PROJECT MONITORING AND QUALITY ASSURANCE
Service offering for Systems Migration
PURPOSE OF THIS DOCUMENT
Logical Heuristics seeks consensus and understanding from Client X on
Project Monitoring and Quality Assurance (PMQA) in relation to Systems
Migration – its definition, values, tenets and principles.
It is our goal that with this document, Client X would have all the information
it needs to make an informed decision to pursue PMQA services.
BACKGROUND
This document was developed based on discussions with Client X and the
need to understand the impact of PMQA on its initiatives to migrate existing
functionalities of Sys1, Sys2 and Sys3 to Client X specific stand alone
systems , in light of LH’s’ value add and expertise.
ASSUMPTIONS
This document is the first step for Client X in exploring the value of PMQA
with the goal of successful deployment of systems on time, on budget and
with quality.
CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
ABOUT THIS DOCUMENT
SYSTEMS
MIGRATION IS A
REALITY
We can all agree any
business transformation in a
digital business era requires
to consider migration of
existing systems, be it
because of Digital
Disruption(e.g. Cloud).
Divestiture or Mergers and
Acquisition.
Yet, rate of migration is now
in hyper mode.
Let’s talk Driving Forces.
CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
M&A
DIVESTITURE
CUSTOMER EXPERIENCE
TECHNOLOGY ADVANCEMENTS
AGILITY
PERFORMANCE
QUALITY
SPEED
BUSINESS MODEL CHANGES
INNOVATION
GROWTH
TOTAL COST OF OWNERSHIP
SUSTAINABILITYRISK MANAGEMENT
COMPLIANCE
DIGITAL DISRUPTION
DIGITAL DISRUPTION
Digital Disruption is forcing businesses to re-think their
fundamental business strategies and organizational structures.
MERGERS AND ACQUISITIONS
M&A IS A REALITY FOR COMPANIES, NOT JUST TO
GROW BUT TO TRANSFORM THEMSELVES
DIVESTITURE
DIVESTITURE IS ENABLING SPIN OFF’S THAT ARE
CREATIVE AND INNOVATIVE WITH SINGULAR FOCUS ON
VALUE CREATION
”SYSTEM MIGRATION LIFE CYCLE
System migration life cycle exists as a generic and adaptable
framework that is leveraged fully or partially for an application
to be migrated to new paradigm that offers agility, cost
reduction and operational efficiency. It centers around three
stages of planning and execution. Pre-Migration, Migration
and Post Migration.
MADHU GAGANAM
”
”MIGRATION VS TRANSFORMATION
Every migration project is related to transformation for an
organization while not every transformational project is
related to migration during digital business transformation
MADHU GAGANAM
”
PROJECT MONITORING / QUALITY ASSURANCE
PMQA is an independent and objective based function of an
organization to ensure quality measures are activated and
monitored across whole migration and / or transformation
process, characterized by the optimal alignment of business
value realization, budget, risk management, fault tolerance,
performance and time.
MADHU GAGANAM
”
Risk Management System and PMQA
PMQA conducts independent review of the RMS from design
through operation to ensure alignment with the organizational
strategy and effective mitigation by the third party. The level
of assurance desired will determine the scope and frequency
of reviews. PMQA performs assessment to enable
preparation for Leadership review.
MADHU GAGANAM
”
KEY CONCEPTS AND PRINCIPLES OF PMQA
4 TRAITS OF PMQA
01
Risks
Identification and control of risk
exposure along people, process
and technology lines
Empirical
Help make informed decisions.
Qualifies, Quantifies and Impact to
project success and quality
Monitoring
Provides improved and Objective
Visibility into Progress and
Quality of Effort.
02
03 04
Governance
Provides guidance on best practices,
guidelines and proactiveness in risk
exposure and mitigation
Definition
Assessment
Planning
Redesign
Development
Deployment
Evaluation
Release /
Roll Out
PRE-MIGRATION
MIGRATION
POSTMIGRATION
The three stages allows an PMQA SME to assess the migration and given paradigms in order to enable
organizations benefiting from the new environment, while ensuring the quality of the whole migration process
THREE STAGES: SYSTEM MIGRATION LIFE CYCLE
SMLC STAGES
PRE-MIGRATION STAGE: This is the core stage; aims to
understand, analyze, and investigate the system functions and
components using different techniques and different quality
metrics. This stage has several phases (Definition,
Assessment, and Planning). E.g. Project Management, Solution
Management.,
MIGRATION STAGE: The second stage aims to accomplish the
migration itself and the modernization / transformation of legacy
systems. It uses several quality assurances techniques,
including RAID/FMEA/SWOT. This stage has three phases
(Redesign, Development, Deployment). E.g. Vendor
Management, Performance Management
POST-MIGRATION STAGE: The third and final stage is the
post-transformation stage. This stage aims to check the new
system operations, provides all the required checks and
system’s functionality to ensure program correctness and
reducing risks. This stage has two phases (Evaluation and
Release / Roll-out). E.g. Change Management, Customer
Management
SMLC
PMQA & TRANSFORMATION STRATEGIES
Transformation of systems requires manifold perspectives
depending on the application functions, time, risks, budgets
and business needs. In some situations, it may be better to
migrate the whole application. Other cases may require
migrating parts of it. Therefore, there are variation of
approaches requiring different PMQA strategies tailored to
the need.
MADHU GAGANAM
”
COMPARISON OF APPROACHES
INCREMENTAL
MIGRATION
COMPLETE
MIGRATION
PARTIAL
MIGRATION
WRAPPING
LOW HIGH
HIGH
CUSTOM
BUSINESSVALUE
QUALITY
MIGRATION TYPES
INCREMENTAL: The legacy system is redeveloped into a new
