ASSESSMENT AND OPERATIONAL
CONTROL OF ON-SITE
ENVIRONMENTAL IMPACTS
Eng. Moemen Ahmed Abd Elfattah
MSc. Construction Management Program, Cairo University, Spring 2014
Supervision
Prof. Dr. Moheeb I. Elsaid
AGENDA
Conclusions.
Case Study; P&R - SUSTAIN Lincolnshire, UK.
Focus Points for Construction Professionals.
Environmental Impacts Control on-site.
Assessment of Environmental Impacts.
Environment Management System & ISO 14001.
Concepts, Definitions & Cycle of management.
CONSTRUCTION, ENVIRONMENT &
SUSTAINABILITY
ENVIRONMENTAL ASPECTS
• Environmental Aspects of construction
projects include any part or activity,
that interact with surroundings.
• Surroundings include; air, water,
resources, land, fauna, flora, humans &
their interrelations.
Emissions to Air
Releases to Water
Releases to Land
Energy Usage & Emissions
Resources Usage
Wastes Production
Physical Attributes (shape, size, … )
ENVIRONMENT MANAGEMENT SYSTEM
(EMS) & ISO 14001 STANDARD
• EMS is a part of organization internal system, which is utilized to manage
environment related issues; developing & implementing environmental policy & by
continues management of environmental aspects.
• ISO 14001 offers a generic EMS model for organizations, which can be adopted
voluntarily.
MANAGEMENT CYCLE OF EMS IN ISO14001
• ISO 14001 methodology is based on
continues improvement, or progressive
elaboration.
• Cycles of PLAN-DO-CHECK-ACT form
the framework of environmental driven
efforts into increasing organization
performance. •Measurements
•Audits
•Mgt. Review
•Corrective
Actions.
•Implement the
plan on site.
•Policy
•Identify
•Assess
PLAN DO
CHECKACT
ENVIRONMENTAL IMPACTS ASSESSMENT
(EIA)
• EIA is a process by which the potential environmental impacts of a proposed
development are assessed at an early stage of decision-making in order to promote
sound environmental management.
• EIA was first introduced by the US National Environmental Policy Act (NEPA) of
1969, and since then provisions for it have been implemented in more than 100
countries
ASSESSMENT METHODOLOGY
• Environmental impacts can be understood & assessed through the Risk
Management framework.
• The Significance (SG) of the Risk related to any Environmental Impact can be
assessed utilizing two factors;
• The Severity of the impact (SV).
• The Concerns level related to such impact (CO).
SG = SV . CO … … … Assessment of Env. Impact Significance
ASSESSMENT INDICATORS
To quantify the severity & concerns level factors indicators need to be developed.
Indicators must be specific and measurable
Aspect Indicator SV=0 SV=1 SV=3 SV=5 CO=1 CO=3 CO=5
Dumping of sanitary
water resulting from
on-site sanitary
conveniences in
municipal
engineering works
Average number of
workers per day
[number of workers]
P = 0.00 0.00 < P ≤ 6.37 6.37 ≤ P <
16.54
P ≥ 16.54 Connection to
sewage system
Dumping in
septic tank
and/or
existence of
previous
treatment
Direct dumping
to the natural or
urban
environment
ASSESSMENT & DECISION MAKING
IMPLEMENTATION & CONTROL ON-SITE
•Documentations
•Communications
•Emergency
Preparations
•Training
•Awareness
•Resources
•Roles
Monitor &
Measure
Evaluation
Corrective/P
reventive
Actions
Records
Control
INTERNAL AUDIT Mgt. REVIEW
COMMON H.R. ISSUES FOUND ON-SITE
Three main issues were found, that hurdle the work of environmental personnel on-
site [G. Rodríguez, 2011, Community of Madrid];
(1) Appointing environmental supervisor, who doesn’t have adequate knowledge,
relative experience, or did not receive appropriate training.
(2) Environmental supervisors did not get the required autonomy in work, and did not
have enough authority to perform as required.
(3) Not allocating enough resources to the support implementing EMS onsite.
ENVIRONMENTAL AUDIT ON-SITE
Audit is a systematic, documented
verification process of measurements to
determine whether the environmental
aspects of the project complies with
determined allowable criteria or not. And
to produce feedback reports, which can be
used to develop and implement corrective
actions
Check
Compliance
Check
Implementation
Validate
System
AUDIT CHECKLIST SAMPLE
Audit Checklist
Implemented?
N/A
Remarks
Specify taken measurements, refer to
required standard, define exact
evidences and propose resolution.
Yes No
1. Water Alteration Control
 Are water discharge licenses valid?
 Are wastewater treatment system being used
and properly maintained on site?
 Are there any wastewater discharged to the
surface water channels? Is the wastewater
being treated?
 Are sewage channels and manholes free of silt
and sediment?
 Are sedimentation traps and tanks free of silt
and sediment?
FOCUS POINT ON-SITE: AWARENESS
Ensure that all vehicles and machinery are fitted
with appropriate emission control equipment,
maintained frequently and serviced.
Air Pollution
Provide bins for construction workers and staff at
locations where they consume food.
Littering
Minimize fuels and chemicals stored onsite.
Implement a contingency plan to handle spills.
Chemicals
& Fuel
Cover all loads of soil being taken off site for disposal.
Roads
Applying EMS on construction onsite work
requires a comprehensive efforts through
both planning and execution phases, such
efforts should be based on systematic
approach as discussed. Still, due to the
dynamic nature of construction work,
which requires responsible personnel on
site to take immediate decisions and
actions on daily base, it is important to
