Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
L.S
Site preparation:
Includes
a. Removal of deans cutting and grading the natural
ground of any type of soil to the dimensions and levels
shown on the drawings including the complete removal
and disposal (as directed by Site Engineer) of
pavements and structures of any kind visible or
encountered during the cutting.
b. Laying out the work
1
Earth Work:
the whole of the work shall be executed according to
section 2 of the specification If rock is encountered
during excavation for foundation and if permitted by the
Site Engineer, it may not need to be removal provided
that the surface is roughened with proper steps and any
other arrangements requested by the Site Engineer to his
satisfaction
2 Cu.m
2.1- Excavation for the foundation of all types of walls,
retaining walls, columns, and back walls for floors yards
walkways, aprons and passages. . etc. and wherever
needed and in all types of soil including "Rock" it
includes keeping the trenches free from water the price
includes also backfilling the excavated trenches with
ordinary approved material in well compacted layers not
exceeding 20 cm in thickness.
Cu.m
2.2- Filling inside and outside the building with
approved materials in well compacted layers not
exceeding 20 cm in thickness
Note:
- Compaction ratio for the filling under the
reinforced concrete flooring and ramp flooring
should be 95 % MDD
- Last layer should not exceed 15 cm
Concrete Work :
All of the works shall be executed according to section
3 of the specification Whenever crushed stone is
specified under foundation concrete it should be very
well compacted in a way that part the stones be
penetrated into the soil of The foundation (With
exception if the soil of the foundation is rock or
conglomerate). The final surface of the crushed stone
should be even and non-porous
3
Cu.m
3.1-Plain concrete (1:2:4) for the foundation of the
walls,
retaining walls (if any), back walls of the walkways,
yards,
Aprons and passages and wherever needed over a
layer of 10 cm thick and compacted crushed stone.
1
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
Cu.m
3.2- Plain concrete (1:3:6) under the reinforced
concrete of the foundation of the walls and the footings
of the columns or wherever needed
3
Cu.m
3.3- Reinforced concrete (1:2:4) for foundation of the
walls The cost includes provision and fixing of
reinforcing steel bars and fixing of needed spacers
according to the drawings.
Cu.m
3.4- Reinforced concrete (1:1.5:3) for columns and
column footings. The cost includes provision and
fixing of reinforcing steel bars and fixing of needed
spacers according to the drawings.
Cu.m
3.5- Reinforced concrete (1:2:4) for slabs lintels.
Beams. Tie Beams at any level, parapets, stairs,
louvers and decorations. The cost includes providing
and fixing of reinforcing steel bars And fixing of
needed spacers according to the drawings.
Sq.m
3.6- Plain concrete (1:2:4) 10 cm thick over a layer of
10 cm thick and compacted crushed stone for floors,
yards. Walkways ramps for disabled. Aprons and
passages. .. Etc. the item includes execution of
expansion joints at intervals not exceeding three
meters (in both directions when the shorter dimension
is more than 3 m) and filling properly with semi dry
cement mortar 1:3. All exposed edges should be
chamfered (2.5 x 2.5) cm. Cost of excavation with
backfilling, plain concrete for foundation and block
wall of the back wall will be paid under the other
relevant items of this B.o.Q.
Sq.m
3.7- Plain concrete (1:2:4) 8 cm thickness under tile
floors and over 10 cm compacted crushed stone
including executing join if require
M.L
3.8- Wall capping with reinforced concrete (1:2:4) of
20 mm maximum size of aggregate for parapets. Top
and sides of the capping should be fair faced. The
cost includes providing and fixing of reinforcing steel
bars and needed spacers according to the drawings.
M.L
3.9- Window sills with reinforced concrete(1:2:4) of 20
mm Maximum size of aggregate. The exposed parts of
the sill Should be fair faced. The cost includes
providing and fixing of reinforcing steel bars and
needed spacers according to the drawings.
2
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
Masonry :
The works shall be executed according to section 7 of
the specification. Stone walls may be constructed with
local available stones if conforms to the specifications
and approved by the Site Engineer. The space between
the two rows of the stone should be filled with stone
pieces and cement mortar 1:3. The stone pieces
Should be surrounded completely by cement mortar
1:3.
4
Cu.m
4.1- Building walls with fabricated perforated brick
(24x12x 8) and cement mortar (1:3). The cost includes
provision insulating sheets between the wall and the
slab or tie beam cast monolithically with the slab as
shown on the drawings.
Metal works conforming to section 16 of
the specification :
5.1- Metal Doors: Steel doors with steel plate G18 leaf
frame with angle Iron of 25x25 mm. for double face and
37.5x37.5 mm. for single face. The outer frame should
be made with double section 3 mm thickness or as
shown on the drawings The doors should be provided
with 4 mm thick glass panes if required, mortise switch
lock (Hungarian type or the best type available in local
market if the. Hungarian type is not available), and door
stoppers fixed on the floor. All iron monger and metal
frames should be painted with two coats of antirust
paint, the first before fixing and the second after fixing
and three layers of oil paint.
5
Sq.ma- Double Face
Sq.mb- Single Face.
Sq.mc- Grilled metal door
M.L
5.2- Metal rails, for locations and as per details shown
on the drawings With a layer of anti rust and three:
Dryers of oil paint for all iron` monger and metal frames
for stairs and balconies
5.3- Metal Works for Disabled:
Set
a- To provide materials and work to fix Grab bars as per
the
Details shown on the drawings. Using G.I. pipe 1.5" dia
(deformed if possible) to be mounted to the wall with
screw into anchor.
M.L
b- To provide materials and work, to fix metal hand rail
on both sides of the Ramp for the disabled of height 60
cm for the Children and 90 crn for the others, with G.I.
pipe 1.5" dia. according to the details shown oil the
drawings
M.L
5.3-Metal fence complete as the details shown on the
drawing including a layer of antirust and three layer of
oil paint
3
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
M.L
5.4- Provide and fix steel stair complete as shown on
the drawings, with two layers of antirust and three
layers of oil Paint. Cost of needed excavation,
backfilling, concrete works will be paid under relevant
items of this B.o.Q.
5
Aluminum works:
according to the specification and as
detailed in the drawings, including all accessories,
requirements for proper fixing, and all other related
Complementary works.
Notes:
1. All glass panes should be 6mm. Thick,
transparent or translucent as shown on
drawings.
2. Sections should be compatible with the
requirements, Specifications and the drawings.
3. All the materials should be Turkish product.
Samples and working drawings should be
approved before Fabrication and installation.
6
Sq.m
6.1- Aluminum doors, using best aluminum sections,
