Status and Proposals for Increase in Water Production
Common Complaints
1. Low water pressure during peak hours
2. Limited service coverage due to inadequate
water supply
3. Breakdowns in machinery and equipment
4. Increasing losses due to leakage and
spoilage (Non Revenue Water)
Service Areas
Service Areas Connections
2020
Average Daily
Consumption
Roxas City 29,770 20,230 m3
Panay 5,319 2,788 m3
Panitan 1,858 1,015 m3
Ivisan 1,663 887 m3
Sigma Bulk Water 1 177 m3
Total 38,611 25,096 m3
Population Served
Service Areas Population Served % Served
Roxas City 138,172 77.5%
Panay 25,166 25.3%
Panitan 8,918 53.0%
Ivisan 7,932 20.8%
Total 180,745 54.4%
Water Production Facilities
Facility Location Source Daily
Output
Salocon WTP Salocon, Panitan Surface Water 38.00 MLD*
Bahit WTP Bahit, Panitan Surface Water 1.50 MLD*
Cabugao Pumping
Station
Cabugao, Roxas
City
Deep Well 0.26 MLD*
Lonoy Pumping
Station
Lonoy, Roxas City Deep Well 0.13 MLD*
39.89 MLD
* Theoretical capacity
Water Production Process
1. Raw Water Intake
2. Sand and Grit
3. Sedimentation Basins
4. Treated Water Pumping Station
5. Reservoirs
6. Distribution
Raw Water Intake
Intended to draw raw water from the
Panay River for processing in the
sedimentation basins.
Composed of the following:
- Intake structure
- Three (3) 75hp submersible pumps
- Replaced by vertical turbine pumps
Sand and Grit
structure intended to remove sand and
other debris from raw water before being
pumped to sedimentation basins
Sedimentation Basins
 two (2) structures designed to
process raw water and produce 15
million liters per day (MLD)
 With a flash mixing chamber,
flocculation tanks, sedimentation or
clarifier basins, and filter media beds
Treated Water Pumping Station
Treated water is pumped to the
reservoirs using:
 Three (3) 300hp vertical turbine
pumps
 Two (2) 75hp vertical turbine pumps
Reservoirs
Main Reservoirs
 Lawaan Reservoir (2,700 m3)
 Arkabalo Reservoir (700 m3)
Other storage facilities:
 Culasi Reservoir (1,000 m3)
 NHA Reservoir (300 m3)
 Ivisan Reservoir (300 m3)
Distribution
 Treated water is distributed from
reservoirs to consumers using gravity
 373 kilometers of distribution
pipelines, from as small as 50mm to
as large as 600mm
Areas Serviced
Facility Areas Serviced Daily Output
Salocon WTP All areas 38.00 MLD
Bahit WTP Panitan 1.50 MLD
Cabugao Pumping
Station
Parts of Roxas City 0.26 MLD
Lonoy Pumping Station Parts of Roxas City,
Ivisan, and Sigma
0.13 MLD
39.89 MLD
Daily Water Consumption (Actual)
Type 2017 2018 2019 2020
Residential 19,397 20,093 21,263 22,432
Government 797 813 847 882
Commercial 2,505 2,570 2,696 2,822
Industrial 105 107 112 117
Bulk Sales 221 236 257 278
Sigma 383 400 216 225
Total 23,408 24,219 25,391 26,755
0
500000
1000000
1500000
2017 2018 2019 2020
Average Water Production
Year Average Annual Water
Production
Increase
2017 809,935 m3
2018 854,810 m3 44,875 m3
2019 987,723 m3 132,913 m3
2020 YTD 1,017,935 m3 30,312 m3
Water Demand Projection
Year Projected Average Daily
Demand
Maximum Daily Demand (ADD x
1.2)
2022 34,716 41,659
2023 36,049 43,259
2024 38,083 45,700
2025 40,254 48,305
2026 42,827 51,392
2027 44,983 53,980
2028 47,515 57,018
2029 50,241 60,289
2030 52,653 63,184
Water Demand Projection
Year Projected Average Daily
Demand
Maximum Daily Demand
(ADD x 1.2)
2031 55,215 66,258
2032 57,945 69,534
2033 60,168 72,202
2034 62,481 74,977
2035 64,901 77,881
Water Demand Projection
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
Average Daily
Demand
Maximum
Daily Demand
(ADD x 1.2)
Water
Production
Water Supply and Demand
Year Average Daily
Demand
Maximum Daily
Demand (ADD
x 1.2)
Daily Water
Production
Non Revenue
Water (20%)
Water Supplied
(WP - NRW)
2022 34,716 41,659 39,890 7,978 31,912
2023 36,049 43,259 39,890 7,978 31,912
2024 38,083 45,700 39,890 7,978 31,912
2025 40,254 48,305 39,890 7,978 31,912
2026 42,827 51,392 39,890 7,978 31,912
2027 44,983 53,980 39,890 7,978 31,912
2028 47,515 57,018 39,890 7,978 31,912
2029 50,241 60,289 39,890 7,978 31,912
2030 52,653 63,184 39,890 7,978 31,912
Water Supply and Demand
Year Average Daily
Demand
Maximum Daily
Demand (ADD
x 1.2)
Daily Water
Production
Non Revenue
Water (20%)
Water Supplied
(WP - NRW)
2030 52,653 63,184 39,890 7,978 31,912
2031 55,215 66,258 39,890 7,978 31,912
2032 57,945 69,534 39,890 7,978 31,912
2033 60,168 72,202 39,890 7,978 31,912
2034 62,481 74,977 39,890 7,978 31,912
2035 64,901 77,881 39,890 7,978 31,912
Water Supply and Demand
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
Average Daily
Demand
Maximum
Daily Demand
(ADD x 1.2)
Daily Water
Production
Water Supplied
(WP - NRW)
Timeline
Date Action
11072019 Long Term Improvement Plan (Resolution no.
103, 2019)
01022020 Creation of Technical Working Group (Office
Order 2020-01-01)
01202020 TWG recommended an independent consultant
to evaluate options
01242020 Approval to engage services of consultant
(Resolution no. 12, 2020)
05052020 Terms of Reference for consultant approved
(Resolution no. 29, 2020)
Timeline
Date Action
05052020 Terms of Reference for consultant approved
(Resolution no. 29, 2020)
07022020 CPE Engineering Services awarded contract
08052020 Final draft of recommendation submitted and
