visual Control 7QC tools
 
Kaizen
KaizenKaizen
Kaizen
 
Tqm
Tqm Tqm
Tqm
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality Management
 
00 Why Change 22 Pgs
00 Why Change 22  Pgs00 Why Change 22  Pgs
00 Why Change 22 Pgs
 

Plus de Kobi Vider

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniquesKobi Vider
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagramKobi Vider
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceKobi Vider
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guideKobi Vider
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolKobi Vider
 
Customer value management
Customer value managementCustomer value management
Customer value managementKobi Vider
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product qualityKobi Vider
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmiKobi Vider
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian networkKobi Vider
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcKobi Vider
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfdKobi Vider
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people Kobi Vider
 
Cross constellations v1
Cross constellations v1Cross constellations v1
Cross constellations v1Kobi Vider
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carKobi Vider
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement Kobi Vider
 
Using cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effortUsing cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effortKobi Vider
 
Assuring assessments leaders team member’s quality and qualification
Assuring assessments leaders  team member’s quality and qualification Assuring assessments leaders  team member’s quality and qualification
Assuring assessments leaders team member’s quality and qualification Kobi Vider
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kitKobi Vider
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk managementKobi Vider
 

Plus de Kobi Vider (20)

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniques
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagram
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importance
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guide
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing tool
 
Customer value management
Customer value managementCustomer value management
Customer value management
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product quality
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmi
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian network
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svc
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfd
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people
 
Cross constellations v1
Cross constellations v1Cross constellations v1
Cross constellations v1
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, car
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement Lesson learned cross constellations multi models process improvement
Lesson learned cross constellations multi models process improvement
 
Using cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effortUsing cmmi svc to lead cross constellations effort
Using cmmi svc to lead cross constellations effort
 
Assuring assessments leaders team member’s quality and qualification
Assuring assessments leaders  team member’s quality and qualification Assuring assessments leaders  team member’s quality and qualification
Assuring assessments leaders team member’s quality and qualification
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kit
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk management
 

Dernier

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 

Dernier (20)

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 

Kaizen – road map to world class processes

  • 2. What is KAIZEN ? KAI = CHANGE ZEN = GOOD (For the Better) KAIZEN = CONTINUAL IMPROVEMENT The starting point of KAIZEN® is to recognize that whatever we are doing, can be improved. Some Japanese managers challenge their subordinates by saying "You should regard how you currently do your job as the worst way to do it." In order to improve you must first perceive the need for change, then recognize the problems and work to solve them
  • 3. Hierarchy of KAIZEN [Policy Deployment / hoshin-kanri] TQM (Total Quality management) TPM (Total Productive maintenance) JIT (Just-In-Time) Improvement of QCD (Quality, Cost, Delivery) QC Circles (small group activities) Suggestions systems Top management policy and Strategy Management directed KAIZEN Gemba KAIZEN (Shop Floor KAIZEN) Top down Bottom up
  • 5. KAIZEN – Road Map to World-Class TQM TPM JIT World Class Order Entry system – Producing as many as Need in the same sequence Integration of JIT and IT Electronic Kanban Upstream management …involving R&D and engineering Supplier management… supplier involvement in JIT-KAIZEN Leveling… adding flexibility to to production scheduling Pull system… Allowing no advance advance production Flow production… Lead Time Reduction (MUDA of conveyance, inventory, excess manpower) Autonomous maintenance TAKT Time… Producing only what customers ordered Phase 0 1 2 3
  • 6. KAIZEN – High Level Principles  Management Full Commitment  FLOW provides us with crucial keys for KAIZEN  Forecasting = Gambling  Improvement is important, but CONTINUAL improvement is much more (“…the DNA of Toyota…”).  Setting improvements’ priorities.  Do better with your EXISTING resources (Taiichi Ohno-Toyota: “…before you recruit additional people or buy additional equipment, do KAIZEN…”)  Go to GEMBA…
  • 7. Go to GEMBA… GEM= Real BA = Place GEMBA=Real Place GEMBA Support Functions Customer Expectations Customer Satisfaction Added value processes / DATA
  • 8. The 5 GEMBA Principles 1. When an abnormality occurs, go to Gemba first (Colombo…) 2. Check with Gembutsu (machine, material, failures, rejects. unsafe conditions, etc) – in other words - Taste… 3. Take temporary countermeasures on the spot 4. Remove root cause 5. Standardize to prevent trouble My Wish (Hiromi Omoto): “Managers in charge of process planning, equipment layout and equipment design always go to visit GEMBA, feel the breathing of operators and machines, with their body”
  • 9. House of Gemba Management Profit Management Q C D Quality & Safety Management Cost Management Delivery Logistics Management Workers’ Operations Information Equipment Products’ & Materials Standardization 5S (Good housekeeping) Muda Elimination Moral enhancement QC circles Team-work Self-discipline Suggestions
  • 10. 7 - Muda List 1. Muda of over-production. 2. Muda of waiting. 3. Muda of transport. 4. Muda of processing. 5. Muda of inventory. 6. Muda of motion. 7. Muda of repair / rejects.
  • 11. 5S  SEIRI - Separate out all that is unnecessary and eliminate it.  SEITON - Those things found to be necessary are put in order so that they lie ready for use when needed.  SEISO - Clean workplace, equipment and prevent defects.  SEIKETSU - Standardize Make cleaning and checking routine  SHITSUKE - Discipline and training Personal cleanliness Apply Kaizen to the previous 4 steps (Sort) (Straighten) (Shine) (Standardize) (Sustain)
  • 12. More Terminologies…  Kanban  Poka-Yoke (fail-safe)  Jidohka – Autonomation  Heijunka – Leveling (Mixed product line)  Andon – Visual problems’ sign (lights and music…)
  • 13. Few observations  QUALITY comes always FIRST (Lead-Time comes after…)  QUALITY and all other Kaizen principles are built into the process from step1, through real CONCURRENT ENGINEERING  KAIZEN (Continues Improvement) is part of the CULTURE  Each employee knows his role – he is responsible for his domain – “It’s mine…”  Total discipline and absolute commitment from all employees  “100% Robotics, of which 70% are mechanical robots…”  Japanese – Obedience / Loyalty / Self-Discipline / Patience  Western - Creativity / Entrepreneurship / Improvisation / Impatience Different Culture…
  • 14. So…What can we learn..? Few more points to think about:  Can we (managers and employees) consider the way we are currently do our job as the worst way to do it?  Do we have real and absolute management commitment for Quality and Continues Improvement and Change?  Do we really “encourage” our suppliers to supply us Perfect Quality? Do we have the right suppliers base for doing so?  Can we build a “Kaizen culture and atmosphere” which will encourage all employees to “flood” us with improvement suggestions?  Do we Gamble (forecast…)?  Do we “Go to Gemba”? Enough? All of us? (New Ops. Org.)
  • 15. So…What can we learn..? And…Few more… :  Do we 5S?… 4S?… 3?  Do the recent changes we have made will lead us to a real operational “Quantum Leap” (like Yazaki)?  Do we “Flow”? Have we minimized the Flow?  Do we have (enough) standard processes?  Have we implemented (enough) visual management (Andon)?  Have we eliminated enough MUDA?  Are we using the Poka-Yoke (fail-safe) approach? Do we need it?  Are we using Jidohka (Autonomation)? Do we need it?