PRODUCT PLANNING AND PRODUCT
CONTROL
UNIT - III
PRODUCT PLANNING
 Evaluation of range
 Pricing of existing and new products
 Pricing based on future market requirements
 Pricing to satisfy company objectives
 Specify the design and development support
PRODUCT PLANNING
 Product development not only for new
products
 It is also for existing products
NEED FOR PRODUCT
PLANNING
1. Need determined from current deficiencies
1. Wanted occurring in present condition
2. Need determined from anticipated
deficiencies
1. Need through prediction of social, technology etc.
PRODUCT PLANNING
PROCESS (8mark)
 Everyone wants a new product
 And every one make the product successful
STEPS:
1. Marketing and marketing analysis
2. Performance and feasibility studies
3. Advanced product planning
1. Marketing and marketing analysis
 Marketing does not require the engineering
involvement
 Technical details for promotion
 Technical support for answering the customer
queries
 Product planned – to satisfy customer needs or not?
 Availability of proper technology to satisfy needs
2. Performance and feasibility studies
 It is to extend the market analysis
 Arriving at the preferred system configuration
 Firm will offer the product.
 ELEMENTS OF FESIBILITY:
 A detailed need analysis
 System operation requirments
 Maintenance support requirments
 Identification of alternate configuration
 Screening and evaluating of available resources’
3. Advanced product planning
 It is the combined results of Preliminary market
analysis and feasibility study.
IT INCLUDES:
1. Product selection and justification
2. Product specification and plans
3. Product acquisition plan
4. Product evaluation plan
5. Product use and logistic support plan
6. System proposal
VALUE ANALYSIS (10 mark)
 Systematic identification Elimination of
unnecessary cost
 Less expensive material
 Less costly methods
 VALUE ANALYSIS is always known as
VALUE ENGINEERING, VALUE
ASSURANCE, VALUE MANAGEMENT
 VALUE ANALYSIS approach ensure that
FUNCTIONS OF MINIMUM COST WITHOUT
COMPARISION OF QUALITY
 PURPOSE:
 Achieving all functions at lower cost
CONCEPT OF VALUE AND FUNCTION
 DEFINITION OF VALUE:
value =-----------
 Difficult to define because, it changes person to person.
 TYPES OF ECONOMIC VALUE:
1. USE VALUE (Properties, qualities, features)
2. ESTEEM VALUE (appearance)
3. COST VALUE (sum of all cost)
4. EXCHANGE VALUE (Properties for exchange)
COST
FUNCTION
FUNCTION
 Working function of a product
TYPES OF FUNCTION:
 PRIMARY FUNCTION (Designed product function,
call function in phone)
 SECONDARY FUNCTION ( other than primary
function , mp3 player)
 TERITARY FUNCTION ( Esteem nature, torch in
mobile)
VALUE ANALYSIS vs VALUE
ENGINEERING
 Value analysis is a remedial process
 Value engineering is a preventive process
USES OF VALUE ANALYSIS:
 Reduce cost
 Better fashion
 New ideas and concepts
 employees with new innovative ideas
 Fulfill customer needs
REASON FOR UNNECESSARY
COST
1. Poor Design
2. Lack of ideas
3. Lack of standardisation
4. Un avoidable delivery constrains
5. Poor production planning
STEPS IN VALUE ANALYSIS (16 mark)
1. BLAST
1. Identify the product (product for study)
2. Collect relevant information(information in
manufacturing, engineering, economics)
3. Define different functions ( Functions setting)
2. CREATE
1. Create different alternatives
2. Critically evaluate alternatives
3. REFINE
1. Develop the best alternative
2. Implement the alternative
PHASES OF VALUE ANALYSIS (16 mark)
1. ORIENTATION PHASE (data collection)
2. INFORMATION PHASE(Identify facts)
3. FUNCTIONAL ANALYSIS(basic function)
4. CREATIVE PHASE( rearrange the information)
5. EVALUATION PHASE(create various alternatives)
6. DEVELOPMENT PHASE (alternatives for
technical requirement)
1. RECOMMENDATION PHASE(decision making)
2. IMPLEMENTATION PHASE(approval)
3. FOLLOW UP PHASE(compare with expectation)
PROCESS PLANNING (16 mark)
 Convert the product design in to manufacturing
plan
 Manufacture the products and parts
 Raw material in to finished state
 It is otherwise called as operations planning
PROCESS PLANNING vs PRODUCTION
PLANNING:
How to make the product (Process Planning)
To order raw materials obtaining resources to
require to make insufficient and demand to it
(production planning)
