7) Power to the Crane should be  switched off  when the Crane is left unattended.
Mobile jib Cranes present extra hazards in use. Particular points requiring attention include: 8) The travelling height of the Crane with jib lowered and raised should be marked on the Crane.
9) Overhead obstructions or hazards should be clearly identified and marked with the maximum clearance height. 10) Care should be taken to ensure that no one is trapped by counter-balance weight, etc., as the crane slews.
11) The condition of the ground should be checked before lifting with a mobile crane and it should not approach close to excavations.
12) Tandem lifts should be avoided if possible. If they must be undertaken, it must be by a fully trained gang under the a  Strict Control of a Competent Person.
 
Crane Check List
Whilst work is in progress: Check that there is an up-to- to-date Test Certificate.
Check that the daily/weekly inspections are being carried out.
Ensure that the Crane is operating from planned / approved position only.
Ensure that the correct  Lifting Gear  is being used.
Ensure that outriggers are being used, and are adequately supported.
Check that the safe load / radius indicator is in working order.
Load Indicator Angle Range of Capacity Boom Length Height Radius
Overload indicators Radius

More Related Content

What's hot

Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009
vtsiri
 
Glidecam x22 ab x 22 stabilizer
Glidecam x22 ab x 22 stabilizerGlidecam x22 ab x 22 stabilizer
Glidecam x22 ab x 22 stabilizer
Tiptop Electronics
 
Lifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesLifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sites
Simon Faulkner-Duke
 

What's hot (19)

Construction Truck Crane 2009
Construction Truck Crane 2009Construction Truck Crane 2009
Construction Truck Crane 2009
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
Cranes and Rigging
Cranes and RiggingCranes and Rigging
Cranes and Rigging
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
11 stepladders
11  stepladders11  stepladders
11 stepladders
 
Scissor Lifts Powerpoint
Scissor Lifts PowerpointScissor Lifts Powerpoint
Scissor Lifts Powerpoint
 
Liftingproedure
LiftingproedureLiftingproedure
Liftingproedure
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbook
 
Working with and around our equipment1
Working with and around our equipment1Working with and around our equipment1
Working with and around our equipment1
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
 
Majid Rigger sahara Persentation
Majid Rigger sahara Persentation Majid Rigger sahara Persentation
Majid Rigger sahara Persentation
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
 
Glidecam x22 ab x 22 stabilizer
Glidecam x22 ab x 22 stabilizerGlidecam x22 ab x 22 stabilizer
Glidecam x22 ab x 22 stabilizer
 
Lifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesLifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sites
 
Lift Plan
Lift PlanLift Plan
Lift Plan
 
2014 CRW - Operating Cranes around Power Lines
2014 CRW - Operating Cranes around Power Lines2014 CRW - Operating Cranes around Power Lines
2014 CRW - Operating Cranes around Power Lines
 
Crane manufacturers coimbatore
Crane manufacturers coimbatoreCrane manufacturers coimbatore
Crane manufacturers coimbatore
 
Rigging | Rigging Safety | Gaurav Singh Rajput
Rigging | Rigging Safety | Gaurav Singh RajputRigging | Rigging Safety | Gaurav Singh Rajput
Rigging | Rigging Safety | Gaurav Singh Rajput
 

Similar to NGI-Cranes-Part 03

2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
Prastowo Priyatmoko
 
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 

Similar to NGI-Cranes-Part 03 (20)

2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Shipboard operations 3 career development
Shipboard operations 3 career developmentShipboard operations 3 career development
Shipboard operations 3 career development
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brown
 
Safety Tip: 10 Steps to Safer Crane Operation
Safety Tip: 10 Steps to Safer Crane OperationSafety Tip: 10 Steps to Safer Crane Operation
Safety Tip: 10 Steps to Safer Crane Operation
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhek
 
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx9 Lifting Operations with Tower crane Risk Assessment Templates.docx
9 Lifting Operations with Tower crane Risk Assessment Templates.docx
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
 
How to Operate a Scissor Lift? - BVM Transport
How to Operate a Scissor Lift? - BVM TransportHow to Operate a Scissor Lift? - BVM Transport
How to Operate a Scissor Lift? - BVM Transport
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.ppt
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
MEWP TRAINING 27.07.2022.pptx
MEWP TRAINING 27.07.2022.pptxMEWP TRAINING 27.07.2022.pptx
MEWP TRAINING 27.07.2022.pptx
 
36 elevating employees
36 elevating employees36 elevating employees
36 elevating employees
 
Forklift Training power point presentation
Forklift Training power point presentationForklift Training power point presentation
Forklift Training power point presentation
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
TRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docxTRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docx
 
Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introduction
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
 

More from lifecombo

NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03
lifecombo
 
NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02
lifecombo
 
NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01
lifecombo
 
NGI-PPE-Part 02
NGI-PPE-Part 02NGI-PPE-Part 02
NGI-PPE-Part 02
lifecombo
 
NGI-PPE-Part 01
NGI-PPE-Part 01NGI-PPE-Part 01
NGI-PPE-Part 01
lifecombo
 
NGI-Cranes-Part 01
NGI-Cranes-Part 01NGI-Cranes-Part 01
NGI-Cranes-Part 01
lifecombo
 
NGI-Risk Assessment
NGI-Risk AssessmentNGI-Risk Assessment
NGI-Risk Assessment
lifecombo
 