paradigm gradually. This strategy is leveraged if the business
value is out of line and does not support current business
needs, PMQA approach developed based on risks, time,
budget, talent and requirements
COMPLETE: This refers to converting the entire old system
into a new infrastructure. This strategy is leveraged if the
existing system is meeting the business needs but is of low
quality. PMQA approach is based on requirements, time, risks
and talent.
PARTIAL: This refers to migrating part of the system
components—for example, using commercial off-the-shelf
(COTS) software. This strategy is leveraged when the business
value is wide, PMQA approach developed based on suitability,
requirements, software customization and reliability.
WRAPPING: This refers to encapsulating the existing code into
a modern interface. This strategy is leveraged if the business
value is meeting the current business needs but the
organization needs to integrate parts of the legacy system and
make only a few changes. PMQA based on impact to
maintainability.
PMQA FRAMEWORK – REVIEW OF PEOPLE –PROCESS - DELIVERABLES
CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
QUALITY ASSURANCE
CAPABILITIES
PROJECT MONITORING
PROJECTINITIATION
BUSINESSPROCESS
REENGINEERING
PROJECTPLANNING
PROJECT
ESTIMATION
PROJECTSCHEDULE
PROJECT
PERSONNEL
PROJECT
ORGANIZATION
CONTRACTOR/SI
COMMITMENT
CONTRACTOR/SI
OVERSIGHT
VENDOR/SI
PERSONNEL
ACCEPTANCEAND
TURNOVER
PROJECT WIDE PROCESSES
§ MIGRATION LIFE CYCLE
§ APPLICATION LIFE CYCLE
§ TRAINING & DOCUMENTATION
§ QUALITY CONTROL
§ STANDARDS AND COMPLIANCE
§ ORGANIZATIONAL CHANGE MANAGEMENT
§ CONFIGURATION MANAGEMENT
§ REQUIREMENTS MANAGEMENT
§ RISK MANAGEMENT
§ SECURITY
§ CAPACITY PLANNING
§ SYSTEMS ENGINEERING
ENVIRONMENTS
§ OPERATING ENVIRONMENT
§ INFORMATION INFRASTRUCTURE
§ DEVELOPMENT ENVIRONMENT
§ SOFTWARE ARCHITECTURE
§ TEST ENVIRONMENT
PROJECT
MANAGEMENT
FINANCIAL
MANAGEMENT
PERFORMANCE
MANAGEMENT
ORGANIZATION
MANAGEMENT
SOLUTION
MANAGEMENT
STAKEHOLDER
MANAGEMENT
CHANGE
MANAGEMENT
CONTRACT
MANAGEMENT
VENDOR
MANAGEMENT
PORTFOLIO
MANAGEMENT
TECHNOLOGY
MANAGEMENT
GOVERNANCE
WE THRIVE IN CO-CREATION AND PARTNERSHIP
All business transformation initiatives are change events.
For any change event, the following building blocks are considered for successful
transition: leadership, solution, technology, process, data and quality. Yet the most
impact and radical change will manifest itself in the organizational space. We believe that
successful transformation is driven by culture. The human factor, the employees will have
to undergo their own transformation. This is the only way to design and sustain a
company’s value creation.
We call this “culture-led” transformation.
CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
WHAT MAKES US DIFFERENT?
OUR CORE VALUES AND BELIEFS IN ACTION
PMQA #1
We believe an objective project monitoring and
quality assurance function is critical for any large
scale business transformation initiative and
identifying early indicators regarding risk and
progress will increase the probability of success.
Project Management Is A Success
Enabler
Project Management is a means to an end. And
that end is successful deployment of a system- an
ideal outcome where business objective is met.
Methodology
We have developed leading best practice
frameworks and approaches based on different
paradigms.. Frameworks enable us to view your
company as a holistic business ecosystem and
approaches tailored based on transformational
initiatives and scope.
Value Realization
As trusted PMQA advisor, we are passionate and
have a strong commitment to value realization.
This is why we consistently monitor, measure and
inform at pivotal milestones during engagements.
CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
WHAT MAKES US DIFFERENT? (cont’d)
OUR CORE VALUES AND BELIEFS IN ACTION
People Centric Transformation
The Human Factor. We believe that people are
the critical success factors when it comes to
driving a sustained transformation initiative,
especially when addressing organization change
management. Culture matters.
Co-Creation
Let’s start with this: We consider you the expert in
your tasks and business knowledge. We present
ourselves as humble advisors. Our approach is to
generate action to address potential risks. We
generate actionable insights to facilitate
meaningful conversations.
Hybrid Leadership
Any business transformation or spin off initiative is
highly nuanced. Change events are complex.
Our PMQA SME’s possess multi-disciplinary
capabilities in business, technology and
architecture design.
Deep Domain Expertise
As seasoned advisors and SME’s, our
Practitioners had exposure to industry best
practices and frameworks, and acquired
knowledge of vertical/industry, technology
products and services.
CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
TOP 6 CHALLENGES IN SYSTEMS MIGRATION
Incumbent businesses are
committed to the idea behind
Modernization and Migration
of existing systems.
However, barriers exist
towards adoption.
Lack of Pragmatic Strategy
Budget limitations
Lack of Talent
Quality Management and Assurance
Organizational Change Management
Leadership Commitment
RE-INVENTING BUSINESSES IS NOT A MATTER OF CHOICE
Transforming businesses has
become a mandate in order to
stay relevant. Companies must
leverage disruptive technologies
and new business models in
order to gain hearts and minds of
the Digital Customer.
“At least 40% of all businesses will die in the next 10 years… if
they don’t figure out how to change their entire company to
accommodate new technologies.”
- John Chambers | Executive Chairman, Cisco System
LOGICAL HEURISTICS
PROJECT MONITORING AND QUALITY ASSURANCE
engage@logicalheuristics.com

