SlideShare une entreprise Scribd logo
1  sur  15
Presentation
Marwan Khaled Issa
• Marital status: Married + Three Children (Gr. 8, Gr. 7 & Gr. 2)
• Place & date of birth: Kuwait, 19th January 1971.
• Nationality: Jordanian.
• Driving license: Valid UAE driving license + personal car.
• Resident of: Abu Dhabi.
Personal Information:
Qualifications
• Master of Engineering Management (MEM) -
University of Wollongong - Dubai 2014.
• B.Sc. in Electromechanical Engineering -
Automation, Amman University for applied
engineering, Jordan 1995.
• Secondary School - Kuwait 1989.
Profile & Mission statement
Mission:
• My education & work experience have provided me with a great sense of
responsibility, enhanced my technical & organizational skills, the ability to meet
deadlines as a playmaker.
Goals:
• Continues learning and skills enforcement.
• Leadership and best management position.
• Zero life defect record.
• Be very effective and professional.
• Be Innovative.
Personal Character:
• I am ambitious, hard working, presentable, and easy to get along with. I have an
ability to work under pressure displaying both efficiency & accuracy.
Professional Experience:
• Extensive experience (20 years) in Electromechanical systems (HVAC, Transformers &
Power Distribution, fire alarm & fighting system, Diesel generators, Lighting ….etc.)
design, service, operation, construction & project management in the field of industrial
& high rise buildings.
• Facilities maintenance & management experience enhanced by technical, leader ship
skills.
(6.5 Year) Facilities Manager @ Education field.
(6 Year) Projects & Facilities In Charge @ Strategic Studies field.
(2.5 Year) Head of Electrical Section @ Hospital field.
(3 Years) Utilities Engineer @ Pharmaceutical field.
(2.5 Year) senior electrical Engineer @ Industry Production field.
(6.5 Year) Facilities Manager @
Education field. (ADVETI)
(6 Year) Projects & Facilities In Charge @ Strategic Studies
field. (ECSSR)
• Lead & Develop implementation of 20 remote location across UAE.
• Projects Management: New expansions/Renovation, preparation of SOW & bidding documents,
Technical Evaluation, project planning & execution, Installation & Commissioning Activities.
• Achieve Comfort & Safe environment requirements in Education field.
• Negotiation & managing maintenance contracts for effective use of resources.
• Fixed Asset Management.
• HSE management & Risk Analysis.
• Soft services Management: Cleaning, Security, landscaping, Catering & offices services.
• Projects In Charge for New Building committee @ ECSSR, AED 120M, Renovation, Interior &
furniture fit out Design.
• Updating Head of Committee of all aspects of project & preparing tender documents for selection
of the consultant & contractors (Turn Key projects) in following scope: Interior design & fit out/
UAE Federation library (1M title)/ Access & Security control/ IT infrastructure & Server Room/ AV
system/ Landscaping (Hard & Soft).
• Complete Maintenance Design & Operation , contractor selection & BMS control room
management.
• Maintain Project Budget guidelines & report variances.
• Managing Operations & maintenance of Utilities Infrastructure services (HVAC, Electrical
distribution system, Mechanical & Plumbing.
• PPM planning & call center design.
(2.5 Year) Head of Electrical Section @ Hospital
field. (DOHMS)
(3 Years) Utilities Engineer @ Pharmaceutical
field. (JULPHAR)
• Responsible for Effective running of all electrical services @ Dubai hospital (630 bed capacity)
• Monitoring & project development for all electrical Infrastructure: Main power supply MV/LV &
ATS panels./ Diesel Generator/ UPS & battery Chargers/HVAC : AHUs & Centrifugal chillers &
Cooling Tower / Medical gas system/ Compressors/ LPG/Boilers & Heating pumps
• Monitoring & Maintaining Fire Alarm System/ Fire pumps & Hose reel / Fire Extinguishers.
• Managing & Monitoring PPM : OTIS Elevators (16nos)
• Building Management System (BMS): Control room.
• In house – Staff managing & utilization.
• Spare Parts Inventory management: safety stock level, order time & JIT.
• Member of New Antibiotic plant committee (JULPHAR 2) for Installation & commissioning all
Electromechanical equipment / $ 3M project budget /In house project/ Supervision of:
• HVAC System: ABB 30Nos AHU/ Carrier Chillers 3Nos/ Chilled water Balance & Air