double face panels complete including all accessories
complete including all accessories, as detailed in the
drawings. The cost includes providing and fixing of door
stoppers, switch locks, handles and ail accessories
should be first class Turkish product. For toilet doors,
type of locks should be of special Type to be selected
by Site Engineer
Sq.m
6.2-Aluminum windows using best Turkish aluminum
Sections with separate steel protection net (Burglar
Bars) fly screen gage 30 for opened area (with
aluminum frame as detailed in the drawings) and 6 mm
thick transparent glass panes for all windows. Except
for toilets, glass should be translucent. The cost
includes a separate steel protection tic, (Burglar Bars)
which should conform to the requirements of item 5 of
the B.o.Q., to be painted with two coats of antirust
paint the first before fixing and the :second after fixing
and Three layers of oil faint.
Sq.m6.3 - Cur tine wall ( Aluminum window )
Sq.m
6.4- Aluminum Door-Windows using best aluminum
sections, double: face panels complete including all
accessories, as detailed in the drawings. The cost
includes providing and fixing of door stoppers. Switch
locks. Handles and all accessories should, be first
class Turkish product. The cost includes providing and
fixing fly screen gage: 30 for opened area (with
aluminum frame, as detailed in the drawings) and 6rnm
thick transparent glass panes. Separate steel
protection net (Burglar Bars) will be paid under other
item of the B.o.Q.
No.
6.5- Door closers (hydraulic, best type available in the
market).
4
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
Sq.m
Alternative
Wooden Doors (Single) conforming to sections 15
and 16 of the specification Providing and installing
wooden doors from Malaysian teak ply wood both
sides thickness 4 mm and frame size (7.5x15) cm
using Finland wood. The cost includes providing and
fixing of Switch lock (Italian or the best type available
in the local market if the Italian type is not available),
applying of at least three layers of good type of
"Spirto" providing and fixing a stopper on the floor and
fixing Aluminum Sheet (20 Cm. high) at the bottom. Of
both sides of the door leaf.
6
Sq.m
Alternative
Wooden Doors (Double Face) conforming to sections
15 and 16 of the specification: Providing and installing
wooden doors from Malaysian teak ply wood both
sides. thickness 4 mm and frame size (7.5x15) cm
using Finland wood and frame cap 1.0 x 7.5 cm The
cost includes providing and fixing of switch lock (Italian
or the best type available in the local market if the
Italian type is not available), applying of at least three
layers of good type of " Spirto" providing and fixing a
stopper on the floor and fixing Aluminum Sheet (20
Cm. high ) at the bottom of both sides of the door leaf
Sq.m
Flooring conforming to section 12 of the
specification:
7.1- Providing and laying; approved mosaic tiles, for
floors (30x30) cm or (40 x40) cm with cement mortar
1:3. And filling the joints with white cement. The
surface should be well smoothed and properly polished
7
Sq.m
7.2- Providing and laying ceramic tiles (20x10) cm or
(20x20) cm of the rough surface type with cement
mortar (1:3) for floors as shown in the Finishing Table.
Sq.m
7.3- Plastic: tile for flooring and other locations. The
price includes P.V.C. skirting and 1:3 cement screed 5
cm. thick according to drawings and specifications.
Sizes Colors and types shall be selected by Site
Engineer.
Sq.m
Finishing conforming to section 11 of the
specification:
8.1- Plastering with cement mortar (1:3) min. thickness
20 mm cement slurry must be applied before.
Plastering.
8
Sq.m
8.2- Rendering (Nather) of approved color, with white
cement and clean sand for the external faces.
Sq.m
8.3- Plastering with gypsum, min. thickness (25) mm.
for walls and ceiling. A base layer of cement slurry
must be applied before plastering.
5
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
8.4- Tiling with first degree ceramic tiles. for the walls
of the toilets, drinking platform and elsewhere as
indicated on the drawings:
8
Sq.ma- ( 10 x 20 ) cm
Sq.mb- ( 15 x 15 ) cm
Sq.mc- ( 15 x 20 ) cm
Sq.md- ( 20 x 25 ) cm
M.L
8.5- Skirting with mosaic tiles cement mortar ( 1:3 ) 10
cm high
Sq.m
8.6- Wainscoting by three layers of oil paint (Alhaditha
or Alshimal trade mark Iraqi Prod.).
Sq.m
8.7- Emulsion Paint: Painting with emulsion (AI-Shimal
trade mark Iraqi Prod.) three; layers for all gypsum
plastering work.
Sanitary Installation:
Includes provision of best quality
Available in the market of materials, fittings, valves,
mixers, traps, gullies with cover supports, hangers,
fasteners and clips. It also includes any needed
excavation with backfilling and manpower for the
installation and internal connection of the water system
to hot and cold Water and to the main water supply
system and connecting the internal sewerage system to
The main outer sewerage system. All water pipes
should be coated with two layers of anti rust (first layer
before fixing and second after fixing) and all imbedded
pipes should be insulated by a layer of bitumen coat
wrapped with jute (canvas). All Hot water, pipes lines
and cold water pipe lines expose to atmosphere should
be wrapped by fiber glass and jute (canvas) The water
system should be tested according to the
specification .Before using any material, the Contractor
shall: submit samples for the approval of the Site
Engineer.
9
9.1- Wash basin (sink) with steel frame made from
angle iron 1.5"x1.5" completely painted with a layer of
antirust and three layers of oil paint and complete
accessories (grill German product with mixer Iran
product
No.a- Single wing and single basin.
No.b- Double wing and single basin.
No.c- Double win and double basin
No.
9.2- Wash basin ceramic 50x60cm having self
contained overflow, Iran product (pars trade mark first
class) with mixer Iran Product (technic trade mark first
class) with steel grill German product and high
pressure connection steel hose, properly fastened with
screw, nut and washer complete with supporting
brackets
6
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
No.
9.3- Ceramic W.C latrine with gully, Iran Prod. (Mina
trade mark first degree) and high pressure connection
steel hose pipe with chrome valve with painted Flash
cistern complete with all necessary works.
9
No.
9.4- Ceramic western W.C with flush cistern and high
pressure connection steel hose pipe with chrome valve
, trap, toilet roller holder 15cm x 15cm and a steel
hose pipe with Chrome valve as shown on the
drawings, Iran Product (Mina trade mark first class)
including all requirements and accessories.
No.9.5- Water tags (1/2"), Chrome plated first class.
No.
9.6-Steel Tanks: The item includes the following:
Supply materials and fabricate pressed steel tank
sizes: as below, external flange plates(1.22x1.22)m
and 5mm thickness and cove plate sheet G(16) fixed to
the frame made from angle iron size (2.5x2.5) inch
then bracing inside the tank with ;angle iron size
(2.5x.2.5)". Fixing flange plates together should be by
iron bolts, nuts and welding according to the drawing .
(The cost includes supply and fixing inlet, outlet. over
Flow).
No.
9.7- Water tank (20 M³
) made of pressed and