develop an environmental sound of
awareness among those professionals.
FOCUS POINT ON-SITE: NOISE
• Construction activities are major source for acoustic
pollution in development areas. Noise pollution has a
direct impact on both neighbors and workers on-site.
• Many regions lack specific regulations to control
construction’s noise impacts on surrounding, therefore
internal awareness of this impact is highly required.
• Excavation is the noisiest stage, since it is directly
linked to the machinery used. Concrete pouring, and
material unloading follow.
• Construction noise is usually of low frequency &
variable nature, which makes it very annoying.
Plan upon max. noise threshold.
Avoid performing different noisy
operations simultaneously.
Consider noise emissions on
machinery choose decisions.
Make sure workers are using
protective ear plugs when needed.
Use sound enclosures, when
applicable.
FOCUS POINT ON-SITE: WASTE
• Construction and Demolition waste is one
of the largest global waste streams and
makes up an estimated 50% of all waste
in some regions [M.INGLIS, NZ, 2007].
• Researches and case studies show that
between 50% and 80% of construction
wastes are reusable [G.Rodrıguez, Spain, 2006].
Inert Wastes
•bricks, concrete remains, stone, sand, gravel
and other dry materials.
Solid Wastes
Hazardous Wastes
•Amianthus, solvents, resins, etc
FOCUS POINT ON-SITE: WASTE MGT.
REDUCE
REUSE
RECYCLE
Common measures to deal with construction wastes on-site
include;
• Obtaining construction materials, paints, lubricants and
other liquids in reusable packaging or containers·
• Sending waste concrete from demolition activities to a
concrete recycler instead of landfill·
• Segregating and recycling solid wastes generated by
construction activities, offices and mess-rooms·
• Collecting lubricating oil from the construction vehicle
fleet and sending it to a recycler.
Waste Management Plan is normally required to handle
wastes effectively on-site.
CASE STUDY, EMS IN S.M.E. : P&R CO.
• P&R Plant Hire is a medium size construction company in UK, which specializes in
groundwork, civil engineering and plant hire.
• In order to be able to compete in market, and under major clients’ pressure, P&R
needed to adopt to ISO 14001 EMS, and to show improvement in environmental
performance.
• In 2011, P&R found technical help from SUSTAIN Lincolnshire, an environmental
program that aims to support organizations to improve their performance from
environmental point of view.
CASE STUDY, EMS IN S.M.E. : P&R CO.
P&R and SUSTAIN Lincolnshire worked out a plan to implement EMS into P&R
constructions operations. Major Activities included;
• Check of existing environmental performance. And defining significant
environmental impacts of P&R operations.
• Implementing a sustainable change, as part of this, P&R organized staff diploma
training in work-based environmental conservation
• P&R obtained Green level accreditation, which they used to prepare for their full
ISO14001 assessment.
CASE STUDY, EMS IN S.M.E. : P&R CO.
High fuel consumption & Emissions by company’s vehicles was identified as a major
environmental aspect, and its resulted impact was assessed as critical to mitigate.
Actions included;
• Investment in new trackers for its fleet of vehicles.
• Investment in advanced software, generating stats such as vehicle GPS location,
time spent on site and fuel consumption data.
• The staff have also taken a fuel efficiency driving course, helping them to develop
their eco-driving skills.
CASE STUDY, EMS IN S.M.E. : P&R CO.
Other changes were implemented to mitigate influence of other environmental aspects of
the company operations, included;
• Reduce Energy Impact: Adopting a switch-off policy. And investment in solar PV for
installation on roof of workshops.
• Waste Management & Reduce Resources Consumption: Hiring a concrete crusher and
sorting, in order to be able to break down old concrete heavy elements and to reuse it in
operations.
• Waste Management: Switching to recycled paper, quality has not been comprised and are
now using a 100% recycled resource. Coupled with changing printers usage policies on
sites, and usage of scrap papers for drafting.
CASE STUDY, EMS IN S.M.E. : P&R CO.
These change actions have helped P&R significantly to mitigate the previously defined
environmental impacts. Significant Results obtained;
• 15% savings on site operational costs is achievable.
• The company diverted hundred tons of waste from going to landfill. Reusing the
concrete reduced consumption of resources, and achieved economical saving for the
company.
• During 2013, P&R has been certified by ISO 14001, an accreditation that will
certainly help the company to have a competitive edge in market, and to get more
work.
CONCLUSIONS
• On-Site environmental impacts control should be seen as a major part of the total efforts
seeking sustainable constructions development.
• The findings of pre-construction assessment job facilitates a better decision making for
top management on early stage.
• Environmental personnel should receive suitable training, and must have autonomy and
authority on site.
• Internal audits & continues reassessment help verifying the EMS system efficiency,
improve performance and minimize environmental risks exposure.
• Applying EMS to construction operations can provide organizations with competitive
advantage.
THANK YOU!

