REC is the currency of Renewable
Energy Market
 1 REC is received for each MWH generation of Electricity through
 sustainable sources like Solar, Wind, etc.
 REC has two categories
         i. Solar REC :- This is the best invention under the “SUN”
         ii. Non Solar REC
 REC represents the attributes of Electricity generation from
 Renewable Energy Sources.
 But Solar REC is most Precious among all and trading done
 separately
 REC has no boundary and no Geographic and Physical limitation.
A. Who cAn do this?
Any individual, Partners, Company, Co-
operative body, Corporation, HUF, Joint
Venture satisfying the State/U.T. norms as
prescribed by Energy Development Agency of
that State or U.T. can do this.
  (Example:GEDA/ MEDA/ WEBREDA/ RRECL/
             CREDA/UPNEDA ETC.)
B. How tHe Project Allotted /
            RegisteRed ?
Eligible can get accredited their
Project with complete details not before Six
Months prior to proposed date of
commissioning.
Should have space like Land/Roof for
minimum installation of 250Kw.
No limit prescribed for maximum installation.
Separate application for separate Projects.
C. How to proCeed for allotment
          and RegistRation?

Eligible can register not before Three Month’s
prior to date of Commissioning at Central
Agency of NLDC.
Registration is possible only after state
Certificate of accreditation.
Total Solar Electricity generated must be sold
to DISCOM at APPC or to any one in the Solar
Exchange Market.
Issue of ReC
Electricity metered by state Load dispatch
centre only acceptable.
This certificate of meter reading is basis of
application to NLDC for issue of REC but all
within three Months only.
REC received to be sold within 365 days.
Trading of rEC
Trading of REC through closed double sided auction on
last Wednesday of every Month.
Power Exchange platform for sale or purchase of REC.
Post confirmation by 5 PM on last Wednesday of each
Month regarding Price and Volume of REC by NLDC.
Purchaser like Companies who are burning Diesel, Petrol
or using fossil fuels like State Roadways, Railways, all
Electricity Board, Transport Corporation etc. are purchaser
They have to inform to State Electricity Regulators about
their purchase of REC, which will be in proportion of
fossil fuel burnt by them on yearly basis.
Trading of rEC
Seller inform to State Electricity Regulators about their
sale in numbers.
All Transactions done unbiased and in transparent mode,
seller does not know the purchaser vice a versa.
Payment released to seller of REC on T+1.
Minimum Price for one Solar REC is 9300 INR and
maximum price is 13,400 INR.

All State Road Transport, Railways, all Discom in India,
who are burning Diesel, Petrol or Fossil Fuel will have to
purchase REC to meet their obligation as per act (RPO).
Trading of rEC
NLDC has issued first REC in Month of May 2012.
REC Market is limit less because everyone who consumes
Diesel, Petrol, Fossil Fuel have to buy this REC at ultimate
stage under RPO Act. The list of purchaser as defined by
Government of India under the act is very long and
volume of solar REC to be transected at power exchange
is estimated around 500 Cr. this year.
World malls With mW
         roof top fit
1. Mall Of Arabia, Egypt- 1.90MWp
2. Grand Canyan Parkway, Las Vegas - 4.4 MWp
3. Isfahan City Center Iran - 4.5 MWp
4. New South China Mall, China, Donggun-
    7.00MWp
5. Golden Resource Mall, China, Beijing- 5.00
    MWp
ADVANTAGES