(Parched) galvanized iron sheets Gauge 18 including
concrete pedestal (base) as shown on the drawing,
fittings (valves, 2 laps at 10 cm from the bottom of the
tank, float valve, wash out valve.), hinged cover cap
and all pipe connections
No.
Alternative
9.8-Water tank (6M3
) made of pressed and (Parched(
Galvanized iron sheets Gauge 18 including concrete
pedestal (base) as shown on the drawing, fittings
(valves, 2 taps at 10 cm from the bottom of the tank,
float valve, wash out valve) hinted cover cap and all
pipe connections.
9.9-Galvanized iron water pipes: (The pipes and
accessories should be first class).
M.La- (1/2") dia. (Turkish prod., 5.1 kg / 6m.l).
M.Lb- (3/4") dia. ( Turkish prod., 7 kg / 6m.l)
M.Lc- (1") dia. (Turkish prod., 9k / 6 m I).
9.10- P.V.C Pipes, including all necessary excavation,
laying, jointing and connecting the pipes, providing and
placing concrete 1:2:4 10 cm. thick under and all
around the pipes as showing in the drawings.
Backfilling with approved compacted material
M.La-(4") dia. (Iraqi prod., pressure 6 Bar and 3 mm thick).
M.Lb-(8") dia. (Iran prod., pressure 6 Bar and 5 mm thick).
7
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
9.11- Masonry manholes. All-inclusive excavation, lean
concrete, watts with concrete blocks and cement
mortar 1:3 plastered inside with cement mortar 1:3 and
cover for the system according to the drawings and
instructions of Site engineer
9
No.a- Size (30 x30) cm. inside dimension.
No.b- Size (40 x 40) cm inside dimension.
No.c- Size (50 x 50) cm. inside dimension.
.No.d- Size (80 x 80)cm., inside dimension
M.L
9.12- Cast iron pipes 4" dia. properly fixed to the wall
and the slab complete with all fillings and accessories
according to the drawings for draining rainwater from
the roof.
M.L
Alternative
9.13- G.I pipes 4" dia. properly fixed to the wall and the
slab, complete with all fittings and accessories
according to the drawings for draining rainwater from
the roof.
9.14- Construction of sewer concrete pipe line on a
base of 20 cm plain concrete 1:3:6 over a 10cm well
compacted crushed stone and completely surrounded
with 15cm concrete 1:3:6 complete as shown on the
drawings. Cost of excavation (including de-watering)
and needed manholes with cover will be paid under the
relevant items of this E.o.Q.
M.La- For 0.4m diameter of pipe
Elec.Work :-
All materials supplied by contractor must be new arid
of the best quality. All materials will be approved by
engineer before using, sample from each type to be
shown and approved by engineer before execution of
the whole work. The work include installation of all
wiring (inside best quality, grade one, high pressure,
plastic pipe, Jordan made), cables, cable trenches,
main distribution board boxes .switches .lights conduits
arid all necessary work all the works will be according
to the standard specification, drawings and instruction
of supervisor engineer .For the below items the price
includes all requirements such as stainless steel pipes,
single wire (1x2.5 min). Steel axes, junction etc .The
whop electric power net must be testes after
completion.
10
pc
10.1- Larne fluorescent (1x40) watt, supply and install
complete florescent base with lamp (1x40,watt) best
quality plastic Cover for false ceiling with all
accessories
pc
10.2- lamp fluorescent: (1x40) Walt, supply and install
complete florescent base With lamp (1x40 ) watt best
quality with all requirements
8
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
pc
10.3-Wall bracket : supply and install wall bracket with
(100)watt best quality with all fitting
10
pc
10.4-Ceiling Lamps: Supply and install Ceiling Lamp
with (100watt latish) English made with all fitting.
pc
10.5-Spot light supply and install spot light(ceiling
Type), England or Italian made with lamp (100watt)
with all fittings.
pc
10.6- Water proof Lamp: supply and install best quality
water proof lamps(100watt),England or Italian with all
necessary annexes and fittings
pc
10.7-Ceiling Lamp (big Thurayia): supply arid install
best quality Ceiling lamps (big Tthurayia), with all
necessary annexes arid fittings
pc
10.8- Projectors (125watt): Supply and install best
quality projectors (125watl) in location specified In the
drawings or engineer satisfaction: with all annexes and
fittings.
pc
10.9- Ceiling Fans: Supply and install best quality
ceiling fans with regulator (Indian type) with all
annexes and fittings According to engineer
satisfaction.
pc
10.10- Exhaust fans 12"x12": supply and install best
quality 12"x12" exhaust fans (Japan made) with all
annexes and fitting
pc
10.11- Exhaust fans 6"x6": supply and install best
quality 6"x6" exhaust fans (Japan made) with all
annexes and fitting
pc
10.12- Admin Bells: Supply and install admin bells with
push boll on ( English made ) with all annexes and
fittings
pc
10.13- Switch Socket 13Amp Supply and install best
quality switch socket 13Amp (English made), (Cribtry)
with all wiring and accessories.
pc
10.14- Switch Socket 15Amp Supply and install best
quality switch socket 15Amp (English made), (Cribtry)
with all wining and accessories.
pc
10.15- 3phase on off starter switch 40Amp Supply and
Install 40Amp. Phase On-Off starter switch original
(English made) with phase filler according to ngineer's
satisfaction.
10.16- Cables for connection between (M.D.B),(C.B)
and all other points by the use of best and approved
quality power cables Turkish or Jordan made. The
work includes trench excavation zinc, backfilling
according to drawings and engineer's satisfaction
9
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
M.La- Cable (4x6) mm2
10
M.Lb- (:able (2x10) mm
M.Lc- Cable (2x16) mm2
M.Ld- Cable (4x10) mm2
M.Le- Cable (3x25+16) mm2
M.Lf- Cable (3x35+25) mm2
M.Lg- Cable (3x300+150) mm2
10.17- supply installs small control board for operating
lighting etc. for criminal all according to the drawing
and engineer
10.18- supply and install small control board for prating
and controlling split units of criminal hall size
(50x40x25)cm from plate G(16mm) includes:
pca- (One Number ) 3phase (100A) breaker (MG)type
pcb-(Four Number)3phase(32A)phase filler best qualities.
pcc- (Four Number) 3phase (32 contractor best qualities.
pcd-(five number) bas bar(3x26)mm
pce- (Three number) signal for phase.
10.19- Supply and install best and approved quality
sub distribution board ( Circuit breaker ) original
England made(Crib try) with all Required annexes
according to the drawings and engineers satisfaction:
pc
a- ( 4 miniature ) circuit breaker single phase with main
capacity 40 Amp
pc
b- ( 9 miniature ) circuit breaker single phase with main
capacity 100 Amp
pc
c- ( 12 miniature ) circuit breaker single phase with
main capacity 100 Amp
pc
d- ( 12 miniature ) circuit breaker single phase with
main capacity 100 Amp
pc
e- ( 6 miniature ) circuit breaker single phase with main
capacity 60 Amp
10.20- Main Distribution board: supply and install main
distribution board (M.D.B) of metal plat gauge ( 2mm)
with ( 4.10x1.60x0.35) m dimension with lockable door
and all required annexes painted with oil paint
according to the drawing and engineer's instruction
which is include
10
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
pc
a- (One number) 3phase. 1000 Amp kilo watt hour meter
KWHm
10