More Related Content

What's hot

Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
Chandrakant Singh
 
Environment impact assessment.pptii
Environment impact assessment.pptiiEnvironment impact assessment.pptii
Environment impact assessment.pptii
Apoorva Mathur
 
Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09
Mohit Singh
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prateek Bansal
 

What's hot (20)

Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
Environmental impact assessment by saweza hashmi
Environmental impact assessment by saweza hashmiEnvironmental impact assessment by saweza hashmi
Environmental impact assessment by saweza hashmi
 
environmental impact assesment
environmental impact assesment environmental impact assesment
environmental impact assesment
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
 
Environment impact assessment.pptii
Environment impact assessment.pptiiEnvironment impact assessment.pptii
Environment impact assessment.pptii
 
Environmental Impact
Environmental ImpactEnvironmental Impact
Environmental Impact
 
Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
 
Environmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental Examination
 
EIA report Lalibela1
EIA report Lalibela1EIA report Lalibela1
EIA report Lalibela1
 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsi
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Eia regulations
Eia regulationsEia regulations
Eia regulations
 
Eia
EiaEia
Eia
 
Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearance
 

Viewers also liked

Resource conservation, tools for screening climate smart practices and public...
Resource conservation, tools for screening climate smart practices and public...Resource conservation, tools for screening climate smart practices and public...
Resource conservation, tools for screening climate smart practices and public...
Prabhakar SVRK
 
Environmental pollution
Environmental pollutionEnvironmental pollution
Environmental pollution
Aditi Parmar
 
Land disposal of waste and Environmental pollution
Land disposal of waste and Environmental pollutionLand disposal of waste and Environmental pollution
Land disposal of waste and Environmental pollution
Chanuk Liyanage
 