Contenu connexe

Tendances

White Paper On Engineering Pmf
White Paper On Engineering PmfWhite Paper On Engineering Pmf
White Paper On Engineering Pmfguestb12736
 
Mega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryMega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryStephen_Forster
 
Implementing ITIL Change Management
Implementing ITIL Change Management Implementing ITIL Change Management
Implementing ITIL Change Management ITSM Academy, Inc.
 
Smart Grid Operational Services Fact Sheet
Smart Grid Operational Services Fact SheetSmart Grid Operational Services Fact Sheet
Smart Grid Operational Services Fact SheetGord Reynolds
 
Pmbok 4th edition chapter 8 - Project Quality Management
Pmbok 4th edition   chapter 8 - Project Quality Management Pmbok 4th edition   chapter 8 - Project Quality Management
Pmbok 4th edition chapter 8 - Project Quality Management Ahmad Maharma, PMP,RMP
 
Introduce the processes of project management pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management pmbok6 by mm rahman stm-skill ...STM-Skill That Matters
 
Noorani Resume - CTB
Noorani Resume - CTBNoorani Resume - CTB
Noorani Resume - CTBNoorani Gulam
 
LinkedInProfile_Deck09072016
LinkedInProfile_Deck09072016LinkedInProfile_Deck09072016
LinkedInProfile_Deck09072016buckkulkarni
 