pcb- (One number) (0-500) volt meter (Germany type).
pc
c- (three number) Amp meter with (1000/5)Amp Germany
type
pcd- (One number) Selector Switch (best quality).
pce- (Three number) Signal light for phases.
pc
f- (ogle number)Main Auto breaker, 3phases, 1000 Amp
Capacity original (MG) France made.
pc
g- (Twenty, eight number) Sub- Auto breaker 3 phases.
With Capacity 100 Amp original (MG) France made.
pc
h- (Three numbers) Sub- Auto breaker, 3phase, with
capacity 150 Amp original (MG) France made.
pc
i- (Four number) Sub- Auto breaker. 3phase, with capacity
200 Amp original (MG) France made.
pc
j- (Five number) bus Bar made form cupper for connecting
the distribution cable with diameter 10x60) mm for above
2000Amp capacity.
10.21- Earth system :-
Supply and Install earth system include connection
between under ground earth system with (M.D.B) (C.B)s &
switch Sockets according to thedrawiongs and engineer's
satisfaction the work include Provision all materials such
as cables, wires,...etc which is indicated in the drawings.
pc
10.22-Telephone System: All materials supplied by the
contractor. must be new, best quality and
get engineer's approval before using:
pc
a- Supply and install best quality Main Distribution
Telephone Box of capacity of (20 pair) lines, according to
the drawings.
pc
b- Supply and install sub-distribution telephone joint box of
Capacity of (5 pair) lines, according to the drawings.
pc
c- Supply arid install sub-distribution telephone joint box of
Capacity (3pair) lit lines according to the drawings.
pc
d- Supply and install sub-distribution joint box of capacity
6pair)lines according to the drawings
pc
e- Supply and install sub-distribution joint box of capacity
30pair) lines according to the drawing.
pc
f- Supply and install sub-distribution telephone joint box of
Capacity (40pair) lines according to the drawings.
11
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
pc
g-Supply and install sub- distribution Tel joint box
capacity of(120 pair)lines according to the drawings.
10
pc
h-Supply and install Tel outlet(MK) English made
include Tel wire ( 4.0x0.6)mm2
( English made )
M.L
i-Supply and install Tel cable(20x0.6) mm2
English
made.
j-Supply and install Tel cable(40x0.6) mm2
English
made.
k- Supply and install Tel cable (10x0.6) mm2
English
made.
I- Supply and install Tel cable (12x0.60) mm2
English
made.
m- Supply and install Tel cable (40x0.6) mm2
English
made.
10.23- Lighting Protection System: Supply and install
Lightning protection system by fixing suitable tower at
the root of the building and arrange lighting protection
system as a loop by using suitable bus bars and
connected it with system arranged under around all
works must be done under supervisor satisfaction and
according to slander specification. The work include
provision all material which is come true the aim
Mechanical work :-
All equipment's and materials supplied by the
contractor rust be new best quality and guaranteed for
min. One year under actual Operation the contractor
must supply detail catalogs operation and maintenance
manuals and other necessary illustration guides to
approval of engineer before supplying Fire work
includes installation connection to the power with all
other necessary accessories and annexes and testing
for operation The whose work must be according to
specification and satisfaction and instruction . The lift
and central Heating & Cooling system must be
according to the following specifications:
11
11.1- package unit installation on the Roof of the
building and testing and all the requirements for proper
connection with the main ducts as shown in the
drawing. Mark need (Zamil-Craft)
No.
a- Specific of package unit Central heating/cooling
system
• Nominal Capacity (18tons)(53Kkw)
• Refrigerant (R-22)
• Nominal (Evaporator Blower)(CFM)L/S
(7500-3539)
• Compressor type/Scroll, Quantity / 2
12
Item
Cost
Unit
Price
Qty.UnitItem DescriptionNo.
No.
b- Specific of Package unit Central heating/cooling
system
Nominal Capacity(21.5Tons)(76kw)
11
M.L
11.2- Rectangular Air Ducts-installation: Including supply of
material work will be done with galvanized sheet metal
gauge (21-24) as described in sheets duct supported and
hanged with steel bar unit and screw. The flexible joint
should be considered between units and main duct. The
work will be done according to the instruction Of the
Supervisor Engineer Installation with fiber glass thickness
(25mm)clothing and two layers of flunkout according to the
specification
11.3- Air Distribution terminals supply and return Air
Diffusers and Grills with Galvanized sheet metal and
wooden frames fixing to the side wall with branch ducts. two
direction manually movable Air Control for each one
No.a- 600x300 mm
No.b- 500x250 mm
No.
11.4- Providing installation and testing of split unit cassette
type Air Conditioner Cooling / Heating Capacity (4tons).The
work will be done according to the instruction of the
supervisor Engineer. Mark needs (Diakin- National-General-
Carrier).
No.
11.5- Shade frame for Packages: supply material and install
Shade frames (3x3x2.5) m size from 2."X2" angle iron
cornered from top by gauge 18(G.L) sheets. Fixed to the
frame properly. The frame Legs fixed to the floor through
(4x150x150) mm iron Plates with screw and socket-The 4
sides should be closed with 8mm dig. B.R.C mesh with door
(BRC arid tube frame).
11.6-Water Pump: Supply and install water pump of
approved quality (Italian made).The works includes fixing in
position and all other required fittings and annexes to
engineer's satisfaction
No.
a- Specific of water pump dies size 40mm,max-H 35m,max-
Q(100 L/min )output 1.5kw.V-Ph-Hz 220-50Amp 6.5
No.
b- Specific of water pump dies size 76.5 mm(3"),max-H
(50-60)m max-Q (0.6-3.6m3
) V-Ph-Hz (380-3-(60-61)),cos.
0.85 Amp 15.5
11.7-Elevator (Lift): All equipments and materials supplied
by the contractor must be new, best quality and guaranteed
for min. one year under actual operation. The contractor
must supply detail catalogs. operation and maintenance
manuals and other necessary illustration guides to approval
of engineer before: supplying The work includes installation
connection to the power with all other necessary
accessories and annexes and testing for operation the
whole work must be according to specification and
engineers satisfaction and instruction , The lift and central
heating & Cooling system must be according to the
following specifications:
13
Item Cost
Unit
Price
Qty.UnitItem DescriptionNo.
Schindler trade mark (Austria );Pressure lift capacity and
Specification
Speed 0.6-1.0 m/s. Drive: A/C geared or rear less two
speed drive with step-starting. Power rating 10kw 50meter
Travel, No. of entrances (10) all, opening on the same
side. Floor Destination: B.F/1 - G.F/2 - 1st
F/3 - 2nd
F/4 –
3rd
F/5 - 4th
F/6 - 5th
F/7 - 6th
F/8 - 7th
F/9 - 8th
F/10,Door
For landing and car, full automatic two panel central -
opening sliding door, Car design Modern all stainless steel
passenger car.
1- Control Unit : Modern electronic technology
2- Hi reliability in operation due to maintenance – free
3- Logical designed control and monitoring indicators
make at tendency easy and safe for the maintenance
personal
4- Adaptability to change operation condition
14