Industrial pollution & environmental degradation (asif,bastab,mridu,gandharv
Industrial pollution & environmental degradation (asif,bastab,mridu,gandharvIndustrial pollution & environmental degradation (asif,bastab,mridu,gandharv
Industrial pollution & environmental degradation (asif,bastab,mridu,gandharv
Mridu Mahanta
 
Defluoridation techniques
Defluoridation techniquesDefluoridation techniques
Defluoridation techniques
ethan1hunt
 

Viewers also liked (20)

operational control
operational controloperational control
operational control
 
The Triple E Model
The Triple E ModelThe Triple E Model
The Triple E Model
 
Golden triangle for sustainability
Golden triangle for sustainabilityGolden triangle for sustainability
Golden triangle for sustainability
 
Resource conservation, tools for screening climate smart practices and public...
Resource conservation, tools for screening climate smart practices and public...Resource conservation, tools for screening climate smart practices and public...
Resource conservation, tools for screening climate smart practices and public...
 
Resource
ResourceResource
Resource
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Defluoridation of drinking water using low cost bioadsorbents
Defluoridation of drinking water using low cost bioadsorbentsDefluoridation of drinking water using low cost bioadsorbents
Defluoridation of drinking water using low cost bioadsorbents
 
Air pollution and Water pollution
Air pollution and Water pollution Air pollution and Water pollution
Air pollution and Water pollution
 
Environmental pollution
Environmental pollutionEnvironmental pollution
Environmental pollution
 
Thermal pollution
Thermal pollutionThermal pollution
Thermal pollution
 
Water Reuse: Benefits and Challenges
Water Reuse: Benefits and ChallengesWater Reuse: Benefits and Challenges
Water Reuse: Benefits and Challenges
 
Health Aspects Related to Waste Management Disposal
Health Aspects Related to Waste Management DisposalHealth Aspects Related to Waste Management Disposal
Health Aspects Related to Waste Management Disposal
 
Ketan seminar ppt
Ketan seminar pptKetan seminar ppt
Ketan seminar ppt
 
Methodology of F&B Control
Methodology of F&B ControlMethodology of F&B Control
Methodology of F&B Control
 
Land disposal of waste and Environmental pollution
Land disposal of waste and Environmental pollutionLand disposal of waste and Environmental pollution
Land disposal of waste and Environmental pollution
 
IMPLICATIONS OF FERTILIZER USE VIS-À-VIS ENVIRONMENTAL POLLUTION
IMPLICATIONS OF FERTILIZER USE VIS-À-VIS ENVIRONMENTALPOLLUTIONIMPLICATIONS OF FERTILIZER USE VIS-À-VIS ENVIRONMENTALPOLLUTION
IMPLICATIONS OF FERTILIZER USE VIS-À-VIS ENVIRONMENTAL POLLUTION
 
L 7 waste volume reduction
L  7 waste volume reductionL  7 waste volume reduction
L 7 waste volume reduction
 
Industrial pollution & environmental degradation (asif,bastab,mridu,gandharv
Industrial pollution & environmental degradation (asif,bastab,mridu,gandharvIndustrial pollution & environmental degradation (asif,bastab,mridu,gandharv
Industrial pollution & environmental degradation (asif,bastab,mridu,gandharv
 
L 8 equalization and proportioning
L  8 equalization and proportioningL  8 equalization and proportioning
L 8 equalization and proportioning
 
Defluoridation techniques
Defluoridation techniquesDefluoridation techniques
Defluoridation techniques
 

Similar to Assessment and operational control of on site environmental impacts- moemen ahmed #31- apr14 ver 1.0

CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
FARSANA26
 
Land Contamination Management & Site Remediation
Land Contamination Management & Site RemediationLand Contamination Management & Site Remediation
Land Contamination Management & Site Remediation
Manas Orpe
 
Green Manufacturing
Green ManufacturingGreen Manufacturing
Green Manufacturing
Ashwin
 
Environmental audit
Environmental auditEnvironmental audit
Environmental audit
SAGAR DODHIA
 