The five core processes: Service transition
The five core processes: Service transitionThe five core processes: Service transition
The five core processes: Service transitionRhy Carloy Basalo
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Ivan Lanin
 
A Simple Introduction To CMMI For Beginer
A Simple Introduction To CMMI For BeginerA Simple Introduction To CMMI For Beginer
A Simple Introduction To CMMI For BeginerManas Das
 
Presentation how a traditional project manager transforms to scrum - final
Presentation   how a traditional project manager transforms to scrum - finalPresentation   how a traditional project manager transforms to scrum - final
Presentation how a traditional project manager transforms to scrum - finalSadaf Saad
 
St Final Hsiq Questcon Sales Presentation 092006
St Final Hsiq Questcon Sales Presentation 092006St Final Hsiq Questcon Sales Presentation 092006
St Final Hsiq Questcon Sales Presentation 092006anjuabel
 
Luke M.Marais_CV
Luke M.Marais_CVLuke M.Marais_CV
Luke M.Marais_CVLuke Walker
 
Trintech current strategies for optimizing bal sheet certification 8 29-2011
Trintech current strategies for optimizing bal sheet certification 8 29-2011Trintech current strategies for optimizing bal sheet certification 8 29-2011
Trintech current strategies for optimizing bal sheet certification 8 29-2011Eric Perry
 

Tendances (20)

CMMI Implementation Guide
CMMI Implementation GuideCMMI Implementation Guide
CMMI Implementation Guide
 
White Paper On Engineering Pmf
White Paper On Engineering PmfWhite Paper On Engineering Pmf
White Paper On Engineering Pmf
 
Mega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryMega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas Industry
 
Implementing ITIL Change Management
Implementing ITIL Change Management Implementing ITIL Change Management
Implementing ITIL Change Management
 
Smart Grid Operational Services Fact Sheet
Smart Grid Operational Services Fact SheetSmart Grid Operational Services Fact Sheet
Smart Grid Operational Services Fact Sheet
 
Pmbok 4th edition chapter 8 - Project Quality Management
Pmbok 4th edition   chapter 8 - Project Quality Management Pmbok 4th edition   chapter 8 - Project Quality Management
Pmbok 4th edition chapter 8 - Project Quality Management
 
Introduce the processes of project management pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management pmbok6 by mm rahman stm-skill ...
 
Karthikeyan_SeniorAssociate
Karthikeyan_SeniorAssociateKarthikeyan_SeniorAssociate
Karthikeyan_SeniorAssociate
 
Noorani Resume - CTB
Noorani Resume - CTBNoorani Resume - CTB
Noorani Resume - CTB
 
Service Transition Overview
Service Transition  OverviewService Transition  Overview
Service Transition Overview
 
LinkedInProfile_Deck09072016
LinkedInProfile_Deck09072016LinkedInProfile_Deck09072016
LinkedInProfile_Deck09072016
 
The five core processes: Service transition
The five core processes: Service transitionThe five core processes: Service transition
The five core processes: Service transition
 
Agile, PMI and PMBOK
Agile, PMI and PMBOKAgile, PMI and PMBOK
Agile, PMI and PMBOK
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)
 
A Simple Introduction To CMMI For Beginer
A Simple Introduction To CMMI For BeginerA Simple Introduction To CMMI For Beginer
A Simple Introduction To CMMI For Beginer
 
Presentation how a traditional project manager transforms to scrum - final
Presentation   how a traditional project manager transforms to scrum - finalPresentation   how a traditional project manager transforms to scrum - final
Presentation how a traditional project manager transforms to scrum - final
 
St Final Hsiq Questcon Sales Presentation 092006
St Final Hsiq Questcon Sales Presentation 092006St Final Hsiq Questcon Sales Presentation 092006
St Final Hsiq Questcon Sales Presentation 092006
 
Management techniques of the world by khawar nehal 4 august 2020-1
Management techniques of the world by khawar nehal   4 august 2020-1Management techniques of the world by khawar nehal   4 august 2020-1
Management techniques of the world by khawar nehal 4 august 2020-1
 
Luke M.Marais_CV
Luke M.Marais_CVLuke M.Marais_CV
Luke M.Marais_CV
 
Trintech current strategies for optimizing bal sheet certification 8 29-2011
Trintech current strategies for optimizing bal sheet certification 8 29-2011Trintech current strategies for optimizing bal sheet certification 8 29-2011
Trintech current strategies for optimizing bal sheet certification 8 29-2011
 