More Related Content

What's hot

Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel strutureEst
 
Exterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionExterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionTaha Padrawala
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructureguasiya
 
Bungalow
Bungalow Bungalow
Bungalow Ah Jun
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame doorEst
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)Zairul Zaiky
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESwendyteosy
 

What's hot (20)

Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Bq floor
Bq floorBq floor
Bq floor
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Earthwork support
Earthwork supportEarthwork support
Earthwork support
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 
Morphology factors
Morphology factorsMorphology factors
Morphology factors
 
Exterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionExterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building Construction
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
ECA form
ECA formECA form
ECA form
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Bungalow
Bungalow Bungalow
Bungalow
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame door
 
Anti termite treatment in foundation
Anti termite treatment in foundationAnti termite treatment in foundation
Anti termite treatment in foundation
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDES
 

Similar to Boq sample

Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Stephen Nzima
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSMohd Danish
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSMohd Danish
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfssuserd43de8
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimationimaduddin91
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quickkristenjames
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updatedArthur Wilson
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSGuy Pomphrey
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochurekristenjames
 

Similar to Boq sample (20)

Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
3D
3D3D
3D
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
rahta.pdf
rahta.pdfrahta.pdf
rahta.pdf
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
 
2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
 
21KUIKspec
21KUIKspec21KUIKspec
21KUIKspec
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimation
 
Office building new
Office building newOffice building new
Office building new
 
Specifications for rcc
Specifications for rcc Specifications for rcc
Specifications for rcc
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quick
 
Versaloc
VersalocVersaloc
Versaloc
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLS
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 

More from Mahmoud Awwad, PMP, MCIOB (9)

الاخطار في الفديك
الاخطار في الفديكالاخطار في الفديك
الاخطار في الفديك
 
Safety plan
Safety planSafety plan
Safety plan
 
Safety manual
Safety manualSafety manual
Safety manual
 
Quality plan
Quality planQuality plan
Quality plan
 
Material logistic plan
Material logistic planMaterial logistic plan
Material logistic plan
 
Delay analysis final
Delay analysis finalDelay analysis final
Delay analysis final
 
Construction claims
Construction claimsConstruction claims
Construction claims
 
Commentary on fidic iv clauses
Commentary on fidic iv clausesCommentary on fidic iv clauses
Commentary on fidic iv clauses
 
Building services planning manual 2007
Building services planning manual 2007Building services planning manual 2007
Building services planning manual 2007
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Boq sample