copies furnished to key personnel
08062020 Department heads tasked to review final draft
08272020 Finance and Planning Departments submitted
detailed financial analysis of all 3 options
09072020 Board of Directors instructed inclusion of pay-as-
you-consume stipulation in Terms of Reference
Options
1. Status Quo
2. Rehabilitation of old Lawaan Water
Treatment Plant
3. Construction of new Water Treatment
Plant at Salocon
4. Bulk Water contract
Status Quo
 No rehabilitation
 No new Water Treatment Plant
 Incremental increase in water production
 No bulk water
 No rate increase
Status Quo Impact on consumers
Year
Average Daily
Consumption
Maximum
Demand (AD
x 1.2)
Water
Supply
Non
Revenue
Water (20%)
Actual Water
Supply
Surplus
(Deficit) on
Average
Demand
Surplus
(Deficit) on
Maximum
Demand
2022 34,716 41,659 39,890 7,978 31,912 (2,804) (9,747)
2023 36,049 43,259 39,890 7,978 31,912 (4,137) (11,347)
2024 38,083 45,700 39,890 7,978 31,912 (6,171) (13,788)
2025 40,254 48,305 39,890 7,978 31,912 (8,342) (16,393)
2026 42,827 51,392 39,890 7,978 31,912 (10,915) (19,480)
2027 44,983 53,980 39,890 7,978 31,912 (13,071) (22,068)
2028 47,515 57,018 39,890 7,978 31,912 (15,603) (25,106)
2029 50,241 60,289 39,890 7,978 31,912 (18,329) (28,377)
2030 52,653 63,184 39,890 7,978 31,912 (20,741) (31,272)
Status Quo Impact on consumers
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2022 2023 2024 2025 2026 2027 2028 2029 2030
Average Daily
Consumption
Maximum
Demand (AD x
1.2)
Water Supply
Actual Water
Supply
Rehabilitation of Lawaan WTP
Rehabilitation of old 15MLD Water Treatment
Plant at Lawaan Reservoir.
This Water Treatment Plant was abandoned
when the Salocon Water Treatment Plant
became operational.
Advantages:
 Existing structure
 Proximity to reservoir
Structures and Equipment (Phase I)
 Raw Water Intake Facility – rehabilitation
of old raw water pumping station
 Raw Water Pumping Station – three (3)
225hp pumps to pump raw water to Lawaan
WTP (18.75MLD)
 Transmission pipeline –10.2 km pipeline
(33MLD)
 6.05 kms of 700mm steel pipes
 4.25 kms of 600mm steel pipes
Structures and Equipment (Phase I)
 Water Treatment Plant – rehabilitation of
old Lawaan WTP (15 MLD)
 Storage Facility – required to account for
pressure drop
 Lot Acquisition – required for ground
reservoir and sludge lagoon (no more
available space at area)
Project Cost
Structure and Equipment Cost
Phase I (15MLD)
Raw Water Intake P5,000,000.00
Raw Water Pumping Station P35,000,000.00
Water Treatment Plant (Construction) P30,000,000.00
Water Treatment Plant (Equipment) P70,000,000.00
Transmission Lines P440,400,000.00
Storage Facility P24,700,000.00
Lot Acquisition P3,250,000.00
Total Cost for Phase I P608,350,000.00
Structures and Equipment (Phase II)
Raw Water Pumping Station –
upgrading (18.75 MLD to 37.5 MLD)
Water Treatment Plant – upgrading
(15MLD to 30MLD)
Project Cost
Structure and Equipment Cost
Phase II (30MLD)
Raw Water Pumping Station P15,000,000.00
Water Treatment Plant (Construction) P105,000,000.00
Water Treatment Plant (Equipment) P70,000,000.00
Total Cost for Phase II P190,000,000.00
Total Basic Construction Cost P798,350,000.00
Contingency Fund (10%) P79,835,000.00
Total Cost for Rehabilitation of
Lawaan WTP
P878,185,000.00
Time to Completion
Project Loan Local Water Utilities Administration
Requirements Duration
Feasibility Study 5 to 6 months
Loan Application
• Financial Evaluation
• Monetary Board Clearance
8 to 11 months
Loan Approval 2 to 3 months
Terms of Reference 0.5 to 1 month
Procurement through Design Build under RA 9184 6 to 8 months
Implementation to Completion 12 to 15 months
Total 33.5 to 44 months
Time to Completion
Project Loan Government Financial Institution
Requirements Duration
Feasibility Study 5 to 6 months
Waiver from Local Water Utilities Administration
and Loan Application
6 to 8 months
Financial Evaluation and Monetary Board
Clearance
5 to 6 months
Loan Approval 1.5 to 2 months
Terms of Reference 0.5 to 1 month
Tendering for Design Build 6 to 8 months
Construction and Implementation 12 to 15 months
Total 36 to 46 months
Impact on consumers
Year
Average Daily
Consumption
Maximum
Demand (AD x
1.2)
Additional
Water Supply
Actual Water
Supply (20%
NRW)
Surplus
(Deficit) on
Average
Demand
Surplus
(Deficit) on
Maximum
Demand
2022 34,716 41,659 31,912 -2,804 -9,747
2023 36,049 43,259 31,912 -4,137 -11,347
2024 38,083 45,700 15,000 46,912 8,829 1,212
2025 40,254 48,305 15,000 46,912 6,658 -1,393
2026 42,827 51,392 15,000 46,912 4,085 -4,480
2027 44,983 53,980 30,000 61,912 16,929 7,932
2028 47,515 57,018 30,000 61,912 14,397 4,894
2029 50,241 60,289 30,000 61,912 11,671 1,623
2030 52,653 63,184 30,000 61,912 9,259 -1,272
Impact on consumers
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2022 2023 2024 2025 2026 2027 2028 2029 2030
Average Daily
Consumption
Maximum
Demand (AD x
1.2)
Actual Water
Supply (20%
NRW)
New 15MLD WTP at Salocon
Construction of new 15MLD Water
Treatment Plant at Sitio Paslang,
Barangay Salocon, Panitan, Capiz using
vacant area.
Advantages:
1. No additional cost for land acquisition
2. Stable design
Structures and Equipment (Phase I)
 Raw Water Intake Facility – rehabilitation
