Major Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project Closure
1. Evaluate if the project delivered the
expected benefits to all stakeholders.
• Was the project managed well?
• Was the customer satisfied?
1. Assess what was done wrong and
what contributed to successes.
2. Identify changes to improve
the delivery of future projects.
14–3
Project Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring Activities
• A review of why the project was selected.
• A reassessment of the project’s role
in the organization’s priorities.
• A check on the organizational culture to ensure it
facilitates the type of project being implemented.
• An assessment of how well the project team is
functioning well and if its is appropriately staffed.
• A check on external factors that might change
where the project is heading or its importance.
• A review of all factors relevant to the project
and to managing future projects.
14–4
Project Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review Deliverables
FIGURE 14.1
14–5
Project ClosureProject ClosureProject ClosureProject Closure
• Types of Project Closure
– Normal
– Premature
– Perpetual
– Failed Project
– Changed Priority
• Close-out Plan:
Questions to be Asked
– What tasks are required
to close the project?
– Who will be responsible
for these tasks?
– When will closure begin
and end?
– How will the project be
delivered?
14–6
Wrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure Checklist
TABLE 14.1
14–7
Implementing ClosedownImplementing ClosedownImplementing ClosedownImplementing Closedown
1. Getting delivery acceptance
from the customer.
2. Shutting down resources
and releasing to new uses.
3. Reassigning project team members.
4. Closing accounts and paying all bills.
5. Evaluating the project team, project team
members, and the project manager.
14–8
Creating the Final ReportCreating the Final ReportCreating the Final ReportCreating the Final Report
• Executive Summary
– Project goals met/unmet
– Stakeholder satisfaction
with project
– User reactions to quality
of deliverables
• Analysis
– Project mission and
objective
– Procedures and
systems used
– Organization resources
used
• Recommendations
– Technical improvements
– Corrective actions
• Lessons Learned
– Reminders
– Retrospectives
• Appendix
– Backup data
– Critical information
14–9
Project Performance EvaluationsProject Performance EvaluationsProject Performance EvaluationsProject Performance Evaluations
• Reasons for Poor-Quality Project
Performance Evaluations:
–Evaluations of individuals are left to
supervisors of the team member’s
home department.
–Typically measure team performance only
on time, cost, and specifications.
14–10
Pre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: Team
• Are standards and goals for measuring performance clear,
challenging, and attainable? Lead to positive consequences?
• Are responsibilities and performance standards known
by all team members?
• Are team rewards adequate? Management believes teams
are important?
• Is there a career path for successful project managers
• Does the team have discretionary authority to manage
short-term difficulties?
• Is there a high level of trust within the organization culture?
• Are there criteria beyond time, cost, and specifications?
14–11
Sample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback Survey
TABLE 14.2
14–12
Project Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: Individual
• Performance Assessment Responsibilities:
–Functional organization or functional matrix: the
individual’s area manager.
• The area manager may solicit the project manager’s opinion
of the individual’s performance on a specific project.
–Balanced matrix: the project manager and the area
manager jointly evaluate an individual’s performance.
–Project matrix and project organizations: the project
manager is responsible for appraising individual
performance.
14–13
Conducting Performance ReviewsConducting Performance ReviewsConducting Performance ReviewsConducting Performance Reviews
• Begin by asking the individual to evaluate his or
her own performance.
• Avoid drawing comparisons with other team members;
rather, assess the individual in terms of established
standards and expectations.
• Focus criticism on specific behaviors rather than
on the individual personally.
• Be consistent and fair in treatment of all team members.
• Treat the review as one point in an ongoing process.
14–14
Individual Performance AssessmentIndividual Performance AssessmentIndividual Performance AssessmentIndividual Performance Assessment
• Multirater appraisal (“360-degree feedback)
–Involves soliciting feedback concerning team
members’ performance from all of the people
that their work affects.
• Project managers, area managers, peers,
subordinates, and customers.
14–15
RetrospectivesRetrospectivesRetrospectivesRetrospectives
• Lessons Learned
–An analysis carried out during and shortly after the
project life cycle to capture positive and negative
project learning—“what worked and what didn’t?”
• Goals of Retrospectives
–To reuse learned solutions
–To stop repetitive mistakes
14–16
Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d)