Similar to Assessment and operational control of on site environmental impacts- moemen ahmed #31- apr14 ver 1.0 (20)

The evolution of green buildings in nigeria
The evolution of green buildings in nigeria The evolution of green buildings in nigeria
The evolution of green buildings in nigeria
 
Mallikarjun.S.D_original
Mallikarjun.S.D_originalMallikarjun.S.D_original
Mallikarjun.S.D_original
 
VET4SBO Level 1 module 5 - unit 1&2&3 - v1.0 en
VET4SBO Level 1   module 5 - unit 1&2&3 - v1.0 enVET4SBO Level 1   module 5 - unit 1&2&3 - v1.0 en
VET4SBO Level 1 module 5 - unit 1&2&3 - v1.0 en
 
Green building.pptx
Green building.pptxGreen building.pptx
Green building.pptx
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environmental auditing ppt
Environmental auditing pptEnvironmental auditing ppt
Environmental auditing ppt
 
New cv muhammad
New cv muhammadNew cv muhammad
New cv muhammad
 
New cv muhammad
New cv muhammadNew cv muhammad
New cv muhammad
 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
 
-Project professionals: Ready for the future? Climate change, Leigh Woodcock
 -Project professionals: Ready for the future? Climate change, Leigh Woodcock -Project professionals: Ready for the future? Climate change, Leigh Woodcock
-Project professionals: Ready for the future? Climate change, Leigh Woodcock
 
Offshorew
OffshorewOffshorew
Offshorew
 
130 waste management
130 waste management130 waste management
130 waste management
 
Land Contamination Management & Site Remediation
Land Contamination Management & Site RemediationLand Contamination Management & Site Remediation
Land Contamination Management & Site Remediation
 
Green Manufacturing
Green ManufacturingGreen Manufacturing
Green Manufacturing
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
SOQ
SOQSOQ
SOQ
 
Sustainable Construction
Sustainable ConstructionSustainable Construction
Sustainable Construction
 
Maryse Speckner Resume 2012
Maryse Speckner Resume 2012Maryse Speckner Resume 2012
Maryse Speckner Resume 2012
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
Environmental audit
Environmental auditEnvironmental audit
Environmental audit
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Assessment and operational control of on site environmental impacts- moemen ahmed #31- apr14 ver 1.0