of old raw water pumping station
 Raw Water Pumping Station – upgrading
to 15MLD (3 x 25hp pumps)
 Water Treatment Plant – 15MLD Water
Treatment Plant to be constructed beside
existing Water Treatment Plants
Structures and Equipment (Phase I)
 Treated Water Pumping Station –
composed of three (3) 150hp vertical turbine
pumps to pump water to reservoirs
 Transmission pipelines – 10.2 kms
600mm steel pipeline to reservoirs (33MLD)
 Storage Facility – use of old Lawaan Water
Treatment Plant as storage facility
Project Cost
Structure and Equipment Cost
Phase I (15MLD)
Raw Water Intake P5,000,000.00
Raw Water Pumping Station P20,000,000.00
Water Treatment Plant (Construction) P92,310,000.00
Water Treatment Plant (Equipment) P88,690,000.00
Treated Water Pumping Station P28,000,000.00
Transmission Lines 374,600,000.00
Storage Facility 3,000,000.00
Site Development P1,000,000.00
Total Cost for Phase I P612,600,000.00
Structures and Equipment (Phase II)
Raw Water Pumping Station –
upgrading (15 MLD to 37.5 MLD)
Treated Water Pumping Station –
upgrading (15MLD to 30MLD)
Water Treatment Plant – upgrading
(15MLD to 30MLD)
Project Cost
Structure and Equipment Cost
Phase II (30MLD)
Raw Water Pumping Station P6,000,000.00
Water Treatment Plant (Construction) P75,735,000.00
Water Treatment Plant (Equipment) P72,765,000.00
Treated Water Pumping Station P12,000,000.00
Total Cost for Phase II P166,500,000.00
Total Basic Construction Cost P779,100,000.00
Contingency Fund (10%) P77,910,000.00
Total Cost for new WTP P857,010,000.00
Time to Completion
Project Loan Local Water Utilities Administration
Requirements Duration
Feasibility Study 5 to 6 months
Loan Application
• Financial Evaluation
• Monetary Board Clearance
8 to 11 months
Loan Approval 2 to 3 months
Terms of Reference 0.5 to 1 month
Procurement through Design Build under RA 9184 6 to 8 months
Implementation to Completion 12 to 15 months
Total 33.5 to 44 months
Time to Completion
Project Loan Government Financial Institution
Requirements Duration
Feasibility Study 5 to 6 months
Waiver from Local Water Utilities Administration
and Loan Application
6 to 8 months
Financial Evaluation and Monetary Board
Clearance
5 to 6 months
Loan Approval 1.5 to 2 months
Terms of Reference 0.5 to 1 month
Tendering for Design Build 6 to 8 months
Construction and Implementation 12 to 15 months
Total 36 to 46 months
Impact on consumers
Year
Average Daily
Consumption
Maximum
Demand (AD x
1.2)
Additional
Water Supply
Actual Water
Supply (20%
NRW)
Surplus
(Deficit) on
Average
Demand
Surplus
(Deficit) on
Maximum
Demand
2022 34,716 41,659 31,912 -2,804 -9,747
2023 36,049 43,259 31,912 -4,137 -11,347
2024 38,083 45,700 15,000 46,912 8,829 1,212
2025 40,254 48,305 15,000 46,912 6,658 -1,393
2026 42,827 51,392 15,000 46,912 4,085 -4,480
2027 44,983 53,980 30,000 61,912 16,929 7,932
2028 47,515 57,018 30,000 61,912 14,397 4,894
2029 50,241 60,289 30,000 61,912 11,671 1,623
2030 52,653 63,184 30,000 61,912 9,259 -1,272
Impact on consumers
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2022 2023 2024 2025 2026 2027 2028 2029 2030
Average Daily
Consumption
Maximum
Demand (AD x
1.2)
Actual Water
Supply (20%
NRW)
Bulk Water Purchase
Purchase of bulk water from independent supplier for
P25.00 per m3 in stages over a period of 15 years.
Year Bulk Water
Purchase
Daily Cost
1 to 3 5 MLD P125,000.00
3 to 6 10 MLD P250,000.00
7 to 15 15 MLD P375,000.00
Project Cost and Revenues
Year Annual Cost Expected Revenues
(based on Effective Water Rate P40)
2022-2024 P45,625,000.00 P73,000,0000.00
2025-2027 P91,250,000.00 P146,000,000.00
2028-2037 P136,875,000.00 P219,000,000.00
P1,642,500,000.00 P2,628,000,000.00
Time to Completion
Procurement
Requirements Duration
Financial Analysis of Bulk Water Rate 1 to 2 months
Terms of Reference and Board Approval 0.5 to 1 month
Procurement until Notice of Award 6 to 8 months
Delivery after Notice of Award 12 to 15 months
Total 19.5 to 26 months
Impact on consumers
Year
Average Daily
Consumption
Maximum
Demand (AD x
1.2)
Additional
Water Supply
Actual Water
Supply (20%
NRW)
Surplus
(Deficit) on
Average
Demand
Surplus
(Deficit) on
Maximum
Demand
2022 34,716 41,659 5,000 36,912 2,196 (4,747)
2023 36,049 43,259 5,000 36,912 863 (6,347)
2024 38,083 45,700 5,000 36,912 (1,171) (8,788)
2025 40,254 48,305 10,000 41,912 1,658 (6,393)
2026 42,827 51,392 10,000 41,912 (915) (9,480)
2027 44,983 53,980 10,000 41,912 (3,071) (12,068)
2028 47,515 57,018 15,000 46,912 (603) (10,106)
2029 50,241 60,289 15,000 46,912 (3,329) (13,377)
2030 52,653 63,184 15,000 46,912 (5,741) (16,272)
Impact on consumers
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2022 2023 2024 2025 2026 2027 2028 2029 2030
Average Daily
Consumption
Maximum
Demand (AD x
1.2)
Actual Water
Supply (20%
NRW)
Gantt Chart
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
LWUA
Loan
Feasibility
Study
Loan Application, Financial
Evaluation, MB clearance
Loan
Approv
al
T
O
R
Procurement Design
Build
Implementation and Completion
GFI
Loan
Feasibility
Study
LWUA waiver, Loan
Application
Evaluation
Appr
oval
T
O
R
Design Build Construction and Implementation
Procure
ment
FA
T
O
R
Procurement Delivery
Year 1 Year 2 Year 3 Year 4
Timeline

