Smart Grid for Sustainable
Development
Regulatory and operational
perspective
Vijay Menghani
Joint Chief ( Engg.)
B.E.,MBA
Central Electricity Regulatory Commission13-05-2016 1
Sustainable Development
• “Development that meets the needs of the
present without compromising the ability of
future generations to meet their own
needs” Brundtland Commission : Our Common Future( 1987)
– Sustainable Economy
– Sustainable Power Sector
– Sustainable Regulatory Mechanism
13-05-2016 2
Indian Scenario
• Low Per Capita Energy Consumption= 918
kWh( 2012-13)
• Installed Capacity=237743 MW ( Feb,2014)
• 2013-14
– Peak Demand Met 129915 MW Shortage 4.3%
– Energy Availability 877784 MU Shortage 4.2%
– Decreasing PLF 70.13 (2012-13) 65.53(2013-14)
– Reason – Coal Shortage, Economic slowdown and
affordability
13-05-2016 3
Many issues
G T D C
Generation Transmission Distribution Consumer
Coal Shortage ROW T&D Losses Low per
capita
consumption
Environmental
issues
Congestion Network
Reach
Affordability
( Legacy
subsidy)
Land Renewable
Integration
Low level of
automation
Information
Asymmetry
13-05-2016 4
Smart Grid as Tool
• Earlier Smart Grid was being viewed as only meant for
distribution in line with US investment in aging
infrastructure.
• For managing grid Regulatory tools of Grid code and
deviation settlement mechanism were being used.
• Commission started viewing this as an integrating solution.
• Electricity Grid is an integrated eco system where problems
of one part quickly spill over to higher voltage level if not
visible, measured and controlled.
• The big event of 30th and 31st July, 2012 due to Network
visibility and reliability , Renewable issues and Grid
discipline and load forecasting and management issues.
13-05-2016 5
Way out
• Generation : For sustainable Development and
Energy Security dependency on Coal need to be
reduced at least for Energy
• It may be due to compulsion like Domestic coal
production not matching with requirement or
costly imported coal resulting in higher
generation cost for which there is no buyer.
• Desirable – TO reduce carbon foot print
Renewable need to be embraced .
13-05-2016 6
IEA estimates
13-05-2016 7
IEA Estimates
13-05-2016 8
Renewable
• Carbon emission (2011)
USA China India World
Total(Milli
on Metric
Ton)
5490 8715 1725 32578
Per capita 17.62 6.52 1.45 4.69
•Sustainable development possible only with Renewable
•12th plan target - MW( working group report)
Wind Solar Biomass Small
Hydro
Waste
to
energy
Tidal/
Geo
Total
15000 10000 4050 2100 500 14 31664
13-05-2016 9
Issues in Renewable
• Grid connected wind has integration issue due to
variability at system operation end and transmission
investment issues.
• Solar PV has integration and commercial issues at
distribution end .
• The mismatch in timing of renewable generation and
demand both daily and seasonal .
• For effective and optimum use Storage and balancing
power requirement .
• The impact of renewable on conventional generation
management and cost of balancing service raise
regulatory issues of tariff realization.
13-05-2016 10
Smart Grid
13-05-2016 11
Solution or more problem
• Where we are , why we are here
(Hum kaoun thai ,kya ho gaye hai or kya hoge abhi)
• Shortage of fund , but more funds are
required to implement smart grid.
• I am facing shortage of power Where I should
invest money, to buy more power or invest in
smart grid.
• Not an alternative solution but a
complimentary solution
13-05-2016 12
Tariff hiked but can it continue
13
Tariff hike needed but can be reduced
14
Necessity
Capacity Reliability
Efficiency Sustainability
Smart Grid
Growing demand
of Electricity
Providing high quality
electrical energy whenever
wherever it needed
Reducing losses in
every part of
delivery chain
Ensuring integration of
Renewables
13-05-2016 15
Sustainable Development Agenda
16
• Transmission for Renewable
• New Capability( PEV, Storage)
• Energy Demand Flexibility
Renewable
Integration
• Network Visibility( PMUs)
• Network Reliability
• Reduce outage duration
Reliability
• Reduction of T&D Losses
• Reduction of theft
Efficiency
• Improve asset Utilization
• Reduce retail operational cost
• Demand Side management
Conservation
Inspired from : Accenture Analytic 2013
Definition
• A smart grid is a modernized electrical
grid that uses analogue or digital information
and communications technology to gather and
act on information, such as information about
the behaviors of suppliers and consumers, in
an automated fashion to improve the
efficiency, reliability, economics, and
sustainability of the production and
distribution of electricity.[
13-05-2016 17
SMART
• Specific – target a specific area for
improvement.
• Measurable – quantify or at least suggest an
indicator of progress.
• Assignable/Attainable – specify who will do it.
• Realistic – state what results can realistically
be achieved, given available resources.
• Time-related – specify when the result(s) can
be achieved.
13-05-2016 18
Why clarity is required
• From a regulatory perspective , a clear
definition is important for following reasons:
1
• It helps if consumers , utilities , vendor and regulators all
starts from a common understanding of smart grid.
2.
• It establishes the framework to guide expectations, resource
allocation decisions and implementation priorities
3.
• We all agree that it implies a modernization of the existing
electric grid but may differ on :
• How modernization translates into the specific policy actions
or resource decisions.
13-05-2016 19
Drivers for Smart Grid in India
Utilities Customers Government
/Regulator
1. Reduction of T&D losses
in all utilities as well as
improved collection
efficiency
2. Peak load management
– multiple options from
direct load control to
consumer pricing
incentives
3. Reduction in power
purchase cost
4. Better asset
management
5. Increased grid visibility
6. Self-healing grid
7. Renewable integration
1. Expand access to electricity –
“Power for All”
2. Improve reliability of supply to
all customers – no power cuts, no
more DG sets and inverters
3. Improve quality of supply – no
more voltage stabilizers
4. User friendly and transparent
interface with utilities
5. Increased choices for
consumers, including green power
6. “Prosumer” (producer and
consumer) enablement
7. Options to save money by
shifting loads from peak periods to
off-peak periods
1. Satisfied
customers
2. Financially sound
utilities
3. Tariff neutral
system upgrade
and modernization
4. Reduction in
emission intensity
13-05-2016 20
Source: Smart Grid forum of India
Objectives for Smart Grid
UTILITY
Cost
Recovery
Customer
Value for
money
Objective
Regulator
Cost
effectiveness
13-05-2016 21
What is a Smart Grid?
A smart grid uses digital technologies to improve the reliability,
security, efficiency, and flexibility of the electric system.
Image used courtesy of Florida Power and Light
Smart Grids Involve
System-Wide Approaches
13-05-2016 22
Existing and expected
Existing Grid Smart Grid
Type Electro mechanical +Digital
Communication One Way Two way
Generation Centralised Distributed
Presence of
sensor
Few Throughout
Monitoring
/Fault Detection
Manual Automatic
Fault Correction Manual Restoration +Self Healing
Control Limited Pervasive
Consumer Passive Active
13-05-2016 23
Source : POWERGRID
Key Technologies and Systems for Smart Grids
24
sourceUS Energy
Cost price and benefit
• To reach informed decision on any Regulatory
issue like Tariff, Quantum of Renewables or smart
Grid investment say Smart meter it is necessary
that whole value chain is understood.
• “It was opined that the cost of smart meter was
quite prohibitive.” Minutes of meeting.
• If smart meter is considered as only a metering
device to get 15 minutes data and it is not clear
that what will be done with that data, this
confusion about cost would prevail.
• Smart Meter is only a building block.
25
Without application?
13-05-2016 26
Spectrum of applications
13-05-2016 27
Regulatory Perspective
• Expectations from Regulator
• Information to Regulator
• Structural issues for Regulator
• Technical and Commercial appraisal issues
• Tariff Design Challenges
• Performance Measurement Challenges
• Consumer Engagement Challenges
Forum of Regulator 39th meeting in Chandigarh emphasis few of
these issues
28
Expectations from Regulator
• Smart Grid need proactive support from Regulator
• The condition of India are different from US and EU . To
sell a concept of smart Grid in high energy
consumption country where people understand benefit
of electricity and its quality is easier than the country
where power shortage exist.
• Indian Regulator is working under various constraints
like staff shortage, technology uncertainty, limited
pass through of investment cost in addition to legacy
political economy issue of subsidy .
• Smart Grid is not a priority area for local government
and utility which is fire fighting with resource crunch.
29
Expectations from Regulator
• Collaborate with public and private sector stakeholders to
determine regulatory and market solutions that can mobilise
private sector investment in all electricity system sectors.
• Recognise that smart grid deployments should reflect regional
needs and conditions – a “one-size-fits-all” does not apply to
the deployment of smart grids.( e.g. Renewable Rich or not,
consumer profile, status of unbundling)
• Plan for evolution in regulation along with technology
development – new technologies will both offer and need
new regulatory options.
• Invest in research, development and demonstration (RD&D)
that address system-wide and broad-range sectoral issues,