• Barriers to Organizational Learning
–Lack of post-project time for developing lessons
–No post-project direction or support for teams
–Lessons become blame sessions
–Lessons are not applied in other locations
–Organizational culture does not recognize
value of learning
14–17
The Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective Analyses
• Making Retrospectives Effective:
–Use an independent facilitator to guide the project
team through the analysis project activities.
–Include a minimum of three in-process learning gates
during the life project cycle.
–Designate a team member as owner for each point in
the retrospective.
–Develop an easy-to-use learning repository to ensure
future utilization of retrospective lessons.
–Mandate use of retrospectives as part of the normal
process for all projects.
14–18
Characteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a Facilitator
1. No direct involvement or direct interest in the project.
2. Perceived as impartial and fair
3. Respect of senior management and other project
stakeholders.
4. Willingness to listen.
5. Independence and authority to report results without
fear of recriminations from special interests.
6. Perceived as having the best interests of the
organization in making decisions.
7. Broad-based experience in the organization or
industry.
14–19
Initiating the Retrospective ReviewInitiating the Retrospective Review
• Have automatic times or points when reviews will
take place. Avoid surprises.
• Conduct reviews carefully and with sensitivity
• Review staff must independent from the project.
• Review reports need to be used and accessible.
• Reviews support organizational culture
• Project closures should be planned and orderly.
• Certain “core conditions” must be in place to support
team and individual evaluation.
• Conduct individual and team evaluations separate
from pay or merit reviews.
14–20
The Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives Process
FIGURE 14.2
14–21
Conducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective Analysis
• Initiation and Staffing
• Data Collection and Analysis
• Reporting
14–22
Project Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review Questionnaire
TABLE 14.3
1. Were the project objectives and strategic
intent of the project clearly and explicitly
communicated?
2. Were the objectives and strategy in
alignment?
3. Were the stakeholders identified and
included in the planning?
4. Were project resources adequate for this
project?
5. Were people with the right skill sets
assigned to this project?
6. Were time estimates reasonable and
achievable?
7. Were the risks for the project
appropriately identified and assessed
before the project started?
8. Were the processes and practices
appropriate for this type of project?
Should projects of similar size and type
use these systems? Why/why not?
9. Did outside contractors perform as
expected? Explain.
10. Were communication methods
appropriate and adequate among all
stakeholders? Explain.
11. Is the customer satisfied with the
project product?
12. Are the customers using the project
deliverables as intended? Are they
satisfied?
13. Were the project objectives met?
14. Are the stakeholders satisfied their
strategic intents have been met?
15. Has the customer or sponsor accepted
a formal statement that the terms of the
project charter and scope have been
met?
16. Were schedule, budget, and scope
standards met?
17. Is there any one important area that
needs to be reviewed and improved
upon? Can you identify the cause?
14–23
Organizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review Questionnaire
TABLE 14.4
1. Was the organizational culture supportive for this type of project?
2. Was senior management support adequate?
3. Were people with the right skills assigned to this project?
4. Did the project office help or hinder management of the project?
Explain.
5. Did the team have access to organizational resources (people,
funds, equipment)?
6. Was training for this project adequate? Explain.
7. Were lessons learned from earlier projects useful? Why? Where?
8. Did the project have a clear link to organizational objectives?
Explain.
9. Was project staff properly reassigned?
10. Was the Human Resources Office helpful in finding new
assignments? Comment.
14–24
Archiving RetrospectivesArchiving RetrospectivesArchiving RetrospectivesArchiving Retrospectives
• Classifying of Projects:
– Project type
– Size
– Staffing
– Technology level
– Strategic or support
– Issues and problems
– Project mission and objectives
– Procedures and systems used
– Organization resources used
14–25
Key TermsKey TermsKey TermsKey Terms
Lessons learned
Organization evaluation
Performance review
Project closure
Project evaluation
Project facilitator
Retrospective
Team evaluation
360-degree review
14–26
Appendix 14.1
Project Closeout Checklist
Project CloseoutProject Closeout
ChecklistChecklist
Project CloseoutProject Closeout
ChecklistChecklist
14–28
Appendix 14.2
Euro Conversion—
Project Closure
Checklist
Euro Conversion—Euro Conversion—
Project ClosureProject Closure
ChecklistChecklist
Euro Conversion—Euro Conversion—
Project ClosureProject Closure
ChecklistChecklist
14–30