More Related Content

Similar to Boost Water Supply with New Treatment Plant

Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyVictoriaColangelo
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study PresentationVictoriaColangelo
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwarePratap Bikram Shahi
 
Proposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plantProposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plantDato Mat Isa
 
AH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate StudyAH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate Studyahcitycouncil
 
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaSite Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaAmali Pathiraja
 
2016 ULI Hines Student Competition Pro Forma_v11
2016 ULI Hines Student Competition  Pro Forma_v112016 ULI Hines Student Competition  Pro Forma_v11
2016 ULI Hines Student Competition Pro Forma_v11Miguel A. Garcia
 
AH CCM 10.08.18 - Item #5 - ppt AH Rate Study
AH CCM 10.08.18 - Item #5 - ppt AH Rate StudyAH CCM 10.08.18 - Item #5 - ppt AH Rate Study
AH CCM 10.08.18 - Item #5 - ppt AH Rate Studyahcitycouncil
 
Gopika viswanath
Gopika viswanathGopika viswanath
Gopika viswanathgopika v
 
City Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity of San Angelo Texas
 
CIP SPIN variances q3 fy 2014
CIP SPIN  variances   q3 fy 2014CIP SPIN  variances   q3 fy 2014
CIP SPIN variances q3 fy 2014Susie Cambria
 
Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptxChinelo Ezenwa
 
Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptxChinelo Ezenwa
 
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...Setiono Winardi
 
Pavilion income statement as to Dec 31 2017
Pavilion income statement as to Dec 31 2017Pavilion income statement as to Dec 31 2017
Pavilion income statement as to Dec 31 2017al karajo jr
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Sadegh Tabatabaei
 

Similar to Boost Water Supply with New Treatment Plant (20)

watson ppt.pptx
watson ppt.pptxwatson ppt.pptx
watson ppt.pptx
 
B'dAfrique newco biocarbon 1
B'dAfrique  newco biocarbon 1B'dAfrique  newco biocarbon 1
B'dAfrique newco biocarbon 1
 
Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate Study
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
 
Proposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plantProposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plant
 
AH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate StudyAH CCM 10.22.18 Item #4 AH Rate Study
AH CCM 10.22.18 Item #4 AH Rate Study
 
Site Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali PathirajaSite Plan for Rathmalana Railway Station - Amali Pathiraja
Site Plan for Rathmalana Railway Station - Amali Pathiraja
 
2016 ULI Hines Student Competition Pro Forma_v11
2016 ULI Hines Student Competition  Pro Forma_v112016 ULI Hines Student Competition  Pro Forma_v11
2016 ULI Hines Student Competition Pro Forma_v11
 
AH CCM 10.08.18 - Item #5 - ppt AH Rate Study
AH CCM 10.08.18 - Item #5 - ppt AH Rate StudyAH CCM 10.08.18 - Item #5 - ppt AH Rate Study
AH CCM 10.08.18 - Item #5 - ppt AH Rate Study
 
Design of an industrial park
Design of an industrial parkDesign of an industrial park
Design of an industrial park
 
Gopika viswanath
Gopika viswanathGopika viswanath
Gopika viswanath
 
City Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget Presentation
 
CIP SPIN variances q3 fy 2014
CIP SPIN  variances   q3 fy 2014CIP SPIN  variances   q3 fy 2014
CIP SPIN variances q3 fy 2014
 
Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptx
 
Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptx
 
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
LOOKING FOR FINANCING TO PROVIDE BUSINESS DEVELOPMENT ON ZIRCONE MINING IN IN...
 