DETAILS OF PROCESS PLAN (8MARK)
 It contains:
 Route sheet
 Process
 Process parameters
 Machine and tools
1. Assembly and component drawings and boll of
materials
2. Machine and equipment details
3. Set up time for job
4. Availability of machine and equipment
Factors affecting process
planning
1. Volume of production
2. Skill and man power
3. Delivery dates for parts
4. Material specification
5. Accuracy requirements for parts
PROCESS PLANNING
ACTIVITIES
1. ANALYSE (part requirments)
2. DETERMINE (Operation sequence)
3. SELECT (equipment)
4. CALCULATE (processing time)
5. DOCUMENT (process plan)
6. COMMUNICATE ( mfg. engg. to shop)
ANALYISE FINISHED PART REQUIRMENTS:
 Analyise the finished part in design softwares.
 Either in engineering drawing or cad model format
SELECT MACHINES:
 Economic consideration
 Durability and dependability
 Longer life
MATERIAL SELECTION PARAMETERS:
1. Function
2. Appearance
3. Reliability
4. Service life
5. Environment
6. Compatibility
7. Producibility
8. cost
APPROACHES TO PROCESS
PLANNING
 Two general approaches:
1. Manual process plan
2. Computer Aided Process plan
1. Retrieval CAPP
2. Generative CAPP
MANUAL PROCESS PLANNING
 Task involves engineering drawings, making
decisions on machine process selection,
 Equipments selection, operations seqence.
ADVANTAGES:
 Small scale companies
 Highly flexible method
 Low investment
DISADVANTAGES:
 Very complex and time consuming
 Human error takes place, because of planner
 Increases paper work
COMPUTER AIDED PROCESS PLANNING
 To overcome the manual process planning.
 CADD provides interface between CAD & CAM
BENEFITS OF CAPP:
1. Process standardisation
2. Productivity improvement
3. Product cost reduction
4. Elimination of human error
5. Reduce in time
6. Reduce paper work
7. Improved legibility ( computer based route sheets prepared)
8. Faster response to engineering changes
9. Incorporate of other application programs
QUANTITY DETERMINATION IN BATCH
PRODUCTION
 Batch production required when variety of
products needed.
 Products made by volume of products needed.
PLANNING FOR BATCH PRODUCTION:
 Determination of batch size ( production lot)
 Determination of batch scheduling.
MERITS AND DEMERITS OF BATCH PRODUCTION
 MERITS
1. Easy aviability of process layout
2. Similar machines are grouped in a department
3. Better utilization of machines
4. Comparatively low investment
5. Job satisfication
 DE-MERITS
1. Irregular flow of lines, material handling is expensive
2. Production planning and control is elobrate
3. Large amount of work process
4. Higher skills are required
STOCK CONTOL
STOCK CONTROL WITHOUT BUFFER STOCK:
 Stock control model of batch production which
varies the level of stock
STOCK CONTROL WITH BUFFER STOCK:
 There is no consumption of stock during
production .
 Buffer stock is also known as safety stock.
DETERMINATION OF BATCH SIZE
1. SETUP COST:
1. Batch production involves set up cost
2. Rough cost at the time of order
3. SETUP COST INCLUDES:
1. Store requirements
2. Tool requirements.
3. Machine set up
2. INVENTORY COST:
1. Finished product to finally sold condition cost
DETERMINATION OF MINIMUM
COST BATCH SIZE
1. CONSTANT COST PER PIECE
2. SETUP COST PER BATCH
3. CARRYING COST
4. STORAGE CARRYING COST
MACHINE CAPACITY
 Batch size calculations, for batch production.
 Focus on machine loading and unloading.
MACHINE LOADING:
1. It is process of assigning a specific job for
machines
2. Smooth workflow can be ensured
3. Machine loading should ensure maximum
utilization
INFORMATION REQUIRED FOR
MACHINE LOADING
1. Number and identification of work order
2. Symbol or identification of part
3. Number of parts
4. List of operations to be performed
5. Necessary tooling's
METHODS TO REDUCE
CYCLE TIME
1. Methods-i- To reduce cycle time
2. Methods-ii- Reduce the independent activity
time (workmen don’t wait for
another workmen for interval)
3. Methods-iii- Reduce the concurrent activity
time (Working by several
parteners)
BALANCING(Machine
balancing)
 Procedure for adjusting the times in working
PROBLEMS OF MACHINE BALANCING:
1. Balanced process
2. Unbalanced process
1min 1min 1min 1min 1min final product
1min 2min 1min 0.5min final product
ANALYSIS OF PROCESS
CAPACITIES IN A MULTI
PRODUCT SYSTEM
(16MARK,10 MARK, 8 MARK)
 REFER NOTES