and that provide insights into behavioral aspects of electricity
use. (Source: IEA Road map)
30
Information base
• Traditional information asymmetry is more pronounced
in Smart Grid investments.
• Traditionally utility held back information from Regulator
for commercial reasons.
• Here even utility is not certain about benefit and
information is either vendor driven and or expectation
driven based on project done elsewhere.
• So there is need of a information clearing house for
knowledge management which become more important
as staff in most of the Commission is on deputation.
13-05-2016 31
Structural and Policy issues
• The success of smart grid elsewhere was driven by
active collaboration of Federal Government( Through
Act), Federal Regulator Policy , State Regulator, Private
Utility, Innovators/ entrepreneur in other sector of
economy like banking and IT.
• Although SGIF are doing commendable job, the policy
and finance support need to be strengthen .
• More active engagement of Central Regulator and
Authority will bring more confidence in investors for
policy certainty.
13-05-2016 32
Technical and commercial appraisal
• Pilot projects and its results must be appraised
for effective transition to large investment grade
projects.
• Difficulty in case of new technology . Industry
need to create sound business case to assure
Regulator.
• The assumptions in appraisal need to be realistic.
• If transparent competitive bidding is there , not
much issue on commercial part.
• Both economic and Non-monetary Appraisal are
required.
13-05-2016 33
Example Analytical Approach to Assess
Smart Grid Technology Benefits
Improves
feeder voltage
regulation
Reduced feeder
losses worth
Rs.per MWh
Automatic
voltage and
VAR control
• Capacitor
controls
• Distribution
Management
System
Functions Mechanisms Benefits
What does the
Smart Grid do?
How does it
do that?
What “goodness”
results?
Monetary
Value
What is the
goodness
worth?
What are Smart
Grid technologies?
Assets
Rs
lakhs
per
year
34 34
13-05-2016 34
Source: EPRI
Cautious handling of Claim Counter
claim
• CLAIM:"For example, the cumulative transmission capacity of all the inter-
regional corridors by 2012 is around 28,000 MW. However, the Transfer
capability based upon voltage/angular stability consideration as well as
off-line simulation studies declared in the Month of March, 2012 is about
8,500 MW. On implementation of URTDSM scheme, conservative side if
10% of the Total Transfer Capability is increased on the inter-regional
corridors only, additional 850 MW power can be exchanged. Such
quantum of power shall translate into annual energy of about 2978 MU
[Energy in MU= (850X0.40X8760)/103].
• If we consider cheapest rate of energy at Rs. 2 per unit on the
conservative side then the total annual energy cost comes out to be about
Rs. 595 Crs. In other words, the subject scheme whose annual estimated
transmission charges is of Rs. 147 Cr. shall enable the grid to handle
additional energy whose cost is of the order of Rs. 595 Cr.
• View:We know that Transfer capability depend on load generation
balance and network on a particular time frame, so this claim can not
form basis of decision.
13-05-2016 35
Cautious handling of Claim Counter claim
• Order:
• 15. The Indian power system is growing manifolds and complexity is increasing in
all fronts viz. generation, transmission and distribution. New regime of open
electricity market also poses challenge in maintaining grid security and reliability.
On the one hand, non-conventional energy resources must be developed and
need to be integrated with the grid for sustainability. On the other hand,
increasing emphasis on Renewable Energy Sources, which are beset with
variability and intermittency in their output, contribute to challenges in system
operation.
• Indian power system now has 1000 MW single power stations, high capacity 765
kV transmission lines and single generation units of 1000 MW and 800kV HVDC
transmission system feeding large cities and various critical loads are on the anvil.
The incidents like natural calamity, etc., even on a single element of this capacity,
have the potential to cause a major grid disturbance.
• The highest order of real time measurements, monitoring and control system is a
must to avoid or mitigate impact of such incidences. To address these issues,
introduction of intelligence in transmission system through smart grid applications
is inevitable.
13-05-2016 36
Cautious handling of Claim Counter
claim
• No false sense of benefit
• 17. Some of the beneficiaries like BSEB and BRPL have submitted that
Regulatory approval should be accorded only if the petitioner assures that
the transmission system would achieve 100% availability after
implementation of the JRTDSM scheme. In this connection, we intend to
clarify that the primary purpose of the URTDSM scheme is to improve the
visibility and security of the grid and to mitigate the probability of the gird
failure and cannot prevent the physical faults like earth fault, line to line
fault, etc. It may not be possible to achieve 100% availability is the forced
outage in the system cannot be ruled out.
13-05-2016 37
Tariff Design Challenges
• The issue of Tariff design for smart Grid is
challenging due to involvement of IT and
Communication technology.
• It is necessary that higher depreciation is allowed
but as benefits of smart grid investments are
realised over a longer period , it is difficult to take
a call.
• CERC tariff Regulations 2014 and RLDC fee and
Charges Regulations take care of the fact that
SCADA and communication system investment
need to paid back early.
13-05-2016 38
Tariff Design Challenges
• For DSM related efforts there is need to adopt
innovative methods to convince utility that by selling
less number of units , it will not suffer.
• The present design of discom tariff wherein the volume
of sales ( unit sold) may affect discom as part of fixed
charges are also recovered through energy charges.
• Any coercive action , may not be fulfilling real objective
of energy saving.
• Say Rs 40 crs granted for DSM are not utilised then
equivalent energy would not be considered for tariff
determination then commercially it may be ok but real
objective of energy saving is not achieved.
• The loads shedding and subsidy structure is also
hampering DSM adoption.
13-05-2016 39
Tariff Design
13-05-2016 40
NREL: Decoupling Policies : Option to Encourage Energy
Efficiency Policy for Utilities
Tariff Design Challenges
• The concept of Decoupling may be adopted to incentivise
utilities.
A decoupling mechanism is simply a system to regularly
adjust rates to ensure a utility’s actual revenues match its
authorized revenues to recover its fixed costs.
The small rate adjustments break the link between—or
decouple—a utility’s revenues and sales by either restoring
to the utility or giving back to customers the money that was
under- or overcollected as a result of fluctuations in retail
sales.
This ensures that utilities:
– Recover only the prudently incurred fixed costs that were
approved by their regulator or governing board
– Cannot make a windfall by encouraging higher sales
– Are not penalized when energy-efficiency programs, clean
distributed generation, and other demand-side efforts
reduce sales13-05-2016 41
Performance Measurement Challenges
• Due to non availability of base line data there is
always a difficulty in measuring the effectiveness
of a initiatives.
• R APDRP is improving situation.
• Utilities more proactive while seeking approval
but at the time of performance measurement not
willing to share the data.
• Portal based real time assessment than year end
review may be a better solution.
• Information dissemination experience in R-
APDRP.
13-05-2016 42
Smart Grid Data Hub
“SGIG and SGDP projects have different reporting
requirements to the Smart Grid Data Hub for build
and impact metrics:
Build metrics are uploaded to the Data Hub on a
quarterly basis for both SGIG and SGDP projects,
following approval by DOE of a project’s Metrics
and Benefits Reporting Plan.
Impact metrics for SGIG projects are uploaded to
the Data Hub on a semi-annual basis, following
approval by DOE of a project’s Metrics and Benefits
Reporting Plan.
13-05-2016 43
Sharing of information is sharing of
responsibility
Electric Transmission
System Assets
Quantity* Incurred Cost**
Number of Entities
Reporting***
PMUs 1,032 $82,420,443 12
Phasor data concentrators 152 $14,083,333 12
Dynamic rating systems 0 $0 0
IT hardware, systems, and
applications that enable
transmission
functionalities
$82,537,945 31
Advanced applications $54,313,513 14
Other transmission
related costs
$281,644,813 24
Total transmission
installed cost
$432,462,101 24
13-05-2016 44
SGIG Program Electric Transmission Asset Expenditures
Deployed as of December 31, 2013 Updated April 1, 2014
Customer Engagement challenges
• The success of Smart Grid will depend on consumer
confidence which can be achieved only through customer
engagement.
• In India it is expected that consumers would react only
during tariff hearing in Regulatory Commission .
• In place of utility , the Regulator through its order is
supposed to satisfy, pacify a consumer who due to
propaganda is already shifted toward opposing any
investment due to tariff fear . ( Delhi Electronic Meter
Expereince)
• Efforts need to be made by utility to engage customer using
all means of communication including social media.
13-05-2016 45
Engage Customers
13-05-2016 46
Capacity Building issues
• 39th meeting Forum of Regulator, emphasis the
