SlideShare a Scribd company logo
1 of 62
Detailed Engineering Design
Aloha - Stage 1 & 2
November 2020
1. Introduction
2. Preparations, Surveys and Laboratory
Testing
3. Engineering Analysis
Table of Contents
su
1.1. Stages of DED
1. Introduction
Stage Detailed Engineering Design
1 Preparations, Surveys & Laboratory
Testing
2 Engineering Analysis
3 Bidding Documents & Reporting
su
2.1 Topographic Survey
a. Benchmark
BM ALH.02
X : 691479.124 m
Y : 9184096.146 m
Z : 5.464 m
BM ALH.03
X : 690770.573 m
Y : 9183854.290 m
Z : 6.222 m
CP ALH.03
X : 690774.963 m
Y : 9183913.953 m
Z : 6.144 m
CP ALH.02
X : 691442.523 m
Y : 9184145.008 m
Z : 6.349 m
CP ALH.01
X : 690883.689 m
Y : 9185212.639 m
Z : 6.026 m
BM ALH.01
X : 690881.839 m
Y : 9185154.760 m
Z : 5.821 m
N
su
c. Dimension
2.1 Topographic Survey
Width : 23.4 m
(include median : 4.5 m)
Width : 16.4 m
(include median curb 1.0 m)
Width : 40.1 m
include :
median : 7.3 m
Separator 1 & Retain wall : 3.6 m
Separator 2 : 5.4 m
Width : 19.8 m
(include median & Drainage : 6.3 m)
Width : 9.6 m
N
su
Aloha
6/2D
6/4D
6/2D
2.2 Traffic Survey
su
Aloha
Traffic Movement
 A1 : From Waru To Juanda
A2 : From Waru To S Parman
B : From Juanda
C1 : Straight to S Parman
C2 : S Parman U turn to Waru
D1 : Straight To Waru
D2 : Waru U turn
su
28/07/2020
Pcr/Hr
Morning Peak
Traffic Weaving
V/C LOS
0,77 D
su
28/07/2020
Pcr/Hr
V/C LOS
0,94 E
Traffic Weaving
Evening Peak
su
3.1 Highway Design
3.2 Structure Analysis
3. Engineering Analysis
su
3.1 Highway Design
su
DESIGN CRITERIA
No Geometric Parameter Unit
Design Criteria
2 Lane 1 Way 2 Lane 2 Way
1. Design Speed
km/
hour
40 60
2. Cross Section
a. Carriage Way m 4,0 3,6
b. Outer Shoulder m 3,0 3,0
c. Inner Shoulder m 1,0 -
d. Separator Marking of Lane/Median m - 0,45
e. Normal Cross Fall of Carriage Way m 2,0 2,0
f. Normal Cross Fall for Outer Shoulder % 4,0 4,0
g. Maximum Super Elevation % 8,0 8,0
h. Minimum Vertical Clearance m 5.1 5,1
i. For Electricity Cable
 Low Voltage ( < 100 kV ) m 8,0 8,0
 Medium Voltage ( 150 kV ) m 9,0 9,0
 High Voltage ( 500 kV ) m 15,0 15,0
3. Minimum Stopping Sight Distance m 40 75
4. Parameter of Horizontal Alignment
a. Minimum Curve Radius m 55 135
b. Minimum Curve Radius with Normal Super
Elevation m
800 2000
c. Minimum Curve Length m 500/ϴ or 70 700/ϴ or 100
d. Minimum Transition Length m 35 50
e. Minimum Curve Radius without Transition m 250 600
f. Relative Run Off Superelevation m 1/125 1/75
5. Parameter of Vertical Alignment
a. Maximum Gradient % 7,0 5,0
b. Minimum Vertical Curve Radius
 Crest m 700 2.000
 Sag m 700 1.500
 Minimum Curve Length m 35 50
su
Simpang Aloha – FS option
su
 Juanda – Sidoarjo gradient 3%
Profile
 Sidoarjo - Juanda gradient 3%
su
Profile Surabaya-Juanda-Surabaya
su
Simpang Aloha
– FS option
Tipikal Sidoarjo-
Juanda
su
Simpang Aloha –
FS option
Tipikal Juanda -
Sidoarjo
su
Simpang Aloha
– FS option
Tipikal Surabaya-
Juanda-Surabaya
su
Tipical section Sidoarjo-Juanda
su
Tipical section pada oprit/ramp
su
su
su
su
su
su
su
su
1981 1985 (ke-1) 1990 (ke-5) 1992 (ke-7) 2005 (ke-20)
1000 1215,5 1626,6 1827,7 3898,8
300 364,7 488,0 548,4 1169,6
50 60,8 81,4 91,4 195,0
30 36,5 48,8 54,9 117,1
10 12,2 16,3 18,3 39,1
su
su
su
su
su
su
su
su
su
su
su
ITP5 = 7,0
DDT = 4; 1,67*LER5 = 87; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5
su
ITP5+15 = 9,7