1. REC has good liquidity
2. Sellers may enter at appropriate time
    and sell REC at raised price.
3. Choice of Two Power Exchange.
4. Certainty of Cash Flow.
ECONOMIC PREVIEW
      10 MWp SYSTEM
a) Yearly minimum generated Unit = 15,000 MWH
b) Yearly REC issued = 15,000 REC.
c) Income from 15,000 MWH sold to DISCOM = 4.50 Cr.
d) Income from 15000 REC sold at Power Exchange = 15
    Cr. (REC rate considered Rs. 10,000 Vs Actually sold
    price of Rs.13,000 for Month of May 2012 at Power
    Exchange)
e) Income received, 1st Year ( c+d )= 19.50 Cr.
f) Estimated Project Cost for 10 MWp = 90 Cr.
g) Life of Project = 25 Years.
ECONOMIC PREVIEW
       10 MWp SYSTEM
   Comparison Of Executed PPA’S and
            Proposed R.E.C.
A. REC sale from Power Exchange gives rate of Rs. 13/- KWh.
B. Minimum sold Price of Electricity to DISCOM as per Act Rs. 3/-
    KWh although producer is free to open access at his rate.
C. REC Generator Company is to receive (A)+(B) = 13+3 = 16/- INR
    per KWh.
D. Existing PPA is having range of INR 07.9 to 17.50.
CONCLUSION: REC is proving better arm for investment for
               Investor. It has a very bright future.
PROFITABILITY
Head Office:
    “Lobel House” 65 Mihir Park, Opp Mittal Apartment,
    Nr Rajeev Tower, Nr Tube Company, O P Road,
     Vadodara-390 020 Tel: +91-9327007854
             Email : lobelpower@gmail.com /
  info@lobelpower.com

Website: www.lobelpower.com




                                          Address:
                               Nr. Santram Temple, Opp. Old Shark
                               Market, Padra, Gujarat, India.
REC basic detail for Solar MW Plant

More Related Content

Viewers also liked

Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
Shrikant Hiremath
 
Business Plan - Mato Auto
Business Plan - Mato AutoBusiness Plan - Mato Auto
Business Plan - Mato Auto
Mishaalhk
 
Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...
Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...
Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...
Ajjay Kumar Gupta
 

Viewers also liked (20)

Training for Students
Training for StudentsTraining for Students
Training for Students
 
How To Plan a Software Project
How To Plan a Software ProjectHow To Plan a Software Project
How To Plan a Software Project
 
Business Plan of Automobile Industry Skyler motors pvt ltd - By Shujaat Khalid
Business Plan of Automobile Industry Skyler motors pvt ltd - By Shujaat KhalidBusiness Plan of Automobile Industry Skyler motors pvt ltd - By Shujaat Khalid
Business Plan of Automobile Industry Skyler motors pvt ltd - By Shujaat Khalid
 
project on software industry
project on software industryproject on software industry
project on software industry
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
 
My Top 10 Design Business Failures
My Top 10 Design Business FailuresMy Top 10 Design Business Failures
My Top 10 Design Business Failures
 
SWOT_Analysis_of_2_wheeler_automobile_industry_in_india, A_seminar_by_Mohan_K...
SWOT_Analysis_of_2_wheeler_automobile_industry_in_india, A_seminar_by_Mohan_K...SWOT_Analysis_of_2_wheeler_automobile_industry_in_india, A_seminar_by_Mohan_K...
SWOT_Analysis_of_2_wheeler_automobile_industry_in_india, A_seminar_by_Mohan_K...
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
Petrol pump plan
Petrol pump planPetrol pump plan
Petrol pump plan
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Computer science Investigatory Project Class 12 C++
Computer science Investigatory Project Class 12 C++Computer science Investigatory Project Class 12 C++
Computer science Investigatory Project Class 12 C++
 
Retail Petroleum
Retail PetroleumRetail Petroleum
Retail Petroleum
 
Business Plan - Mato Auto
Business Plan - Mato AutoBusiness Plan - Mato Auto
Business Plan - Mato Auto
 
automobile industry
automobile industryautomobile industry
automobile industry
 
Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...
Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...
Automobile Industry and Auto Components, Automotive Components, Spare Parts, ...
 