Similaire à Lh pmqa presentation

Transformation to World Leading Quality: Is Your Organization Ready?
Transformation to World Leading Quality: Is Your Organization Ready?Transformation to World Leading Quality: Is Your Organization Ready?
Transformation to World Leading Quality: Is Your Organization Ready?Cognizant
 
What Constitutes a Successful QMS?
What Constitutes a Successful QMS?What Constitutes a Successful QMS?
What Constitutes a Successful QMS?Sameeksha Verma
 
How Morgan Stanley is Using Apps to Transform the Workplace
How Morgan Stanley is Using Apps to Transform the WorkplaceHow Morgan Stanley is Using Apps to Transform the Workplace
How Morgan Stanley is Using Apps to Transform the WorkplaceDreamforce
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementGlen Alleman
 
Chase Cooper Overview
Chase Cooper OverviewChase Cooper Overview
Chase Cooper OverviewAoife Brennan
 
Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Techedge Group
 
A New Era of Compliance: Innovations in ServiceNow GRC 
A New Era of Compliance: Innovations in ServiceNow GRC A New Era of Compliance: Innovations in ServiceNow GRC 
A New Era of Compliance: Innovations in ServiceNow GRC Aelum Consulting
 
IRJET- Agile Management in Construction Industry
IRJET-  	  Agile Management in Construction IndustryIRJET-  	  Agile Management in Construction Industry
IRJET- Agile Management in Construction IndustryIRJET Journal
 
Shawn Carlson Enterprise Transformation Leader CV
Shawn Carlson Enterprise Transformation Leader CVShawn Carlson Enterprise Transformation Leader CV
Shawn Carlson Enterprise Transformation Leader CVShawn Carlson
 
Why to outsource qa services
Why to outsource qa servicesWhy to outsource qa services
Why to outsource qa servicesTestingXperts
 
De-risking Life and Annuity Policy Admin System Conversions
De-risking Life and Annuity Policy Admin System ConversionsDe-risking Life and Annuity Policy Admin System Conversions
De-risking Life and Annuity Policy Admin System ConversionsCognizant
 
Capital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvementsCapital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvementsGenpact Ltd
 
Why is QA Transformation vital for Digital Transformation.pdf
Why is QA Transformation vital for Digital Transformation.pdfWhy is QA Transformation vital for Digital Transformation.pdf
Why is QA Transformation vital for Digital Transformation.pdfSparity1
 
Defect management tools qtp analyst
Defect management tools  qtp analystDefect management tools  qtp analyst
Defect management tools qtp analystpusbharat
 
Is qms really needed
Is qms really needed Is qms really needed
Is qms really needed johnsqms
 
System re-engineering kasb Securities Ltd
System re-engineering kasb Securities LtdSystem re-engineering kasb Securities Ltd
System re-engineering kasb Securities LtdShehroz Adil
 

Similaire à Lh pmqa presentation (20)

Transformation to World Leading Quality: Is Your Organization Ready?
Transformation to World Leading Quality: Is Your Organization Ready?Transformation to World Leading Quality: Is Your Organization Ready?
Transformation to World Leading Quality: Is Your Organization Ready?
 
What Constitutes a Successful QMS?
What Constitutes a Successful QMS?What Constitutes a Successful QMS?
What Constitutes a Successful QMS?
 
How Morgan Stanley is Using Apps to Transform the Workplace
How Morgan Stanley is Using Apps to Transform the WorkplaceHow Morgan Stanley is Using Apps to Transform the Workplace
How Morgan Stanley is Using Apps to Transform the Workplace
 
Agile testing solution
Agile testing solutionAgile testing solution
Agile testing solution
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value Management
 
Risk-Based Monitoring Implementation- A Case Study
Risk-Based Monitoring Implementation- A Case StudyRisk-Based Monitoring Implementation- A Case Study
Risk-Based Monitoring Implementation- A Case Study
 
Chase Cooper Overview
Chase Cooper OverviewChase Cooper Overview
Chase Cooper Overview
 
Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2
 
A New Era of Compliance: Innovations in ServiceNow GRC 
A New Era of Compliance: Innovations in ServiceNow GRC A New Era of Compliance: Innovations in ServiceNow GRC 
A New Era of Compliance: Innovations in ServiceNow GRC 
 