need of capacity building for Smart Grid
“Consultation/awareness programmes for Regulators
and regulatory staff should be undertaken on the
subject.”
• Capacity building in not required only at
Regulatory level but at utility level, junior
and middle level staff need to be roped in as
success of any Smart Grid project depend on
their support.
13-05-2016 47
Smart Grid applications
Wide Area Measurement Applications-
PMU and analytic, Dynamic rating
Distribution Network Applications- CVR,
Automatic switching
Customer end Applications -DSM
13-05-2016 48
Distribution Level Applications
• Distribution Automation SCADA
• Outage Management Automated Switching
• Controlled Voltage Reduction
13-05-2016 49
DSM –Customer end applications
• With Common Sense
• With Tariff Design
• With Smart Meter
13-05-2016 50
Three DSM Programs
• MSEDCL initiated three activities
– Pilot Agricultural DSM Program: Replacement of Old
Agricultural Pumps by 4 Star rated pumps – BEE support
– Replacement of 5000 Old Ceiling fans by 5 Star rated
Ceiling Fans -- LBNL support
– Coating roofs with white color to reduce room
temperatures and energy use -- LBNL support
13-05-2016 51
Replacement of 5000 Old Ceiling Fans by
5-Star Rated Ceiling Fans
• Old ceiling fans with over 7 years vintage
– Ceiling fans consume power in 80-105 watts
– 5-Star rated fans have 55 watts consumption
• Goal: Switch 5000 fans in MSEDCL commercial
33/11 KV substations and section offices in 13 cities
• Cost was Rs. 1135 per fan
• Ongoing M&V being carried out in 520 cites
• 25 watts saving, and 11 hrs/day use, results in
0.4 M kWh reduction
• MSEDCL Potential Money saving - utility
perspective – Rs.575 per year per fan
13-05-2016 52
India Cool Roofs Experiments
Two India experiments
• In Hyderabad, India, 2007-2008
– Cool roof on two air-conditioned(AC) industry
buildings
• In Nagpur, India, 2013 --
– Cool roof on a utility company non-AC building
13-05-2016 53
Source:
LBNL
• LBNL conducted a one year experiment at Satyam Computers Training Center in
Hyderabad, India in 2006-07 –> 10 -20% reduction in AC load due to white roofs
• LBNL staff convinced Delhi Chief Minister who approved mandatory white roofs for
all new government buildings in July 2009
Albedo Effect: 100m2(~1000 ft2) of a white roof, replacing a dark roof,
offsets the emission of 10 t CO2
White Roofs (WR) — Albedo Effect
India WR activity is ancient
United States India – WR over many centuries
Source: Akbari, Menon, and Rosenfeld 200813-05-2016 54
Nagpur MSEDCL Building Data Example (2013)
White Roof outdoor and indoor temperature difference is 15 degrees
compared to 7 degrees difference in Grey Roof.
-20
-15
-10
-5
0
5
10
15
20
25
30
4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun
Indoorair&outdoorairtemperature(°C)
ia1-oa1
ia2-oa2
ia1-oa1 is white roof
ia2-oa2 is gray roof
13-05-2016 55
Source:
LBNL
Increasing Renewables
56
Variability and Uncertainty: Few
Examples-TamilNadu
5713-05-2016
Variability and Uncertainty: Few
Examples-Tamil Nadu
5813-05-2016
MAX WIND DAY: MAHARASHTRA 25 June 2011
30.69 MU GENERATED, 9.48 % OF TOTAL STATE CONSUMPTION
49.5
49.7
49.9
50.1
50.3
200
400
600
800
1000
1200
1400
1600
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Maharashtra total Wind
WIND GENERATION IN MW
FREQUENCY
MW
Hz
Time(hrs)
MAX: 1415 MW, MIN: 1136 MW
9% OF DEMAND MET BY WIND @ 09:00 HRS.
13-05-2016 59
MAX WIND DAY:GUJARAT 17 June 2011
35 MU GENERATED, 15.15% OF TOTAL STATE CONSUMPTION
49.5
49.7
49.9
50.1
50.3
200
400
600
800
1000
1200
1400
1600
1800
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Gujarat Total Wind
WIND GENERATION IN MW
FREQUENCY
MW
Hz
MAX: 1642 MW, MIN 1239 MW
17% OF DEMAND MET BY WIND @18 HRS
Time(hrs)
13-05-2016 60
Renewable integration
• The variability and uncertainty of Renewables affect both
transmission i.e. Grid integration ,distribution and
conventional generation too.
• The problem are both technical and commercial.
• Green initiatives require that renewables are to be
absorbed as “Must Run”.
• Renewable generation pattern is different from load
pattern, so to use it economic and efficient way , Energy
Storage is a solution ,but costly at present.
• With lack of Pump storage facilities and costly imported
gas , surely there is surely a need for Energy Storage case
study but lack of data may hamper a true picture?
• Utilities are using Deviation settlement mechanism to
curtail wind generation.
13-05-2016 61
Renewables Variability to stability
62
Partners to reliable integrate high levels of VERs
including regional coordination
Generation Storage
Demand
Response
Dispatchable
Quick Start
Wider Operating Range
Load Shift
Over
Generation
Mitigation
Voltage
Support
Peak Load Reduction
Dispatchable
Wind/Solar
Fast Ramping
Regulation
Frequency
Response
Slide 6313-05-2016 63
Grid Storage
64
Benefits of smart grid
65
Smart Grid :PMU initiative in India
• CERC approved pilot project in Northern Region for
installation of four PMUs and Data concentrator in
Dec,2009. and for Western Region in 2010
• Similar Pilot projects were initiated in other four
regions with installation of PMUs at important
locations.
• Unified Real Time Dynamic State Measurement
Scheme( URDSM) scheme for installation of 1186
+554 PMUs and 32 PDCs and Analytic software
approved on 6.9.2013 at Rs 655 crs and include
11000 km optical fibre.
13-05-2016 66
Process of Regulatory Approval
After getting approval in Standing Committee of Power( 5.3.12) POWERGRID filed
petition
Commission asked to give cost benefit and discuss issue in Regional power
Committee in each Region
Investment agreed in each RPC and queries of states replied by POWERGRID
Hearing held and all stakeholders were asked to give their comments
Approval for stage I was given on 6.9.2013 with instruction to file status report
13-05-2016 67
WAMS / PMUs Projects
Total no of PMUs - 59 Nos.
(including 3 nos. PMU
installed by IPPs)
Region wise PMUs:
NR - 14 Nos
WR - 15 Nos
ER - 12 Nos
SR - 10 Nos
NER – 08 Nos
At present data from 44
PMUs are available at NLDC
PDC.
In addition to above data
from 4 PMUs installed as
demo project is also available
13-05-2016 68
PMU Architecture
13-05-2016 69
Synchronization of SR grid with NEW grid at 2025hrs on 31.12.13
328 MW
-191 MW
13-05-2016 70
Frequency Variation
Two grids –Two FrequenciesOne Grid –One Frequency
13-05-2016 71
How PMUs helped in Grid Integration
• Continuous tracking of the following parameters from Raichur and Sholapur end
PMUs
– Frequency
– Voltage
– Current
– Phasor Angle
• 765 kV Raichur – Sholapur line flow monitored continuously
• Angular separation between asynchronous grids (NEW & SR) monitored continuously
for appropriate moment of synchronization.
• Dynamic Visibility of the following events:
– Bus Charging
– Line Reactor Charging
– ICT Charging
– Line Charging
– Line Synchronization
7213-05-2016
30.7.2012
13-05-2016 73
31.7.2012
13-05-2016 74
Possible usage of PMUs
• Island detection tools – incorporate frequency into AGC
• Automatic event analyzer
• Dynamic model validation studies
• State Estimator - validation and angle baselining
• Dynamic phase angle difference limit – study the
usefulness of combining real-time PMU measurements
with model-based programs
• Additional studies on oscillation mode detection and
analysis – combined efforts with adjacent balancing
authorities to write operating procedures
13-05-2016 75
76
Synchrophasors- Too much data
How much data will synchrophasors generate?
A phasor measurement unit (PMU) sampling at 30 times per second with a data
stream of typical parameters results in approximately 70 megabytes per day of data.
Assuming 500 PMUs in the region, this requires storing 35 gigabytes per day at a
central reliability center.
How is the data time-stamped?
All PMUs in the region are taking data at the same instant in time and the PMU time-
stamps each sample.
How will the data be transmitted?
The data is transmitted to a Phasor Data Concentrator, often at a control center, over
communication channels from various locations in the region. The data is likely to
arrive at the PDC at slightly different times over the various communications paths, so
the PDC aligns the data according the time-stamps to be used in visualization tools and
other applications.
13-05-2016
Role of Academia
• While it is necessary that Government, Regulator,
Utility and vendors works together, the academia
need to provide the backbone to this
development.
• Research is necessary to provide cost effective
solution for smart metering, distribution
switches, communication protocol and most
important Cyber security.
• Application development for PMU and data
analytic.
13-05-2016 77
Let us try
13-05-2016
Process should not be seen as Utility or vendor driven
but need to be explained as an effort toward better
and reliable power supply for people .
78
Action Plan
• Go ahead with firm belief that Smart Grid
provides tool and applications for sustainable
Development by integrating all components of
Electrical power which enable optimum
utilization of Renewables .
• Central Regulator’s action plan for near term is
focussed on following issues and it is expected
that Industry would support us:
– Renewable integration through Renewable
Management Centres: Visibility, Measurement and
Forecasting
– Business case for Storage solution in comparison of
using existing stranded gas capacity.
– PMU data analytics for transfer capability
optimisation
13-05-2016 79
Smart Grid require smart
attitude.
Vijay Menghani
9999035484
vmenghani@cercind.gov.in
13-05-2016 80