Pavilion income statement as to Dec 31 2017
Pavilion income statement as to Dec 31 2017Pavilion income statement as to Dec 31 2017
Pavilion income statement as to Dec 31 2017
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640
 
for LinkedIN
for LinkedINfor LinkedIN
for LinkedIN
 

More from Marcelo Augusto A. Cosgayon

0104 report ethics and accountability in the government
0104 report ethics and accountability in the government0104 report ethics and accountability in the government
0104 report ethics and accountability in the governmentMarcelo Augusto A. Cosgayon
 
Final term paper management information systems styled
Final term paper management information systems styledFinal term paper management information systems styled
Final term paper management information systems styledMarcelo Augusto A. Cosgayon
 
Final term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch iiFinal term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch iiMarcelo Augusto A. Cosgayon
 
01020 final examinations human resource management 2016
01020 final examinations human resource management 201601020 final examinations human resource management 2016
01020 final examinations human resource management 2016Marcelo Augusto A. Cosgayon
 
Economic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon newEconomic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon newMarcelo Augusto A. Cosgayon
 
0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...Marcelo Augusto A. Cosgayon
 
Group 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel newGroup 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel newMarcelo Augusto A. Cosgayon
 

More from Marcelo Augusto A. Cosgayon (20)

0104 report ethics and accountability in the government
0104 report ethics and accountability in the government0104 report ethics and accountability in the government
0104 report ethics and accountability in the government
 
Data Analysis
Data AnalysisData Analysis
Data Analysis
 
Wages
WagesWages
Wages
 
Collective Bargaining Agreements
Collective Bargaining AgreementsCollective Bargaining Agreements
Collective Bargaining Agreements
 
Case Study Research
Case Study ResearchCase Study Research
Case Study Research
 
Laws against violence against women new
Laws against violence against women newLaws against violence against women new
Laws against violence against women new
 
Lean production toyota production system
Lean production toyota production systemLean production toyota production system
Lean production toyota production system
 
Graceville subdivision drainage problem
Graceville subdivision drainage problemGraceville subdivision drainage problem
Graceville subdivision drainage problem
 
Ethical privacy and security issues
Ethical privacy and security issuesEthical privacy and security issues
Ethical privacy and security issues
 
0201B Aggregate Resource Planning
0201B Aggregate Resource Planning0201B Aggregate Resource Planning
0201B Aggregate Resource Planning
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
0103B Pegasus Airlines Case Study
0103B Pegasus Airlines Case Study0103B Pegasus Airlines Case Study
0103B Pegasus Airlines Case Study
 
Final term paper management information systems styled
Final term paper management information systems styledFinal term paper management information systems styled
Final term paper management information systems styled
 
Final term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch iiFinal term paper management information systems cosgayon batch ii
Final term paper management information systems cosgayon batch ii
 
01020 final examinations human resource management 2016
01020 final examinations human resource management 201601020 final examinations human resource management 2016
01020 final examinations human resource management 2016
 
Economic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon newEconomic analysis of annulment of marriage cosgayon new
Economic analysis of annulment of marriage cosgayon new
 
0102 final term paper human resource management
0102 final term paper human resource management0102 final term paper human resource management
0102 final term paper human resource management
 
0103 b assignment 1 operations manager
0103 b assignment 1 operations manager0103 b assignment 1 operations manager
0103 b assignment 1 operations manager
 
0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...0103 b assignment 2 history and advancements of management science and operat...
0103 b assignment 2 history and advancements of management science and operat...
 
Group 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel newGroup 2 marketing plan the premiere business hotel new
Group 2 marketing plan the premiere business hotel new
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Boost Water Supply with New Treatment Plant

