international federation of national associations of independent consulting Engineers
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 1
FIDIC Forms of Contracts
Training Course:
Saudi Arabian Council of Engineers
March 2018
LECTURE 07B
‫عليكن‬ ‫السالم‬‫وبركاته‬ ‫هللا‬ ‫ورحوة‬
2018
.
• Contact details
• moustafa1_ismail@yahoo.com
• https://www.linkedin.com/in/dr-moustafa-ismail-cfcc-mciob-
rmp-pmp-arics-93798a16/
• https://twitter.com/moustafaabudief
• https://www.slideshare.net/moustafismail
• 00966508297971- +96598922125-Kuwait
March 2018FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 2
Contract Price & Payment
• Cl.14 Contract Price
o Measured and will vary – Red Book
o Fixed Lump Sum – Yellow Book
o Fixed Lump Sum – Silver Book
o Lump Sum or Re-measure – Green Book
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 3March 2018
Advance Payment
• Cl.14.2 Advance payment
o Interest free loan for mobilisation
• Guarantee
• Application Cl.14.3
• Performance Security – approved by Employer
o Repayment of advance payment
• Commence after when certificates >10%
• Deductions 25% of each Certificate
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 4March 2018
Interim Payment
• Cl.14.3 Application
o 6 copies
o In a form approved (Cl.4.9)
o Cl.4.21
o List of items (a) – (g)
o Note : Cl.20 items included
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 5March 2018
Interim Payment
• Cl.14.4 Schedule of payments:
o Payment dates not recommended
o Engineer determination Cl.3.5
o Cross guarantees
o Milestones preferred
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 6March 2018
Interim Payment
• Cl.14.6 Issue of IPC
o Engineer determines FAIRLY
o IPC SHALL not be withheld
• Cl.14.7 Payment
o IPC paid within 56 days after Engineer receives
Statement
• Cl.14.8 Interest on late payments
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 7March 2018
Non Payment
• Cl.16.1 Suspension
o Engineer fails to certify
o Employer does not provide Cl.2.4 details
o Non payment
o 21 days notice
• Cl.16.2 Termination
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 8March 2018
Guarantees & Bonds
• Cl.4.2 Performance Security
• Contractor finance
o Guarantee by Employer
o No Cl.8.1 notice before Guarantee
• Cl.14.2 Advance Payment Guarantee
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 9March 2018
Contract Price & Payment
14.1 The Contract Price
(a) agreed or determined under S. –Cl. 12.3 [Evaluation]
(b) taxes. duties and fees required /by contractor, no adjustment
(c) any quantities which may be set out in the BOQ.
• are estimated and to be re-measured.
• NOTE
• Contractor within 28 d. after the Commencement
Date. a breakdown of each lump sum price in the
BOQ. Engineer (Apply or not) when preparing P.C.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 10March 2018
Contract Price & Payment
14.2 Advance Payment
• Considered Interest-free loan for mobilization.
• Contractor submits a guarantee
• The total advance payment./ no of installments/ timing/
currencies shall be as stated in the Appendix to Tender.
• Deduct from IPC.
• Unless guarantee. or if not in the Appendix to
Tender. this Sub-Clause shall not apply.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 11March 2018
Contract Price & Payment
14.2 Advance Payment- continued
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
12March 2018
Advance Payment-continued
14.2 Advance Payment- continued
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
13March 2018
Contract Price & Payment
14.3 Application for Interim Payment Certificates
• Contractor submits monthly a Statement in 6 copies
• form approved by the Engineer- detailed amounts, supporting
documents which include the PR S. Cl. 4.21 -Progress Reports
• Statement include in sequence listed:
a) estimated contract value of the Works executed , Documents
produced, including Variations.
b) any amount added/deducted / changes for legislation/cost CL.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC-
V
14March 2018
Contract Price & Payment
14.3 Application for Interim Payment Certificates- continued
c) Deduction for retention ( App.To Tender)
d) Deduction for the advance payment after 10% of the contract
e) Amounts added and deducted for Plant and Materials
f) any other additions or deductions which may become due
g) the deduction of amounts certified in all previous PC.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 15March 2018