DDT = 4; 2,5*LER15 = 688; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5
su
ITP5 = 7,0
su
ITP5+15 = 9,7
su
su
su
ITP7 = 7,5
DDT = 4; 1,67*LER7 = 129; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5
su
ITP7+13 = 9,6
DDT = 4; 2,5*LER13 = 620; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5
su
ITP7 = 7,5
su
ITP7+13 = 9,6
su
su
su
su
RUAS PADALARANG BYPASS
JALAN TOL CIKAMPEK - PADALARANG
su
1. PEKERJAAN SUBGRADE
1. PEKERJAAN PEMBENTUKAN BADAN JALAN
DENGAN MENGGUNAKAN MOTORGRADER
2. PEKERJAAN PEMADATAN SUBGRADE DENGAN
MENGGUNAKAN VIBRO ROLLER SAMPAI
KEDALAMAN 20 CM DI BAWAH ELEVASI
su
Kualitas material pada Base A dan Base B harus ditentukan terlebih
dahulu dengan peninjauan dan pengetesan ke lokasi sample material
(stone Cruser atau Quarry) terdekat, dengan hasil tersebut baru dapat
dilaksanakan pengadaan materialnya.
2. PEKERJAAN SUB BASE COURSE CLASS B = 18 Cm
Pemadatan dimulai dari arah tepi, kemudian secara bertahap
ke arah pusat dalam satu arah memanjang,
Pada daerah super elevasi, pemadatan dimulai dari bagian
yang lebih rendah.
su
1. PENGANGKUTAN MATERIAL SUBBASE CLASS -
B
DENGAN MENGGUNAKAN DUMP TRUCK
2. DUMPING MATERIAL SUB BASE DARI DUMP TRUCK
KE SPREADER BOX
4. PEKERJAAN PEMADATAN SUB BASE DENGAN
MENGGUNAKAN VIBRO ROLLER PER LAYER 15
CM
2. PEKERJAAN SUB BASE COURSE CLASS B = 18 Cm
3. PENGHAMPARAN & PERATAAN SUBBASE
CLASS-B
MENGGUNAKAN SPREADER BOX
su
1. PENGANGKUTAN MATERIAL BASE COURSE
CLASS - A DENGAN MENGGUNAKAN DUMP
TRUCK
2. DUMPING MATERIAL BASE COURSE DARI
DUMP TRUCK KE SPREADER BOX
3. PEKERJAAN PENGHAMPARAN BASE COURSE
DENGAN MENGGUNAKAN SPREADER BOX
3. PEKERJAAN BASE COURSE CLASS A= 15 Cm
4. PEKERJAAN PEMADATAN BASE COURSE
MENGGUNAKAN VIBRO ROLLER PER LAYER 15
CM
su
4. PEKERJAAN PERKERASAN ASPAL JALAN AKSES
1. PELAPISAN PRIME COAT DENGAN ASPHALT SPRAYER
A. PRIME COAT
B. ASPHALT TREATED BASE (ATB) 15 CM
2. PENGANGKUTAN ATB DENGAN DUMP TRUCK
3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER
4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER
5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER
6. PEMADATAN AKHIR DENGAN TANDEM ROLLER
1. PELAPISAN TACK COAT DENGAN ASPHALT SPRAYER
C. TACK COAT
D. ASPHALT CONCRETE ( 5 cm Binder Coarse) & (5 cm Wearing Coarse)
2. PENGANGKUTAN ASPHALT DENGAN DUMP TRUCK
4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER
5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER
6. PEMADATAN AKHIR DENGAN TANDEM ROLLER
3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER
su
4. PEKERJAAN PERKERASAN ASPAL BAHU JALAN
1. PELAPISAN PRIME COAT DENGAN ASPHALT SPRAYER
A. PRIME COAT
B. ASPHALT TREATED BASE (ATB) 10 CM
2. PENGANGKUTAN ATB DENGAN DUMP TRUCK
3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER
4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER
5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER
6. PEMADATAN AKHIR DENGAN TANDEM ROLLER
su
4. PEKERJAAN PERKERASAN ASPAL DIATAS RIGID PAVEMENT
JALUR UTAMA / RAMP
1. PELAPISAN TACK COAT DENGAN ASPHALT SPRAYER
TACK COAT
ASPHALT CONCRETE (AC) 6 CM (Wearing Coarse)
2. PENGANGKUTAN ASPHALT DENGAN DUMP TRUCK
4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER
5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER
6. PEMADATAN AKHIR DENGAN TANDEM ROLLER
3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER
su
PEMADATAN
ASPHALT TREATED BASE
su
Terima Kasih
su