  • 1. ASSESSMENT AND OPERATIONAL CONTROL OF ON-SITE ENVIRONMENTAL IMPACTS Eng. Moemen Ahmed Abd Elfattah MSc. Construction Management Program, Cairo University, Spring 2014 Supervision Prof. Dr. Moheeb I. Elsaid
  • 2. AGENDA Conclusions. Case Study; P&R - SUSTAIN Lincolnshire, UK. Focus Points for Construction Professionals. Environmental Impacts Control on-site. Assessment of Environmental Impacts. Environment Management System & ISO 14001. Concepts, Definitions & Cycle of management.
  • 4. ENVIRONMENTAL ASPECTS • Environmental Aspects of construction projects include any part or activity, that interact with surroundings. • Surroundings include; air, water, resources, land, fauna, flora, humans & their interrelations. Emissions to Air Releases to Water Releases to Land Energy Usage & Emissions Resources Usage Wastes Production Physical Attributes (shape, size, … )
  • 5. ENVIRONMENT MANAGEMENT SYSTEM (EMS) & ISO 14001 STANDARD • EMS is a part of organization internal system, which is utilized to manage environment related issues; developing & implementing environmental policy & by continues management of environmental aspects. • ISO 14001 offers a generic EMS model for organizations, which can be adopted voluntarily.
  • 6. MANAGEMENT CYCLE OF EMS IN ISO14001 • ISO 14001 methodology is based on continues improvement, or progressive elaboration. • Cycles of PLAN-DO-CHECK-ACT form the framework of environmental driven efforts into increasing organization performance. •Measurements •Audits •Mgt. Review •Corrective Actions. •Implement the plan on site. •Policy •Identify •Assess PLAN DO CHECKACT
  • 7. ENVIRONMENTAL IMPACTS ASSESSMENT (EIA) • EIA is a process by which the potential environmental impacts of a proposed development are assessed at an early stage of decision-making in order to promote sound environmental management. • EIA was first introduced by the US National Environmental Policy Act (NEPA) of 1969, and since then provisions for it have been implemented in more than 100 countries
  • 8. ASSESSMENT METHODOLOGY • Environmental impacts can be understood & assessed through the Risk Management framework. • The Significance (SG) of the Risk related to any Environmental Impact can be assessed utilizing two factors; • The Severity of the impact (SV). • The Concerns level related to such impact (CO). SG = SV . CO … … … Assessment of Env. Impact Significance
  • 9. ASSESSMENT INDICATORS To quantify the severity & concerns level factors indicators need to be developed. Indicators must be specific and measurable Aspect Indicator SV=0 SV=1 SV=3 SV=5 CO=1 CO=3 CO=5 Dumping of sanitary water resulting from on-site sanitary conveniences in municipal engineering works Average number of workers per day [number of workers] P = 0.00 0.00 < P ≤ 6.37 6.37 ≤ P < 16.54 P ≥ 16.54 Connection to sewage system Dumping in septic tank and/or existence of previous treatment Direct dumping to the natural or urban environment
  • 11. IMPLEMENTATION & CONTROL ON-SITE •Documentations •Communications •Emergency Preparations •Training •Awareness •Resources •Roles Monitor & Measure Evaluation Corrective/P reventive Actions Records Control INTERNAL AUDIT Mgt. REVIEW
  • 12. COMMON H.R. ISSUES FOUND ON-SITE Three main issues were found, that hurdle the work of environmental personnel on- site [G. Rodríguez, 2011, Community of Madrid]; (1) Appointing environmental supervisor, who doesn’t have adequate knowledge, relative experience, or did not receive appropriate training. (2) Environmental supervisors did not get the required autonomy in work, and did not have enough authority to perform as required. (3) Not allocating enough resources to the support implementing EMS onsite.
  • 13. ENVIRONMENTAL AUDIT ON-SITE Audit is a systematic, documented verification process of measurements to determine whether the environmental aspects of the project complies with determined allowable criteria or not. And to produce feedback reports, which can be used to develop and implement corrective actions Check Compliance Check Implementation Validate System
  • 14. AUDIT CHECKLIST SAMPLE Audit Checklist Implemented? N/A Remarks Specify taken measurements, refer to required standard, define exact evidences and propose resolution. Yes No 1. Water Alteration Control  Are water discharge licenses valid?  Are wastewater treatment system being used and properly maintained on site?  Are there any wastewater discharged to the surface water channels? Is the wastewater being treated?  Are sewage channels and manholes free of silt and sediment?  Are sedimentation traps and tanks free of silt and sediment?
  • 15. FOCUS POINT ON-SITE: AWARENESS Ensure that all vehicles and machinery are fitted with appropriate emission control equipment, maintained frequently and serviced. Air Pollution Provide bins for construction workers and staff at locations where they consume food. Littering Minimize fuels and chemicals stored onsite. Implement a contingency plan to handle spills. Chemicals & Fuel Cover all loads of soil being taken off site for disposal. Roads Applying EMS on construction onsite work requires a comprehensive efforts through both planning and execution phases, such efforts should be based on systematic approach as discussed. Still, due to the dynamic nature of construction work, which requires responsible personnel on site to take immediate decisions and actions on daily base, it is important to develop an environmental sound of awareness among those professionals.