More Related Content

What's hot

INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGSathishkumarM89
 
Design for assembly methods
Design for assembly methodsDesign for assembly methods
Design for assembly methodsaman1312
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planningVenu Yadav
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow AnalysisKEERTHIVASAN RAVI
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planningjashid41
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPmanimaran m
 
Unit ii Process Planning
Unit ii Process PlanningUnit ii Process Planning
Unit ii Process PlanningAsha A
 
Machinability data syste
Machinability data systeMachinability data syste
Machinability data systeVenu Yadav
 
Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and controlMohanKirthik
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches chethan kumar
 
Integration of cad-cam systems & shared data base
Integration of cad-cam systems & shared data baseIntegration of cad-cam systems & shared data base
Integration of cad-cam systems & shared data baseArnab Chakraborty
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGjntuhcej
 
manufacturing support system
manufacturing support systemmanufacturing support system
manufacturing support systemsantan chaurasiya
 
Inventory control and recent trends in ppc
Inventory control and recent trends in ppcInventory control and recent trends in ppc
Inventory control and recent trends in ppcMohanKirthik
 
Introduction to automation - Module 01
Introduction to automation - Module 01Introduction to automation - Module 01
Introduction to automation - Module 01Ameya Nijasure
 

What's hot (20)

INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNING
 
Design for assembly methods
Design for assembly methodsDesign for assembly methods
Design for assembly methods
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
 
PROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATIONPROCESS PLANNING AND COST ESTIMATION
PROCESS PLANNING AND COST ESTIMATION
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planning
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPP
 
UNIT 1 - INTRODUCTION TO PRODUCTION PLANNING AND CONTROL
UNIT 1 - INTRODUCTION TO PRODUCTION PLANNING AND CONTROLUNIT 1 - INTRODUCTION TO PRODUCTION PLANNING AND CONTROL
UNIT 1 - INTRODUCTION TO PRODUCTION PLANNING AND CONTROL
 
Me6703 cim systems
Me6703 cim systemsMe6703 cim systems
Me6703 cim systems
 
Unit ii Process Planning
Unit ii Process PlanningUnit ii Process Planning
Unit ii Process Planning
 
Machinability data syste
Machinability data systeMachinability data syste
Machinability data syste
 
Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and control
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Integration of cad-cam systems & shared data base
Integration of cad-cam systems & shared data baseIntegration of cad-cam systems & shared data base
Integration of cad-cam systems & shared data base
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Work Study
Work StudyWork Study
Work Study
 
manufacturing support system
manufacturing support systemmanufacturing support system
manufacturing support system
 
Inventory control and recent trends in ppc
Inventory control and recent trends in ppcInventory control and recent trends in ppc
Inventory control and recent trends in ppc
 
Introduction to automation - Module 01
Introduction to automation - Module 01Introduction to automation - Module 01
Introduction to automation - Module 01
 

Similar to PPC-Unit III- PRODUCT PLANNING AND PRODUCT CONTROL

Product planning and product control
Product planning and product controlProduct planning and product control
Product planning and product controlMohanKirthik
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL AttiMurugan
 
UNIT-I.ppt
UNIT-I.pptUNIT-I.ppt
UNIT-I.pptmahe49
 
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL Dr.PERIASAMY K
 
Product and process planning
Product and process planningProduct and process planning
Product and process planningzimbar
 
Mb0044 production & operation mangement
Mb0044 production & operation mangementMb0044 production & operation mangement
Mb0044 production & operation mangementDevendra Kachhi
 
PROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptxPROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptxmurugarajan001
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations managementHarold B. Duran, LCB
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process PlanningPraveenManickam2
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selectionSujan Oli
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation managementSanjay Thakur
 
Production management_AFFAN.pptx
Production management_AFFAN.pptxProduction management_AFFAN.pptx
Production management_AFFAN.pptxaffan82
 
Ch 2 product design (1)
Ch 2  product design (1)Ch 2  product design (1)
Ch 2 product design (1)Shadina Shah
 
Operationsmamnagement
OperationsmamnagementOperationsmamnagement
OperationsmamnagementChandu Kolli
 
Process Design and Development of Engine Block
Process Design and Development of Engine BlockProcess Design and Development of Engine Block
Process Design and Development of Engine Blockpaperpublications3
 
Production Management
Production ManagementProduction Management
Production ManagementHiten Patel
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineeringAyush dixit
 

Similar to PPC-Unit III- PRODUCT PLANNING AND PRODUCT CONTROL (20)

Product planning and product control
Product planning and product controlProduct planning and product control
Product planning and product control
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
UNIT-I.ppt
UNIT-I.pptUNIT-I.ppt
UNIT-I.ppt
 
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
PPC-Unit I- INTRODUCTION OF PRODUCTION PLANNING AND CONTROL
 
Product and process planning
Product and process planningProduct and process planning
Product and process planning
 
Lecture 1 and 2
Lecture 1 and 2Lecture 1 and 2
Lecture 1 and 2
 
Mb0044 production & operation mangement
Mb0044 production & operation mangementMb0044 production & operation mangement
Mb0044 production & operation mangement
 
PROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptxPROCESS PLANNING 1.pptx
PROCESS PLANNING 1.pptx
 
Production & operations management
Production & operations managementProduction & operations management
Production & operations management
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selection
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation management
 
Production management_AFFAN.pptx
Production management_AFFAN.pptxProduction management_AFFAN.pptx
Production management_AFFAN.pptx
 
Pm1
Pm1Pm1
Pm1
 
Ch 2 product design (1)
Ch 2  product design (1)Ch 2  product design (1)
Ch 2 product design (1)
 
Operationsmamnagement
OperationsmamnagementOperationsmamnagement
Operationsmamnagement
 
Process Design and Development of Engine Block
Process Design and Development of Engine BlockProcess Design and Development of Engine Block
Process Design and Development of Engine Block
 
Value engineering
Value engineeringValue engineering
Value engineering
 
Production Management
Production ManagementProduction Management
Production Management
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineering
 

More from Dr.PERIASAMY K (20)