More Related Content

More from darmadi ir,mm

02 Aspek-Hidrolika-Dalam-Drainase.pdf
02 Aspek-Hidrolika-Dalam-Drainase.pdf02 Aspek-Hidrolika-Dalam-Drainase.pdf
02 Aspek-Hidrolika-Dalam-Drainase.pdfdarmadi ir,mm
 
Materi LKPS_HR_Akreditasi-UnggulI.pdf
Materi LKPS_HR_Akreditasi-UnggulI.pdfMateri LKPS_HR_Akreditasi-UnggulI.pdf
Materi LKPS_HR_Akreditasi-UnggulI.pdfdarmadi ir,mm
 
metode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.pptmetode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.pptdarmadi ir,mm
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxdarmadi ir,mm
 
TUGAS ASESSOR RPL.pptx
TUGAS ASESSOR RPL.pptxTUGAS ASESSOR RPL.pptx
TUGAS ASESSOR RPL.pptxdarmadi ir,mm
 
Kuliah Tatacara Asesmen.ppt
Kuliah Tatacara Asesmen.pptKuliah Tatacara Asesmen.ppt
Kuliah Tatacara Asesmen.pptdarmadi ir,mm
 
vehicle calibration.ppt
vehicle calibration.pptvehicle calibration.ppt
vehicle calibration.pptdarmadi ir,mm
 
tatacara kalibrasi Kendaraan.ppt
tatacara kalibrasi Kendaraan.ppttatacara kalibrasi Kendaraan.ppt
tatacara kalibrasi Kendaraan.pptdarmadi ir,mm
 
Template seminar TA 2020.pptx
Template seminar TA 2020.pptxTemplate seminar TA 2020.pptx
Template seminar TA 2020.pptxdarmadi ir,mm
 
Laporan Kerja Praktek-Latif Murdian.pptx
Laporan Kerja Praktek-Latif Murdian.pptxLaporan Kerja Praktek-Latif Murdian.pptx
Laporan Kerja Praktek-Latif Murdian.pptxdarmadi ir,mm
 
DARMADI Menyusun Skripsi.pptx
DARMADI Menyusun Skripsi.pptxDARMADI Menyusun Skripsi.pptx
DARMADI Menyusun Skripsi.pptxdarmadi ir,mm
 
08 PERKERASAN_BERBUTIR.pptx
08 PERKERASAN_BERBUTIR.pptx08 PERKERASAN_BERBUTIR.pptx
08 PERKERASAN_BERBUTIR.pptxdarmadi ir,mm
 
SKET SAMBUNGAN R10.pdf
SKET SAMBUNGAN R10.pdfSKET SAMBUNGAN R10.pdf
SKET SAMBUNGAN R10.pdfdarmadi ir,mm
 
Base A dapat digunakan sebagai Drain Layer.pptx
Base A dapat digunakan sebagai Drain Layer.pptxBase A dapat digunakan sebagai Drain Layer.pptx
Base A dapat digunakan sebagai Drain Layer.pptxdarmadi ir,mm
 
Manajemen proyek network.ppt
Manajemen proyek network.pptManajemen proyek network.ppt
Manajemen proyek network.pptdarmadi ir,mm
 
63. Metode-Rigid.ppt
63. Metode-Rigid.ppt63. Metode-Rigid.ppt
63. Metode-Rigid.pptdarmadi ir,mm
 
revisi-ppt-gempa-bab-5.pptx
revisi-ppt-gempa-bab-5.pptxrevisi-ppt-gempa-bab-5.pptx
revisi-ppt-gempa-bab-5.pptxdarmadi ir,mm
 
BAHAN_INTAKINDO_M1.pptx
BAHAN_INTAKINDO_M1.pptxBAHAN_INTAKINDO_M1.pptx
BAHAN_INTAKINDO_M1.pptxdarmadi ir,mm
 