Contract Price & Payment
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC-
V
16March 2018
Contract No. : : Interim Payment No. : 012
: Invoice No. : 012
SAP. P.O. No. : Invoice Period : NOVEMBER 2016
Service Entry Sheet # Cost Center ****
Vendor No. : Invoice Type
Bank Account No. : SA13 4500 0000 042 440792 001 Advance Payment
Bank Name : Saudi British Bank (SABB) X Progress Billing
Bank Branch : King Abdul Aziz Street, Al-Khobar Retetion
Others
: ARABIAN GULF CONSTRUCTION CO., LTD.
: KHURAIS AL CRUDE INCREMENT - TEMPORARY CONSTRUCTION FACILITIES
OVERALL PROGRESS
1.1.1
1.1.2
1.2 527,956 25.554 25.554 423,724.39 5,005.48 428,729.87
8,000,000.00
103,911,894.03 83,397,108.04 985,174.73 84,382,282.7780.2575 0.9481 81.2056
Mobilization 47,744 35,808.00 35,808.00 75.00 5,812,500.007,750,000.00 5,812,500.00
Civil Works
Demobilization 37,549
75.0000
To Date
Description
Planned
Budget
Labor Unit
(BLU)
Planned
Equivalent
Wt.
(Physical)
Planned
Over All
Equivalent
Wt.
Actual Labor Unit (BLU) Actual Equivalent Wt. (Physical) SCHEDULE C Actual Progress Billing
Previous This Period
6600036076
6510748644
MONTHLY PROGRESS BILLING FOR THE MONTH OF NOVEMBER 2016
To Date
Amount
10006668
10-01506-002B
Previous This Report To Date Previous This Report
March 2018
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC-
V
17
Contract Price & Payment
Contract Price & Payment
14.4 Schedule of Payments
• If the Contract includes a schedule of payment:
then unless otherwise stated in this schedule:
• (a) the installments in this schedule of payments shall apply
for S. Cl. 14.3
• The Engineer may determine new installments if not achieved.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 18March 2018
Contract Price & Payment
14.5 Plant and Materials intended for the Works
• If this Sub-Clause applies. IPC include (i) an amount for Plant
and Materials which have been sent to the Site for
incorporation in the Permanent Works.
• If the lists referred to in sub-paragraphs (b)(i) or (c)(i) below
are not included in the Appendix to Tender. this Sub-Clause
shall not apply.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 19March 2018
Contract Price & Payment
14.5 Plant and Materials intended for the Works
(a) the Contractor has:
(i) kept satisfactory records (ii) submitted a statement
of the Cost of Plant and Materials to the Site.
• and either:
(b) the relevant Plant and Materials:
i. are those listed in the App. TT.
ii. shipped to the Country. en route to the Site.
iii. are described in a clean shipped bill of lading or other
evidence of shipment.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 20March 2018
Contract Price & Payment
14.5 Plant and Materials intended for Works continued
OR
c) the relevant Plant and Materials:
(i) are those listed in the Appendix to Tender for payment when
delivered to the Site. and
(ii) delivered to and are properly stored/ protected on the Site and
appear to be in accordance with the Contract.
• The additional amount to be certified shall be 80% of
Engineer’s determination of cost of Plant and Materials
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 21March 2018
Contract Price & Payment
14.6 Issue of Interim Payment Certificates
• Only after receiving and approval of p. security.
• The Engineer shall. within 28 days after receiving a
Statement and supporting documents. issue to the
Employer an IPC stating the amount fairly determines
to be due. with supporting particulars.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC-
V
22March 2018
Contract Price & Payment
14.6 Issue of Interim Payment Certificates
 Amount may be withheld.
 A Payment Certificate shall not be deemed to indicate the
Engineer’s acceptance. approval. consent or satisfaction.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
23March 2018
Contract Price & Payment
14.7 Payment---- Critical
 The Employer shall pay to the Contractor:
(a) the first installment of the advance payment after the later of
after issuing the
• within 42 days Letter of Acceptance or
• within 21 days after receiving the 4.2 [Performance Security)
and Sub-Clause 14.2 [Advance Payment). whichever is later:
(b) the IPC within 56 days after the Engineer receives
(PROPOER) Statement : and
(c) the amount certified in the Final Payment Certificate within
56 days after Employer receives Payment Certificate. 28+56=84