IRJET- Agile Management in Construction Industry
IRJET-  	  Agile Management in Construction IndustryIRJET-  	  Agile Management in Construction Industry
IRJET- Agile Management in Construction Industry
 
Shawn Carlson Enterprise Transformation Leader CV
Shawn Carlson Enterprise Transformation Leader CVShawn Carlson Enterprise Transformation Leader CV
Shawn Carlson Enterprise Transformation Leader CV
 
Why to outsource qa services
Why to outsource qa servicesWhy to outsource qa services
Why to outsource qa services
 
De-risking Life and Annuity Policy Admin System Conversions
De-risking Life and Annuity Policy Admin System ConversionsDe-risking Life and Annuity Policy Admin System Conversions
De-risking Life and Annuity Policy Admin System Conversions
 
Capital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvementsCapital markets: The impact of business process operations improvements
Capital markets: The impact of business process operations improvements
 
Manano 2
Manano 2Manano 2
Manano 2
 
Why is QA Transformation vital for Digital Transformation.pdf
Why is QA Transformation vital for Digital Transformation.pdfWhy is QA Transformation vital for Digital Transformation.pdf
Why is QA Transformation vital for Digital Transformation.pdf
 
Defect management tools qtp analyst
Defect management tools  qtp analystDefect management tools  qtp analyst
Defect management tools qtp analyst
 
Is qms really needed
Is qms really needed Is qms really needed
Is qms really needed
 
System re-engineering kasb Securities Ltd
System re-engineering kasb Securities LtdSystem re-engineering kasb Securities Ltd
System re-engineering kasb Securities Ltd
 
Program Management Office (PMO)
Program Management Office (PMO)Program Management Office (PMO)
Program Management Office (PMO)
 

Dernier

From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 

Dernier (16)

