Pekerjaan :
Lokasi : Kabupaten Muna Barat
Sumber Dana : APBD
Tahun Anggaran : 2019
Scope Pekerjaan : = 120.00 m'
HARGA JUMLAH
SATUAN HARGA
( Rp ) ( Rp )
1 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Alat ls 1.00 10,000,000.00 10,000,000.00
2 Administrasi Pelaporan / Dokumentasi ls 1.00 3,500,000.00 3,500,000.00
3 Shop Drawing dan As Built Drawing ls 1.00 3,500,000.00 3,500,000.00
17,000,000.00
II. PEKERJAAN TANAH
1 Pemasangan Bowplank m' 120.00 57,293.00 6,875,160.00
3 Galian Tanah Biasa (Mekanis) m3 454.90 24,394.07 11,096,862.08
5 Timbunan Tanah didatangkan dari luar m3 378.00 206,168.78 77,931,798.84
95,903,820.92
III. PEKERJAAN PASANGAN
1 Tiang Pancang Pondasi Bronjong m3 648.00 480,309.00 311,240,232.00
2 Pas Bronjong UIC. 2 x 1 x 0,5 m (Pabrikasi) m2 1,020.00 774,582.50 790,074,150.00
1,101,314,382.00
CV. Graha Cipta Consulindo
Kendari, 18 Maret 2019
Damsya,ST
Direktur
DAFTAR KUANTITAS DAN HARGA
Normalisasi dan Perkuatan Tebing Sungai Remba
Perkuatan Tebing Bronjong
Kiri Dan Kanan
NO U R A I A N SAT. VOLUME
ALTERNATIF 1 (SATU)
2
Sub. Total I
Sub. Total II
Sub. Total III
PEMERINTAH PROVINSI SULAWESI TENGGARA
DINAS SUMBER DAYA AIR DAN BINA MARGA
Jl. Haluoleo No.5 Kompleks Perkantoran Bumi Praja Anduonohu, Kendari 93232

More Related Content

Similar to Kwantitas a.1

Permohonan penyaluran dana desa tahap i 2016
Permohonan penyaluran dana desa tahap i  2016Permohonan penyaluran dana desa tahap i  2016
Permohonan penyaluran dana desa tahap i 2016
marcello noya
 

Similar to Kwantitas a.1 (20)

Drainase bungaejaya
Drainase bungaejayaDrainase bungaejaya
Drainase bungaejaya
 
Paparan Kolam Retensi Banjarbaru_020124.pptx
Paparan Kolam Retensi Banjarbaru_020124.pptxPaparan Kolam Retensi Banjarbaru_020124.pptx
Paparan Kolam Retensi Banjarbaru_020124.pptx
 
Desa sukaratu
Desa sukaratuDesa sukaratu
Desa sukaratu
 
LPD PNPM Perdesaan Desa Melung 2013
LPD PNPM Perdesaan Desa Melung 2013LPD PNPM Perdesaan Desa Melung 2013
LPD PNPM Perdesaan Desa Melung 2013
 
Rab paket 1
Rab paket 1Rab paket 1
Rab paket 1
 
TKDN.pdf
TKDN.pdfTKDN.pdf
TKDN.pdf
 
paybar17.pdf
paybar17.pdfpaybar17.pdf
paybar17.pdf
 
Pengelolaan RAB.ppt
Pengelolaan RAB.pptPengelolaan RAB.ppt
Pengelolaan RAB.ppt
 
Permohonan penyaluran dana desa tahap i 2016
Permohonan penyaluran dana desa tahap i  2016Permohonan penyaluran dana desa tahap i  2016
Permohonan penyaluran dana desa tahap i 2016
 
5.bappeda
5.bappeda5.bappeda
5.bappeda
 
Pembuka1
Pembuka1Pembuka1
Pembuka1
 
Perubahan APBDes Tahun 2020 Desa Tirtomoyo
Perubahan APBDes Tahun 2020 Desa TirtomoyoPerubahan APBDes Tahun 2020 Desa Tirtomoyo
Perubahan APBDes Tahun 2020 Desa Tirtomoyo
 
Evaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_okEvaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_ok
 
Evaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_okEvaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_ok
 
Evaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_okEvaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_ok
 
Evaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_okEvaluasi renja 2016 kec_darul_ihsan_ok
Evaluasi renja 2016 kec_darul_ihsan_ok
 
4. Lampiran 3
4. Lampiran 34. Lampiran 3
4. Lampiran 3
 
Final Review misi ADB TA. 2018
Final Review misi ADB TA. 2018Final Review misi ADB TA. 2018
Final Review misi ADB TA. 2018
 