UNIT-III.ppt
UNIT-III.pptUNIT-III.ppt
UNIT-III.ppt
 
UNIT-II updated.ppt
UNIT-II updated.pptUNIT-II updated.ppt
UNIT-II updated.ppt
 
UNIT 1.ppt
UNIT 1.pptUNIT 1.ppt
UNIT 1.ppt
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptx
 
PPCE Unit-4.pptx
PPCE Unit-4.pptxPPCE Unit-4.pptx
PPCE Unit-4.pptx
 
PPCE Unit-3.pptx
PPCE Unit-3.pptxPPCE Unit-3.pptx
PPCE Unit-3.pptx
 
PPCE Unit-2.pptx
PPCE Unit-2.pptxPPCE Unit-2.pptx
PPCE Unit-2.pptx
 
PPCE Unit -1.pptx
PPCE Unit -1.pptxPPCE Unit -1.pptx
PPCE Unit -1.pptx
 
POM UNIT-3.pptx
POM UNIT-3.pptxPOM UNIT-3.pptx
POM UNIT-3.pptx
 
POM UNIT-4.pptx
POM UNIT-4.pptxPOM UNIT-4.pptx
POM UNIT-4.pptx
 
Unit 5 Controlling.ppt
Unit 5 Controlling.pptUnit 5 Controlling.ppt
Unit 5 Controlling.ppt
 
POM UNIT-2.pptx
POM UNIT-2.pptxPOM UNIT-2.pptx
POM UNIT-2.pptx
 
POM UNIT-I.pdf
POM UNIT-I.pdfPOM UNIT-I.pdf
POM UNIT-I.pdf
 
MANUFACTURING PROCESS-II
MANUFACTURING PROCESS-IIMANUFACTURING PROCESS-II
MANUFACTURING PROCESS-II
 
MANUFACTURING PROCESS-II
MANUFACTURING PROCESS-IIMANUFACTURING PROCESS-II
MANUFACTURING PROCESS-II
 
MANUFACTURING PROCESS-II
MANUFACTURING PROCESS-IIMANUFACTURING PROCESS-II
MANUFACTURING PROCESS-II
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 
MANUFACTURING PROCESS-I
MANUFACTURING PROCESS-IMANUFACTURING PROCESS-I
MANUFACTURING PROCESS-I
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Recently uploaded (20)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