Contenu connexe

Tendances

Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart gridAshfaq khan
 
Day-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challDay-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challIPPAI
 
Smart grid- Indian Perspective
Smart grid- Indian PerspectiveSmart grid- Indian Perspective
Smart grid- Indian PerspectiveChandan Kumar
 
IRJET- Integration of Renewable Energy in Smart Grid
IRJET- Integration of Renewable Energy in Smart GridIRJET- Integration of Renewable Energy in Smart Grid
IRJET- Integration of Renewable Energy in Smart GridIRJET Journal
 
Smart grids business case
Smart grids  business caseSmart grids  business case
Smart grids business caseSumit K Jha
 
Smart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesSmart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesCapgemini
 
Route Green - Solar Solutions
Route Green - Solar SolutionsRoute Green - Solar Solutions
Route Green - Solar SolutionsVipin Verma
 
Context of smart grids in india knowledge paper of india smart grid day 2013
Context of smart grids in india   knowledge paper of india smart grid day 2013Context of smart grids in india   knowledge paper of india smart grid day 2013
Context of smart grids in india knowledge paper of india smart grid day 2013L&C
 
Day-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSESDay-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSESIPPAI
 
IREC part 02
IREC part 02IREC part 02
IREC part 02RCREEE
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNAIPPAI
 
Carbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in indiaCarbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in indiaPallav Purohit
 
Vehicle-to-Everything (V2X) Energy Services
Vehicle-to-Everything (V2X) Energy ServicesVehicle-to-Everything (V2X) Energy Services
Vehicle-to-Everything (V2X) Energy ServicesLeonardo ENERGY
 

Tendances (20)

smart grid
smart gridsmart grid
smart grid
 
Smart Energy
Smart EnergySmart Energy
Smart Energy
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
 
Smart grid technology
Smart grid technologySmart grid technology
Smart grid technology
 
Day-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challDay-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans chall
 
Smart grid- Indian Perspective
Smart grid- Indian PerspectiveSmart grid- Indian Perspective
Smart grid- Indian Perspective
 
Smart grid: technology and market evidence
Smart grid: technology and market evidenceSmart grid: technology and market evidence
Smart grid: technology and market evidence
 
IRJET- Integration of Renewable Energy in Smart Grid
IRJET- Integration of Renewable Energy in Smart GridIRJET- Integration of Renewable Energy in Smart Grid
IRJET- Integration of Renewable Energy in Smart Grid
 
Smart Grid
Smart GridSmart Grid
Smart Grid
 
Smart grids business case
Smart grids  business caseSmart grids  business case
Smart grids business case
 
Smart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunitiesSmart electrical grids challenges and opportunities
Smart electrical grids challenges and opportunities
 
Route Green - Solar Solutions
Route Green - Solar SolutionsRoute Green - Solar Solutions
Route Green - Solar Solutions
 
Context of smart grids in india knowledge paper of india smart grid day 2013
Context of smart grids in india   knowledge paper of india smart grid day 2013Context of smart grids in india   knowledge paper of india smart grid day 2013
Context of smart grids in india knowledge paper of india smart grid day 2013
 
Day-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSESDay-3, Mr. Arvind Gujral, BSES
Day-3, Mr. Arvind Gujral, BSES
 
Smart village vfb 111621
Smart village vfb 111621Smart village vfb 111621
Smart village vfb 111621
 
IREC part 02
IREC part 02IREC part 02
IREC part 02
 
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNADay-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
Day-3, Mr. SC Shrivastav connectivity MTOA & lTA and concept of GNA
 
Smart grid
Smart gridSmart grid
Smart grid
 
Carbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in indiaCarbon finance potential of renewable energy technologies in india
Carbon finance potential of renewable energy technologies in india
 
Vehicle-to-Everything (V2X) Energy Services
Vehicle-to-Everything (V2X) Energy ServicesVehicle-to-Everything (V2X) Energy Services
Vehicle-to-Everything (V2X) Energy Services
 

En vedette

Smart grid presentation
Smart grid presentationSmart grid presentation
Smart grid presentationSally Smith
 
Smart Grids: An Introduction
Smart Grids: An IntroductionSmart Grids: An Introduction
Smart Grids: An IntroductionHarshad Desai
 
Smart Grid Technology
Smart Grid TechnologySmart Grid Technology
Smart Grid TechnologyAditya Jalan
 
Smart Grid Cyber Security
Smart Grid Cyber SecuritySmart Grid Cyber Security
Smart Grid Cyber SecurityJAZEEL K T
 
Smart Grid Solutions( June 2012)
Smart Grid Solutions( June 2012)Smart Grid Solutions( June 2012)
Smart Grid Solutions( June 2012)Berik Dossayev
 
Smart Grid - An Explanation from Sun Tzu's Art of War
Smart Grid - An Explanation from Sun Tzu's Art of WarSmart Grid - An Explanation from Sun Tzu's Art of War
Smart Grid - An Explanation from Sun Tzu's Art of Warserwah
 
Reaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s Potential
Reaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s PotentialReaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s Potential
Reaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s Potentialcomplianceonline123
 
India Smart Grids Future Session and Report Update, Team Finland Future Watch...
India Smart Grids Future Session and Report Update, Team Finland Future Watch...India Smart Grids Future Session and Report Update, Team Finland Future Watch...
India Smart Grids Future Session and Report Update, Team Finland Future Watch...Team Finland Future Watch
 
China smart grid & smart cities
China smart grid & smart citiesChina smart grid & smart cities
China smart grid & smart citiesPatrick Schuler
 
Energy smart grid-analytics and insights of Intelen patented Technology
Energy smart grid-analytics and insights of Intelen patented TechnologyEnergy smart grid-analytics and insights of Intelen patented Technology
Energy smart grid-analytics and insights of Intelen patented TechnologyVassilis Nikolopoulos
 
Smart grid
Smart gridSmart grid
Smart gridyas_ta
 
Comarch Smart City concept: How to design and build a Smart City
Comarch Smart City concept: How to design and build a Smart CityComarch Smart City concept: How to design and build a Smart City
Comarch Smart City concept: How to design and build a Smart CityComarch
 
powerline communication system
powerline communication systempowerline communication system
powerline communication systemAhmed Hassan
 
MIS: A case study on Smart Grid
MIS: A case study on Smart GridMIS: A case study on Smart Grid
MIS: A case study on Smart GridSultan Islam
 

En vedette (20)

Smart grid presentation
Smart grid presentationSmart grid presentation
Smart grid presentation
 
Smart Grids: An Introduction
Smart Grids: An IntroductionSmart Grids: An Introduction
Smart Grids: An Introduction
 
Smart Grid Technology
Smart Grid TechnologySmart Grid Technology
Smart Grid Technology
 
Smart Grid Cyber Security
Smart Grid Cyber SecuritySmart Grid Cyber Security
Smart Grid Cyber Security
 
Smart Grid Technology
Smart Grid TechnologySmart Grid Technology
Smart Grid Technology
 
Smart Grid Solutions( June 2012)
Smart Grid Solutions( June 2012)Smart Grid Solutions( June 2012)
Smart Grid Solutions( June 2012)
 
Smart grid
Smart gridSmart grid
Smart grid
 
Smart Grid - An Explanation from Sun Tzu's Art of War
Smart Grid - An Explanation from Sun Tzu's Art of WarSmart Grid - An Explanation from Sun Tzu's Art of War
Smart Grid - An Explanation from Sun Tzu's Art of War
 
Reaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s Potential
Reaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s PotentialReaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s Potential
Reaching Clean Power Plan Goals at No Cost: Securing the Smart Grid’s Potential
 
India Smart Grids Future Session and Report Update, Team Finland Future Watch...
India Smart Grids Future Session and Report Update, Team Finland Future Watch...India Smart Grids Future Session and Report Update, Team Finland Future Watch...
India Smart Grids Future Session and Report Update, Team Finland Future Watch...
 