More from darmadi ir,mm (20)

02 Aspek-Hidrolika-Dalam-Drainase.pdf
02 Aspek-Hidrolika-Dalam-Drainase.pdf02 Aspek-Hidrolika-Dalam-Drainase.pdf
02 Aspek-Hidrolika-Dalam-Drainase.pdf
 
Materi LKPS_HR_Akreditasi-UnggulI.pdf
Materi LKPS_HR_Akreditasi-UnggulI.pdfMateri LKPS_HR_Akreditasi-UnggulI.pdf
Materi LKPS_HR_Akreditasi-UnggulI.pdf
 
metode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.pptmetode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
 
TUGAS ASESSOR RPL.pptx
TUGAS ASESSOR RPL.pptxTUGAS ASESSOR RPL.pptx
TUGAS ASESSOR RPL.pptx
 
Kuliah Tatacara Asesmen.ppt
Kuliah Tatacara Asesmen.pptKuliah Tatacara Asesmen.ppt
Kuliah Tatacara Asesmen.ppt
 
vehicle calibration.ppt
vehicle calibration.pptvehicle calibration.ppt
vehicle calibration.ppt
 
tatacara kalibrasi Kendaraan.ppt
tatacara kalibrasi Kendaraan.ppttatacara kalibrasi Kendaraan.ppt
tatacara kalibrasi Kendaraan.ppt
 
Template seminar TA 2020.pptx
Template seminar TA 2020.pptxTemplate seminar TA 2020.pptx
Template seminar TA 2020.pptx
 
Laporan Kerja Praktek-Latif Murdian.pptx
Laporan Kerja Praktek-Latif Murdian.pptxLaporan Kerja Praktek-Latif Murdian.pptx
Laporan Kerja Praktek-Latif Murdian.pptx
 
DARMADI Menyusun Skripsi.pptx
DARMADI Menyusun Skripsi.pptxDARMADI Menyusun Skripsi.pptx
DARMADI Menyusun Skripsi.pptx
 
08 PERKERASAN_BERBUTIR.pptx
08 PERKERASAN_BERBUTIR.pptx08 PERKERASAN_BERBUTIR.pptx
08 PERKERASAN_BERBUTIR.pptx
 
SKET SAMBUNGAN R10.pdf
SKET SAMBUNGAN R10.pdfSKET SAMBUNGAN R10.pdf
SKET SAMBUNGAN R10.pdf
 
Base A dapat digunakan sebagai Drain Layer.pptx
Base A dapat digunakan sebagai Drain Layer.pptxBase A dapat digunakan sebagai Drain Layer.pptx
Base A dapat digunakan sebagai Drain Layer.pptx
 
Manajemen proyek network.ppt
Manajemen proyek network.pptManajemen proyek network.ppt
Manajemen proyek network.ppt
 
63. Metode-Rigid.ppt
63. Metode-Rigid.ppt63. Metode-Rigid.ppt
63. Metode-Rigid.ppt
 
revisi-ppt-gempa-bab-5.pptx
revisi-ppt-gempa-bab-5.pptxrevisi-ppt-gempa-bab-5.pptx
revisi-ppt-gempa-bab-5.pptx
 
RTA Patim.pptx
RTA Patim.pptxRTA Patim.pptx
RTA Patim.pptx
 
BAHAN_INTAKINDO_M1.pptx
BAHAN_INTAKINDO_M1.pptxBAHAN_INTAKINDO_M1.pptx
BAHAN_INTAKINDO_M1.pptx
 
