3. Primoris Services Corporation PRIMORIS SERVICES CORPORATION Cardinal Contractors, Inc. ARB, Inc. ARB Structures, Inc. Onquest, Inc. Cardinal Mechanical Primoris Renewable Resources Onquest Heaters, Inc. Born Heaters of Canada, Ltd. ARB International LTD ARB Ecuador Cia, Ltda. ARB Arendal, S.de R.L. de C.V. 49%
68. Quito, EcuadorSan Francisco Las Vegas Pittsburg Bakersfield United States Lake Forest San Diego Houston/Conroe Mexico Sarasota Monterrey Quito Ecuador
94. Project Experience Otay Mesa Generating Station 540 MW 2x1 GE 7FA CTG, Siemen’s STG Owner – Calpine Corporation Engineer – Burns & Roe Location – San Diego, California Scope - Civil/Foundations, ACC Erection, CTG & STG Erection, Structural steel, piping and balance of plant equipment
95. Project Experience Niland Gas Turbine Plant 100 MW - Dual GE LM 6000 Gas Combustion Turbines Owner – Imperial Irrigation District Engineer – Harris Group Location - Niland, California Scope – Complete turn-key green-field construction including Civil/Foundations, HRSG Erection, CTG & Structural steel, I&E, piping and balance of plant equipment
96. Project Experience Moss Landing Power Plant 1060 MW Combined Cycle Power Plant 4x2 GE 7FA CTG Owner – Duke Energy Engineer – Duke/Fluor Daniel Moss Landing, California HRSG erection, high energy piping installation
97. Project Experience Paramount Petroleum Paramount added gasoline production and clean burning diesel to its existing capabilities in 2005. ARB installed all carbon and alloy piping for the two new units.
98.
99. Fluid Feed Hydro Desulfurization UnitEngineer – Jacobs & Fluor Location – Carson, California Scope – Cast in place piles, foundations, structural steel, equipment erection, piping, I&E
100. Project Experience Hydrogen Reformer Hydrogen Reformer 96 SCFMMD Owner – Air Products & Chemical, Inc. Engineer – KTI Carson, California Erect hydrogen reformer heater, convection section and related piping.
106. LUZ project at Kraemer Junction, California at the SEGS (Solar Electric Generating Station) Units 8 & 9. Parabolic trough installation in 80 MW blocks for each unit. Included the fabrication and installation of structural steel, rebar and concrete work
107. Roof mounted PV panels, such as Santa Monica parking structureSolar photovoltaic panels installed at the ARCO Solar facility at Carrisa Plains, California
108. Project Experience Southern California Gas Company 19 Miles of 24-inch Natural Gas Pipeline Etiwanda through Fontana to the Mountain View Power Plant in San Bernardino, CA Southern California Edison 10 Miles of 16 and 24-inch Pipeline Port of Los Angeles to Dominguez, CA Kinder Morgan Energy Partners 70 Miles of 20-inch Pipeline Concord to Sacramento, CA