Final project report on Solar street light
Final project report on Solar street light Final project report on Solar street light
Final project report on Solar street light
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Automobile Sector
Automobile SectorAutomobile Sector
Automobile Sector
 
Honda
HondaHonda
Honda
 
Automobile Industry - history, evolution & growth
Automobile Industry - history, evolution & growthAutomobile Industry - history, evolution & growth
Automobile Industry - history, evolution & growth
 

Similar to REC basic detail for Solar MW Plant

REC a market ready for take-off
REC   a market ready for take-offREC   a market ready for take-off
REC a market ready for take-off
Anuj Kaushik
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
Bakul Haria
 
Natural group solar presentation - Solar Market India Aug 2012
Natural group solar presentation - Solar Market India Aug 2012Natural group solar presentation - Solar Market India Aug 2012
Natural group solar presentation - Solar Market India Aug 2012
Ritesh Pothan
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTOR
Ranbir Ghosh
 

Similar to REC basic detail for Solar MW Plant (20)

REC a market ready for take-off
REC   a market ready for take-offREC   a market ready for take-off
REC a market ready for take-off
 
Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...
Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...
Rsm GC Advisory Renewable Purchase Obligation (RPO) & Renewable Energy Certif...
 
H2 generation ppt by amol bakane(1)
H2 generation  ppt by amol bakane(1)H2 generation  ppt by amol bakane(1)
H2 generation ppt by amol bakane(1)
 
Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar
 
영문=10mw. fiji
영문=10mw. fiji영문=10mw. fiji
영문=10mw. fiji
 
Feasibility and Efficiency of Renewable Energy Habitat
 Feasibility and Efficiency of Renewable Energy Habitat  Feasibility and Efficiency of Renewable Energy Habitat
Feasibility and Efficiency of Renewable Energy Habitat
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Cover letter 20 dec.2014
Cover letter 20 dec.2014Cover letter 20 dec.2014
Cover letter 20 dec.2014
 
Natural group solar presentation - Solar Market India Aug 2012
Natural group solar presentation - Solar Market India Aug 2012Natural group solar presentation - Solar Market India Aug 2012
Natural group solar presentation - Solar Market India Aug 2012
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTOR
 
Profile
ProfileProfile
Profile
 
REAR_Newsletter_202204.pdf
REAR_Newsletter_202204.pdfREAR_Newsletter_202204.pdf
REAR_Newsletter_202204.pdf
 
Solar energy services in india
Solar energy services in indiaSolar energy services in india
Solar energy services in india
 
LEAD ACID STORAGE BATTERY presentation.pptx
LEAD ACID STORAGE BATTERY presentation.pptxLEAD ACID STORAGE BATTERY presentation.pptx
LEAD ACID STORAGE BATTERY presentation.pptx
 
Contact Solar
Contact SolarContact Solar
Contact Solar
 
200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA
 
RECs
RECsRECs
RECs
 
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANTSOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
 

More from L'Obel Solar Power System

Why lobel is best for solar power plant ?
Why lobel is best for solar power plant ?Why lobel is best for solar power plant ?
Why lobel is best for solar power plant ?
L'Obel Solar Power System
 
How to clean & What to care of solar PV module for better life ?
How to clean & What to care of solar PV module for better life ?How to clean & What to care of solar PV module for better life ?
How to clean & What to care of solar PV module for better life ?
L'Obel Solar Power System
 

More from L'Obel Solar Power System (20)

Lobel Technical Specification .pdf
Lobel Technical Specification .pdfLobel Technical Specification .pdf
Lobel Technical Specification .pdf
 
L’Obel Solar Brochure.pdf
L’Obel Solar Brochure.pdfL’Obel Solar Brochure.pdf
L’Obel Solar Brochure.pdf
 
BIS Ksolare 1Ph Inverters.pdf
BIS Ksolare 1Ph Inverters.pdfBIS Ksolare 1Ph Inverters.pdf
BIS Ksolare 1Ph Inverters.pdf
 
BIS Ksolare Certificate 3KW-3P to 50KW-3P.pdf
BIS Ksolare Certificate 3KW-3P to 50KW-3P.pdfBIS Ksolare Certificate 3KW-3P to 50KW-3P.pdf
BIS Ksolare Certificate 3KW-3P to 50KW-3P.pdf
 
Why Lobel Solar Power .pdf
Why Lobel Solar Power .pdfWhy Lobel Solar Power .pdf
Why Lobel Solar Power .pdf
 
Lobel Web Brochure 2021.pdf
Lobel Web Brochure 2021.pdfLobel Web Brochure 2021.pdf
Lobel Web Brochure 2021.pdf
 
Why lobel is best for solar power plant ?
Why lobel is best for solar power plant ?Why lobel is best for solar power plant ?
Why lobel is best for solar power plant ?
 