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 24March 2018
Contract Price & Payment
14.8 Delayed Payment
 If the payment is delayed in accordance with Sub-Clause 14.7:
 Contractor shall be entitled to receive financing charges
compounded monthly on amount unpaid during the period of
delay.
 This period is deemed to commence on date for payment.
 financing charges = the annual rate of three percentage points
above the discount rate of the central bank. + 3%
 Entitlement without notice.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 25March 2018
Contract Price & Payment
14.9 Payment of Retention
• 50 % after TOC or proportioned for section. (40%)
• Balance of the retention is Promptly latest of the expiry dates
of the Defects Notification Periods.
14.10 Statement at Completion
• Within 84 days after TOC. The Contractor shall submit 6
copies of a Statement at completion showing:
i. Total value of all work done
ii. any further sums which the Contractor considers to be due
iii. an estimate of any other amounts the Contractor considers
will become due to him under the Contract.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 26March 2018
Contract Price & Payment
14.11 Application for Final Payment Certificate
• 56 days after TOC 6 copies of a draft final statement :
(a) the value of all work done
(b) any further sums
The Engineer review, negotiate / dispute or certify.
14.12 Discharge
• With Final Statement. the Contractor shall submit a written
discharge which confirms that the total of the Final Statement
represents full and final settlement of all moneys due to the
Contractor under or in connection with the Contract
(Performance Security and the outstanding balance of this total
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 27March 2018
Contract Price & Payment
14.13 Issue of Final Payment Certificate
• Within 28 days after receiving the Final Statement the
Engineer shall issue. to the Employer. the Final
• Payment Certificate which shall state:
i. the amount which is finally due. And
ii. (if any) due from the Employer to the Contractor or from the
Contractor to the Employer. as the case may be.
14.14 Cessation of Employer’s Liability
• The Employer shall not be liable to the Contractor for any
matter or thing under or in connection with the Contract or
execution of the Works. except to the extent that the
Contractor included an amount expressly for it.
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018
LEC- V
28March 2018
Contract Price & Payment
14.15 Currencies of Payment
• The Contract Price shall be paid in the currency or currencies
named in A to Tender/ stated in the Particular Conditions.
• if no rates of exchange are stated in the Appendix to Tender.
they shall be those prevailing on the Base Date and determined
by the central bank of the Country
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 29March 2018
You are the project Contractor for a private school construction project which includes
hundreds of activities, valued 4.50 M SAR and the contract is FIDIC Red Book 1999,
the value of the school buildings is 4.0 M SAR while the fence and car shades are 0.50
M SAR, total duration 8 months Discuss the following in case you are the project
Contractor
1. If the Employer released an IPC IN 86 days from the day of properly submitted by
the Contractor- discuss clauses late payment- value/ EOT if any
……………………………………………………………………………………………
……………………………………………………………………………………………
……………………………………………………………………………………………
……………………………………....
Analyzed by Eng. …………
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 30
Event Analysis 5
March 2018
You are the project Contractor for a private school construction project
which includes hundreds of activities, valued 4.50 M SAR and the contract
is FIDIC Red Book 1999, the value of the school buildings is 4.0 M SAR
while the fence and car shades are 0.50 M SAR, total duration 8 months
Discuss the following in case you are the project Engineer/Employer
1. What is the requirements for releasing the 1st IPC
………………………………………………………………………………
………………………………………………………………………………
………………………………………………………………………………
……………………………………………………………………………....
Analyzed by Eng. …………
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 31
Event Analysis 5
March 2018
END OF
LECTURE SEVEN-B
Thank You
‫هللا‬ ‫ورحوة‬ ‫عليكن‬ ‫السالم‬
‫هللا‬ ‫أهاى‬ ‫فى‬
FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 32March 2018