  • 1. Item Cost Unit Price Qty.UnitItem DescriptionNo. L.S Site preparation: Includes a. Removal of deans cutting and grading the natural ground of any type of soil to the dimensions and levels shown on the drawings including the complete removal and disposal (as directed by Site Engineer) of pavements and structures of any kind visible or encountered during the cutting. b. Laying out the work 1 Earth Work: the whole of the work shall be executed according to section 2 of the specification If rock is encountered during excavation for foundation and if permitted by the Site Engineer, it may not need to be removal provided that the surface is roughened with proper steps and any other arrangements requested by the Site Engineer to his satisfaction 2 Cu.m 2.1- Excavation for the foundation of all types of walls, retaining walls, columns, and back walls for floors yards walkways, aprons and passages. . etc. and wherever needed and in all types of soil including "Rock" it includes keeping the trenches free from water the price includes also backfilling the excavated trenches with ordinary approved material in well compacted layers not exceeding 20 cm in thickness. Cu.m 2.2- Filling inside and outside the building with approved materials in well compacted layers not exceeding 20 cm in thickness Note: - Compaction ratio for the filling under the reinforced concrete flooring and ramp flooring should be 95 % MDD - Last layer should not exceed 15 cm Concrete Work : All of the works shall be executed according to section 3 of the specification Whenever crushed stone is specified under foundation concrete it should be very well compacted in a way that part the stones be penetrated into the soil of The foundation (With exception if the soil of the foundation is rock or conglomerate). The final surface of the crushed stone should be even and non-porous 3 Cu.m 3.1-Plain concrete (1:2:4) for the foundation of the walls, retaining walls (if any), back walls of the walkways, yards, Aprons and passages and wherever needed over a layer of 10 cm thick and compacted crushed stone. 1
  • 2. Item Cost Unit Price Qty.UnitItem DescriptionNo. Cu.m 3.2- Plain concrete (1:3:6) under the reinforced concrete of the foundation of the walls and the footings of the columns or wherever needed 3 Cu.m 3.3- Reinforced concrete (1:2:4) for foundation of the walls The cost includes provision and fixing of reinforcing steel bars and fixing of needed spacers according to the drawings. Cu.m 3.4- Reinforced concrete (1:1.5:3) for columns and column footings. The cost includes provision and fixing of reinforcing steel bars and fixing of needed spacers according to the drawings. Cu.m 3.5- Reinforced concrete (1:2:4) for slabs lintels. Beams. Tie Beams at any level, parapets, stairs, louvers and decorations. The cost includes providing and fixing of reinforcing steel bars And fixing of needed spacers according to the drawings. Sq.m 3.6- Plain concrete (1:2:4) 10 cm thick over a layer of 10 cm thick and compacted crushed stone for floors, yards. Walkways ramps for disabled. Aprons and passages. .. Etc. the item includes execution of expansion joints at intervals not exceeding three meters (in both directions when the shorter dimension is more than 3 m) and filling properly with semi dry cement mortar 1:3. All exposed edges should be chamfered (2.5 x 2.5) cm. Cost of excavation with backfilling, plain concrete for foundation and block wall of the back wall will be paid under the other relevant items of this B.o.Q. Sq.m 3.7- Plain concrete (1:2:4) 8 cm thickness under tile floors and over 10 cm compacted crushed stone including executing join if require M.L 3.8- Wall capping with reinforced concrete (1:2:4) of 20 mm maximum size of aggregate for parapets. Top and sides of the capping should be fair faced. The cost includes providing and fixing of reinforcing steel bars and needed spacers according to the drawings. M.L 3.9- Window sills with reinforced concrete(1:2:4) of 20 mm Maximum size of aggregate. The exposed parts of the sill Should be fair faced. The cost includes providing and fixing of reinforcing steel bars and needed spacers according to the drawings. 2
  • 3. Item Cost Unit Price Qty.UnitItem DescriptionNo. Masonry : The works shall be executed according to section 7 of the specification. Stone walls may be constructed with local available stones if conforms to the specifications and approved by the Site Engineer. The space between the two rows of the stone should be filled with stone pieces and cement mortar 1:3. The stone pieces Should be surrounded completely by cement mortar 1:3. 4 Cu.m 4.1- Building walls with fabricated perforated brick (24x12x 8) and cement mortar (1:3). The cost includes provision insulating sheets between the wall and the slab or tie beam cast monolithically with the slab as shown on the drawings. Metal works conforming to section 16 of the specification : 5.1- Metal Doors: Steel doors with steel plate G18 leaf frame with angle Iron of 25x25 mm. for double face and 37.5x37.5 mm. for single face. The outer frame should be made with double section 3 mm thickness or as shown on the drawings The doors should be provided with 4 mm thick glass panes if required, mortise switch lock (Hungarian type or the best type available in local market if the. Hungarian type is not available), and door stoppers fixed on the floor. All iron monger and metal frames should be painted with two coats of antirust paint, the first before fixing and the second after fixing and three layers of oil paint. 5 Sq.ma- Double Face Sq.mb- Single Face. Sq.mc- Grilled metal door M.L 5.2- Metal rails, for locations and as per details shown on the drawings With a layer of anti rust and three: Dryers of oil paint for all iron` monger and metal frames for stairs and balconies 5.3- Metal Works for Disabled: Set a- To provide materials and work to fix Grab bars as per the Details shown on the drawings. Using G.I. pipe 1.5" dia (deformed if possible) to be mounted to the wall with screw into anchor. M.L b- To provide materials and work, to fix metal hand rail on both sides of the Ramp for the disabled of height 60 cm for the Children and 90 crn for the others, with G.I. pipe 1.5" dia. according to the details shown oil the drawings M.L 5.3-Metal fence complete as the details shown on the drawing including a layer of antirust and three layer of oil paint 3
  • 4. Item Cost Unit Price Qty.UnitItem DescriptionNo. M.L 5.4- Provide and fix steel stair complete as shown on the drawings, with two layers of antirust and three layers of oil Paint. Cost of needed excavation, backfilling, concrete works will be paid under relevant items of this B.o.Q. 5 Aluminum works: according to the specification and as detailed in the drawings, including all accessories, requirements for proper fixing, and all other related Complementary works. Notes: 1. All glass panes should be 6mm. Thick, transparent or translucent as shown on drawings. 2. Sections should be compatible with the requirements, Specifications and the drawings. 3. All the materials should be Turkish product. Samples and working drawings should be approved before Fabrication and installation. 6 Sq.m 6.1- Aluminum doors, using best aluminum sections, double face panels complete including all accessories complete including all accessories, as detailed in the drawings. The cost includes providing and fixing of door stoppers, switch locks, handles and ail accessories should be first class Turkish product. For toilet doors, type of locks should be of special Type to be selected by Site Engineer Sq.m 6.2-Aluminum windows using best Turkish aluminum Sections with separate steel protection net (Burglar Bars) fly screen gage 30 for opened area (with aluminum frame as detailed in the drawings) and 6 mm thick transparent glass panes for all windows. Except for toilets, glass should be translucent. The cost includes a separate steel protection tic, (Burglar Bars) which should conform to the requirements of item 5 of the B.o.Q., to be painted with two coats of antirust paint the first before fixing and the :second after fixing and Three layers of oil faint. Sq.m6.3 - Cur tine wall ( Aluminum window ) Sq.m 6.4- Aluminum Door-Windows using best aluminum sections, double: face panels complete including all accessories, as detailed in the drawings. The cost includes providing and fixing of door stoppers. Switch locks. Handles and all accessories should, be first class Turkish product. The cost includes providing and fixing fly screen gage: 30 for opened area (with aluminum frame, as detailed in the drawings) and 6rnm thick transparent glass panes. Separate steel protection net (Burglar Bars) will be paid under other item of the B.o.Q. No. 6.5- Door closers (hydraulic, best type available in the market). 4
