• Indian Power Sector –
Installed capacity – 107,000 MW (Thermal-76%,
Hydro-23%, Nuclear-1%)
Peak Demand – 82,000 MW
Transmission lines - 5 Million Ckt. kms
Regional Grids – 5
National Grid under progress
Growth Rate of energy– 9% per annum
INDIAN POWER SECTOR- A PROFILE
3
4
FUTURE POWER SUPPLY SCENARIOFUTURE POWER SUPPLY SCENARIO
• Peak demand (expected)- 157,000 MW
• Capacity Addition envisaged-100,000 MW in
next 10 years
• Goal – Power for all by 2012
BY THE YEAR 2012
5
NEED FOR NATIONAL GRIDNEED FOR NATIONAL GRID
 Uneven disposition of Natural resources
- Coal reserves concentrated in Eastern region
- Hydro potential mainly in North Eastern & Northern
region
 Establishment of large sized pit head stations to achieve
economy of scale
 Load Centers located at distant locations in Northern,
Western & Southern regions
 Constraints on Right-of-Way (ROW)
 Flexible & high capacity transmission system required for
power transfer to different regions
6
7
Phase – 1 – Already completed
• Interconnection of Regional Grids through HVDC Back-to-Back links
having cumulative capacity of 5000 MW
Phase – 2 – Partly completed
• Hybrid system comprising of high capacity HVDC and HVAC lines (both
765 kV and 400 kV)
 2000MW, 1400kms long HVDC bipole between Eastern and Southern
regions – completed
 400kV synchronous interconnections between Eastern and Western
regions resulting into synchronous operation of power system having
50,000MW capacity – completed
This will transfer operational surplus and would provide flexibility in
inter-regional transfer of power
• Present cumulative capacity is 8000 MW
• On an average, 1500-2000 MW is being transferred and about 35 MU/day
is being traded
PLAN FOR NATIONAL GRID-A PHASED DEVELOPMENT
8
Phase – 2
• Most of transmission lines would be part of associated transmission
system of large sized generation project.
• Cumulative inter-regional capacity would be 23,000 MW
Phase – 3 – to be completed by 2012
• Ring of 765 kV transmission lines inter-connecting ER, WR and NR
• Cumulative capacity would be 30,000 MW
• This would be utilised for transfer of short term as well as long term
surplus
Estimated Investment : US$ 20 billion
– POWERGRID’s Investment : US$11 billion
– Private sector Investment : US$9 billion
This will facilitate development of power market
PLAN FOR NATIONAL GRID-A PHASED DEVELOPMENT
9
10
Phase – II & III
11
Salakati
Bongaigaon
Birpara
Malda
Dehri
Sasaram
Sahupuri
Allahabad North-eastern
Eastern
Northernn
Belgaum
Kolhapur
Budhipadar
Rourkela
Korba
Raipur
Auraiya
Malanpur
Western
Southern
Balimela
Upper
Sileru
Chandrapur
Ramagundam
Jeypore
Gazuwaka
Singrauli
Vindhyachal
400kV
220kV
220kV
500MW
500MWW
220kV
1000MW 500MW
220kV
400kV
220 kV
220kV
Talcher
Kolar
2500MW
Gorakhpur/
Lucknow
MAJOR INTER REGIONAL LINKS-8000 MW CAPCITY
12
GROWTH OF CUMULATIVE CAPACITY OF INTER-
REGIONAL LINKS
8000
23000
30000
0
5000
10000
15000
20000
25000
30000
35000
Plan
CumulativeCapacity(MW)
Present By 2006-07 By 2011- 12
13
Major Issues & Suggestions
Issues
• Uncertainty in Generation Addition
• Mobilisation of Funds
• Recovery of Investment
• Proper Energy Accounting System needs to be evolved to
take care of unscheduled power transfer
• Accounting of transmission losses in different conditions
• Wheeling charges to different owners
14
Major Issues & Suggestions
Suggestions
• Creation of Transmission Highways from resource
pockets to load centres, without linking them to a
particular generation project
• Special methodology need to be adopted for recovery
of transmission charges of Transmission highways
• Most important is that there should be long term
commercial agreement to enable huge investment in
transmission sector
15