More Related Content

What's hot

FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementASHISH KUMAR SINGH
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN PanigrahiSN Panigrahi, PMP
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction ProvisionRichard Retita
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerKai Yun Pang
 
KSI Presentation Expediting 2014
KSI Presentation Expediting 2014KSI Presentation Expediting 2014
KSI Presentation Expediting 2014Samanta Ribeiro
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Divyanshu Dayal
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2Shze Hwa Lee
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerTrace96
 
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...Antonio Coladarce
 

What's hot (20)

FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
 
Kandil_Sameh_AR50360
Kandil_Sameh_AR50360Kandil_Sameh_AR50360
Kandil_Sameh_AR50360
 
Kandil_Sameh_AR50123
Kandil_Sameh_AR50123Kandil_Sameh_AR50123
Kandil_Sameh_AR50123
 
Cl report final
Cl report finalCl report final
Cl report final
 
Kandil_Sameh_CPMPart 3 _b
Kandil_Sameh_CPMPart 3 _bKandil_Sameh_CPMPart 3 _b
Kandil_Sameh_CPMPart 3 _b
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 
Kandil_Sameh_CPMPart 5 _b
Kandil_Sameh_CPMPart 5 _bKandil_Sameh_CPMPart 5 _b
Kandil_Sameh_CPMPart 5 _b
 
Cl presentation
Cl presentationCl presentation
Cl presentation
 
Site Instruction Provision
Site Instruction ProvisionSite Instruction Provision
Site Instruction Provision
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Accounting for CWIP Provision
Accounting for CWIP Provision Accounting for CWIP Provision
Accounting for CWIP Provision
 
KSI Presentation Expediting 2014
KSI Presentation Expediting 2014KSI Presentation Expediting 2014
KSI Presentation Expediting 2014
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
 
Pp2 p5
Pp2   p5Pp2   p5
Pp2 p5
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
PP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by EmployerPP2 Seminar - Determination of Contractor's Employment by Employer
PP2 Seminar - Determination of Contractor's Employment by Employer
 
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...Advanced training for  construction management: CONTRACTS MANAGEMENT part 2 (...
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
 
Claims and insolvencies (1)
Claims and insolvencies (1)Claims and insolvencies (1)
Claims and insolvencies (1)
 

Similar to FIDIC Training Contract Price & Payment

Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_aMoustafa Ismail Abu Dief
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxArshadMahmood155695
 
Presentation on GST Transitional Credits - Disputes & Way Forward
Presentation on GST Transitional Credits - Disputes & Way ForwardPresentation on GST Transitional Credits - Disputes & Way Forward
Presentation on GST Transitional Credits - Disputes & Way ForwardTaxmann
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxSantoshkumarGupta67
 
RERA- Certification and issues in Alteration
RERA- Certification and issues in AlterationRERA- Certification and issues in Alteration
RERA- Certification and issues in Alterationsandesh mundra
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...Harish Sharma
 
Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020Taxmann
 
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...Varun Sethi
 
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...Varun Sethi
 
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...Varun Sethi
 

Similar to FIDIC Training Contract Price & Payment (20)

Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
Ss 07 training fidic moustafa ismail  2018 _ lec 7_aSs 07 training fidic moustafa ismail  2018 _ lec 7_a
Ss 07 training fidic moustafa ismail 2018 _ lec 7_a
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docx
 
Presentation on GST Transitional Credits - Disputes & Way Forward
Presentation on GST Transitional Credits - Disputes & Way ForwardPresentation on GST Transitional Credits - Disputes & Way Forward
Presentation on GST Transitional Credits - Disputes & Way Forward
 
1217 loc tenders
1217 loc tenders1217 loc tenders
1217 loc tenders
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
 
RERA- Certification and issues in Alteration
RERA- Certification and issues in AlterationRERA- Certification and issues in Alteration
RERA- Certification and issues in Alteration
 