PPC-Unit III- PRODUCT PLANNING AND PRODUCT CONTROL

  • 1. PRODUCT PLANNING AND PRODUCT CONTROL UNIT - III
  • 2. PRODUCT PLANNING  Evaluation of range  Pricing of existing and new products  Pricing based on future market requirements  Pricing to satisfy company objectives  Specify the design and development support
  • 3. PRODUCT PLANNING  Product development not only for new products  It is also for existing products
  • 4. NEED FOR PRODUCT PLANNING 1. Need determined from current deficiencies 1. Wanted occurring in present condition 2. Need determined from anticipated deficiencies 1. Need through prediction of social, technology etc.
  • 5. PRODUCT PLANNING PROCESS (8mark)  Everyone wants a new product  And every one make the product successful STEPS: 1. Marketing and marketing analysis 2. Performance and feasibility studies 3. Advanced product planning
  • 6. 1. Marketing and marketing analysis  Marketing does not require the engineering involvement  Technical details for promotion  Technical support for answering the customer queries  Product planned – to satisfy customer needs or not?  Availability of proper technology to satisfy needs
  • 7. 2. Performance and feasibility studies  It is to extend the market analysis  Arriving at the preferred system configuration  Firm will offer the product.  ELEMENTS OF FESIBILITY:  A detailed need analysis  System operation requirments  Maintenance support requirments  Identification of alternate configuration  Screening and evaluating of available resources’
  • 8. 3. Advanced product planning  It is the combined results of Preliminary market analysis and feasibility study. IT INCLUDES: 1. Product selection and justification 2. Product specification and plans 3. Product acquisition plan 4. Product evaluation plan 5. Product use and logistic support plan 6. System proposal
  • 9. VALUE ANALYSIS (10 mark)  Systematic identification Elimination of unnecessary cost  Less expensive material  Less costly methods  VALUE ANALYSIS is always known as VALUE ENGINEERING, VALUE ASSURANCE, VALUE MANAGEMENT
  • 10.  VALUE ANALYSIS approach ensure that FUNCTIONS OF MINIMUM COST WITHOUT COMPARISION OF QUALITY  PURPOSE:  Achieving all functions at lower cost
  • 11. CONCEPT OF VALUE AND FUNCTION  DEFINITION OF VALUE: value =-----------  Difficult to define because, it changes person to person.  TYPES OF ECONOMIC VALUE: 1. USE VALUE (Properties, qualities, features) 2. ESTEEM VALUE (appearance) 3. COST VALUE (sum of all cost) 4. EXCHANGE VALUE (Properties for exchange) COST FUNCTION
  • 12. FUNCTION  Working function of a product TYPES OF FUNCTION:  PRIMARY FUNCTION (Designed product function, call function in phone)  SECONDARY FUNCTION ( other than primary function , mp3 player)  TERITARY FUNCTION ( Esteem nature, torch in mobile)
  • 13. VALUE ANALYSIS vs VALUE ENGINEERING  Value analysis is a remedial process  Value engineering is a preventive process USES OF VALUE ANALYSIS:  Reduce cost  Better fashion  New ideas and concepts  employees with new innovative ideas  Fulfill customer needs
  • 14. REASON FOR UNNECESSARY COST 1. Poor Design 2. Lack of ideas 3. Lack of standardisation 4. Un avoidable delivery constrains 5. Poor production planning
  • 15. STEPS IN VALUE ANALYSIS (16 mark) 1. BLAST 1. Identify the product (product for study) 2. Collect relevant information(information in manufacturing, engineering, economics) 3. Define different functions ( Functions setting) 2. CREATE 1. Create different alternatives 2. Critically evaluate alternatives 3. REFINE 1. Develop the best alternative 2. Implement the alternative
  • 16. PHASES OF VALUE ANALYSIS (16 mark) 1. ORIENTATION PHASE (data collection) 2. INFORMATION PHASE(Identify facts) 3. FUNCTIONAL ANALYSIS(basic function) 4. CREATIVE PHASE( rearrange the information) 5. EVALUATION PHASE(create various alternatives) 6. DEVELOPMENT PHASE (alternatives for technical requirement) 1. RECOMMENDATION PHASE(decision making) 2. IMPLEMENTATION PHASE(approval) 3. FOLLOW UP PHASE(compare with expectation)
  • 17. PROCESS PLANNING (16 mark)  Convert the product design in to manufacturing plan  Manufacture the products and parts  Raw material in to finished state  It is otherwise called as operations planning PROCESS PLANNING vs PRODUCTION PLANNING: How to make the product (Process Planning) To order raw materials obtaining resources to require to make insufficient and demand to it (production planning)