NGI-Incident Reporting
NGI-Incident ReportingNGI-Incident Reporting
NGI-Incident Reporting
lifecombo
 
NGI-Cause Tree Analysis
NGI-Cause Tree AnalysisNGI-Cause Tree Analysis
NGI-Cause Tree Analysis
lifecombo
 
NGI-Confined Spaces
NGI-Confined SpacesNGI-Confined Spaces
NGI-Confined Spaces
lifecombo
 
NGI-Radiation Awareness
NGI-Radiation AwarenessNGI-Radiation Awareness
NGI-Radiation Awareness
lifecombo
 
NGI-Chemical Handling
NGI-Chemical HandlingNGI-Chemical Handling
NGI-Chemical Handling
lifecombo
 
NGI-Tool Box Meeting
NGI-Tool Box MeetingNGI-Tool Box Meeting
NGI-Tool Box Meeting
lifecombo
 
NGI-Manual Handling
NGI-Manual HandlingNGI-Manual Handling
NGI-Manual Handling
lifecombo
 
NGI-Defensive Driving
NGI-Defensive DrivingNGI-Defensive Driving
NGI-Defensive Driving
lifecombo
 
NGI-H2S Awareness
NGI-H2S AwarenessNGI-H2S Awareness
NGI-H2S Awareness
lifecombo
 
NGI-Basic First Aid
NGI-Basic First AidNGI-Basic First Aid
NGI-Basic First Aid
lifecombo
 
NGI-Authorized Gas Testing
NGI-Authorized Gas TestingNGI-Authorized Gas Testing
NGI-Authorized Gas Testing
lifecombo
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
lifecombo
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazards
lifecombo
 

More from lifecombo (20)

NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03NGI-Welding & Cutting-Part 03
NGI-Welding & Cutting-Part 03
 
NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02NGI-Welding & Cutting-Part 02
NGI-Welding & Cutting-Part 02
 
NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01NGI-Welding & Cutting-Part 01
NGI-Welding & Cutting-Part 01
 
NGI-PPE-Part 02
NGI-PPE-Part 02NGI-PPE-Part 02
NGI-PPE-Part 02
 
NGI-PPE-Part 01
NGI-PPE-Part 01NGI-PPE-Part 01
NGI-PPE-Part 01
 
NGI-Cranes-Part 01
NGI-Cranes-Part 01NGI-Cranes-Part 01
NGI-Cranes-Part 01
 
NGI-Risk Assessment
NGI-Risk AssessmentNGI-Risk Assessment
NGI-Risk Assessment
 
NGI-Incident Reporting
NGI-Incident ReportingNGI-Incident Reporting
NGI-Incident Reporting
 
NGI-Cause Tree Analysis
NGI-Cause Tree AnalysisNGI-Cause Tree Analysis
NGI-Cause Tree Analysis
 
NGI-Confined Spaces
NGI-Confined SpacesNGI-Confined Spaces
NGI-Confined Spaces
 
NGI-Radiation Awareness
NGI-Radiation AwarenessNGI-Radiation Awareness
NGI-Radiation Awareness
 
NGI-Chemical Handling
NGI-Chemical HandlingNGI-Chemical Handling
NGI-Chemical Handling
 
NGI-Tool Box Meeting
NGI-Tool Box MeetingNGI-Tool Box Meeting
NGI-Tool Box Meeting
 
NGI-Manual Handling
NGI-Manual HandlingNGI-Manual Handling
NGI-Manual Handling
 
NGI-Defensive Driving
NGI-Defensive DrivingNGI-Defensive Driving
NGI-Defensive Driving
 
NGI-H2S Awareness
NGI-H2S AwarenessNGI-H2S Awareness
NGI-H2S Awareness
 
NGI-Basic First Aid
NGI-Basic First AidNGI-Basic First Aid
NGI-Basic First Aid
 
NGI-Authorized Gas Testing
NGI-Authorized Gas TestingNGI-Authorized Gas Testing
NGI-Authorized Gas Testing
 
NGI-Permit to Work
NGI-Permit to WorkNGI-Permit to Work
NGI-Permit to Work
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazards
 

Recently uploaded

Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Recently uploaded (20)

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 

NGI-Cranes-Part 03

  • 1. 7) Power to the Crane should be switched off when the Crane is left unattended.
  • 2. Mobile jib Cranes present extra hazards in use. Particular points requiring attention include: 8) The travelling height of the Crane with jib lowered and raised should be marked on the Crane.
  • 3. 9) Overhead obstructions or hazards should be clearly identified and marked with the maximum clearance height. 10) Care should be taken to ensure that no one is trapped by counter-balance weight, etc., as the crane slews.
  • 4. 11) The condition of the ground should be checked before lifting with a mobile crane and it should not approach close to excavations.
  • 5. 12) Tandem lifts should be avoided if possible. If they must be undertaken, it must be by a fully trained gang under the a Strict Control of a Competent Person.
  • 6.  
  • 8. Whilst work is in progress: Check that there is an up-to- to-date Test Certificate.
  • 9. Check that the daily/weekly inspections are being carried out.
  • 10. Ensure that the Crane is operating from planned / approved position only.
  • 11. Ensure that the correct Lifting Gear is being used.
  • 12. Ensure that outriggers are being used, and are adequately supported.
  • 13. Check that the safe load / radius indicator is in working order.
  • 14. Load Indicator Angle Range of Capacity Boom Length Height Radius