1. METHOD STATEMENT FOR PAINTING WORKS
Work Scope : The workscope shall applytoall buildingworks
Materials : Paint(Emulsionpaint,acrylicpaintandgrossenamel) asperapproval brandand color
scheme
Handling & Storage : All paintto be n coveredstorage
Equipment& tools : Brush and roll brush
Works Methodology:-
1. Color scheme and paint manufacture approval shall be obtained before works is
commenced
2. Protect appropriate fittings and other surface. Do not stand on finished works, fixtures
of fitting to gain access.
3. Before applying coating, ensure moisture content of substrate will not adversely affect
the completed works. As per manufactures requirement all specification.
4. Check for surface irregularities, ensure surface to be painted are cleaned, remove
mortar and plaster splashes and avoid excessive wetting.
5. Keep all brushes n clean and serviceable condition and thoroughly clean out brushes
and equipment before applying different materials of different colors
6. Mix paint well by stirring evenly giving a continuous film, free form runs, brush marks
and other imperfections
7. If primer is required, works primer well into surface, joints and angles and on timber
into end grain.