2. Agenda
• Introduction to P6 Analytics R1
• P6 Reporting Database R2
• Benefits to your Business
• Enterprise Reporting for P6
• Oracle BI (OBIEE)
• Sample Dashboards & Demo
3. Management Excellence:
The Next Competitive Edge
Made Possible with BI & Analytics
Competitive
Advantage Smart
Agile
MANAGEMENT
EXCELLENCE Aligned
Cost
OPERATIONAL
EXCELLENCE Quality
Speed
Time
3
4. P6 Analytics
Project Portfolio Performance Executive Reporting Portal
Turn Insights into Action
Link back to P6 from the OBI Reporting Portal
to view and update projects and portfolios
P6 Reporting Database is basis for P6 Analytics, turning mass
amounts of data into insights
5. P6 Analytics and Reporting Database
Business Benefits
• Manage by exception with project and portfolio performance
dashboards
• Uncover root-cause of poorly performing projects with interactive
drill-down
• Actionable BI enabled with drill-through directly into P6
• Look at resource utilization across all projects
• Perform portfolio analysis based on any custom or prebuilt
objectives
• View trends from past project history to uncover best practices for
improving current projects
6. P6 Analytics Contents
Enhanced & Enterprise Reporting Benefits
Business
Data Visibility
Intelligence Flexibility
• Access to calculated • Pre-calculated, • Customize and create
values summarized and your own dashboards
aggregated data for fast with OBIEE
• Persists in-memory db
querying
values
• Access reports using • Enhance P6 Analytics
• Look at values across with other enterprise
standard SQL and
the entire database reporting tools data
• Activity codes can be used • Add ERP, CRM, work orders,
to group, sort or filter over • Utilizes P6 existing
financials, etc.
all the activities in the security controls and
database hierarchies
• Removes reporting
burden off production
system
7. P6 Reporting DB R2
What is new?
• 4 new star schemas
– Projects, Project history, Resource utilization and Resource assignments
• Improved ETL performance and reliability
– Parallel processing and quicker load times
• P6 security is inherited at the star schema level
• P6 project, activity & resource codes are now available as
customizable dimensions in the star schemas
• An updated Operational Data Store (ODS) for operational
reporting that includes the WBS hierarchy
• Daily spreads for activity and resource assignments
9. Oracle BI - Designed for the Enterprise
HR / Workforce
Customers Suppliers
Procurement
Operations
Marketing
Projects
Finance
Service
Sales
Customers Suppliers
Customers Suppliers
In a Call Center, how does agent tenure, training, &
compensation affect productivity & cross-selling?
What impact does supplier performance have on customer
satisfaction and revenue consistency?
What is the root-cause for my projects to overrun their budgets?
9
10. Oracle BI Server
Next-generation BI and Analytics Server
• Simplified business model view
• Advanced calculation &
integration engine
• Intelligent request generation
and optimized, distributed data
access
• Mission critical scalability and
performance
10
11. Common Enterprise Information Model
“Model once, deploy everywhere”
End user adoption is about information consistency and availability where and
when its needed. The Common Enterprise Information Model breaks down data
silos and makes information available on-demand.
11
12. P6 Analytics
Product Mapping
P6 Analytics
P6 Reporting DB (RUL)
Dashboards
Reports
Metadata
Oracle Business Intelligence
Interactive dashboards
Data models
Ad-hoc queries
BI Server
P6 Reporting Database
ODS
ETL
Star schemas
P6 EPPM
13. P6 Architecture for Enterprise Reporting & Analytics
Native view reporting
directly from P6 Web client
Threshold Alerts
Developer
PPM Business
Projects
Alerts Processing
Star
Server
Model
Web
Reporting ODS P6 PMDB
Portal Oracle Metadata Oracle BI Server Resources
Star
Activity
Oracle Business Intelligence Star P6 EPPM
Project PMO Report Author
History Star using BI Publisher for
Operational Reports
Business
End Users
Report Author
Data
accessing
reports via report using OBIEE Warehouse
portal
NOTE: All capabilities and dates are for planning purposes only and may not be used in any contract.
15. Pre-built and pre-mapped metadata makes building ad-hoc queries
and customizing out-of-the-box reports quick & easy for business
users. No need to call IT to change a report on a dashboard.
16. Landing page for P6 Analytics
Customize
dashboards and
save them as your
own personal
dashboards
17. Project Health: Critical Activities Behind Schedule
Export or print to
many different
multiple formats
including PDF,
PowerPoint, Excel
and more.
18. Earned Value: Cumulative + Period values
Use filters to select project
or portfolio earned value
by projects, portfolios, time
period, project codes or
pick your own fields
19. Resource Utilization with interactive drill-down
Dashboard reports
can be changed on
the fly by selecting
slicers
P6 Reporting DB R2 is included as a restricted use license with P6 Analytics R1. All user licenses purchases for P6 Analytics grants rights to the Reporting DB to those same users. OBI is a separate purchase and pre-requisite for P6 Analytics. P6 Reporting DB can run on Oracle databases and does not require OBI.
The combination of P6 information and Oracle BI presents an intuitive interface for communicating portfolio and project performance. Using the Oracle BI interface, individuals can instantly drill through individual projects all the way down to the lowest level of detail to find the contributing factors to project performance and health. In addition to P6 information, Oracle BI provides a foundation to blend information from multiple sources to provide a holistic, single source of truth for organizations that are rely on project success for their business.