Nit55
Nit55Nit55
Nit55
 
Bid document reverse tendering
Bid document reverse tenderingBid document reverse tendering
Bid document reverse tendering
 
AWI20202 commercial
AWI20202 commercialAWI20202 commercial
AWI20202 commercial
 
CV
CVCV
CV
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020Taxmann's Daily Tax Digest | 24th July 2020
Taxmann's Daily Tax Digest | 24th July 2020
 
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
 
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
 
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...CA Varun Sethi - IFRS trainings -  IFRIC 12 - Accounting for service concessi...
CA Varun Sethi - IFRS trainings - IFRIC 12 - Accounting for service concessi...
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
Calidda conference call 3T 13
Calidda conference call 3T 13Calidda conference call 3T 13
Calidda conference call 3T 13
 
Tc10 b taxation-qd14
Tc10 b taxation-qd14Tc10 b taxation-qd14
Tc10 b taxation-qd14
 

More from Moustafa Ismail Abu Dief

Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Moustafa Ismail Abu Dief
 
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...Moustafa Ismail Abu Dief
 
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...Moustafa Ismail Abu Dief
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...Moustafa Ismail Abu Dief
 
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...Moustafa Ismail Abu Dief
 
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...Moustafa Ismail Abu Dief
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10Moustafa Ismail Abu Dief
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9Moustafa Ismail Abu Dief
 
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...Moustafa Ismail Abu Dief
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6Moustafa Ismail Abu Dief
 
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
Cfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismailCfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismail
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismailMoustafa Ismail Abu Dief
 
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4Moustafa Ismail Abu Dief
 

More from Moustafa Ismail Abu Dief (18)

Bim arabia red fidic
Bim arabia red fidicBim arabia red fidic
Bim arabia red fidic
 
Fidic 2017 engineering
Fidic 2017 engineeringFidic 2017 engineering
Fidic 2017 engineering
 
Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020Presentation eci dr moustafa ismail 20 july 2020
Presentation eci dr moustafa ismail 20 july 2020
 
Yellow book session bimarabia
Yellow book session bimarabiaYellow book session bimarabia
Yellow book session bimarabia
 
CMC certification
CMC certificationCMC certification
CMC certification
 
Construction Claims Training Course 2019
Construction Claims Training Course 2019Construction Claims Training Course 2019
Construction Claims Training Course 2019
 
Construction Claims Training Course 2019
Construction Claims Training Course 2019Construction Claims Training Course 2019
Construction Claims Training Course 2019
 
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...Ss 09 cost engineering management  training- nov 2017  moustafa sec 5 part ii...
Ss 09 cost engineering management training- nov 2017 moustafa sec 5 part ii...
 
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...07 b  cost engineering management  training- nov 2017  moustafa sec 5 part ii...
07 b cost engineering management training- nov 2017 moustafa sec 5 part ii...
 
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...07A  cost engineering management  training- nov 2017  moustafa sec 5 part iii...
07A cost engineering management training- nov 2017 moustafa sec 5 part iii...
 
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...Ss 06 cost engineering management  training- nov 2017 - moustafa part ii ch 1...
Ss 06 cost engineering management training- nov 2017 - moustafa part ii ch 1...
 
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...SCE 1 2018 claims management-in-construction-projects-seminar-.-2017  dr mous...
SCE 1 2018 claims management-in-construction-projects-seminar-.-2017 dr mous...
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
 
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...Ss 03 CCP- AACE.org  cost engineering management  training- 2017 - dr. mousta...
Ss 03 CCP- AACE.org cost engineering management training- 2017 - dr. mousta...
 