Smart grid
Smart gridSmart grid
Smart grid
 
China smart grid & smart cities
China smart grid & smart citiesChina smart grid & smart cities
China smart grid & smart cities
 
Energy smart grid-analytics and insights of Intelen patented Technology
Energy smart grid-analytics and insights of Intelen patented TechnologyEnergy smart grid-analytics and insights of Intelen patented Technology
Energy smart grid-analytics and insights of Intelen patented Technology
 
Technical seminar
Technical seminarTechnical seminar
Technical seminar
 
Smart grid
Smart gridSmart grid
Smart grid
 
Smart grid security
Smart grid securitySmart grid security
Smart grid security
 
G.E.T. Smart - Smart Grid: IBM Presentation
G.E.T. Smart - Smart Grid: IBM PresentationG.E.T. Smart - Smart Grid: IBM Presentation
G.E.T. Smart - Smart Grid: IBM Presentation
 
Comarch Smart City concept: How to design and build a Smart City
Comarch Smart City concept: How to design and build a Smart CityComarch Smart City concept: How to design and build a Smart City
Comarch Smart City concept: How to design and build a Smart City
 
powerline communication system
powerline communication systempowerline communication system
powerline communication system
 
MIS: A case study on Smart Grid
MIS: A case study on Smart GridMIS: A case study on Smart Grid
MIS: A case study on Smart Grid
 

Similaire à Smart Grid for Sustainable Development Regulatory Perspective

Smart Grid
Smart GridSmart Grid
Smart GridNexus
 
Smart Grid training course description V_2.1
Smart Grid training course description V_2.1Smart Grid training course description V_2.1
Smart Grid training course description V_2.1Håkan Johansson
 
State Grid Modernization presentation from SEPA's 2018 Utility Conference
State Grid Modernization presentation from SEPA's 2018 Utility ConferenceState Grid Modernization presentation from SEPA's 2018 Utility Conference
State Grid Modernization presentation from SEPA's 2018 Utility ConferenceSmart Electric Power Alliance
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden, Inc.
 
Influence of Smart Technology in Power System
Influence of Smart Technology in Power SystemInfluence of Smart Technology in Power System
Influence of Smart Technology in Power Systempavanrajawat5
 
Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016Mark Coughlin
 
Mysore, pilot project
Mysore, pilot projectMysore, pilot project
Mysore, pilot projectcanaleenergia
 
e21 Forum on Integrated Systems Planning
e21 Forum on Integrated Systems Planninge21 Forum on Integrated Systems Planning
e21 Forum on Integrated Systems PlanningTrevor Drake
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slidesJennifer Szaro
 
Smart Grid - Concept to Reality 21.09.22.pptx
Smart Grid - Concept to Reality  21.09.22.pptxSmart Grid - Concept to Reality  21.09.22.pptx
Smart Grid - Concept to Reality 21.09.22.pptxshivarajCSRaj
 

Similaire à Smart Grid for Sustainable Development Regulatory Perspective (20)

Smart grid journey
Smart grid journey Smart grid journey
Smart grid journey
 
Smart Grid
Smart GridSmart Grid
Smart Grid
 
Smart Grid
Smart GridSmart Grid
Smart Grid
 
V-ELEC 12 Redes Inteligentes en la Region LAC, vision 2030
V-ELEC 12 Redes Inteligentes en la Region LAC, vision 2030V-ELEC 12 Redes Inteligentes en la Region LAC, vision 2030
V-ELEC 12 Redes Inteligentes en la Region LAC, vision 2030
 
SMG.pdf
SMG.pdfSMG.pdf
SMG.pdf
 
Smart Grid training course description V_2.1
Smart Grid training course description V_2.1Smart Grid training course description V_2.1
Smart Grid training course description V_2.1
 
State Grid Modernization presentation from SEPA's 2018 Utility Conference
State Grid Modernization presentation from SEPA's 2018 Utility ConferenceState Grid Modernization presentation from SEPA's 2018 Utility Conference
State Grid Modernization presentation from SEPA's 2018 Utility Conference
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State Roadmap
 
The 51st State Initiative
The 51st State InitiativeThe 51st State Initiative
The 51st State Initiative
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
1013
10131013
1013
 
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
10.5_Concordville Microgrid_PECO_EPRI/SNL Microgrid Symposium
 
Influence of Smart Technology in Power System
Influence of Smart Technology in Power SystemInfluence of Smart Technology in Power System
Influence of Smart Technology in Power System
 
Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016Australian Energy Week - The Utility of the Future must act now - June 2016
Australian Energy Week - The Utility of the Future must act now - June 2016
 
Mysore, pilot project
Mysore, pilot projectMysore, pilot project
Mysore, pilot project
 
e21 Forum on Integrated Systems Planning
e21 Forum on Integrated Systems Planninge21 Forum on Integrated Systems Planning
e21 Forum on Integrated Systems Planning
 
Unique.ppt
Unique.pptUnique.ppt
Unique.ppt
 
20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides20161006 Szaro Power Matters Conference all slides
20161006 Szaro Power Matters Conference all slides
 
Smart Grid - Concept to Reality 21.09.22.pptx
Smart Grid - Concept to Reality  21.09.22.pptxSmart Grid - Concept to Reality  21.09.22.pptx
Smart Grid - Concept to Reality 21.09.22.pptx
 

Dernier

Alexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogiAlexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogiBlayneRush1
 
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfWurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfssuser3e15612
 
Hungarian legislation made by Robert Miklos
Hungarian legislation made by Robert MiklosHungarian legislation made by Robert Miklos
Hungarian legislation made by Robert Miklosbeduinpower135
 
PPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training CenterPPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training Centerejlfernandez22
 
Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.2020000445musaib
 
Conditions Restricting Transfer Under TPA,1882
Conditions Restricting Transfer Under TPA,1882Conditions Restricting Transfer Under TPA,1882
Conditions Restricting Transfer Under TPA,18822020000445musaib
 
RA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptxRA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptxJFSB1
 
1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in Sales1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in SalesMelvinPernez2
 
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesAre There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesChesley Lawyer
 
Department order DAO 97-32. powerpoint presentation
Department order DAO 97-32. powerpoint presentationDepartment order DAO 97-32. powerpoint presentation
Department order DAO 97-32. powerpoint presentationPhillisYvonMarshBagu
 
citizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicablecitizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicableSaraSantiago44
 
Illinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideIllinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideillinoisworknet11
 
Labour legislations in India and its history
Labour legislations in India and its historyLabour legislations in India and its history
Labour legislations in India and its historyprasannamurthy6
 
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptxThe Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptxgurcharnsinghlecengl
 
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksUnderstanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksFinlaw Associates
 
Attestation presentation under Transfer of property Act
Attestation presentation under Transfer of property ActAttestation presentation under Transfer of property Act
Attestation presentation under Transfer of property Act2020000445musaib
 
Grey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxGrey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxBharatMunjal4
 
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxSarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxAnto Jebin
 
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTSTHE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTSRoshniSingh312153
 
Guide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docxGuide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docxjennysansano2
 

Dernier (20)

Alexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogiAlexis O'Connell Arrest Records Houston Texas lexileeyogi
Alexis O'Connell Arrest Records Houston Texas lexileeyogi
 
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfWurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
 
Hungarian legislation made by Robert Miklos
Hungarian legislation made by Robert MiklosHungarian legislation made by Robert Miklos
Hungarian legislation made by Robert Miklos
 
PPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training CenterPPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training Center
 
Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.
 