  • 5. Item Cost Unit Price Qty.UnitItem DescriptionNo. Sq.m Alternative Wooden Doors (Single) conforming to sections 15 and 16 of the specification Providing and installing wooden doors from Malaysian teak ply wood both sides thickness 4 mm and frame size (7.5x15) cm using Finland wood. The cost includes providing and fixing of Switch lock (Italian or the best type available in the local market if the Italian type is not available), applying of at least three layers of good type of "Spirto" providing and fixing a stopper on the floor and fixing Aluminum Sheet (20 Cm. high) at the bottom. Of both sides of the door leaf. 6 Sq.m Alternative Wooden Doors (Double Face) conforming to sections 15 and 16 of the specification: Providing and installing wooden doors from Malaysian teak ply wood both sides. thickness 4 mm and frame size (7.5x15) cm using Finland wood and frame cap 1.0 x 7.5 cm The cost includes providing and fixing of switch lock (Italian or the best type available in the local market if the Italian type is not available), applying of at least three layers of good type of " Spirto" providing and fixing a stopper on the floor and fixing Aluminum Sheet (20 Cm. high ) at the bottom of both sides of the door leaf Sq.m Flooring conforming to section 12 of the specification: 7.1- Providing and laying; approved mosaic tiles, for floors (30x30) cm or (40 x40) cm with cement mortar 1:3. And filling the joints with white cement. The surface should be well smoothed and properly polished 7 Sq.m 7.2- Providing and laying ceramic tiles (20x10) cm or (20x20) cm of the rough surface type with cement mortar (1:3) for floors as shown in the Finishing Table. Sq.m 7.3- Plastic: tile for flooring and other locations. The price includes P.V.C. skirting and 1:3 cement screed 5 cm. thick according to drawings and specifications. Sizes Colors and types shall be selected by Site Engineer. Sq.m Finishing conforming to section 11 of the specification: 8.1- Plastering with cement mortar (1:3) min. thickness 20 mm cement slurry must be applied before. Plastering. 8 Sq.m 8.2- Rendering (Nather) of approved color, with white cement and clean sand for the external faces. Sq.m 8.3- Plastering with gypsum, min. thickness (25) mm. for walls and ceiling. A base layer of cement slurry must be applied before plastering. 5
  • 6. Item Cost Unit Price Qty.UnitItem DescriptionNo. 8.4- Tiling with first degree ceramic tiles. for the walls of the toilets, drinking platform and elsewhere as indicated on the drawings: 8 Sq.ma- ( 10 x 20 ) cm Sq.mb- ( 15 x 15 ) cm Sq.mc- ( 15 x 20 ) cm Sq.md- ( 20 x 25 ) cm M.L 8.5- Skirting with mosaic tiles cement mortar ( 1:3 ) 10 cm high Sq.m 8.6- Wainscoting by three layers of oil paint (Alhaditha or Alshimal trade mark Iraqi Prod.). Sq.m 8.7- Emulsion Paint: Painting with emulsion (AI-Shimal trade mark Iraqi Prod.) three; layers for all gypsum plastering work. Sanitary Installation: Includes provision of best quality Available in the market of materials, fittings, valves, mixers, traps, gullies with cover supports, hangers, fasteners and clips. It also includes any needed excavation with backfilling and manpower for the installation and internal connection of the water system to hot and cold Water and to the main water supply system and connecting the internal sewerage system to The main outer sewerage system. All water pipes should be coated with two layers of anti rust (first layer before fixing and second after fixing) and all imbedded pipes should be insulated by a layer of bitumen coat wrapped with jute (canvas). All Hot water, pipes lines and cold water pipe lines expose to atmosphere should be wrapped by fiber glass and jute (canvas) The water system should be tested according to the specification .Before using any material, the Contractor shall: submit samples for the approval of the Site Engineer. 9 9.1- Wash basin (sink) with steel frame made from angle iron 1.5"x1.5" completely painted with a layer of antirust and three layers of oil paint and complete accessories (grill German product with mixer Iran product No.a- Single wing and single basin. No.b- Double wing and single basin. No.c- Double win and double basin No. 9.2- Wash basin ceramic 50x60cm having self contained overflow, Iran product (pars trade mark first class) with mixer Iran Product (technic trade mark first class) with steel grill German product and high pressure connection steel hose, properly fastened with screw, nut and washer complete with supporting brackets 6
  • 7. Item Cost Unit Price Qty.UnitItem DescriptionNo. No. 9.3- Ceramic W.C latrine with gully, Iran Prod. (Mina trade mark first degree) and high pressure connection steel hose pipe with chrome valve with painted Flash cistern complete with all necessary works. 9 No. 9.4- Ceramic western W.C with flush cistern and high pressure connection steel hose pipe with chrome valve , trap, toilet roller holder 15cm x 15cm and a steel hose pipe with Chrome valve as shown on the drawings, Iran Product (Mina trade mark first class) including all requirements and accessories. No.9.5- Water tags (1/2"), Chrome plated first class. No. 9.6-Steel Tanks: The item includes the following: Supply materials and fabricate pressed steel tank sizes: as below, external flange plates(1.22x1.22)m and 5mm thickness and cove plate sheet G(16) fixed to the frame made from angle iron size (2.5x2.5) inch then bracing inside the tank with ;angle iron size (2.5x.2.5)". Fixing flange plates together should be by iron bolts, nuts and welding according to the drawing . (The cost includes supply and fixing inlet, outlet. over Flow). No. 9.7- Water tank (20 M³ ) made of pressed and (Parched) galvanized iron sheets Gauge 18 including concrete pedestal (base) as shown on the drawing, fittings (valves, 2 laps at 10 cm from the bottom of the tank, float valve, wash out valve.), hinged cover cap and all pipe connections No. Alternative 9.8-Water tank (6M3 ) made of pressed and (Parched( Galvanized iron sheets Gauge 18 including concrete pedestal (base) as shown on the drawing, fittings (valves, 2 taps at 10 cm from the bottom of the tank, float valve, wash out valve) hinted cover cap and all pipe connections. 9.9-Galvanized iron water pipes: (The pipes and accessories should be first class). M.La- (1/2") dia. (Turkish prod., 5.1 kg / 6m.l). M.Lb- (3/4") dia. ( Turkish prod., 7 kg / 6m.l) M.Lc- (1") dia. (Turkish prod., 9k / 6 m I). 9.10- P.V.C Pipes, including all necessary excavation, laying, jointing and connecting the pipes, providing and placing concrete 1:2:4 10 cm. thick under and all around the pipes as showing in the drawings. Backfilling with approved compacted material M.La-(4") dia. (Iraqi prod., pressure 6 Bar and 3 mm thick). M.Lb-(8") dia. (Iran prod., pressure 6 Bar and 5 mm thick). 7
  • 8. Item Cost Unit Price Qty.UnitItem DescriptionNo. 9.11- Masonry manholes. All-inclusive excavation, lean concrete, watts with concrete blocks and cement mortar 1:3 plastered inside with cement mortar 1:3 and cover for the system according to the drawings and instructions of Site engineer 9 No.a- Size (30 x30) cm. inside dimension. No.b- Size (40 x 40) cm inside dimension. No.c- Size (50 x 50) cm. inside dimension. .No.d- Size (80 x 80)cm., inside dimension M.L 9.12- Cast iron pipes 4" dia. properly fixed to the wall and the slab complete with all fillings and accessories according to the drawings for draining rainwater from the roof. M.L Alternative 9.13- G.I pipes 4" dia. properly fixed to the wall and the slab, complete with all fittings and accessories according to the drawings for draining rainwater from the roof. 9.14- Construction of sewer concrete pipe line on a base of 20 cm plain concrete 1:3:6 over a 10cm well compacted crushed stone and completely surrounded with 15cm concrete 1:3:6 complete as shown on the drawings. Cost of excavation (including de-watering) and needed manholes with cover will be paid under the relevant items of this E.o.Q. M.La- For 0.4m diameter of pipe Elec.Work :- All materials supplied by contractor must be new arid of the best quality. All materials will be approved by engineer before using, sample from each type to be shown and approved by engineer before execution of the whole work. The work include installation of all wiring (inside best quality, grade one, high pressure, plastic pipe, Jordan made), cables, cable trenches, main distribution board boxes .switches .lights conduits arid all necessary work all the works will be according to the standard specification, drawings and instruction of supervisor engineer .For the below items the price includes all requirements such as stainless steel pipes, single wire (1x2.5 min). Steel axes, junction etc .The whop electric power net must be testes after completion. 10 pc 10.1- Larne fluorescent (1x40) watt, supply and install complete florescent base with lamp (1x40,watt) best quality plastic Cover for false ceiling with all accessories pc 10.2- lamp fluorescent: (1x40) Walt, supply and install complete florescent base With lamp (1x40 ) watt best quality with all requirements 8
  • 9. Item Cost Unit Price Qty.UnitItem DescriptionNo. pc 10.3-Wall bracket : supply and install wall bracket with (100)watt best quality with all fitting 10 pc 10.4-Ceiling Lamps: Supply and install Ceiling Lamp with (100watt latish) English made with all fitting. pc 10.5-Spot light supply and install spot light(ceiling Type), England or Italian made with lamp (100watt) with all fittings. pc 10.6- Water proof Lamp: supply and install best quality water proof lamps(100watt),England or Italian with all necessary annexes and fittings pc 10.7-Ceiling Lamp (big Thurayia): supply arid install best quality Ceiling lamps (big Tthurayia), with all necessary annexes arid fittings pc 10.8- Projectors (125watt): Supply and install best quality projectors (125watl) in location specified In the drawings or engineer satisfaction: with all annexes and fittings. pc 10.9- Ceiling Fans: Supply and install best quality ceiling fans with regulator (Indian type) with all annexes and fittings According to engineer satisfaction. pc 10.10- Exhaust fans 12"x12": supply and install best quality 12"x12" exhaust fans (Japan made) with all annexes and fitting pc 10.11- Exhaust fans 6"x6": supply and install best quality 6"x6" exhaust fans (Japan made) with all annexes and fitting pc 10.12- Admin Bells: Supply and install admin bells with push boll on ( English made ) with all annexes and fittings pc 10.13- Switch Socket 13Amp Supply and install best quality switch socket 13Amp (English made), (Cribtry) with all wiring and accessories. pc 10.14- Switch Socket 15Amp Supply and install best quality switch socket 15Amp (English made), (Cribtry) with all wining and accessories. pc 10.15- 3phase on off starter switch 40Amp Supply and Install 40Amp. Phase On-Off starter switch original (English made) with phase filler according to ngineer's satisfaction. 10.16- Cables for connection between (M.D.B),(C.B) and all other points by the use of best and approved quality power cables Turkish or Jordan made. The work includes trench excavation zinc, backfilling according to drawings and engineer's satisfaction 9