PPT MD3 SJS.pptx
PPT MD3 SJS.pptxPPT MD3 SJS.pptx
PPT MD3 SJS.pptx
 
M.Yoga Kurniansyah PPT TEST SKK.pptx
M.Yoga Kurniansyah PPT TEST SKK.pptxM.Yoga Kurniansyah PPT TEST SKK.pptx
M.Yoga Kurniansyah PPT TEST SKK.pptx
 

Recently uploaded

SOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptx
SOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptxSOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptx
SOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptx
FahrizalTriPrasetyo
 
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get CytotecAbortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
Arisatrianingsih
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
FujiAdam
 
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
EnginerMine
 
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxManajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
arifyudianto3
 
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
yoodika046
 

Recently uploaded (16)

SOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptx
SOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptxSOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptx
SOAL UJIAN SKKhhhhhhjjjjjjjjjjjjjjjj.pptx
 
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get CytotecAbortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
Abortion Pills In Doha // QATAR (+966572737505 ) Get Cytotec
 
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.pptPresentasi gedung jenjang 6 - Isman Kurniawan.ppt
Presentasi gedung jenjang 6 - Isman Kurniawan.ppt
 
POWER POINT TEKLING UNTUK SARJANA KEATAS
POWER POINT TEKLING UNTUK SARJANA KEATASPOWER POINT TEKLING UNTUK SARJANA KEATAS
POWER POINT TEKLING UNTUK SARJANA KEATAS
 
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).pptBAB_3_Teorema superposisi_thevenin_norton (1).ppt
BAB_3_Teorema superposisi_thevenin_norton (1).ppt
 
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdfTEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
TEKNIS TES TULIS REKRUTMEN PAMSIMAS 2024.pdf
 
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptxppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
ppt hidrolika_ARI SATRIA NINGSIH_E1A120026.pptx
 
sample for Flow Chart Permintaan Spare Part
sample for Flow Chart Permintaan Spare Partsample for Flow Chart Permintaan Spare Part
sample for Flow Chart Permintaan Spare Part
 
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdfPengolahan Kelapa Sawit 1 pabrik pks.pdf
Pengolahan Kelapa Sawit 1 pabrik pks.pdf
 
Materi Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptx
Materi Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptxMateri Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptx
Materi Asesi SKK Manajer Pelaksana SPAM- jenjang 6.pptx
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
 
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE TriwulanpptxLaporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
Laporan Tinjauan Manajemen HSE/Laporan HSE Triwulanpptx
 
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptxUTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
UTILITAS BANGUNAN BERUPA PENANGKAL PETIR.pptx
 
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
2024.02.26 - Pra-Rakor Tol IKN 3A-2 - R2 V2.pptx
 
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptxManajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
Manajer Lapangan Pelaksanaan Pekerjaan Gedung - Endy Aitya.pptx
 
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptxPresentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
Presentation Bisnis Teknologi Modern Biru & Ungu_20240429_074226_0000.pptx
 

Kwantitas a.1

  • 1. Pekerjaan : Lokasi : Kabupaten Muna Barat Sumber Dana : APBD Tahun Anggaran : 2019 Scope Pekerjaan : = 120.00 m' HARGA JUMLAH SATUAN HARGA ( Rp ) ( Rp ) 1 3 4 5 6 I. PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi Alat ls 1.00 10,000,000.00 10,000,000.00 2 Administrasi Pelaporan / Dokumentasi ls 1.00 3,500,000.00 3,500,000.00 3 Shop Drawing dan As Built Drawing ls 1.00 3,500,000.00 3,500,000.00 17,000,000.00 II. PEKERJAAN TANAH 1 Pemasangan Bowplank m' 120.00 57,293.00 6,875,160.00 3 Galian Tanah Biasa (Mekanis) m3 454.90 24,394.07 11,096,862.08 5 Timbunan Tanah didatangkan dari luar m3 378.00 206,168.78 77,931,798.84 95,903,820.92 III. PEKERJAAN PASANGAN 1 Tiang Pancang Pondasi Bronjong m3 648.00 480,309.00 311,240,232.00 2 Pas Bronjong UIC. 2 x 1 x 0,5 m (Pabrikasi) m2 1,020.00 774,582.50 790,074,150.00 1,101,314,382.00 CV. Graha Cipta Consulindo Kendari, 18 Maret 2019 Damsya,ST Direktur DAFTAR KUANTITAS DAN HARGA Normalisasi dan Perkuatan Tebing Sungai Remba Perkuatan Tebing Bronjong Kiri Dan Kanan NO U R A I A N SAT. VOLUME ALTERNATIF 1 (SATU) 2 Sub. Total I Sub. Total II Sub. Total III PEMERINTAH PROVINSI SULAWESI TENGGARA DINAS SUMBER DAYA AIR DAN BINA MARGA Jl. Haluoleo No.5 Kompleks Perkantoran Bumi Praja Anduonohu, Kendari 93232