  • 16. FOCUS POINT ON-SITE: NOISE • Construction activities are major source for acoustic pollution in development areas. Noise pollution has a direct impact on both neighbors and workers on-site. • Many regions lack specific regulations to control construction’s noise impacts on surrounding, therefore internal awareness of this impact is highly required. • Excavation is the noisiest stage, since it is directly linked to the machinery used. Concrete pouring, and material unloading follow. • Construction noise is usually of low frequency & variable nature, which makes it very annoying. Plan upon max. noise threshold. Avoid performing different noisy operations simultaneously. Consider noise emissions on machinery choose decisions. Make sure workers are using protective ear plugs when needed. Use sound enclosures, when applicable.
  • 17. FOCUS POINT ON-SITE: WASTE • Construction and Demolition waste is one of the largest global waste streams and makes up an estimated 50% of all waste in some regions [M.INGLIS, NZ, 2007]. • Researches and case studies show that between 50% and 80% of construction wastes are reusable [G.Rodrıguez, Spain, 2006]. Inert Wastes •bricks, concrete remains, stone, sand, gravel and other dry materials. Solid Wastes Hazardous Wastes •Amianthus, solvents, resins, etc
  • 18. FOCUS POINT ON-SITE: WASTE MGT. REDUCE REUSE RECYCLE Common measures to deal with construction wastes on-site include; • Obtaining construction materials, paints, lubricants and other liquids in reusable packaging or containers· • Sending waste concrete from demolition activities to a concrete recycler instead of landfill· • Segregating and recycling solid wastes generated by construction activities, offices and mess-rooms· • Collecting lubricating oil from the construction vehicle fleet and sending it to a recycler. Waste Management Plan is normally required to handle wastes effectively on-site.
  • 19. CASE STUDY, EMS IN S.M.E. : P&R CO. • P&R Plant Hire is a medium size construction company in UK, which specializes in groundwork, civil engineering and plant hire. • In order to be able to compete in market, and under major clients’ pressure, P&R needed to adopt to ISO 14001 EMS, and to show improvement in environmental performance. • In 2011, P&R found technical help from SUSTAIN Lincolnshire, an environmental program that aims to support organizations to improve their performance from environmental point of view.
  • 20. CASE STUDY, EMS IN S.M.E. : P&R CO. P&R and SUSTAIN Lincolnshire worked out a plan to implement EMS into P&R constructions operations. Major Activities included; • Check of existing environmental performance. And defining significant environmental impacts of P&R operations. • Implementing a sustainable change, as part of this, P&R organized staff diploma training in work-based environmental conservation • P&R obtained Green level accreditation, which they used to prepare for their full ISO14001 assessment.
  • 21. CASE STUDY, EMS IN S.M.E. : P&R CO. High fuel consumption & Emissions by company’s vehicles was identified as a major environmental aspect, and its resulted impact was assessed as critical to mitigate. Actions included; • Investment in new trackers for its fleet of vehicles. • Investment in advanced software, generating stats such as vehicle GPS location, time spent on site and fuel consumption data. • The staff have also taken a fuel efficiency driving course, helping them to develop their eco-driving skills.
  • 22. CASE STUDY, EMS IN S.M.E. : P&R CO. Other changes were implemented to mitigate influence of other environmental aspects of the company operations, included; • Reduce Energy Impact: Adopting a switch-off policy. And investment in solar PV for installation on roof of workshops. • Waste Management & Reduce Resources Consumption: Hiring a concrete crusher and sorting, in order to be able to break down old concrete heavy elements and to reuse it in operations. • Waste Management: Switching to recycled paper, quality has not been comprised and are now using a 100% recycled resource. Coupled with changing printers usage policies on sites, and usage of scrap papers for drafting.
  • 23. CASE STUDY, EMS IN S.M.E. : P&R CO. These change actions have helped P&R significantly to mitigate the previously defined environmental impacts. Significant Results obtained; • 15% savings on site operational costs is achievable. • The company diverted hundred tons of waste from going to landfill. Reusing the concrete reduced consumption of resources, and achieved economical saving for the company. • During 2013, P&R has been certified by ISO 14001, an accreditation that will certainly help the company to have a competitive edge in market, and to get more work.
  • 24. CONCLUSIONS • On-Site environmental impacts control should be seen as a major part of the total efforts seeking sustainable constructions development. • The findings of pre-construction assessment job facilitates a better decision making for top management on early stage. • Environmental personnel should receive suitable training, and must have autonomy and authority on site. • Internal audits & continues reassessment help verifying the EMS system efficiency, improve performance and minimize environmental risks exposure. • Applying EMS to construction operations can provide organizations with competitive advantage.