balance/Advanced Air filtration system/ HEPA filters/ Temperature & Humidity control.
• Writing all operation, cleaning & preventive maintenance procedures (SOP) for HVAC system.
• Control room: Managing BMS & daily reports.
• Production Machines: installation & Commissioning / PLC troubleshooting.
• Power Distribution System: ABB Transformers /RMU/ Main Switchgears & Diesel Generator.
• IQ & OQ Documentation.
(2.5 Year) Senior Electrical Engineer @ Industry Production
field. (Crown Industry)
• Assist planning & organizing the preventive maintenance & repair / Production machines .
• Using Advanced PLC Technology in Monitoring & Troubleshooting Production & packaging
Machines: Day- to – Day Task.
• Monitoring Utilities services for the plant : Power Supply system, Diesel Generators, Water
treatment Plant…etc.
• Fire Alarm & Fire fighting system.
• Electrical Inventory control.
• Area of Knowledge :
-Thermal Station – Power Generation
-Steel Pipes fabrication Industry (rolling mills)
-Food production & Packing
-Aluminum Can making Industry
-Pharmaceutical Industry
-Health Care & Hospitals
-Research & Conferences
-Education
Work Experience :
.
summary of Main Tasks:
• Projects management
• Design Programmable Preventive Maintenance (PPM).
• Routine check, Corrective maintenance & Major Shutdown.
• Facilities maintenance & management experience for Hard services (maintenance) &
Soft services (Cleaning, Catering, Security, Landscaping, & events management).
Main Challenges in managing building Maintenance:
• Effective Maintenance needs a qualified staff with extensive training on best practice
for doing the Preventive & Corrective maintenance.
• You need to ensure Reliability which reflected by Availability (Response time) &
Maintainability (Break Down Time)
• Interruption operations: you need to plan redundant system or alternative solution &
proper shutdown time that not interfering operations.
• Budget control & visibility.
• Maintaining Zero life defects with strict HES standards & Procedures.
Future Vision & Mission
• Project Management & Planning
• Building Renovation Process
• Building Renovation Challenges
• Aspirations & Suggestions
• My Plan to Manage Maintenance Division
Project Management & Planning
Building Renovation Process
• Currently @ Education field (ADVETI), we are handing over many schools from
ADEC, and most of these schools have been renovated to meet ADVETI standards
for vocational & Training programs, Upgrading HVAC system, Fire Alarm & fighting
system with AD code of building safety, Use LED lighting for reducing power
consumption & heat dissipation, Mix between modern design and classic in fit out
and decoration concept.
• Carried out renovation work at Dubai Hospital which was built on 1980 for patients
wards and upgrade main reception, HVAC cooling system & replace pneumatic
control system with DDC control, replaced SMDBs & DBs as per DEWA regulations.
• Manage MEP renovation works at Emirates center (ECSSR) for developing Ball
Room & function room with State – of Art building fit out and decoration.
Building Renovation Challenges
• Design Challenges: renovation design is normally
restricted with actual situation and previous main civil
construction which force designer with many
considerations that need deep alteration and sometimes
became costly.
• Operational Challenges: renovation tasks (WBS) need
complicated planning through several stages in order to
maintain smooth running for the daily business of the firm
& this might create inconvenience atmosphere for both
staff & visitors/Guests.
Aspirations & Suggestions
• Focusing on Advance Management for applying best practices
in Effective maintenance management & Strategic planning,
resource utilization, budget control, Logistics & supply chain,
Quality & HSE standards.
• My future plan in using Technology for supporting maintenance
& Facilities Division (BMS system & office automation
equipment), Green building concept & Power Save concept.
Furthermore, I think that KUSTAR business is proper place for
me, where I can transfer my experience for the benefit of campus
& suggest Automation of most of office equipment system &
Archiving, Data Center Development, Electronic Library,
Advanced security monitoring Camera & Access control.
Thank You