More Related Content

What's hot

Finance P Pt On Power Grid
Finance P Pt On Power GridFinance P Pt On Power Grid
Finance P Pt On Power Grid
MOHD ARISH
 

What's hot (10)

THINK GCCIA
THINK GCCIA THINK GCCIA
THINK GCCIA
 
The report on ghazi brotha dam
The report on ghazi brotha damThe report on ghazi brotha dam
The report on ghazi brotha dam
 
Psmp 2010
Psmp 2010Psmp 2010
Psmp 2010
 
Finance P Pt On Power Grid
Finance P Pt On Power GridFinance P Pt On Power Grid
Finance P Pt On Power Grid
 
Business Line 28 May 2010 Reliance Infra transfers 3 plants to R Power
Business Line 28 May 2010 Reliance Infra transfers 3 plants to R PowerBusiness Line 28 May 2010 Reliance Infra transfers 3 plants to R Power
Business Line 28 May 2010 Reliance Infra transfers 3 plants to R Power
 
Storage summit edf - richard burton 25.02.18
Storage summit   edf - richard burton 25.02.18Storage summit   edf - richard burton 25.02.18
Storage summit edf - richard burton 25.02.18
 
Treaties between Nepal & India
Treaties between Nepal & IndiaTreaties between Nepal & India
Treaties between Nepal & India
 
Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman Power Sector Analysis Report 2017_Sultanate of Oman
Power Sector Analysis Report 2017_Sultanate of Oman
 
Supergrid modelling for the Indian Subcontinent . farhan beg
Supergrid modelling for the Indian Subcontinent . farhan begSupergrid modelling for the Indian Subcontinent . farhan beg
Supergrid modelling for the Indian Subcontinent . farhan beg
 
Tidal energy takes scotland inner sound
Tidal energy takes scotland inner soundTidal energy takes scotland inner sound
Tidal energy takes scotland inner sound
 

Similar to Gsm hvdc kolar_talcher line

presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
WondererBack
 
Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sector
Rahul Gupta
 
SAARC Energy Ring - a Vision to Promote Energy Security in South Asia
SAARC Energy Ring - a Vision to Promote Energy Security in South AsiaSAARC Energy Ring - a Vision to Promote Energy Security in South Asia
SAARC Energy Ring - a Vision to Promote Energy Security in South Asia
IPPAI
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
Kachinga-Wankunda Phiri
 

Similar to Gsm hvdc kolar_talcher line (20)

Overview of nepal power sector
Overview of nepal power sectorOverview of nepal power sector
Overview of nepal power sector
 
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
presentation-by-pgcil-development-of-transmission-system-in-india-foir-worksh...
 
Ppt of PGCIL by d.p.yadav( 91 8432379261)
Ppt of PGCIL by d.p.yadav( 91 8432379261)Ppt of PGCIL by d.p.yadav( 91 8432379261)
Ppt of PGCIL by d.p.yadav( 91 8432379261)
 
21PESGM2656.pptx
21PESGM2656.pptx21PESGM2656.pptx
21PESGM2656.pptx
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Grid PPT-1 and 2 (1).pptx
Grid PPT-1 and 2 (1).pptxGrid PPT-1 and 2 (1).pptx
Grid PPT-1 and 2 (1).pptx
 
Structure of Transmission System in India
Structure of Transmission System in IndiaStructure of Transmission System in India
Structure of Transmission System in India
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
 
Energy distribution in Pakistan
Energy distribution in PakistanEnergy distribution in Pakistan
Energy distribution in Pakistan
 
Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sector
 
SAARC Energy Ring - a Vision to Promote Energy Security in South Asia
SAARC Energy Ring - a Vision to Promote Energy Security in South AsiaSAARC Energy Ring - a Vision to Promote Energy Security in South Asia
SAARC Energy Ring - a Vision to Promote Energy Security in South Asia
 
Load Research Concept and Approach _Kolkata.pptx
Load Research Concept and Approach  _Kolkata.pptxLoad Research Concept and Approach  _Kolkata.pptx
Load Research Concept and Approach _Kolkata.pptx
 
Power sector in india
Power sector in indiaPower sector in india
Power sector in india
 
Renewable Integration - POWERGRID.pptx
Renewable Integration - POWERGRID.pptxRenewable Integration - POWERGRID.pptx
Renewable Integration - POWERGRID.pptx
 