Conditions Restricting Transfer Under TPA,1882
Conditions Restricting Transfer Under TPA,1882Conditions Restricting Transfer Under TPA,1882
Conditions Restricting Transfer Under TPA,1882
 
RA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptxRA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptx
 
1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in Sales1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in Sales
 
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesAre There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
 
Department order DAO 97-32. powerpoint presentation
Department order DAO 97-32. powerpoint presentationDepartment order DAO 97-32. powerpoint presentation
Department order DAO 97-32. powerpoint presentation
 
citizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicablecitizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicable
 
Illinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideIllinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guide
 
Labour legislations in India and its history
Labour legislations in India and its historyLabour legislations in India and its history
Labour legislations in India and its history
 
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptxThe Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
 
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksUnderstanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
 
Attestation presentation under Transfer of property Act
Attestation presentation under Transfer of property ActAttestation presentation under Transfer of property Act
Attestation presentation under Transfer of property Act
 
Grey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxGrey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptx
 
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxSarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
 
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTSTHE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
 
Guide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docxGuide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docx
 

Smart Grid for Sustainable Development Regulatory Perspective

  • 1. Smart Grid for Sustainable Development Regulatory and operational perspective Vijay Menghani Joint Chief ( Engg.) B.E.,MBA Central Electricity Regulatory Commission13-05-2016 1
  • 2. Sustainable Development • “Development that meets the needs of the present without compromising the ability of future generations to meet their own needs” Brundtland Commission : Our Common Future( 1987) – Sustainable Economy – Sustainable Power Sector – Sustainable Regulatory Mechanism 13-05-2016 2
  • 3. Indian Scenario • Low Per Capita Energy Consumption= 918 kWh( 2012-13) • Installed Capacity=237743 MW ( Feb,2014) • 2013-14 – Peak Demand Met 129915 MW Shortage 4.3% – Energy Availability 877784 MU Shortage 4.2% – Decreasing PLF 70.13 (2012-13) 65.53(2013-14) – Reason – Coal Shortage, Economic slowdown and affordability 13-05-2016 3
  • 4. Many issues G T D C Generation Transmission Distribution Consumer Coal Shortage ROW T&D Losses Low per capita consumption Environmental issues Congestion Network Reach Affordability ( Legacy subsidy) Land Renewable Integration Low level of automation Information Asymmetry 13-05-2016 4
  • 5. Smart Grid as Tool • Earlier Smart Grid was being viewed as only meant for distribution in line with US investment in aging infrastructure. • For managing grid Regulatory tools of Grid code and deviation settlement mechanism were being used. • Commission started viewing this as an integrating solution. • Electricity Grid is an integrated eco system where problems of one part quickly spill over to higher voltage level if not visible, measured and controlled. • The big event of 30th and 31st July, 2012 due to Network visibility and reliability , Renewable issues and Grid discipline and load forecasting and management issues. 13-05-2016 5
  • 6. Way out • Generation : For sustainable Development and Energy Security dependency on Coal need to be reduced at least for Energy • It may be due to compulsion like Domestic coal production not matching with requirement or costly imported coal resulting in higher generation cost for which there is no buyer. • Desirable – TO reduce carbon foot print Renewable need to be embraced . 13-05-2016 6
  • 9. Renewable • Carbon emission (2011) USA China India World Total(Milli on Metric Ton) 5490 8715 1725 32578 Per capita 17.62 6.52 1.45 4.69 •Sustainable development possible only with Renewable •12th plan target - MW( working group report) Wind Solar Biomass Small Hydro Waste to energy Tidal/ Geo Total 15000 10000 4050 2100 500 14 31664 13-05-2016 9
  • 10. Issues in Renewable • Grid connected wind has integration issue due to variability at system operation end and transmission investment issues. • Solar PV has integration and commercial issues at distribution end . • The mismatch in timing of renewable generation and demand both daily and seasonal . • For effective and optimum use Storage and balancing power requirement . • The impact of renewable on conventional generation management and cost of balancing service raise regulatory issues of tariff realization. 13-05-2016 10
  • 12. Solution or more problem • Where we are , why we are here (Hum kaoun thai ,kya ho gaye hai or kya hoge abhi) • Shortage of fund , but more funds are required to implement smart grid. • I am facing shortage of power Where I should invest money, to buy more power or invest in smart grid. • Not an alternative solution but a complimentary solution 13-05-2016 12
  • 13. Tariff hiked but can it continue 13
  • 14. Tariff hike needed but can be reduced 14
  • 15. Necessity Capacity Reliability Efficiency Sustainability Smart Grid Growing demand of Electricity Providing high quality electrical energy whenever wherever it needed Reducing losses in every part of delivery chain Ensuring integration of Renewables 13-05-2016 15
  • 16. Sustainable Development Agenda 16 • Transmission for Renewable • New Capability( PEV, Storage) • Energy Demand Flexibility Renewable Integration • Network Visibility( PMUs) • Network Reliability • Reduce outage duration Reliability • Reduction of T&D Losses • Reduction of theft Efficiency • Improve asset Utilization • Reduce retail operational cost • Demand Side management Conservation Inspired from : Accenture Analytic 2013
  • 17. Definition • A smart grid is a modernized electrical grid that uses analogue or digital information and communications technology to gather and act on information, such as information about the behaviors of suppliers and consumers, in an automated fashion to improve the efficiency, reliability, economics, and sustainability of the production and distribution of electricity.[ 13-05-2016 17
  • 18. SMART • Specific – target a specific area for improvement. • Measurable – quantify or at least suggest an indicator of progress. • Assignable/Attainable – specify who will do it. • Realistic – state what results can realistically be achieved, given available resources. • Time-related – specify when the result(s) can be achieved. 13-05-2016 18
  • 19. Why clarity is required • From a regulatory perspective , a clear definition is important for following reasons: 1 • It helps if consumers , utilities , vendor and regulators all starts from a common understanding of smart grid. 2. • It establishes the framework to guide expectations, resource allocation decisions and implementation priorities 3. • We all agree that it implies a modernization of the existing electric grid but may differ on : • How modernization translates into the specific policy actions or resource decisions. 13-05-2016 19
  • 20. Drivers for Smart Grid in India Utilities Customers Government /Regulator 1. Reduction of T&D losses in all utilities as well as improved collection efficiency 2. Peak load management – multiple options from direct load control to consumer pricing incentives 3. Reduction in power purchase cost 4. Better asset management 5. Increased grid visibility 6. Self-healing grid 7. Renewable integration 1. Expand access to electricity – “Power for All” 2. Improve reliability of supply to all customers – no power cuts, no more DG sets and inverters 3. Improve quality of supply – no more voltage stabilizers 4. User friendly and transparent interface with utilities 5. Increased choices for consumers, including green power 6. “Prosumer” (producer and consumer) enablement 7. Options to save money by shifting loads from peak periods to off-peak periods 1. Satisfied customers 2. Financially sound utilities 3. Tariff neutral system upgrade and modernization 4. Reduction in emission intensity 13-05-2016 20 Source: Smart Grid forum of India
  • 21. Objectives for Smart Grid UTILITY Cost Recovery Customer Value for money Objective Regulator Cost effectiveness 13-05-2016 21
  • 22. What is a Smart Grid? A smart grid uses digital technologies to improve the reliability, security, efficiency, and flexibility of the electric system. Image used courtesy of Florida Power and Light Smart Grids Involve System-Wide Approaches 13-05-2016 22
  • 23. Existing and expected Existing Grid Smart Grid Type Electro mechanical +Digital Communication One Way Two way Generation Centralised Distributed Presence of sensor Few Throughout Monitoring /Fault Detection Manual Automatic Fault Correction Manual Restoration +Self Healing Control Limited Pervasive Consumer Passive Active 13-05-2016 23 Source : POWERGRID
  • 24. Key Technologies and Systems for Smart Grids 24 sourceUS Energy
  • 25. Cost price and benefit • To reach informed decision on any Regulatory issue like Tariff, Quantum of Renewables or smart Grid investment say Smart meter it is necessary that whole value chain is understood. • “It was opined that the cost of smart meter was quite prohibitive.” Minutes of meeting. • If smart meter is considered as only a metering device to get 15 minutes data and it is not clear that what will be done with that data, this confusion about cost would prevail. • Smart Meter is only a building block. 25
  • 28. Regulatory Perspective • Expectations from Regulator • Information to Regulator • Structural issues for Regulator • Technical and Commercial appraisal issues • Tariff Design Challenges • Performance Measurement Challenges • Consumer Engagement Challenges Forum of Regulator 39th meeting in Chandigarh emphasis few of these issues 28