Hari Raya 6.pptx
Hari Raya 6.pptxHari Raya 6.pptx
Hari Raya 6.pptx
 

Presentasi DED Ujian RKK Pluit 2022.ppt

  • 1. Detailed Engineering Design Aloha - Stage 1 & 2 November 2020
  • 2. 1. Introduction 2. Preparations, Surveys and Laboratory Testing 3. Engineering Analysis Table of Contents su
  • 3. 1.1. Stages of DED 1. Introduction Stage Detailed Engineering Design 1 Preparations, Surveys & Laboratory Testing 2 Engineering Analysis 3 Bidding Documents & Reporting su
  • 4. 2.1 Topographic Survey a. Benchmark BM ALH.02 X : 691479.124 m Y : 9184096.146 m Z : 5.464 m BM ALH.03 X : 690770.573 m Y : 9183854.290 m Z : 6.222 m CP ALH.03 X : 690774.963 m Y : 9183913.953 m Z : 6.144 m CP ALH.02 X : 691442.523 m Y : 9184145.008 m Z : 6.349 m CP ALH.01 X : 690883.689 m Y : 9185212.639 m Z : 6.026 m BM ALH.01 X : 690881.839 m Y : 9185154.760 m Z : 5.821 m N su
  • 5. c. Dimension 2.1 Topographic Survey Width : 23.4 m (include median : 4.5 m) Width : 16.4 m (include median curb 1.0 m) Width : 40.1 m include : median : 7.3 m Separator 1 & Retain wall : 3.6 m Separator 2 : 5.4 m Width : 19.8 m (include median & Drainage : 6.3 m) Width : 9.6 m N su
  • 7. Aloha Traffic Movement  A1 : From Waru To Juanda A2 : From Waru To S Parman B : From Juanda C1 : Straight to S Parman C2 : S Parman U turn to Waru D1 : Straight To Waru D2 : Waru U turn su
  • 10. 3.1 Highway Design 3.2 Structure Analysis 3. Engineering Analysis su
  • 12. DESIGN CRITERIA No Geometric Parameter Unit Design Criteria 2 Lane 1 Way 2 Lane 2 Way 1. Design Speed km/ hour 40 60 2. Cross Section a. Carriage Way m 4,0 3,6 b. Outer Shoulder m 3,0 3,0 c. Inner Shoulder m 1,0 - d. Separator Marking of Lane/Median m - 0,45 e. Normal Cross Fall of Carriage Way m 2,0 2,0 f. Normal Cross Fall for Outer Shoulder % 4,0 4,0 g. Maximum Super Elevation % 8,0 8,0 h. Minimum Vertical Clearance m 5.1 5,1 i. For Electricity Cable  Low Voltage ( < 100 kV ) m 8,0 8,0  Medium Voltage ( 150 kV ) m 9,0 9,0  High Voltage ( 500 kV ) m 15,0 15,0 3. Minimum Stopping Sight Distance m 40 75 4. Parameter of Horizontal Alignment a. Minimum Curve Radius m 55 135 b. Minimum Curve Radius with Normal Super Elevation m 800 2000 c. Minimum Curve Length m 500/ϴ or 70 700/ϴ or 100 d. Minimum Transition Length m 35 50 e. Minimum Curve Radius without Transition m 250 600 f. Relative Run Off Superelevation m 1/125 1/75 5. Parameter of Vertical Alignment a. Maximum Gradient % 7,0 5,0 b. Minimum Vertical Curve Radius  Crest m 700 2.000  Sag m 700 1.500  Minimum Curve Length m 35 50 su
  • 13. Simpang Aloha – FS option su
  • 14.  Juanda – Sidoarjo gradient 3% Profile  Sidoarjo - Juanda gradient 3% su
  • 16. Simpang Aloha – FS option Tipikal Sidoarjo- Juanda su
  • 17. Simpang Aloha – FS option Tipikal Juanda - Sidoarjo su
  • 18. Simpang Aloha – FS option Tipikal Surabaya- Juanda-Surabaya su
  • 20. Tipical section pada oprit/ramp su
  • 21. su
  • 22. su
  • 23.
  • 24. su
  • 25. su
  • 26. su
  • 27. su
  • 28. su
  • 29. 1981 1985 (ke-1) 1990 (ke-5) 1992 (ke-7) 2005 (ke-20) 1000 1215,5 1626,6 1827,7 3898,8 300 364,7 488,0 548,4 1169,6 50 60,8 81,4 91,4 195,0 30 36,5 48,8 54,9 117,1 10 12,2 16,3 18,3 39,1 su
  • 30. su
  • 31. su
  • 32. su
  • 33. su
  • 34. su
  • 35. su
  • 36. su
  • 37. su
  • 38. su
  • 39. su
  • 40. ITP5 = 7,0 DDT = 4; 1,67*LER5 = 87; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5 su
