LEAN2 in the Way we Work and the Projects We Deliver
Presentation Overview:
As it currently operates, the commercial real estate construction industry is a disaster full of built-in waste. Seventy percent of all projects are over -budget, poor quality, and are delivered late.
Our clients deserve better and should not be subjected to the risk, stress and embarrassment of getting tumbled on a reef of knarly change notices, schedule delays and poor quality associated with tendered projects.
Teams that adopt the LEAN Integrated Project Delivery (LIPD) approach are able to achieve paradigm shift levels of performance improvements. 200% improvements in productivity, 40% reductions in capital cost and 30% reductions in operating costs.
The LIPD process requires a proactive, collaborative approach to Project Management and the adoption of principles, tools and process from LEAN manufacturing that have been adapted for the building industry. Our approach to Lean Project Delivery eables teams to achieve significant “Performance” and “Quality” and “Productivity” improvement!
2. “The definition of
insanity is doing the
same thing over and
over and expecting
different results.”
Albert Einstein
WHY?
3. VALUE Management
University of Winnipeg Science Complex
& Richardson College for the Environment
University of Winnipeg Science Complex
& Richardson College for the EnvironmentWHY?
Want to have a Planet for our Children
200% Productivity … 40% less Capital Cost … 30% less Operating Cost
LEAN pays for GREEN
On track for a 5
DGC increase by
2100
5. VALUE Management
University of Winnipeg Science Complex
& Richardson College for the Environment
University of Winnipeg Science Complex
& Richardson College for the EnvironmentWHY?
Want to mitigate RISK
Deliver projects with less
than a 2% contingency
6. Our clients deserve better and
should not be subjected to the
risk, stress and embarrassment
of getting tumbled on a reef of
gnarly change notices,
schedule delays and poor
quality and productivity
associated with tendered
projects.
Why? …For our Clients
7. Okanagan College Kelowna Trades Centre
Living Building Challenge Project #2
As leaders in the community it is our duty to protect the planet and demonstrate that
triple bottom line economics work. For our second Living Building Challenge project,
we have adopted Lean Project Delivery to raise the bar even higher as we want less
cost, less time and to be fully commissioned at substantial completion.
Kathleen Lausman
8. For our project we wanted to demonstrate to that triple bottom line economics work for
commercial real estate. We are on target to deliver the Mosaic Centre to the highest level of
sustainability as defined by Living Building Challenge for approximately the same cost as a
traditional build.
Our return on investment will be in the productivity of our people, recognition as good
stewards of the planet and from the financial benefits of having higher occupancy and no
energy bills.
Dennis Cuku Mosaic Center for Community and Commerce
Canada’s first private commercial Living Building Challenge project
10. VALUE Management
University of Winnipeg Science Complex
& Richardson College for the Environment
University of Winnipeg Science Complex
& Richardson College for the EnvironmentLets Get Lean Going in Canada?
http://bit.ly/LeanConstruction_Canada
11. Murray Guy (aka @Lean_tobe_Green)
Ph: 306.222.5384
Email: mguy@i-designs.ca
www.i-designs.ca & www.eco-smart.ca
Dispelling the MYTH that High Performance Costs More
Breaking Down Barriers to High Performance
We provide coaching, facilitation and commissioning
services that enable much higher levels of performance
We design and build buildings that are unique, sustainable
and provide a return on investment
Editor's Notes
How does IDI participate on our projects to define value and why is that REALLY important?
How does IDI participate on our projects to define value and why is that REALLY important?
IDI are working with OC and PCL to deliver there second Living Building Challenge Project
IDI are working with Mosaic, Arch Manaic Issac and contractor Chandos
How does IDI participate on our projects to define value and why is that REALLY important?