  • 10. Item Cost Unit Price Qty.UnitItem DescriptionNo. M.La- Cable (4x6) mm2 10 M.Lb- (:able (2x10) mm M.Lc- Cable (2x16) mm2 M.Ld- Cable (4x10) mm2 M.Le- Cable (3x25+16) mm2 M.Lf- Cable (3x35+25) mm2 M.Lg- Cable (3x300+150) mm2 10.17- supply installs small control board for operating lighting etc. for criminal all according to the drawing and engineer 10.18- supply and install small control board for prating and controlling split units of criminal hall size (50x40x25)cm from plate G(16mm) includes: pca- (One Number ) 3phase (100A) breaker (MG)type pcb-(Four Number)3phase(32A)phase filler best qualities. pcc- (Four Number) 3phase (32 contractor best qualities. pcd-(five number) bas bar(3x26)mm pce- (Three number) signal for phase. 10.19- Supply and install best and approved quality sub distribution board ( Circuit breaker ) original England made(Crib try) with all Required annexes according to the drawings and engineers satisfaction: pc a- ( 4 miniature ) circuit breaker single phase with main capacity 40 Amp pc b- ( 9 miniature ) circuit breaker single phase with main capacity 100 Amp pc c- ( 12 miniature ) circuit breaker single phase with main capacity 100 Amp pc d- ( 12 miniature ) circuit breaker single phase with main capacity 100 Amp pc e- ( 6 miniature ) circuit breaker single phase with main capacity 60 Amp 10.20- Main Distribution board: supply and install main distribution board (M.D.B) of metal plat gauge ( 2mm) with ( 4.10x1.60x0.35) m dimension with lockable door and all required annexes painted with oil paint according to the drawing and engineer's instruction which is include 10
  • 11. Item Cost Unit Price Qty.UnitItem DescriptionNo. pc a- (One number) 3phase. 1000 Amp kilo watt hour meter KWHm 10 pcb- (One number) (0-500) volt meter (Germany type). pc c- (three number) Amp meter with (1000/5)Amp Germany type pcd- (One number) Selector Switch (best quality). pce- (Three number) Signal light for phases. pc f- (ogle number)Main Auto breaker, 3phases, 1000 Amp Capacity original (MG) France made. pc g- (Twenty, eight number) Sub- Auto breaker 3 phases. With Capacity 100 Amp original (MG) France made. pc h- (Three numbers) Sub- Auto breaker, 3phase, with capacity 150 Amp original (MG) France made. pc i- (Four number) Sub- Auto breaker. 3phase, with capacity 200 Amp original (MG) France made. pc j- (Five number) bus Bar made form cupper for connecting the distribution cable with diameter 10x60) mm for above 2000Amp capacity. 10.21- Earth system :- Supply and Install earth system include connection between under ground earth system with (M.D.B) (C.B)s & switch Sockets according to thedrawiongs and engineer's satisfaction the work include Provision all materials such as cables, wires,...etc which is indicated in the drawings. pc 10.22-Telephone System: All materials supplied by the contractor. must be new, best quality and get engineer's approval before using: pc a- Supply and install best quality Main Distribution Telephone Box of capacity of (20 pair) lines, according to the drawings. pc b- Supply and install sub-distribution telephone joint box of Capacity of (5 pair) lines, according to the drawings. pc c- Supply arid install sub-distribution telephone joint box of Capacity (3pair) lit lines according to the drawings. pc d- Supply and install sub-distribution joint box of capacity 6pair)lines according to the drawings pc e- Supply and install sub-distribution joint box of capacity 30pair) lines according to the drawing. pc f- Supply and install sub-distribution telephone joint box of Capacity (40pair) lines according to the drawings. 11
  • 12. Item Cost Unit Price Qty.UnitItem DescriptionNo. pc g-Supply and install sub- distribution Tel joint box capacity of(120 pair)lines according to the drawings. 10 pc h-Supply and install Tel outlet(MK) English made include Tel wire ( 4.0x0.6)mm2 ( English made ) M.L i-Supply and install Tel cable(20x0.6) mm2 English made. j-Supply and install Tel cable(40x0.6) mm2 English made. k- Supply and install Tel cable (10x0.6) mm2 English made. I- Supply and install Tel cable (12x0.60) mm2 English made. m- Supply and install Tel cable (40x0.6) mm2 English made. 10.23- Lighting Protection System: Supply and install Lightning protection system by fixing suitable tower at the root of the building and arrange lighting protection system as a loop by using suitable bus bars and connected it with system arranged under around all works must be done under supervisor satisfaction and according to slander specification. The work include provision all material which is come true the aim Mechanical work :- All equipment's and materials supplied by the contractor rust be new best quality and guaranteed for min. One year under actual Operation the contractor must supply detail catalogs operation and maintenance manuals and other necessary illustration guides to approval of engineer before supplying Fire work includes installation connection to the power with all other necessary accessories and annexes and testing for operation The whose work must be according to specification and satisfaction and instruction . The lift and central Heating & Cooling system must be according to the following specifications: 11 11.1- package unit installation on the Roof of the building and testing and all the requirements for proper connection with the main ducts as shown in the drawing. Mark need (Zamil-Craft) No. a- Specific of package unit Central heating/cooling system • Nominal Capacity (18tons)(53Kkw) • Refrigerant (R-22) • Nominal (Evaporator Blower)(CFM)L/S (7500-3539) • Compressor type/Scroll, Quantity / 2 12
  • 13. Item Cost Unit Price Qty.UnitItem DescriptionNo. No. b- Specific of Package unit Central heating/cooling system Nominal Capacity(21.5Tons)(76kw) 11 M.L 11.2- Rectangular Air Ducts-installation: Including supply of material work will be done with galvanized sheet metal gauge (21-24) as described in sheets duct supported and hanged with steel bar unit and screw. The flexible joint should be considered between units and main duct. The work will be done according to the instruction Of the Supervisor Engineer Installation with fiber glass thickness (25mm)clothing and two layers of flunkout according to the specification 11.3- Air Distribution terminals supply and return Air Diffusers and Grills with Galvanized sheet metal and wooden frames fixing to the side wall with branch ducts. two direction manually movable Air Control for each one No.a- 600x300 mm No.b- 500x250 mm No. 11.4- Providing installation and testing of split unit cassette type Air Conditioner Cooling / Heating Capacity (4tons).The work will be done according to the instruction of the supervisor Engineer. Mark needs (Diakin- National-General- Carrier). No. 11.5- Shade frame for Packages: supply material and install Shade frames (3x3x2.5) m size from 2."X2" angle iron cornered from top by gauge 18(G.L) sheets. Fixed to the frame properly. The frame Legs fixed to the floor through (4x150x150) mm iron Plates with screw and socket-The 4 sides should be closed with 8mm dig. B.R.C mesh with door (BRC arid tube frame). 11.6-Water Pump: Supply and install water pump of approved quality (Italian made).The works includes fixing in position and all other required fittings and annexes to engineer's satisfaction No. a- Specific of water pump dies size 40mm,max-H 35m,max- Q(100 L/min )output 1.5kw.V-Ph-Hz 220-50Amp 6.5 No. b- Specific of water pump dies size 76.5 mm(3"),max-H (50-60)m max-Q (0.6-3.6m3 ) V-Ph-Hz (380-3-(60-61)),cos. 0.85 Amp 15.5 11.7-Elevator (Lift): All equipments and materials supplied by the contractor must be new, best quality and guaranteed for min. one year under actual operation. The contractor must supply detail catalogs. operation and maintenance manuals and other necessary illustration guides to approval of engineer before: supplying The work includes installation connection to the power with all other necessary accessories and annexes and testing for operation the whole work must be according to specification and engineers satisfaction and instruction , The lift and central heating & Cooling system must be according to the following specifications: 13
  • 14. Item Cost Unit Price Qty.UnitItem DescriptionNo. Schindler trade mark (Austria );Pressure lift capacity and Specification Speed 0.6-1.0 m/s. Drive: A/C geared or rear less two speed drive with step-starting. Power rating 10kw 50meter Travel, No. of entrances (10) all, opening on the same side. Floor Destination: B.F/1 - G.F/2 - 1st F/3 - 2nd F/4 – 3rd F/5 - 4th F/6 - 5th F/7 - 6th F/8 - 7th F/9 - 8th F/10,Door For landing and car, full automatic two panel central - opening sliding door, Car design Modern all stainless steel passenger car. 1- Control Unit : Modern electronic technology 2- Hi reliability in operation due to maintenance – free 3- Logical designed control and monitoring indicators make at tendency easy and safe for the maintenance personal 4- Adaptability to change operation condition 14