  • 1. Status and Proposals for Increase in Water Production
  • 2. Common Complaints 1. Low water pressure during peak hours 2. Limited service coverage due to inadequate water supply 3. Breakdowns in machinery and equipment 4. Increasing losses due to leakage and spoilage (Non Revenue Water)
  • 3. Service Areas Service Areas Connections 2020 Average Daily Consumption Roxas City 29,770 20,230 m3 Panay 5,319 2,788 m3 Panitan 1,858 1,015 m3 Ivisan 1,663 887 m3 Sigma Bulk Water 1 177 m3 Total 38,611 25,096 m3
  • 4. Population Served Service Areas Population Served % Served Roxas City 138,172 77.5% Panay 25,166 25.3% Panitan 8,918 53.0% Ivisan 7,932 20.8% Total 180,745 54.4%
  • 5. Water Production Facilities Facility Location Source Daily Output Salocon WTP Salocon, Panitan Surface Water 38.00 MLD* Bahit WTP Bahit, Panitan Surface Water 1.50 MLD* Cabugao Pumping Station Cabugao, Roxas City Deep Well 0.26 MLD* Lonoy Pumping Station Lonoy, Roxas City Deep Well 0.13 MLD* 39.89 MLD * Theoretical capacity
  • 6. Water Production Process 1. Raw Water Intake 2. Sand and Grit 3. Sedimentation Basins 4. Treated Water Pumping Station 5. Reservoirs 6. Distribution
  • 7. Raw Water Intake Intended to draw raw water from the Panay River for processing in the sedimentation basins. Composed of the following: - Intake structure - Three (3) 75hp submersible pumps - Replaced by vertical turbine pumps
  • 8. Sand and Grit structure intended to remove sand and other debris from raw water before being pumped to sedimentation basins
  • 9. Sedimentation Basins  two (2) structures designed to process raw water and produce 15 million liters per day (MLD)  With a flash mixing chamber, flocculation tanks, sedimentation or clarifier basins, and filter media beds
  • 10. Treated Water Pumping Station Treated water is pumped to the reservoirs using:  Three (3) 300hp vertical turbine pumps  Two (2) 75hp vertical turbine pumps
  • 11. Reservoirs Main Reservoirs  Lawaan Reservoir (2,700 m3)  Arkabalo Reservoir (700 m3) Other storage facilities:  Culasi Reservoir (1,000 m3)  NHA Reservoir (300 m3)  Ivisan Reservoir (300 m3)
  • 12. Distribution  Treated water is distributed from reservoirs to consumers using gravity  373 kilometers of distribution pipelines, from as small as 50mm to as large as 600mm
  • 13. Areas Serviced Facility Areas Serviced Daily Output Salocon WTP All areas 38.00 MLD Bahit WTP Panitan 1.50 MLD Cabugao Pumping Station Parts of Roxas City 0.26 MLD Lonoy Pumping Station Parts of Roxas City, Ivisan, and Sigma 0.13 MLD 39.89 MLD
  • 14. Daily Water Consumption (Actual) Type 2017 2018 2019 2020 Residential 19,397 20,093 21,263 22,432 Government 797 813 847 882 Commercial 2,505 2,570 2,696 2,822 Industrial 105 107 112 117 Bulk Sales 221 236 257 278 Sigma 383 400 216 225 Total 23,408 24,219 25,391 26,755
  • 15. 0 500000 1000000 1500000 2017 2018 2019 2020 Average Water Production Year Average Annual Water Production Increase 2017 809,935 m3 2018 854,810 m3 44,875 m3 2019 987,723 m3 132,913 m3 2020 YTD 1,017,935 m3 30,312 m3
  • 16. Water Demand Projection Year Projected Average Daily Demand Maximum Daily Demand (ADD x 1.2) 2022 34,716 41,659 2023 36,049 43,259 2024 38,083 45,700 2025 40,254 48,305 2026 42,827 51,392 2027 44,983 53,980 2028 47,515 57,018 2029 50,241 60,289 2030 52,653 63,184
  • 17. Water Demand Projection Year Projected Average Daily Demand Maximum Daily Demand (ADD x 1.2) 2031 55,215 66,258 2032 57,945 69,534 2033 60,168 72,202 2034 62,481 74,977 2035 64,901 77,881
  • 18. Water Demand Projection 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Average Daily Demand Maximum Daily Demand (ADD x 1.2) Water Production
  • 19. Water Supply and Demand Year Average Daily Demand Maximum Daily Demand (ADD x 1.2) Daily Water Production Non Revenue Water (20%) Water Supplied (WP - NRW) 2022 34,716 41,659 39,890 7,978 31,912 2023 36,049 43,259 39,890 7,978 31,912 2024 38,083 45,700 39,890 7,978 31,912 2025 40,254 48,305 39,890 7,978 31,912 2026 42,827 51,392 39,890 7,978 31,912 2027 44,983 53,980 39,890 7,978 31,912 2028 47,515 57,018 39,890 7,978 31,912 2029 50,241 60,289 39,890 7,978 31,912 2030 52,653 63,184 39,890 7,978 31,912
  • 20. Water Supply and Demand Year Average Daily Demand Maximum Daily Demand (ADD x 1.2) Daily Water Production Non Revenue Water (20%) Water Supplied (WP - NRW) 2030 52,653 63,184 39,890 7,978 31,912 2031 55,215 66,258 39,890 7,978 31,912 2032 57,945 69,534 39,890 7,978 31,912 2033 60,168 72,202 39,890 7,978 31,912 2034 62,481 74,977 39,890 7,978 31,912 2035 64,901 77,881 39,890 7,978 31,912
  • 21. Water Supply and Demand 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 Average Daily Demand Maximum Daily Demand (ADD x 1.2) Daily Water Production Water Supplied (WP - NRW)
  • 22. Timeline Date Action 11072019 Long Term Improvement Plan (Resolution no. 103, 2019) 01022020 Creation of Technical Working Group (Office Order 2020-01-01) 01202020 TWG recommended an independent consultant to evaluate options 01242020 Approval to engage services of consultant (Resolution no. 12, 2020) 05052020 Terms of Reference for consultant approved (Resolution no. 29, 2020)
  • 23. Timeline Date Action 05052020 Terms of Reference for consultant approved (Resolution no. 29, 2020) 07022020 CPE Engineering Services awarded contract 08052020 Final draft of recommendation submitted and copies furnished to key personnel 08062020 Department heads tasked to review final draft 08272020 Finance and Planning Departments submitted detailed financial analysis of all 3 options 09072020 Board of Directors instructed inclusion of pay-as- you-consume stipulation in Terms of Reference