Lobel Solar Latetst Specification
Lobel Solar Latetst SpecificationLobel Solar Latetst Specification
Lobel Solar Latetst Specification
 
Lobel Solar Updated Company Profile
Lobel Solar Updated Company ProfileLobel Solar Updated Company Profile
Lobel Solar Updated Company Profile
 
How to clean & What to care of solar PV module for better life ?
How to clean & What to care of solar PV module for better life ?How to clean & What to care of solar PV module for better life ?
How to clean & What to care of solar PV module for better life ?
 
Lobel solar GEDA & MNRE domestic subsidy power project
Lobel solar GEDA & MNRE domestic subsidy power projectLobel solar GEDA & MNRE domestic subsidy power project
Lobel solar GEDA & MNRE domestic subsidy power project
 
MNRE on-grid approval latter - 9998931555
MNRE on-grid approval latter - 9998931555MNRE on-grid approval latter - 9998931555
MNRE on-grid approval latter - 9998931555
 
Tax depriciation & other benefits for the investors in lobel solar power plant
Tax depriciation & other benefits for the investors in lobel solar power plantTax depriciation & other benefits for the investors in lobel solar power plant
Tax depriciation & other benefits for the investors in lobel solar power plant
 
Lobel solar brochure
Lobel solar brochureLobel solar brochure
Lobel solar brochure
 
Lobel No voltage relay with display
Lobel No voltage relay with displayLobel No voltage relay with display
Lobel No voltage relay with display
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
 
Solar petrol pump proposal
Solar petrol pump proposalSolar petrol pump proposal
Solar petrol pump proposal
 
Lobel solar pv accessories
Lobel solar pv accessoriesLobel solar pv accessories
Lobel solar pv accessories
 
Lobel LED Leaflet - New launching of LED Products in this Diwali.
Lobel LED Leaflet - New launching of LED Products in this Diwali.  Lobel LED Leaflet - New launching of LED Products in this Diwali.
Lobel LED Leaflet - New launching of LED Products in this Diwali.
 
Gujarat solar power_policy_2015
Gujarat solar power_policy_2015Gujarat solar power_policy_2015
Gujarat solar power_policy_2015
 

Recently uploaded

NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 

Recently uploaded (20)

A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
Stages of Startup Funding - An Explainer
Stages of Startup Funding - An ExplainerStages of Startup Funding - An Explainer
Stages of Startup Funding - An Explainer
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datass
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxUnveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 