  • 18. DETAILS OF PROCESS PLAN (8MARK)  It contains:  Route sheet  Process  Process parameters  Machine and tools 1. Assembly and component drawings and boll of materials 2. Machine and equipment details 3. Set up time for job 4. Availability of machine and equipment
  • 19. Factors affecting process planning 1. Volume of production 2. Skill and man power 3. Delivery dates for parts 4. Material specification 5. Accuracy requirements for parts
  • 20. PROCESS PLANNING ACTIVITIES 1. ANALYSE (part requirments) 2. DETERMINE (Operation sequence) 3. SELECT (equipment) 4. CALCULATE (processing time) 5. DOCUMENT (process plan) 6. COMMUNICATE ( mfg. engg. to shop)
  • 21. ANALYISE FINISHED PART REQUIRMENTS:  Analyise the finished part in design softwares.  Either in engineering drawing or cad model format SELECT MACHINES:  Economic consideration  Durability and dependability  Longer life MATERIAL SELECTION PARAMETERS: 1. Function 2. Appearance 3. Reliability 4. Service life 5. Environment 6. Compatibility 7. Producibility 8. cost
  • 22. APPROACHES TO PROCESS PLANNING  Two general approaches: 1. Manual process plan 2. Computer Aided Process plan 1. Retrieval CAPP 2. Generative CAPP
  • 23. MANUAL PROCESS PLANNING  Task involves engineering drawings, making decisions on machine process selection,  Equipments selection, operations seqence. ADVANTAGES:  Small scale companies  Highly flexible method  Low investment DISADVANTAGES:  Very complex and time consuming  Human error takes place, because of planner  Increases paper work
  • 24. COMPUTER AIDED PROCESS PLANNING  To overcome the manual process planning.  CADD provides interface between CAD & CAM BENEFITS OF CAPP: 1. Process standardisation 2. Productivity improvement 3. Product cost reduction 4. Elimination of human error 5. Reduce in time 6. Reduce paper work 7. Improved legibility ( computer based route sheets prepared) 8. Faster response to engineering changes 9. Incorporate of other application programs
  • 25. QUANTITY DETERMINATION IN BATCH PRODUCTION  Batch production required when variety of products needed.  Products made by volume of products needed. PLANNING FOR BATCH PRODUCTION:  Determination of batch size ( production lot)  Determination of batch scheduling.
  • 26. MERITS AND DEMERITS OF BATCH PRODUCTION  MERITS 1. Easy aviability of process layout 2. Similar machines are grouped in a department 3. Better utilization of machines 4. Comparatively low investment 5. Job satisfication  DE-MERITS 1. Irregular flow of lines, material handling is expensive 2. Production planning and control is elobrate 3. Large amount of work process 4. Higher skills are required
  • 27. STOCK CONTOL STOCK CONTROL WITHOUT BUFFER STOCK:  Stock control model of batch production which varies the level of stock
  • 28. STOCK CONTROL WITH BUFFER STOCK:  There is no consumption of stock during production .  Buffer stock is also known as safety stock.
  • 29. DETERMINATION OF BATCH SIZE 1. SETUP COST: 1. Batch production involves set up cost 2. Rough cost at the time of order 3. SETUP COST INCLUDES: 1. Store requirements 2. Tool requirements. 3. Machine set up 2. INVENTORY COST: 1. Finished product to finally sold condition cost
  • 30. DETERMINATION OF MINIMUM COST BATCH SIZE 1. CONSTANT COST PER PIECE 2. SETUP COST PER BATCH 3. CARRYING COST 4. STORAGE CARRYING COST
  • 31. MACHINE CAPACITY  Batch size calculations, for batch production.  Focus on machine loading and unloading. MACHINE LOADING: 1. It is process of assigning a specific job for machines 2. Smooth workflow can be ensured 3. Machine loading should ensure maximum utilization
  • 32. INFORMATION REQUIRED FOR MACHINE LOADING 1. Number and identification of work order 2. Symbol or identification of part 3. Number of parts 4. List of operations to be performed 5. Necessary tooling's
  • 33. METHODS TO REDUCE CYCLE TIME 1. Methods-i- To reduce cycle time 2. Methods-ii- Reduce the independent activity time (workmen don’t wait for another workmen for interval) 3. Methods-iii- Reduce the concurrent activity time (Working by several parteners)
  • 34. BALANCING(Machine balancing)  Procedure for adjusting the times in working PROBLEMS OF MACHINE BALANCING: 1. Balanced process 2. Unbalanced process 1min 1min 1min 1min 1min final product 1min 2min 1min 0.5min final product
  • 35. ANALYSIS OF PROCESS CAPACITIES IN A MULTI PRODUCT SYSTEM (16MARK,10 MARK, 8 MARK)  REFER NOTES