  • 24. Options 1. Status Quo 2. Rehabilitation of old Lawaan Water Treatment Plant 3. Construction of new Water Treatment Plant at Salocon 4. Bulk Water contract
  • 25. Status Quo  No rehabilitation  No new Water Treatment Plant  Incremental increase in water production  No bulk water  No rate increase
  • 26. Status Quo Impact on consumers Year Average Daily Consumption Maximum Demand (AD x 1.2) Water Supply Non Revenue Water (20%) Actual Water Supply Surplus (Deficit) on Average Demand Surplus (Deficit) on Maximum Demand 2022 34,716 41,659 39,890 7,978 31,912 (2,804) (9,747) 2023 36,049 43,259 39,890 7,978 31,912 (4,137) (11,347) 2024 38,083 45,700 39,890 7,978 31,912 (6,171) (13,788) 2025 40,254 48,305 39,890 7,978 31,912 (8,342) (16,393) 2026 42,827 51,392 39,890 7,978 31,912 (10,915) (19,480) 2027 44,983 53,980 39,890 7,978 31,912 (13,071) (22,068) 2028 47,515 57,018 39,890 7,978 31,912 (15,603) (25,106) 2029 50,241 60,289 39,890 7,978 31,912 (18,329) (28,377) 2030 52,653 63,184 39,890 7,978 31,912 (20,741) (31,272)
  • 27. Status Quo Impact on consumers 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 2022 2023 2024 2025 2026 2027 2028 2029 2030 Average Daily Consumption Maximum Demand (AD x 1.2) Water Supply Actual Water Supply
  • 28. Rehabilitation of Lawaan WTP Rehabilitation of old 15MLD Water Treatment Plant at Lawaan Reservoir. This Water Treatment Plant was abandoned when the Salocon Water Treatment Plant became operational. Advantages:  Existing structure  Proximity to reservoir
  • 29. Structures and Equipment (Phase I)  Raw Water Intake Facility – rehabilitation of old raw water pumping station  Raw Water Pumping Station – three (3) 225hp pumps to pump raw water to Lawaan WTP (18.75MLD)  Transmission pipeline –10.2 km pipeline (33MLD)  6.05 kms of 700mm steel pipes  4.25 kms of 600mm steel pipes
  • 30. Structures and Equipment (Phase I)  Water Treatment Plant – rehabilitation of old Lawaan WTP (15 MLD)  Storage Facility – required to account for pressure drop  Lot Acquisition – required for ground reservoir and sludge lagoon (no more available space at area)
  • 31. Project Cost Structure and Equipment Cost Phase I (15MLD) Raw Water Intake P5,000,000.00 Raw Water Pumping Station P35,000,000.00 Water Treatment Plant (Construction) P30,000,000.00 Water Treatment Plant (Equipment) P70,000,000.00 Transmission Lines P440,400,000.00 Storage Facility P24,700,000.00 Lot Acquisition P3,250,000.00 Total Cost for Phase I P608,350,000.00
  • 32. Structures and Equipment (Phase II) Raw Water Pumping Station – upgrading (18.75 MLD to 37.5 MLD) Water Treatment Plant – upgrading (15MLD to 30MLD)
  • 33. Project Cost Structure and Equipment Cost Phase II (30MLD) Raw Water Pumping Station P15,000,000.00 Water Treatment Plant (Construction) P105,000,000.00 Water Treatment Plant (Equipment) P70,000,000.00 Total Cost for Phase II P190,000,000.00 Total Basic Construction Cost P798,350,000.00 Contingency Fund (10%) P79,835,000.00 Total Cost for Rehabilitation of Lawaan WTP P878,185,000.00
  • 34. Time to Completion Project Loan Local Water Utilities Administration Requirements Duration Feasibility Study 5 to 6 months Loan Application • Financial Evaluation • Monetary Board Clearance 8 to 11 months Loan Approval 2 to 3 months Terms of Reference 0.5 to 1 month Procurement through Design Build under RA 9184 6 to 8 months Implementation to Completion 12 to 15 months Total 33.5 to 44 months
  • 35. Time to Completion Project Loan Government Financial Institution Requirements Duration Feasibility Study 5 to 6 months Waiver from Local Water Utilities Administration and Loan Application 6 to 8 months Financial Evaluation and Monetary Board Clearance 5 to 6 months Loan Approval 1.5 to 2 months Terms of Reference 0.5 to 1 month Tendering for Design Build 6 to 8 months Construction and Implementation 12 to 15 months Total 36 to 46 months
  • 36. Impact on consumers Year Average Daily Consumption Maximum Demand (AD x 1.2) Additional Water Supply Actual Water Supply (20% NRW) Surplus (Deficit) on Average Demand Surplus (Deficit) on Maximum Demand 2022 34,716 41,659 31,912 -2,804 -9,747 2023 36,049 43,259 31,912 -4,137 -11,347 2024 38,083 45,700 15,000 46,912 8,829 1,212 2025 40,254 48,305 15,000 46,912 6,658 -1,393 2026 42,827 51,392 15,000 46,912 4,085 -4,480 2027 44,983 53,980 30,000 61,912 16,929 7,932 2028 47,515 57,018 30,000 61,912 14,397 4,894 2029 50,241 60,289 30,000 61,912 11,671 1,623 2030 52,653 63,184 30,000 61,912 9,259 -1,272
  • 37. Impact on consumers 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 2022 2023 2024 2025 2026 2027 2028 2029 2030 Average Daily Consumption Maximum Demand (AD x 1.2) Actual Water Supply (20% NRW)
  • 38. New 15MLD WTP at Salocon Construction of new 15MLD Water Treatment Plant at Sitio Paslang, Barangay Salocon, Panitan, Capiz using vacant area. Advantages: 1. No additional cost for land acquisition 2. Stable design
  • 39. Structures and Equipment (Phase I)  Raw Water Intake Facility – rehabilitation of old raw water pumping station  Raw Water Pumping Station – upgrading to 15MLD (3 x 25hp pumps)  Water Treatment Plant – 15MLD Water Treatment Plant to be constructed beside existing Water Treatment Plants
  • 40. Structures and Equipment (Phase I)  Treated Water Pumping Station – composed of three (3) 150hp vertical turbine pumps to pump water to reservoirs  Transmission pipelines – 10.2 kms 600mm steel pipeline to reservoirs (33MLD)  Storage Facility – use of old Lawaan Water Treatment Plant as storage facility