From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 

Lh pmqa presentation

  • 1. PROJECT MONITORING AND QUALITY ASSURANCE Service offering for Systems Migration
  • 2. PURPOSE OF THIS DOCUMENT Logical Heuristics seeks consensus and understanding from Client X on Project Monitoring and Quality Assurance (PMQA) in relation to Systems Migration – its definition, values, tenets and principles. It is our goal that with this document, Client X would have all the information it needs to make an informed decision to pursue PMQA services. BACKGROUND This document was developed based on discussions with Client X and the need to understand the impact of PMQA on its initiatives to migrate existing functionalities of Sys1, Sys2 and Sys3 to Client X specific stand alone systems , in light of LH’s’ value add and expertise. ASSUMPTIONS This document is the first step for Client X in exploring the value of PMQA with the goal of successful deployment of systems on time, on budget and with quality. CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S ABOUT THIS DOCUMENT
  • 3. SYSTEMS MIGRATION IS A REALITY We can all agree any business transformation in a digital business era requires to consider migration of existing systems, be it because of Digital Disruption(e.g. Cloud). Divestiture or Mergers and Acquisition. Yet, rate of migration is now in hyper mode. Let’s talk Driving Forces. CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S M&A DIVESTITURE CUSTOMER EXPERIENCE TECHNOLOGY ADVANCEMENTS AGILITY PERFORMANCE QUALITY SPEED BUSINESS MODEL CHANGES INNOVATION GROWTH TOTAL COST OF OWNERSHIP SUSTAINABILITYRISK MANAGEMENT COMPLIANCE DIGITAL DISRUPTION
  • 4. DIGITAL DISRUPTION Digital Disruption is forcing businesses to re-think their fundamental business strategies and organizational structures.
  • 5. MERGERS AND ACQUISITIONS M&A IS A REALITY FOR COMPANIES, NOT JUST TO GROW BUT TO TRANSFORM THEMSELVES
  • 6. DIVESTITURE DIVESTITURE IS ENABLING SPIN OFF’S THAT ARE CREATIVE AND INNOVATIVE WITH SINGULAR FOCUS ON VALUE CREATION
  • 7. ”SYSTEM MIGRATION LIFE CYCLE System migration life cycle exists as a generic and adaptable framework that is leveraged fully or partially for an application to be migrated to new paradigm that offers agility, cost reduction and operational efficiency. It centers around three stages of planning and execution. Pre-Migration, Migration and Post Migration. MADHU GAGANAM ”
  • 8. ”MIGRATION VS TRANSFORMATION Every migration project is related to transformation for an organization while not every transformational project is related to migration during digital business transformation MADHU GAGANAM ”
  • 9. PROJECT MONITORING / QUALITY ASSURANCE PMQA is an independent and objective based function of an organization to ensure quality measures are activated and monitored across whole migration and / or transformation process, characterized by the optimal alignment of business value realization, budget, risk management, fault tolerance, performance and time. MADHU GAGANAM ”
  • 10. Risk Management System and PMQA PMQA conducts independent review of the RMS from design through operation to ensure alignment with the organizational strategy and effective mitigation by the third party. The level of assurance desired will determine the scope and frequency of reviews. PMQA performs assessment to enable preparation for Leadership review. MADHU GAGANAM ”
  • 11. KEY CONCEPTS AND PRINCIPLES OF PMQA
  • 12. 4 TRAITS OF PMQA 01 Risks Identification and control of risk exposure along people, process and technology lines Empirical Help make informed decisions. Qualifies, Quantifies and Impact to project success and quality Monitoring Provides improved and Objective Visibility into Progress and Quality of Effort. 02 03 04 Governance Provides guidance on best practices, guidelines and proactiveness in risk exposure and mitigation
  • 13. Definition Assessment Planning Redesign Development Deployment Evaluation Release / Roll Out PRE-MIGRATION MIGRATION POSTMIGRATION The three stages allows an PMQA SME to assess the migration and given paradigms in order to enable organizations benefiting from the new environment, while ensuring the quality of the whole migration process THREE STAGES: SYSTEM MIGRATION LIFE CYCLE SMLC STAGES PRE-MIGRATION STAGE: This is the core stage; aims to understand, analyze, and investigate the system functions and components using different techniques and different quality metrics. This stage has several phases (Definition, Assessment, and Planning). E.g. Project Management, Solution Management., MIGRATION STAGE: The second stage aims to accomplish the migration itself and the modernization / transformation of legacy systems. It uses several quality assurances techniques, including RAID/FMEA/SWOT. This stage has three phases (Redesign, Development, Deployment). E.g. Vendor Management, Performance Management POST-MIGRATION STAGE: The third and final stage is the post-transformation stage. This stage aims to check the new system operations, provides all the required checks and system’s functionality to ensure program correctness and reducing risks. This stage has two phases (Evaluation and Release / Roll-out). E.g. Change Management, Customer Management SMLC
  • 14. PMQA & TRANSFORMATION STRATEGIES Transformation of systems requires manifold perspectives depending on the application functions, time, risks, budgets and business needs. In some situations, it may be better to migrate the whole application. Other cases may require migrating parts of it. Therefore, there are variation of approaches requiring different PMQA strategies tailored to the need. MADHU GAGANAM ”