  • 41. ITP5+15 = 9,7 DDT = 4; 2,5*LER15 = 688; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5 su
  • 44. su
  • 45. su
  • 46. ITP7 = 7,5 DDT = 4; 1,67*LER7 = 129; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5 su
  • 47. ITP7+13 = 9,6 DDT = 4; 2,5*LER13 = 620; FR = 1,0; IP = 2,0; IPo = 3,9 – 3,5 su
  • 50. su
  • 51. su
  • 52. su
  • 53. RUAS PADALARANG BYPASS JALAN TOL CIKAMPEK - PADALARANG su
  • 54. 1. PEKERJAAN SUBGRADE 1. PEKERJAAN PEMBENTUKAN BADAN JALAN DENGAN MENGGUNAKAN MOTORGRADER 2. PEKERJAAN PEMADATAN SUBGRADE DENGAN MENGGUNAKAN VIBRO ROLLER SAMPAI KEDALAMAN 20 CM DI BAWAH ELEVASI su
  • 55. Kualitas material pada Base A dan Base B harus ditentukan terlebih dahulu dengan peninjauan dan pengetesan ke lokasi sample material (stone Cruser atau Quarry) terdekat, dengan hasil tersebut baru dapat dilaksanakan pengadaan materialnya. 2. PEKERJAAN SUB BASE COURSE CLASS B = 18 Cm Pemadatan dimulai dari arah tepi, kemudian secara bertahap ke arah pusat dalam satu arah memanjang, Pada daerah super elevasi, pemadatan dimulai dari bagian yang lebih rendah. su
  • 56. 1. PENGANGKUTAN MATERIAL SUBBASE CLASS - B DENGAN MENGGUNAKAN DUMP TRUCK 2. DUMPING MATERIAL SUB BASE DARI DUMP TRUCK KE SPREADER BOX 4. PEKERJAAN PEMADATAN SUB BASE DENGAN MENGGUNAKAN VIBRO ROLLER PER LAYER 15 CM 2. PEKERJAAN SUB BASE COURSE CLASS B = 18 Cm 3. PENGHAMPARAN & PERATAAN SUBBASE CLASS-B MENGGUNAKAN SPREADER BOX su
  • 57. 1. PENGANGKUTAN MATERIAL BASE COURSE CLASS - A DENGAN MENGGUNAKAN DUMP TRUCK 2. DUMPING MATERIAL BASE COURSE DARI DUMP TRUCK KE SPREADER BOX 3. PEKERJAAN PENGHAMPARAN BASE COURSE DENGAN MENGGUNAKAN SPREADER BOX 3. PEKERJAAN BASE COURSE CLASS A= 15 Cm 4. PEKERJAAN PEMADATAN BASE COURSE MENGGUNAKAN VIBRO ROLLER PER LAYER 15 CM su
  • 58. 4. PEKERJAAN PERKERASAN ASPAL JALAN AKSES 1. PELAPISAN PRIME COAT DENGAN ASPHALT SPRAYER A. PRIME COAT B. ASPHALT TREATED BASE (ATB) 15 CM 2. PENGANGKUTAN ATB DENGAN DUMP TRUCK 3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER 4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER 5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER 6. PEMADATAN AKHIR DENGAN TANDEM ROLLER 1. PELAPISAN TACK COAT DENGAN ASPHALT SPRAYER C. TACK COAT D. ASPHALT CONCRETE ( 5 cm Binder Coarse) & (5 cm Wearing Coarse) 2. PENGANGKUTAN ASPHALT DENGAN DUMP TRUCK 4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER 5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER 6. PEMADATAN AKHIR DENGAN TANDEM ROLLER 3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER su
  • 59. 4. PEKERJAAN PERKERASAN ASPAL BAHU JALAN 1. PELAPISAN PRIME COAT DENGAN ASPHALT SPRAYER A. PRIME COAT B. ASPHALT TREATED BASE (ATB) 10 CM 2. PENGANGKUTAN ATB DENGAN DUMP TRUCK 3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER 4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER 5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER 6. PEMADATAN AKHIR DENGAN TANDEM ROLLER su
  • 60. 4. PEKERJAAN PERKERASAN ASPAL DIATAS RIGID PAVEMENT JALUR UTAMA / RAMP 1. PELAPISAN TACK COAT DENGAN ASPHALT SPRAYER TACK COAT ASPHALT CONCRETE (AC) 6 CM (Wearing Coarse) 2. PENGANGKUTAN ASPHALT DENGAN DUMP TRUCK 4. PEMADATAN PERTAMA DENGAN TANDEM ROLLER 5. PEMADATAN KEDUA DENGAN PNEUMATIC TIRE ROLLER 6. PEMADATAN AKHIR DENGAN TANDEM ROLLER 3. PENGHAMPARAN & PERATAAN ASPHALT DENGAN ASPHALT FINISHER su