  • 41. Project Cost Structure and Equipment Cost Phase I (15MLD) Raw Water Intake P5,000,000.00 Raw Water Pumping Station P20,000,000.00 Water Treatment Plant (Construction) P92,310,000.00 Water Treatment Plant (Equipment) P88,690,000.00 Treated Water Pumping Station P28,000,000.00 Transmission Lines 374,600,000.00 Storage Facility 3,000,000.00 Site Development P1,000,000.00 Total Cost for Phase I P612,600,000.00
  • 42. Structures and Equipment (Phase II) Raw Water Pumping Station – upgrading (15 MLD to 37.5 MLD) Treated Water Pumping Station – upgrading (15MLD to 30MLD) Water Treatment Plant – upgrading (15MLD to 30MLD)
  • 43. Project Cost Structure and Equipment Cost Phase II (30MLD) Raw Water Pumping Station P6,000,000.00 Water Treatment Plant (Construction) P75,735,000.00 Water Treatment Plant (Equipment) P72,765,000.00 Treated Water Pumping Station P12,000,000.00 Total Cost for Phase II P166,500,000.00 Total Basic Construction Cost P779,100,000.00 Contingency Fund (10%) P77,910,000.00 Total Cost for new WTP P857,010,000.00
  • 44. Time to Completion Project Loan Local Water Utilities Administration Requirements Duration Feasibility Study 5 to 6 months Loan Application • Financial Evaluation • Monetary Board Clearance 8 to 11 months Loan Approval 2 to 3 months Terms of Reference 0.5 to 1 month Procurement through Design Build under RA 9184 6 to 8 months Implementation to Completion 12 to 15 months Total 33.5 to 44 months
  • 45. Time to Completion Project Loan Government Financial Institution Requirements Duration Feasibility Study 5 to 6 months Waiver from Local Water Utilities Administration and Loan Application 6 to 8 months Financial Evaluation and Monetary Board Clearance 5 to 6 months Loan Approval 1.5 to 2 months Terms of Reference 0.5 to 1 month Tendering for Design Build 6 to 8 months Construction and Implementation 12 to 15 months Total 36 to 46 months
  • 46. Impact on consumers Year Average Daily Consumption Maximum Demand (AD x 1.2) Additional Water Supply Actual Water Supply (20% NRW) Surplus (Deficit) on Average Demand Surplus (Deficit) on Maximum Demand 2022 34,716 41,659 31,912 -2,804 -9,747 2023 36,049 43,259 31,912 -4,137 -11,347 2024 38,083 45,700 15,000 46,912 8,829 1,212 2025 40,254 48,305 15,000 46,912 6,658 -1,393 2026 42,827 51,392 15,000 46,912 4,085 -4,480 2027 44,983 53,980 30,000 61,912 16,929 7,932 2028 47,515 57,018 30,000 61,912 14,397 4,894 2029 50,241 60,289 30,000 61,912 11,671 1,623 2030 52,653 63,184 30,000 61,912 9,259 -1,272
  • 47. Impact on consumers 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 2022 2023 2024 2025 2026 2027 2028 2029 2030 Average Daily Consumption Maximum Demand (AD x 1.2) Actual Water Supply (20% NRW)
  • 48. Bulk Water Purchase Purchase of bulk water from independent supplier for P25.00 per m3 in stages over a period of 15 years. Year Bulk Water Purchase Daily Cost 1 to 3 5 MLD P125,000.00 3 to 6 10 MLD P250,000.00 7 to 15 15 MLD P375,000.00
  • 49. Project Cost and Revenues Year Annual Cost Expected Revenues (based on Effective Water Rate P40) 2022-2024 P45,625,000.00 P73,000,0000.00 2025-2027 P91,250,000.00 P146,000,000.00 2028-2037 P136,875,000.00 P219,000,000.00 P1,642,500,000.00 P2,628,000,000.00
  • 50. Time to Completion Procurement Requirements Duration Financial Analysis of Bulk Water Rate 1 to 2 months Terms of Reference and Board Approval 0.5 to 1 month Procurement until Notice of Award 6 to 8 months Delivery after Notice of Award 12 to 15 months Total 19.5 to 26 months
  • 51. Impact on consumers Year Average Daily Consumption Maximum Demand (AD x 1.2) Additional Water Supply Actual Water Supply (20% NRW) Surplus (Deficit) on Average Demand Surplus (Deficit) on Maximum Demand 2022 34,716 41,659 5,000 36,912 2,196 (4,747) 2023 36,049 43,259 5,000 36,912 863 (6,347) 2024 38,083 45,700 5,000 36,912 (1,171) (8,788) 2025 40,254 48,305 10,000 41,912 1,658 (6,393) 2026 42,827 51,392 10,000 41,912 (915) (9,480) 2027 44,983 53,980 10,000 41,912 (3,071) (12,068) 2028 47,515 57,018 15,000 46,912 (603) (10,106) 2029 50,241 60,289 15,000 46,912 (3,329) (13,377) 2030 52,653 63,184 15,000 46,912 (5,741) (16,272)
  • 52. Impact on consumers 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 2022 2023 2024 2025 2026 2027 2028 2029 2030 Average Daily Consumption Maximum Demand (AD x 1.2) Actual Water Supply (20% NRW)
  • 53. Gantt Chart 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 LWUA Loan Feasibility Study Loan Application, Financial Evaluation, MB clearance Loan Approv al T O R Procurement Design Build Implementation and Completion GFI Loan Feasibility Study LWUA waiver, Loan Application Evaluation Appr oval T O R Design Build Construction and Implementation Procure ment FA T O R Procurement Delivery Year 1 Year 2 Year 3 Year 4

Editor's Notes

  1. Residential 18.18 Government 90.85 Commercial 52.29 Industrial 152.98 Bulk Sales 59.11
  2. Residential 18.18 Government 90.85 Commercial 52.29 Industrial 152.98 Bulk Sales 59.11
  3. Average Daily Demand - Maximum Daily Demand
  4. Average Daily Demand - Maximum Daily Demand
  5. Average Daily Demand - Maximum Daily Demand
  6. 39MLD 20% NRW
  7. 39MLD 20% NRW
  8. Transmission Lines 700mm P44,000.00 per meter x 6,050 meters = P266,200.00 600mm P36,000.00 per meter x 4,250 meters = P153,000.00 Storage Facility P19,000 per cubic meter x 1,300 cubic meters = P24,700.00
  9. Starting point January 2021 Completion October 2023 or August 2024
  10. Starting point January 2021 Completion December 2023 or October 2024
  11. Starting point January 2021 Completion October 2023 or August 2024
  12. Starting point January 2021 Completion December 2023 or October 2024
  13. Starting point January 2021 Completion July 2022 or January 2023