Overview of energy grid in india
Overview of energy grid in indiaOverview of energy grid in india
Overview of energy grid in india
 
Overview of energy grid in india
Overview of energy grid in indiaOverview of energy grid in india
Overview of energy grid in india
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
Tata power delhi distribution's solar journey
Tata power delhi distribution's solar journeyTata power delhi distribution's solar journey
Tata power delhi distribution's solar journey
 
Power Scenario in India
Power Scenario in IndiaPower Scenario in India
Power Scenario in India
 
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
 

Recently uploaded

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Recently uploaded (20)

Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 

Gsm hvdc kolar_talcher line

  • 1. 1 Developing a PowerDeveloping a Power Market in IndiaMarket in India - A Transmission- A Transmission PerspectivePerspective
  • 2. 2 • Indian Power Sector – Installed capacity – 107,000 MW (Thermal-76%, Hydro-23%, Nuclear-1%) Peak Demand – 82,000 MW Transmission lines - 5 Million Ckt. kms Regional Grids – 5 National Grid under progress Growth Rate of energy– 9% per annum INDIAN POWER SECTOR- A PROFILE
  • 3. 3
  • 4. 4 FUTURE POWER SUPPLY SCENARIOFUTURE POWER SUPPLY SCENARIO • Peak demand (expected)- 157,000 MW • Capacity Addition envisaged-100,000 MW in next 10 years • Goal – Power for all by 2012 BY THE YEAR 2012
  • 5. 5 NEED FOR NATIONAL GRIDNEED FOR NATIONAL GRID  Uneven disposition of Natural resources - Coal reserves concentrated in Eastern region - Hydro potential mainly in North Eastern & Northern region  Establishment of large sized pit head stations to achieve economy of scale  Load Centers located at distant locations in Northern, Western & Southern regions  Constraints on Right-of-Way (ROW)  Flexible & high capacity transmission system required for power transfer to different regions
  • 6. 6
  • 7. 7 Phase – 1 – Already completed • Interconnection of Regional Grids through HVDC Back-to-Back links having cumulative capacity of 5000 MW Phase – 2 – Partly completed • Hybrid system comprising of high capacity HVDC and HVAC lines (both 765 kV and 400 kV)  2000MW, 1400kms long HVDC bipole between Eastern and Southern regions – completed  400kV synchronous interconnections between Eastern and Western regions resulting into synchronous operation of power system having 50,000MW capacity – completed This will transfer operational surplus and would provide flexibility in inter-regional transfer of power • Present cumulative capacity is 8000 MW • On an average, 1500-2000 MW is being transferred and about 35 MU/day is being traded PLAN FOR NATIONAL GRID-A PHASED DEVELOPMENT
  • 8. 8 Phase – 2 • Most of transmission lines would be part of associated transmission system of large sized generation project. • Cumulative inter-regional capacity would be 23,000 MW Phase – 3 – to be completed by 2012 • Ring of 765 kV transmission lines inter-connecting ER, WR and NR • Cumulative capacity would be 30,000 MW • This would be utilised for transfer of short term as well as long term surplus Estimated Investment : US$ 20 billion – POWERGRID’s Investment : US$11 billion – Private sector Investment : US$9 billion This will facilitate development of power market PLAN FOR NATIONAL GRID-A PHASED DEVELOPMENT
  • 9. 9
  • 12. 12 GROWTH OF CUMULATIVE CAPACITY OF INTER- REGIONAL LINKS 8000 23000 30000 0 5000 10000 15000 20000 25000 30000 35000 Plan CumulativeCapacity(MW) Present By 2006-07 By 2011- 12
  • 13. 13 Major Issues & Suggestions Issues • Uncertainty in Generation Addition • Mobilisation of Funds • Recovery of Investment • Proper Energy Accounting System needs to be evolved to take care of unscheduled power transfer • Accounting of transmission losses in different conditions • Wheeling charges to different owners
  • 14. 14 Major Issues & Suggestions Suggestions • Creation of Transmission Highways from resource pockets to load centres, without linking them to a particular generation project • Special methodology need to be adopted for recovery of transmission charges of Transmission highways • Most important is that there should be long term commercial agreement to enable huge investment in transmission sector