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6Ss 2 cost engineering management  training- 2017 -dr  moustafa ismail  ch  5-6
Ss 2 cost engineering management training- 2017 -dr moustafa ismail ch 5-6
 
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
Cfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismailCfcc certified forensic claims consultant  lecture one  2017- dr moustafa ismail
Cfcc certified forensic claims consultant lecture one 2017- dr moustafa ismail
 
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
 

Recently uploaded

Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

FIDIC Training Contract Price & Payment

  • 1. international federation of national associations of independent consulting Engineers FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 1 FIDIC Forms of Contracts Training Course: Saudi Arabian Council of Engineers March 2018 LECTURE 07B ‫عليكن‬ ‫السالم‬‫وبركاته‬ ‫هللا‬ ‫ورحوة‬ 2018 .
  • 2. • Contact details • moustafa1_ismail@yahoo.com • https://www.linkedin.com/in/dr-moustafa-ismail-cfcc-mciob- rmp-pmp-arics-93798a16/ • https://twitter.com/moustafaabudief • https://www.slideshare.net/moustafismail • 00966508297971- +96598922125-Kuwait March 2018FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 2
  • 3. Contract Price & Payment • Cl.14 Contract Price o Measured and will vary – Red Book o Fixed Lump Sum – Yellow Book o Fixed Lump Sum – Silver Book o Lump Sum or Re-measure – Green Book FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 3March 2018
  • 4. Advance Payment • Cl.14.2 Advance payment o Interest free loan for mobilisation • Guarantee • Application Cl.14.3 • Performance Security – approved by Employer o Repayment of advance payment • Commence after when certificates >10% • Deductions 25% of each Certificate FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 4March 2018
  • 5. Interim Payment • Cl.14.3 Application o 6 copies o In a form approved (Cl.4.9) o Cl.4.21 o List of items (a) – (g) o Note : Cl.20 items included FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 5March 2018
  • 6. Interim Payment • Cl.14.4 Schedule of payments: o Payment dates not recommended o Engineer determination Cl.3.5 o Cross guarantees o Milestones preferred FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 6March 2018
  • 7. Interim Payment • Cl.14.6 Issue of IPC o Engineer determines FAIRLY o IPC SHALL not be withheld • Cl.14.7 Payment o IPC paid within 56 days after Engineer receives Statement • Cl.14.8 Interest on late payments FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 7March 2018
  • 8. Non Payment • Cl.16.1 Suspension o Engineer fails to certify o Employer does not provide Cl.2.4 details o Non payment o 21 days notice • Cl.16.2 Termination FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 8March 2018
  • 9. Guarantees & Bonds • Cl.4.2 Performance Security • Contractor finance o Guarantee by Employer o No Cl.8.1 notice before Guarantee • Cl.14.2 Advance Payment Guarantee FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 9March 2018
  • 10. Contract Price & Payment 14.1 The Contract Price (a) agreed or determined under S. –Cl. 12.3 [Evaluation] (b) taxes. duties and fees required /by contractor, no adjustment (c) any quantities which may be set out in the BOQ. • are estimated and to be re-measured. • NOTE • Contractor within 28 d. after the Commencement Date. a breakdown of each lump sum price in the BOQ. Engineer (Apply or not) when preparing P.C. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 10March 2018
  • 11. Contract Price & Payment 14.2 Advance Payment • Considered Interest-free loan for mobilization. • Contractor submits a guarantee • The total advance payment./ no of installments/ timing/ currencies shall be as stated in the Appendix to Tender. • Deduct from IPC. • Unless guarantee. or if not in the Appendix to Tender. this Sub-Clause shall not apply. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 11March 2018
  • 12. Contract Price & Payment 14.2 Advance Payment- continued FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 12March 2018
  • 13. Advance Payment-continued 14.2 Advance Payment- continued FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 13March 2018
  • 14. Contract Price & Payment 14.3 Application for Interim Payment Certificates • Contractor submits monthly a Statement in 6 copies • form approved by the Engineer- detailed amounts, supporting documents which include the PR S. Cl. 4.21 -Progress Reports • Statement include in sequence listed: a) estimated contract value of the Works executed , Documents produced, including Variations. b) any amount added/deducted / changes for legislation/cost CL. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 14March 2018