  • 29. Expectations from Regulator • Smart Grid need proactive support from Regulator • The condition of India are different from US and EU . To sell a concept of smart Grid in high energy consumption country where people understand benefit of electricity and its quality is easier than the country where power shortage exist. • Indian Regulator is working under various constraints like staff shortage, technology uncertainty, limited pass through of investment cost in addition to legacy political economy issue of subsidy . • Smart Grid is not a priority area for local government and utility which is fire fighting with resource crunch. 29
  • 30. Expectations from Regulator • Collaborate with public and private sector stakeholders to determine regulatory and market solutions that can mobilise private sector investment in all electricity system sectors. • Recognise that smart grid deployments should reflect regional needs and conditions – a “one-size-fits-all” does not apply to the deployment of smart grids.( e.g. Renewable Rich or not, consumer profile, status of unbundling) • Plan for evolution in regulation along with technology development – new technologies will both offer and need new regulatory options. • Invest in research, development and demonstration (RD&D) that address system-wide and broad-range sectoral issues, and that provide insights into behavioral aspects of electricity use. (Source: IEA Road map) 30
  • 31. Information base • Traditional information asymmetry is more pronounced in Smart Grid investments. • Traditionally utility held back information from Regulator for commercial reasons. • Here even utility is not certain about benefit and information is either vendor driven and or expectation driven based on project done elsewhere. • So there is need of a information clearing house for knowledge management which become more important as staff in most of the Commission is on deputation. 13-05-2016 31
  • 32. Structural and Policy issues • The success of smart grid elsewhere was driven by active collaboration of Federal Government( Through Act), Federal Regulator Policy , State Regulator, Private Utility, Innovators/ entrepreneur in other sector of economy like banking and IT. • Although SGIF are doing commendable job, the policy and finance support need to be strengthen . • More active engagement of Central Regulator and Authority will bring more confidence in investors for policy certainty. 13-05-2016 32
  • 33. Technical and commercial appraisal • Pilot projects and its results must be appraised for effective transition to large investment grade projects. • Difficulty in case of new technology . Industry need to create sound business case to assure Regulator. • The assumptions in appraisal need to be realistic. • If transparent competitive bidding is there , not much issue on commercial part. • Both economic and Non-monetary Appraisal are required. 13-05-2016 33
  • 34. Example Analytical Approach to Assess Smart Grid Technology Benefits Improves feeder voltage regulation Reduced feeder losses worth Rs.per MWh Automatic voltage and VAR control • Capacitor controls • Distribution Management System Functions Mechanisms Benefits What does the Smart Grid do? How does it do that? What “goodness” results? Monetary Value What is the goodness worth? What are Smart Grid technologies? Assets Rs lakhs per year 34 34 13-05-2016 34 Source: EPRI
  • 35. Cautious handling of Claim Counter claim • CLAIM:"For example, the cumulative transmission capacity of all the inter- regional corridors by 2012 is around 28,000 MW. However, the Transfer capability based upon voltage/angular stability consideration as well as off-line simulation studies declared in the Month of March, 2012 is about 8,500 MW. On implementation of URTDSM scheme, conservative side if 10% of the Total Transfer Capability is increased on the inter-regional corridors only, additional 850 MW power can be exchanged. Such quantum of power shall translate into annual energy of about 2978 MU [Energy in MU= (850X0.40X8760)/103]. • If we consider cheapest rate of energy at Rs. 2 per unit on the conservative side then the total annual energy cost comes out to be about Rs. 595 Crs. In other words, the subject scheme whose annual estimated transmission charges is of Rs. 147 Cr. shall enable the grid to handle additional energy whose cost is of the order of Rs. 595 Cr. • View:We know that Transfer capability depend on load generation balance and network on a particular time frame, so this claim can not form basis of decision. 13-05-2016 35
  • 36. Cautious handling of Claim Counter claim • Order: • 15. The Indian power system is growing manifolds and complexity is increasing in all fronts viz. generation, transmission and distribution. New regime of open electricity market also poses challenge in maintaining grid security and reliability. On the one hand, non-conventional energy resources must be developed and need to be integrated with the grid for sustainability. On the other hand, increasing emphasis on Renewable Energy Sources, which are beset with variability and intermittency in their output, contribute to challenges in system operation. • Indian power system now has 1000 MW single power stations, high capacity 765 kV transmission lines and single generation units of 1000 MW and 800kV HVDC transmission system feeding large cities and various critical loads are on the anvil. The incidents like natural calamity, etc., even on a single element of this capacity, have the potential to cause a major grid disturbance. • The highest order of real time measurements, monitoring and control system is a must to avoid or mitigate impact of such incidences. To address these issues, introduction of intelligence in transmission system through smart grid applications is inevitable. 13-05-2016 36
  • 37. Cautious handling of Claim Counter claim • No false sense of benefit • 17. Some of the beneficiaries like BSEB and BRPL have submitted that Regulatory approval should be accorded only if the petitioner assures that the transmission system would achieve 100% availability after implementation of the JRTDSM scheme. In this connection, we intend to clarify that the primary purpose of the URTDSM scheme is to improve the visibility and security of the grid and to mitigate the probability of the gird failure and cannot prevent the physical faults like earth fault, line to line fault, etc. It may not be possible to achieve 100% availability is the forced outage in the system cannot be ruled out. 13-05-2016 37
  • 38. Tariff Design Challenges • The issue of Tariff design for smart Grid is challenging due to involvement of IT and Communication technology. • It is necessary that higher depreciation is allowed but as benefits of smart grid investments are realised over a longer period , it is difficult to take a call. • CERC tariff Regulations 2014 and RLDC fee and Charges Regulations take care of the fact that SCADA and communication system investment need to paid back early. 13-05-2016 38
  • 39. Tariff Design Challenges • For DSM related efforts there is need to adopt innovative methods to convince utility that by selling less number of units , it will not suffer. • The present design of discom tariff wherein the volume of sales ( unit sold) may affect discom as part of fixed charges are also recovered through energy charges. • Any coercive action , may not be fulfilling real objective of energy saving. • Say Rs 40 crs granted for DSM are not utilised then equivalent energy would not be considered for tariff determination then commercially it may be ok but real objective of energy saving is not achieved. • The loads shedding and subsidy structure is also hampering DSM adoption. 13-05-2016 39
  • 40. Tariff Design 13-05-2016 40 NREL: Decoupling Policies : Option to Encourage Energy Efficiency Policy for Utilities
  • 41. Tariff Design Challenges • The concept of Decoupling may be adopted to incentivise utilities. A decoupling mechanism is simply a system to regularly adjust rates to ensure a utility’s actual revenues match its authorized revenues to recover its fixed costs. The small rate adjustments break the link between—or decouple—a utility’s revenues and sales by either restoring to the utility or giving back to customers the money that was under- or overcollected as a result of fluctuations in retail sales. This ensures that utilities: – Recover only the prudently incurred fixed costs that were approved by their regulator or governing board – Cannot make a windfall by encouraging higher sales – Are not penalized when energy-efficiency programs, clean distributed generation, and other demand-side efforts reduce sales13-05-2016 41
  • 42. Performance Measurement Challenges • Due to non availability of base line data there is always a difficulty in measuring the effectiveness of a initiatives. • R APDRP is improving situation. • Utilities more proactive while seeking approval but at the time of performance measurement not willing to share the data. • Portal based real time assessment than year end review may be a better solution. • Information dissemination experience in R- APDRP. 13-05-2016 42
  • 43. Smart Grid Data Hub “SGIG and SGDP projects have different reporting requirements to the Smart Grid Data Hub for build and impact metrics: Build metrics are uploaded to the Data Hub on a quarterly basis for both SGIG and SGDP projects, following approval by DOE of a project’s Metrics and Benefits Reporting Plan. Impact metrics for SGIG projects are uploaded to the Data Hub on a semi-annual basis, following approval by DOE of a project’s Metrics and Benefits Reporting Plan. 13-05-2016 43
  • 44. Sharing of information is sharing of responsibility Electric Transmission System Assets Quantity* Incurred Cost** Number of Entities Reporting*** PMUs 1,032 $82,420,443 12 Phasor data concentrators 152 $14,083,333 12 Dynamic rating systems 0 $0 0 IT hardware, systems, and applications that enable transmission functionalities $82,537,945 31 Advanced applications $54,313,513 14 Other transmission related costs $281,644,813 24 Total transmission installed cost $432,462,101 24 13-05-2016 44 SGIG Program Electric Transmission Asset Expenditures Deployed as of December 31, 2013 Updated April 1, 2014