Contenu connexe

Tendances (18)

Gerard judge
Gerard judgeGerard judge
Gerard judge
 
New resume Ivan 2015
New resume Ivan 2015New resume Ivan 2015
New resume Ivan 2015
 
eimCV
eimCVeimCV
eimCV
 
Maintenance
MaintenanceMaintenance
Maintenance
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
Tamer Akl C.V
Tamer Akl C.VTamer Akl C.V
Tamer Akl C.V
 
MOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&MMOHAMMED IMRAN_CV_O&M
MOHAMMED IMRAN_CV_O&M
 
khaled-engineering
khaled-engineeringkhaled-engineering
khaled-engineering
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
BIO DATA - kaushik - latest
BIO DATA - kaushik - latestBIO DATA - kaushik - latest
BIO DATA - kaushik - latest
 
Faiyaz Sabir Khan CV
Faiyaz Sabir Khan CVFaiyaz Sabir Khan CV
Faiyaz Sabir Khan CV
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
Mechanical Maintenance Engineer
Mechanical Maintenance Engineer Mechanical Maintenance Engineer
Mechanical Maintenance Engineer
 
resume34
resume34resume34
resume34
 
Mark Joseph Chua_CV
Mark Joseph Chua_CVMark Joseph Chua_CV
Mark Joseph Chua_CV
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 

En vedette

Reference Letter_Greek Army
Reference Letter_Greek ArmyReference Letter_Greek Army
Reference Letter_Greek ArmyThanos Koutras
 
NTR 300 powerpoint presentation
NTR 300 powerpoint presentationNTR 300 powerpoint presentation
NTR 300 powerpoint presentationWm. Riley Maynard
 
досвід роботи дворської о. м.
досвід роботи дворської о. м.досвід роботи дворської о. м.
досвід роботи дворської о. м.Олеся Дворська
 
¡Sumerjámonos en el mar!
¡Sumerjámonos en el mar!¡Sumerjámonos en el mar!
¡Sumerjámonos en el mar!itsas_05
 
Evaluation questions 2, 3, 4 and 5
Evaluation   questions 2, 3, 4 and 5Evaluation   questions 2, 3, 4 and 5
Evaluation questions 2, 3, 4 and 5toni lough
 
Le web social, c'est pas obligé d'être compliqué
Le web social, c'est pas obligé d'être compliquéLe web social, c'est pas obligé d'être compliqué
Le web social, c'est pas obligé d'être compliquéSebastien Provencher
 
Men in film
Men in filmMen in film
Men in filmddoggart
 
incomplete abortion case study
incomplete abortion case studyincomplete abortion case study
incomplete abortion case studyPsyche Gayodan
 
IT’S ABOUT TIME: SAVE TIME WITH DOCUSIGN
IT’S ABOUT TIME: SAVE TIME WITH DOCUSIGNIT’S ABOUT TIME: SAVE TIME WITH DOCUSIGN
IT’S ABOUT TIME: SAVE TIME WITH DOCUSIGNDocuSign
 

En vedette (12)

Reference Letter_Greek Army
Reference Letter_Greek ArmyReference Letter_Greek Army
Reference Letter_Greek Army
 
NTR 300 powerpoint presentation
NTR 300 powerpoint presentationNTR 300 powerpoint presentation
NTR 300 powerpoint presentation
 
досвід роботи дворської о. м.
досвід роботи дворської о. м.досвід роботи дворської о. м.
досвід роботи дворської о. м.
 
¡Sumerjámonos en el mar!
¡Sumerjámonos en el mar!¡Sumerjámonos en el mar!
¡Sumerjámonos en el mar!
 
Vilkolokiai
VilkolokiaiVilkolokiai
Vilkolokiai
 
Evaluation questions 2, 3, 4 and 5
Evaluation   questions 2, 3, 4 and 5Evaluation   questions 2, 3, 4 and 5
Evaluation questions 2, 3, 4 and 5
 
The Art of Meeting
The Art of MeetingThe Art of Meeting
The Art of Meeting
 
Le web social, c'est pas obligé d'être compliqué
Le web social, c'est pas obligé d'être compliquéLe web social, c'est pas obligé d'être compliqué
Le web social, c'est pas obligé d'être compliqué
 
Men in film
Men in filmMen in film
Men in film
 
incomplete abortion case study
incomplete abortion case studyincomplete abortion case study
incomplete abortion case study
 
IT’S ABOUT TIME: SAVE TIME WITH DOCUSIGN
IT’S ABOUT TIME: SAVE TIME WITH DOCUSIGNIT’S ABOUT TIME: SAVE TIME WITH DOCUSIGN
IT’S ABOUT TIME: SAVE TIME WITH DOCUSIGN
 
Tecnología
TecnologíaTecnología
Tecnología
 

Similaire à Marwan Presentation 1

Similaire à Marwan Presentation 1 (20)

Mohd Norrasyid Sudarno_Resume1
Mohd Norrasyid Sudarno_Resume1Mohd Norrasyid Sudarno_Resume1
Mohd Norrasyid Sudarno_Resume1
 
Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
 
SHASHANK CV
SHASHANK CVSHASHANK CV
SHASHANK CV
 
Ted D Harris CV
Ted D Harris CVTed D Harris CV
Ted D Harris CV
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 
Hassan CV
Hassan CVHassan CV
Hassan CV
 
Resume
ResumeResume
Resume
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
Facility Engineer
Facility EngineerFacility Engineer
Facility Engineer
 
Resume - Alamsha faiz Updated, feb'16
Resume - Alamsha faiz Updated, feb'16Resume - Alamsha faiz Updated, feb'16
Resume - Alamsha faiz Updated, feb'16
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
Saeed Fadl CV
Saeed Fadl CVSaeed Fadl CV
Saeed Fadl CV
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
Arun das latest resume (1)
Arun das latest resume (1)Arun das latest resume (1)
Arun das latest resume (1)
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 

Marwan Presentation 1

  • 2. Marwan Khaled Issa • Marital status: Married + Three Children (Gr. 8, Gr. 7 & Gr. 2) • Place & date of birth: Kuwait, 19th January 1971. • Nationality: Jordanian. • Driving license: Valid UAE driving license + personal car. • Resident of: Abu Dhabi. Personal Information:
  • 3. Qualifications • Master of Engineering Management (MEM) - University of Wollongong - Dubai 2014. • B.Sc. in Electromechanical Engineering - Automation, Amman University for applied engineering, Jordan 1995. • Secondary School - Kuwait 1989.
  • 4. Profile & Mission statement Mission: • My education & work experience have provided me with a great sense of responsibility, enhanced my technical & organizational skills, the ability to meet deadlines as a playmaker. Goals: • Continues learning and skills enforcement. • Leadership and best management position. • Zero life defect record. • Be very effective and professional. • Be Innovative. Personal Character: • I am ambitious, hard working, presentable, and easy to get along with. I have an ability to work under pressure displaying both efficiency & accuracy.
  • 5. Professional Experience: • Extensive experience (20 years) in Electromechanical systems (HVAC, Transformers & Power Distribution, fire alarm & fighting system, Diesel generators, Lighting ….etc.) design, service, operation, construction & project management in the field of industrial & high rise buildings. • Facilities maintenance & management experience enhanced by technical, leader ship skills. (6.5 Year) Facilities Manager @ Education field. (6 Year) Projects & Facilities In Charge @ Strategic Studies field. (2.5 Year) Head of Electrical Section @ Hospital field. (3 Years) Utilities Engineer @ Pharmaceutical field. (2.5 Year) senior electrical Engineer @ Industry Production field.
  • 6. (6.5 Year) Facilities Manager @ Education field. (ADVETI) (6 Year) Projects & Facilities In Charge @ Strategic Studies field. (ECSSR) • Lead & Develop implementation of 20 remote location across UAE. • Projects Management: New expansions/Renovation, preparation of SOW & bidding documents, Technical Evaluation, project planning & execution, Installation & Commissioning Activities. • Achieve Comfort & Safe environment requirements in Education field. • Negotiation & managing maintenance contracts for effective use of resources. • Fixed Asset Management. • HSE management & Risk Analysis. • Soft services Management: Cleaning, Security, landscaping, Catering & offices services. • Projects In Charge for New Building committee @ ECSSR, AED 120M, Renovation, Interior & furniture fit out Design. • Updating Head of Committee of all aspects of project & preparing tender documents for selection of the consultant & contractors (Turn Key projects) in following scope: Interior design & fit out/ UAE Federation library (1M title)/ Access & Security control/ IT infrastructure & Server Room/ AV system/ Landscaping (Hard & Soft). • Complete Maintenance Design & Operation , contractor selection & BMS control room management. • Maintain Project Budget guidelines & report variances. • Managing Operations & maintenance of Utilities Infrastructure services (HVAC, Electrical distribution system, Mechanical & Plumbing. • PPM planning & call center design.