  • 15. Contract Price & Payment 14.3 Application for Interim Payment Certificates- continued c) Deduction for retention ( App.To Tender) d) Deduction for the advance payment after 10% of the contract e) Amounts added and deducted for Plant and Materials f) any other additions or deductions which may become due g) the deduction of amounts certified in all previous PC. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 15March 2018
  • 16. Contract Price & Payment FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 16March 2018 Contract No. : : Interim Payment No. : 012 : Invoice No. : 012 SAP. P.O. No. : Invoice Period : NOVEMBER 2016 Service Entry Sheet # Cost Center **** Vendor No. : Invoice Type Bank Account No. : SA13 4500 0000 042 440792 001 Advance Payment Bank Name : Saudi British Bank (SABB) X Progress Billing Bank Branch : King Abdul Aziz Street, Al-Khobar Retetion Others : ARABIAN GULF CONSTRUCTION CO., LTD. : KHURAIS AL CRUDE INCREMENT - TEMPORARY CONSTRUCTION FACILITIES OVERALL PROGRESS 1.1.1 1.1.2 1.2 527,956 25.554 25.554 423,724.39 5,005.48 428,729.87 8,000,000.00 103,911,894.03 83,397,108.04 985,174.73 84,382,282.7780.2575 0.9481 81.2056 Mobilization 47,744 35,808.00 35,808.00 75.00 5,812,500.007,750,000.00 5,812,500.00 Civil Works Demobilization 37,549 75.0000 To Date Description Planned Budget Labor Unit (BLU) Planned Equivalent Wt. (Physical) Planned Over All Equivalent Wt. Actual Labor Unit (BLU) Actual Equivalent Wt. (Physical) SCHEDULE C Actual Progress Billing Previous This Period 6600036076 6510748644 MONTHLY PROGRESS BILLING FOR THE MONTH OF NOVEMBER 2016 To Date Amount 10006668 10-01506-002B Previous This Report To Date Previous This Report
  • 17. March 2018 FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 17 Contract Price & Payment
  • 18. Contract Price & Payment 14.4 Schedule of Payments • If the Contract includes a schedule of payment: then unless otherwise stated in this schedule: • (a) the installments in this schedule of payments shall apply for S. Cl. 14.3 • The Engineer may determine new installments if not achieved. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 18March 2018
  • 19. Contract Price & Payment 14.5 Plant and Materials intended for the Works • If this Sub-Clause applies. IPC include (i) an amount for Plant and Materials which have been sent to the Site for incorporation in the Permanent Works. • If the lists referred to in sub-paragraphs (b)(i) or (c)(i) below are not included in the Appendix to Tender. this Sub-Clause shall not apply. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 19March 2018
  • 20. Contract Price & Payment 14.5 Plant and Materials intended for the Works (a) the Contractor has: (i) kept satisfactory records (ii) submitted a statement of the Cost of Plant and Materials to the Site. • and either: (b) the relevant Plant and Materials: i. are those listed in the App. TT. ii. shipped to the Country. en route to the Site. iii. are described in a clean shipped bill of lading or other evidence of shipment. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 20March 2018
  • 21. Contract Price & Payment 14.5 Plant and Materials intended for Works continued OR c) the relevant Plant and Materials: (i) are those listed in the Appendix to Tender for payment when delivered to the Site. and (ii) delivered to and are properly stored/ protected on the Site and appear to be in accordance with the Contract. • The additional amount to be certified shall be 80% of Engineer’s determination of cost of Plant and Materials FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 21March 2018
  • 22. Contract Price & Payment 14.6 Issue of Interim Payment Certificates • Only after receiving and approval of p. security. • The Engineer shall. within 28 days after receiving a Statement and supporting documents. issue to the Employer an IPC stating the amount fairly determines to be due. with supporting particulars. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 22March 2018
  • 23. Contract Price & Payment 14.6 Issue of Interim Payment Certificates  Amount may be withheld.  A Payment Certificate shall not be deemed to indicate the Engineer’s acceptance. approval. consent or satisfaction. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 23March 2018
  • 24. Contract Price & Payment 14.7 Payment---- Critical  The Employer shall pay to the Contractor: (a) the first installment of the advance payment after the later of after issuing the • within 42 days Letter of Acceptance or • within 21 days after receiving the 4.2 [Performance Security) and Sub-Clause 14.2 [Advance Payment). whichever is later: (b) the IPC within 56 days after the Engineer receives (PROPOER) Statement : and (c) the amount certified in the Final Payment Certificate within 56 days after Employer receives Payment Certificate. 28+56=84 FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 24March 2018