  • 45. Customer Engagement challenges • The success of Smart Grid will depend on consumer confidence which can be achieved only through customer engagement. • In India it is expected that consumers would react only during tariff hearing in Regulatory Commission . • In place of utility , the Regulator through its order is supposed to satisfy, pacify a consumer who due to propaganda is already shifted toward opposing any investment due to tariff fear . ( Delhi Electronic Meter Expereince) • Efforts need to be made by utility to engage customer using all means of communication including social media. 13-05-2016 45
  • 47. Capacity Building issues • 39th meeting Forum of Regulator, emphasis the need of capacity building for Smart Grid “Consultation/awareness programmes for Regulators and regulatory staff should be undertaken on the subject.” • Capacity building in not required only at Regulatory level but at utility level, junior and middle level staff need to be roped in as success of any Smart Grid project depend on their support. 13-05-2016 47
  • 48. Smart Grid applications Wide Area Measurement Applications- PMU and analytic, Dynamic rating Distribution Network Applications- CVR, Automatic switching Customer end Applications -DSM 13-05-2016 48
  • 49. Distribution Level Applications • Distribution Automation SCADA • Outage Management Automated Switching • Controlled Voltage Reduction 13-05-2016 49
  • 50. DSM –Customer end applications • With Common Sense • With Tariff Design • With Smart Meter 13-05-2016 50
  • 51. Three DSM Programs • MSEDCL initiated three activities – Pilot Agricultural DSM Program: Replacement of Old Agricultural Pumps by 4 Star rated pumps – BEE support – Replacement of 5000 Old Ceiling fans by 5 Star rated Ceiling Fans -- LBNL support – Coating roofs with white color to reduce room temperatures and energy use -- LBNL support 13-05-2016 51
  • 52. Replacement of 5000 Old Ceiling Fans by 5-Star Rated Ceiling Fans • Old ceiling fans with over 7 years vintage – Ceiling fans consume power in 80-105 watts – 5-Star rated fans have 55 watts consumption • Goal: Switch 5000 fans in MSEDCL commercial 33/11 KV substations and section offices in 13 cities • Cost was Rs. 1135 per fan • Ongoing M&V being carried out in 520 cites • 25 watts saving, and 11 hrs/day use, results in 0.4 M kWh reduction • MSEDCL Potential Money saving - utility perspective – Rs.575 per year per fan 13-05-2016 52
  • 53. India Cool Roofs Experiments Two India experiments • In Hyderabad, India, 2007-2008 – Cool roof on two air-conditioned(AC) industry buildings • In Nagpur, India, 2013 -- – Cool roof on a utility company non-AC building 13-05-2016 53 Source: LBNL
  • 54. • LBNL conducted a one year experiment at Satyam Computers Training Center in Hyderabad, India in 2006-07 –> 10 -20% reduction in AC load due to white roofs • LBNL staff convinced Delhi Chief Minister who approved mandatory white roofs for all new government buildings in July 2009 Albedo Effect: 100m2(~1000 ft2) of a white roof, replacing a dark roof, offsets the emission of 10 t CO2 White Roofs (WR) — Albedo Effect India WR activity is ancient United States India – WR over many centuries Source: Akbari, Menon, and Rosenfeld 200813-05-2016 54
  • 55. Nagpur MSEDCL Building Data Example (2013) White Roof outdoor and indoor temperature difference is 15 degrees compared to 7 degrees difference in Grey Roof. -20 -15 -10 -5 0 5 10 15 20 25 30 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun Indoorair&outdoorairtemperature(°C) ia1-oa1 ia2-oa2 ia1-oa1 is white roof ia2-oa2 is gray roof 13-05-2016 55 Source: LBNL
  • 57. Variability and Uncertainty: Few Examples-TamilNadu 5713-05-2016
  • 58. Variability and Uncertainty: Few Examples-Tamil Nadu 5813-05-2016
  • 59. MAX WIND DAY: MAHARASHTRA 25 June 2011 30.69 MU GENERATED, 9.48 % OF TOTAL STATE CONSUMPTION 49.5 49.7 49.9 50.1 50.3 200 400 600 800 1000 1200 1400 1600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Maharashtra total Wind WIND GENERATION IN MW FREQUENCY MW Hz Time(hrs) MAX: 1415 MW, MIN: 1136 MW 9% OF DEMAND MET BY WIND @ 09:00 HRS. 13-05-2016 59
  • 60. MAX WIND DAY:GUJARAT 17 June 2011 35 MU GENERATED, 15.15% OF TOTAL STATE CONSUMPTION 49.5 49.7 49.9 50.1 50.3 200 400 600 800 1000 1200 1400 1600 1800 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Gujarat Total Wind WIND GENERATION IN MW FREQUENCY MW Hz MAX: 1642 MW, MIN 1239 MW 17% OF DEMAND MET BY WIND @18 HRS Time(hrs) 13-05-2016 60
  • 61. Renewable integration • The variability and uncertainty of Renewables affect both transmission i.e. Grid integration ,distribution and conventional generation too. • The problem are both technical and commercial. • Green initiatives require that renewables are to be absorbed as “Must Run”. • Renewable generation pattern is different from load pattern, so to use it economic and efficient way , Energy Storage is a solution ,but costly at present. • With lack of Pump storage facilities and costly imported gas , surely there is surely a need for Energy Storage case study but lack of data may hamper a true picture? • Utilities are using Deviation settlement mechanism to curtail wind generation. 13-05-2016 61
  • 63. Partners to reliable integrate high levels of VERs including regional coordination Generation Storage Demand Response Dispatchable Quick Start Wider Operating Range Load Shift Over Generation Mitigation Voltage Support Peak Load Reduction Dispatchable Wind/Solar Fast Ramping Regulation Frequency Response Slide 6313-05-2016 63
  • 65. Benefits of smart grid 65
  • 66. Smart Grid :PMU initiative in India • CERC approved pilot project in Northern Region for installation of four PMUs and Data concentrator in Dec,2009. and for Western Region in 2010 • Similar Pilot projects were initiated in other four regions with installation of PMUs at important locations. • Unified Real Time Dynamic State Measurement Scheme( URDSM) scheme for installation of 1186 +554 PMUs and 32 PDCs and Analytic software approved on 6.9.2013 at Rs 655 crs and include 11000 km optical fibre. 13-05-2016 66
  • 67. Process of Regulatory Approval After getting approval in Standing Committee of Power( 5.3.12) POWERGRID filed petition Commission asked to give cost benefit and discuss issue in Regional power Committee in each Region Investment agreed in each RPC and queries of states replied by POWERGRID Hearing held and all stakeholders were asked to give their comments Approval for stage I was given on 6.9.2013 with instruction to file status report 13-05-2016 67
  • 68. WAMS / PMUs Projects Total no of PMUs - 59 Nos. (including 3 nos. PMU installed by IPPs) Region wise PMUs: NR - 14 Nos WR - 15 Nos ER - 12 Nos SR - 10 Nos NER – 08 Nos At present data from 44 PMUs are available at NLDC PDC. In addition to above data from 4 PMUs installed as demo project is also available 13-05-2016 68
  • 70. Synchronization of SR grid with NEW grid at 2025hrs on 31.12.13 328 MW -191 MW 13-05-2016 70
  • 71. Frequency Variation Two grids –Two FrequenciesOne Grid –One Frequency 13-05-2016 71
  • 72. How PMUs helped in Grid Integration • Continuous tracking of the following parameters from Raichur and Sholapur end PMUs – Frequency – Voltage – Current – Phasor Angle • 765 kV Raichur – Sholapur line flow monitored continuously • Angular separation between asynchronous grids (NEW & SR) monitored continuously for appropriate moment of synchronization. • Dynamic Visibility of the following events: – Bus Charging – Line Reactor Charging – ICT Charging – Line Charging – Line Synchronization 7213-05-2016
  • 75. Possible usage of PMUs • Island detection tools – incorporate frequency into AGC • Automatic event analyzer • Dynamic model validation studies • State Estimator - validation and angle baselining • Dynamic phase angle difference limit – study the usefulness of combining real-time PMU measurements with model-based programs • Additional studies on oscillation mode detection and analysis – combined efforts with adjacent balancing authorities to write operating procedures 13-05-2016 75
  • 76. 76 Synchrophasors- Too much data How much data will synchrophasors generate? A phasor measurement unit (PMU) sampling at 30 times per second with a data stream of typical parameters results in approximately 70 megabytes per day of data. Assuming 500 PMUs in the region, this requires storing 35 gigabytes per day at a central reliability center. How is the data time-stamped? All PMUs in the region are taking data at the same instant in time and the PMU time- stamps each sample. How will the data be transmitted? The data is transmitted to a Phasor Data Concentrator, often at a control center, over communication channels from various locations in the region. The data is likely to arrive at the PDC at slightly different times over the various communications paths, so the PDC aligns the data according the time-stamps to be used in visualization tools and other applications. 13-05-2016
  • 77. Role of Academia • While it is necessary that Government, Regulator, Utility and vendors works together, the academia need to provide the backbone to this development. • Research is necessary to provide cost effective solution for smart metering, distribution switches, communication protocol and most important Cyber security. • Application development for PMU and data analytic. 13-05-2016 77
  • 78. Let us try 13-05-2016 Process should not be seen as Utility or vendor driven but need to be explained as an effort toward better and reliable power supply for people . 78
  • 79. Action Plan • Go ahead with firm belief that Smart Grid provides tool and applications for sustainable Development by integrating all components of Electrical power which enable optimum utilization of Renewables . • Central Regulator’s action plan for near term is focussed on following issues and it is expected that Industry would support us: – Renewable integration through Renewable Management Centres: Visibility, Measurement and Forecasting – Business case for Storage solution in comparison of using existing stranded gas capacity. – PMU data analytics for transfer capability optimisation 13-05-2016 79
  • 80. Smart Grid require smart attitude. Vijay Menghani 9999035484 vmenghani@cercind.gov.in 13-05-2016 80

Notes de l'éditeur

  1. Selctionm of the builfings, design of the monitoring Protocol, specification of monitoring equipment, procurement, calibraiton, installtion, validation, quasi realitime data rtrival and anaylysis, complete analysis, preperation of report, one pager, website . Equipoment is doanted and can be used in other projects