  • 15. COMPARISON OF APPROACHES INCREMENTAL MIGRATION COMPLETE MIGRATION PARTIAL MIGRATION WRAPPING LOW HIGH HIGH CUSTOM BUSINESSVALUE QUALITY MIGRATION TYPES INCREMENTAL: The legacy system is redeveloped into a new paradigm gradually. This strategy is leveraged if the business value is out of line and does not support current business needs, PMQA approach developed based on risks, time, budget, talent and requirements COMPLETE: This refers to converting the entire old system into a new infrastructure. This strategy is leveraged if the existing system is meeting the business needs but is of low quality. PMQA approach is based on requirements, time, risks and talent. PARTIAL: This refers to migrating part of the system components—for example, using commercial off-the-shelf (COTS) software. This strategy is leveraged when the business value is wide, PMQA approach developed based on suitability, requirements, software customization and reliability. WRAPPING: This refers to encapsulating the existing code into a modern interface. This strategy is leveraged if the business value is meeting the current business needs but the organization needs to integrate parts of the legacy system and make only a few changes. PMQA based on impact to maintainability.
  • 16. PMQA FRAMEWORK – REVIEW OF PEOPLE –PROCESS - DELIVERABLES CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S QUALITY ASSURANCE CAPABILITIES PROJECT MONITORING PROJECTINITIATION BUSINESSPROCESS REENGINEERING PROJECTPLANNING PROJECT ESTIMATION PROJECTSCHEDULE PROJECT PERSONNEL PROJECT ORGANIZATION CONTRACTOR/SI COMMITMENT CONTRACTOR/SI OVERSIGHT VENDOR/SI PERSONNEL ACCEPTANCEAND TURNOVER PROJECT WIDE PROCESSES § MIGRATION LIFE CYCLE § APPLICATION LIFE CYCLE § TRAINING & DOCUMENTATION § QUALITY CONTROL § STANDARDS AND COMPLIANCE § ORGANIZATIONAL CHANGE MANAGEMENT § CONFIGURATION MANAGEMENT § REQUIREMENTS MANAGEMENT § RISK MANAGEMENT § SECURITY § CAPACITY PLANNING § SYSTEMS ENGINEERING ENVIRONMENTS § OPERATING ENVIRONMENT § INFORMATION INFRASTRUCTURE § DEVELOPMENT ENVIRONMENT § SOFTWARE ARCHITECTURE § TEST ENVIRONMENT PROJECT MANAGEMENT FINANCIAL MANAGEMENT PERFORMANCE MANAGEMENT ORGANIZATION MANAGEMENT SOLUTION MANAGEMENT STAKEHOLDER MANAGEMENT CHANGE MANAGEMENT CONTRACT MANAGEMENT VENDOR MANAGEMENT PORTFOLIO MANAGEMENT TECHNOLOGY MANAGEMENT GOVERNANCE
  • 17. WE THRIVE IN CO-CREATION AND PARTNERSHIP
  • 18. All business transformation initiatives are change events. For any change event, the following building blocks are considered for successful transition: leadership, solution, technology, process, data and quality. Yet the most impact and radical change will manifest itself in the organizational space. We believe that successful transformation is driven by culture. The human factor, the employees will have to undergo their own transformation. This is the only way to design and sustain a company’s value creation. We call this “culture-led” transformation. CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
  • 19. WHAT MAKES US DIFFERENT? OUR CORE VALUES AND BELIEFS IN ACTION PMQA #1 We believe an objective project monitoring and quality assurance function is critical for any large scale business transformation initiative and identifying early indicators regarding risk and progress will increase the probability of success. Project Management Is A Success Enabler Project Management is a means to an end. And that end is successful deployment of a system- an ideal outcome where business objective is met. Methodology We have developed leading best practice frameworks and approaches based on different paradigms.. Frameworks enable us to view your company as a holistic business ecosystem and approaches tailored based on transformational initiatives and scope. Value Realization As trusted PMQA advisor, we are passionate and have a strong commitment to value realization. This is why we consistently monitor, measure and inform at pivotal milestones during engagements. CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
  • 20. WHAT MAKES US DIFFERENT? (cont’d) OUR CORE VALUES AND BELIEFS IN ACTION People Centric Transformation The Human Factor. We believe that people are the critical success factors when it comes to driving a sustained transformation initiative, especially when addressing organization change management. Culture matters. Co-Creation Let’s start with this: We consider you the expert in your tasks and business knowledge. We present ourselves as humble advisors. Our approach is to generate action to address potential risks. We generate actionable insights to facilitate meaningful conversations. Hybrid Leadership Any business transformation or spin off initiative is highly nuanced. Change events are complex. Our PMQA SME’s possess multi-disciplinary capabilities in business, technology and architecture design. Deep Domain Expertise As seasoned advisors and SME’s, our Practitioners had exposure to industry best practices and frameworks, and acquired knowledge of vertical/industry, technology products and services. CONFIDENTIAL | All Rights Reserved 2018 | L O G I C A L H E U R I S T I C S
  • 21. TOP 6 CHALLENGES IN SYSTEMS MIGRATION Incumbent businesses are committed to the idea behind Modernization and Migration of existing systems. However, barriers exist towards adoption. Lack of Pragmatic Strategy Budget limitations Lack of Talent Quality Management and Assurance Organizational Change Management Leadership Commitment
  • 22. RE-INVENTING BUSINESSES IS NOT A MATTER OF CHOICE Transforming businesses has become a mandate in order to stay relevant. Companies must leverage disruptive technologies and new business models in order to gain hearts and minds of the Digital Customer. “At least 40% of all businesses will die in the next 10 years… if they don’t figure out how to change their entire company to accommodate new technologies.” - John Chambers | Executive Chairman, Cisco System LOGICAL HEURISTICS PROJECT MONITORING AND QUALITY ASSURANCE engage@logicalheuristics.com