  • 25. Contract Price & Payment 14.8 Delayed Payment  If the payment is delayed in accordance with Sub-Clause 14.7:  Contractor shall be entitled to receive financing charges compounded monthly on amount unpaid during the period of delay.  This period is deemed to commence on date for payment.  financing charges = the annual rate of three percentage points above the discount rate of the central bank. + 3%  Entitlement without notice. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 25March 2018
  • 26. Contract Price & Payment 14.9 Payment of Retention • 50 % after TOC or proportioned for section. (40%) • Balance of the retention is Promptly latest of the expiry dates of the Defects Notification Periods. 14.10 Statement at Completion • Within 84 days after TOC. The Contractor shall submit 6 copies of a Statement at completion showing: i. Total value of all work done ii. any further sums which the Contractor considers to be due iii. an estimate of any other amounts the Contractor considers will become due to him under the Contract. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 26March 2018
  • 27. Contract Price & Payment 14.11 Application for Final Payment Certificate • 56 days after TOC 6 copies of a draft final statement : (a) the value of all work done (b) any further sums The Engineer review, negotiate / dispute or certify. 14.12 Discharge • With Final Statement. the Contractor shall submit a written discharge which confirms that the total of the Final Statement represents full and final settlement of all moneys due to the Contractor under or in connection with the Contract (Performance Security and the outstanding balance of this total FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 27March 2018
  • 28. Contract Price & Payment 14.13 Issue of Final Payment Certificate • Within 28 days after receiving the Final Statement the Engineer shall issue. to the Employer. the Final • Payment Certificate which shall state: i. the amount which is finally due. And ii. (if any) due from the Employer to the Contractor or from the Contractor to the Employer. as the case may be. 14.14 Cessation of Employer’s Liability • The Employer shall not be liable to the Contractor for any matter or thing under or in connection with the Contract or execution of the Works. except to the extent that the Contractor included an amount expressly for it. FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 28March 2018
  • 29. Contract Price & Payment 14.15 Currencies of Payment • The Contract Price shall be paid in the currency or currencies named in A to Tender/ stated in the Particular Conditions. • if no rates of exchange are stated in the Appendix to Tender. they shall be those prevailing on the Base Date and determined by the central bank of the Country FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 29March 2018
  • 30. You are the project Contractor for a private school construction project which includes hundreds of activities, valued 4.50 M SAR and the contract is FIDIC Red Book 1999, the value of the school buildings is 4.0 M SAR while the fence and car shades are 0.50 M SAR, total duration 8 months Discuss the following in case you are the project Contractor 1. If the Employer released an IPC IN 86 days from the day of properly submitted by the Contractor- discuss clauses late payment- value/ EOT if any …………………………………………………………………………………………… …………………………………………………………………………………………… …………………………………………………………………………………………… …………………………………….... Analyzed by Eng. ………… FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 30 Event Analysis 5 March 2018
  • 31. You are the project Contractor for a private school construction project which includes hundreds of activities, valued 4.50 M SAR and the contract is FIDIC Red Book 1999, the value of the school buildings is 4.0 M SAR while the fence and car shades are 0.50 M SAR, total duration 8 months Discuss the following in case you are the project Engineer/Employer 1. What is the requirements for releasing the 1st IPC ……………………………………………………………………………… ……………………………………………………………………………… ……………………………………………………………………………… …………………………………………………………………………….... Analyzed by Eng. ………… FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 31 Event Analysis 5 March 2018
  • 32. END OF LECTURE SEVEN-B Thank You ‫هللا‬ ‫ورحوة‬ ‫عليكن‬ ‫السالم‬ ‫هللا‬ ‫أهاى‬ ‫فى‬ FIDIC Training Riyadh 1020 BTA - Dr. Moustafa Ismail March 2018 LEC- V 32March 2018