REC basic detail for Solar MW Plant

  • 1.
  • 2. OPENING DOOR TO ALL ENTERPRENURE FOR GREEN ECONOMY AND GREEN BUSINESS
  • 3. REC is the currency of Renewable Energy Market 1 REC is received for each MWH generation of Electricity through sustainable sources like Solar, Wind, etc. REC has two categories i. Solar REC :- This is the best invention under the “SUN” ii. Non Solar REC REC represents the attributes of Electricity generation from Renewable Energy Sources. But Solar REC is most Precious among all and trading done separately REC has no boundary and no Geographic and Physical limitation.
  • 4. A. Who cAn do this? Any individual, Partners, Company, Co- operative body, Corporation, HUF, Joint Venture satisfying the State/U.T. norms as prescribed by Energy Development Agency of that State or U.T. can do this. (Example:GEDA/ MEDA/ WEBREDA/ RRECL/ CREDA/UPNEDA ETC.)
  • 5. B. How tHe Project Allotted / RegisteRed ? Eligible can get accredited their Project with complete details not before Six Months prior to proposed date of commissioning. Should have space like Land/Roof for minimum installation of 250Kw. No limit prescribed for maximum installation. Separate application for separate Projects.
  • 6. C. How to proCeed for allotment and RegistRation? Eligible can register not before Three Month’s prior to date of Commissioning at Central Agency of NLDC. Registration is possible only after state Certificate of accreditation. Total Solar Electricity generated must be sold to DISCOM at APPC or to any one in the Solar Exchange Market.
  • 7. Issue of ReC Electricity metered by state Load dispatch centre only acceptable. This certificate of meter reading is basis of application to NLDC for issue of REC but all within three Months only. REC received to be sold within 365 days.
  • 8. Trading of rEC Trading of REC through closed double sided auction on last Wednesday of every Month. Power Exchange platform for sale or purchase of REC. Post confirmation by 5 PM on last Wednesday of each Month regarding Price and Volume of REC by NLDC. Purchaser like Companies who are burning Diesel, Petrol or using fossil fuels like State Roadways, Railways, all Electricity Board, Transport Corporation etc. are purchaser They have to inform to State Electricity Regulators about their purchase of REC, which will be in proportion of fossil fuel burnt by them on yearly basis.
  • 9. Trading of rEC Seller inform to State Electricity Regulators about their sale in numbers. All Transactions done unbiased and in transparent mode, seller does not know the purchaser vice a versa. Payment released to seller of REC on T+1. Minimum Price for one Solar REC is 9300 INR and maximum price is 13,400 INR. All State Road Transport, Railways, all Discom in India, who are burning Diesel, Petrol or Fossil Fuel will have to purchase REC to meet their obligation as per act (RPO).
  • 10. Trading of rEC NLDC has issued first REC in Month of May 2012. REC Market is limit less because everyone who consumes Diesel, Petrol, Fossil Fuel have to buy this REC at ultimate stage under RPO Act. The list of purchaser as defined by Government of India under the act is very long and volume of solar REC to be transected at power exchange is estimated around 500 Cr. this year.
  • 11. World malls With mW roof top fit 1. Mall Of Arabia, Egypt- 1.90MWp 2. Grand Canyan Parkway, Las Vegas - 4.4 MWp 3. Isfahan City Center Iran - 4.5 MWp 4. New South China Mall, China, Donggun- 7.00MWp 5. Golden Resource Mall, China, Beijing- 5.00 MWp
  • 12.
  • 13. ADVANTAGES 1. REC has good liquidity 2. Sellers may enter at appropriate time and sell REC at raised price. 3. Choice of Two Power Exchange. 4. Certainty of Cash Flow.
  • 14. ECONOMIC PREVIEW 10 MWp SYSTEM a) Yearly minimum generated Unit = 15,000 MWH b) Yearly REC issued = 15,000 REC. c) Income from 15,000 MWH sold to DISCOM = 4.50 Cr. d) Income from 15000 REC sold at Power Exchange = 15 Cr. (REC rate considered Rs. 10,000 Vs Actually sold price of Rs.13,000 for Month of May 2012 at Power Exchange) e) Income received, 1st Year ( c+d )= 19.50 Cr. f) Estimated Project Cost for 10 MWp = 90 Cr. g) Life of Project = 25 Years.
  • 15. ECONOMIC PREVIEW 10 MWp SYSTEM Comparison Of Executed PPA’S and Proposed R.E.C. A. REC sale from Power Exchange gives rate of Rs. 13/- KWh. B. Minimum sold Price of Electricity to DISCOM as per Act Rs. 3/- KWh although producer is free to open access at his rate. C. REC Generator Company is to receive (A)+(B) = 13+3 = 16/- INR per KWh. D. Existing PPA is having range of INR 07.9 to 17.50. CONCLUSION: REC is proving better arm for investment for Investor. It has a very bright future.
  • 17. Head Office: “Lobel House” 65 Mihir Park, Opp Mittal Apartment, Nr Rajeev Tower, Nr Tube Company, O P Road, Vadodara-390 020 Tel: +91-9327007854 Email : lobelpower@gmail.com / info@lobelpower.com Website: www.lobelpower.com Address: Nr. Santram Temple, Opp. Old Shark Market, Padra, Gujarat, India.