  • 7. (2.5 Year) Head of Electrical Section @ Hospital field. (DOHMS) (3 Years) Utilities Engineer @ Pharmaceutical field. (JULPHAR) • Responsible for Effective running of all electrical services @ Dubai hospital (630 bed capacity) • Monitoring & project development for all electrical Infrastructure: Main power supply MV/LV & ATS panels./ Diesel Generator/ UPS & battery Chargers/HVAC : AHUs & Centrifugal chillers & Cooling Tower / Medical gas system/ Compressors/ LPG/Boilers & Heating pumps • Monitoring & Maintaining Fire Alarm System/ Fire pumps & Hose reel / Fire Extinguishers. • Managing & Monitoring PPM : OTIS Elevators (16nos) • Building Management System (BMS): Control room. • In house – Staff managing & utilization. • Spare Parts Inventory management: safety stock level, order time & JIT. • Member of New Antibiotic plant committee (JULPHAR 2) for Installation & commissioning all Electromechanical equipment / $ 3M project budget /In house project/ Supervision of: • HVAC System: ABB 30Nos AHU/ Carrier Chillers 3Nos/ Chilled water Balance & Air balance/Advanced Air filtration system/ HEPA filters/ Temperature & Humidity control. • Writing all operation, cleaning & preventive maintenance procedures (SOP) for HVAC system. • Control room: Managing BMS & daily reports. • Production Machines: installation & Commissioning / PLC troubleshooting. • Power Distribution System: ABB Transformers /RMU/ Main Switchgears & Diesel Generator. • IQ & OQ Documentation.
  • 8. (2.5 Year) Senior Electrical Engineer @ Industry Production field. (Crown Industry) • Assist planning & organizing the preventive maintenance & repair / Production machines . • Using Advanced PLC Technology in Monitoring & Troubleshooting Production & packaging Machines: Day- to – Day Task. • Monitoring Utilities services for the plant : Power Supply system, Diesel Generators, Water treatment Plant…etc. • Fire Alarm & Fire fighting system. • Electrical Inventory control. • Area of Knowledge : -Thermal Station – Power Generation -Steel Pipes fabrication Industry (rolling mills) -Food production & Packing -Aluminum Can making Industry -Pharmaceutical Industry -Health Care & Hospitals -Research & Conferences -Education
  • 9. Work Experience : . summary of Main Tasks: • Projects management • Design Programmable Preventive Maintenance (PPM). • Routine check, Corrective maintenance & Major Shutdown. • Facilities maintenance & management experience for Hard services (maintenance) & Soft services (Cleaning, Catering, Security, Landscaping, & events management). Main Challenges in managing building Maintenance: • Effective Maintenance needs a qualified staff with extensive training on best practice for doing the Preventive & Corrective maintenance. • You need to ensure Reliability which reflected by Availability (Response time) & Maintainability (Break Down Time) • Interruption operations: you need to plan redundant system or alternative solution & proper shutdown time that not interfering operations. • Budget control & visibility. • Maintaining Zero life defects with strict HES standards & Procedures.
  • 10. Future Vision & Mission • Project Management & Planning • Building Renovation Process • Building Renovation Challenges • Aspirations & Suggestions • My Plan to Manage Maintenance Division
  • 12. Building Renovation Process • Currently @ Education field (ADVETI), we are handing over many schools from ADEC, and most of these schools have been renovated to meet ADVETI standards for vocational & Training programs, Upgrading HVAC system, Fire Alarm & fighting system with AD code of building safety, Use LED lighting for reducing power consumption & heat dissipation, Mix between modern design and classic in fit out and decoration concept. • Carried out renovation work at Dubai Hospital which was built on 1980 for patients wards and upgrade main reception, HVAC cooling system & replace pneumatic control system with DDC control, replaced SMDBs & DBs as per DEWA regulations. • Manage MEP renovation works at Emirates center (ECSSR) for developing Ball Room & function room with State – of Art building fit out and decoration.
  • 13. Building Renovation Challenges • Design Challenges: renovation design is normally restricted with actual situation and previous main civil construction which force designer with many considerations that need deep alteration and sometimes became costly. • Operational Challenges: renovation tasks (WBS) need complicated planning through several stages in order to maintain smooth running for the daily business of the firm & this might create inconvenience atmosphere for both staff & visitors/Guests.
  • 14. Aspirations & Suggestions • Focusing on Advance Management for applying best practices in Effective maintenance management & Strategic planning, resource utilization, budget control, Logistics & supply chain, Quality & HSE standards. • My future plan in using Technology for supporting maintenance & Facilities Division (BMS system & office automation equipment), Green building concept & Power Save concept. Furthermore, I think that KUSTAR business is proper place for me, where I can transfer my experience for the benefit of campus & suggest Automation of most of office equipment system & Archiving, Data Center Development, Electronic Library, Advanced security monitoring Camera & Access control.