More Related Content

What's hot

Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
Think For A Change
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
Mahesh Bendigeri
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
Velita Furtado
 

What's hot (20)

Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Project planning and scheduling
Project planning and schedulingProject planning and scheduling
Project planning and scheduling
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 
An Introduction to Project Management
An Introduction to Project Management An Introduction to Project Management
An Introduction to Project Management
 
project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
 
PMP_Project Stakeholder Management
PMP_Project Stakeholder ManagementPMP_Project Stakeholder Management
PMP_Project Stakeholder Management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project management
Project managementProject management
Project management
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 

Viewers also liked

Theory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmTheory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
Scott Abel
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
Shiva Y Cmath
 
Project Completion Report 2014
Project Completion Report 2014Project Completion Report 2014
Project Completion Report 2014
Roshan Chitrakar
 

Viewers also liked (20)

Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Project closeout transition checklist
Project closeout transition checklistProject closeout transition checklist
Project closeout transition checklist
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant ParadigmTheory of Constraints and Project Management: Challenging the Dominant Paradigm
Theory of Constraints and Project Management: Challenging the Dominant Paradigm
 
Project audit
Project auditProject audit
Project audit
 
How to do a Project Audit
How to do a Project AuditHow to do a Project Audit
How to do a Project Audit
 
Audit Process, Audit Procedures, Audit Planning, Auditing
Audit Process, Audit Procedures, Audit Planning, AuditingAudit Process, Audit Procedures, Audit Planning, Auditing
Audit Process, Audit Procedures, Audit Planning, Auditing
 
Project management
Project managementProject management
Project management
 
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
Romanian Experiences with Monitoring and Water Quality Through Agricultural P...
 
C-RE-07
C-RE-07C-RE-07
C-RE-07
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
Mining strategies for the future - Trench & Sykes - Nov 2015 - Centre for Exp...
 
Project Completion Report 2014
Project Completion Report 2014Project Completion Report 2014
Project Completion Report 2014
 
Project management@ ppt doms
Project management@ ppt doms Project management@ ppt doms
Project management@ ppt doms
 
Project Management Constraints
Project Management ConstraintsProject Management Constraints
Project Management Constraints
 
Metodologia
MetodologiaMetodologia
Metodologia
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
How to close a project
How to close a projectHow to close a project
How to close a project
 

Similar to Project audit & closure

02.pptx
02.pptx02.pptx
02.pptx
Maryam522887
 
Project Management
Project ManagementProject Management
Project Management
Atif Rehmat
 

Similar to Project audit & closure (20)

Lecture 6 Project Audit & Closure.ppt
Lecture 6 Project Audit & Closure.pptLecture 6 Project Audit & Closure.ppt
Lecture 6 Project Audit & Closure.ppt
 
Chap014
Chap014Chap014
Chap014
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10
 
02.pptx
02.pptx02.pptx
02.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
project integration mgmt.pdf
project integration mgmt.pdfproject integration mgmt.pdf
project integration mgmt.pdf
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.ppt
 
Hm 418 harris ch10 ppt
Hm 418 harris ch10 pptHm 418 harris ch10 ppt
Hm 418 harris ch10 ppt
 
Project Auditing
Project AuditingProject Auditing
Project Auditing
 
Project management
Project managementProject management
Project management
 
Business Analyst vs. Project Manager - Eliminating the Confusion!
Business Analyst vs. Project Manager - Eliminating the Confusion!Business Analyst vs. Project Manager - Eliminating the Confusion!
Business Analyst vs. Project Manager - Eliminating the Confusion!
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - Foundation
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 

More from Gopalakrishnan P

More from Gopalakrishnan P (7)

Design of an accuracy control system in ship building industry
Design of an accuracy control system in ship building  industryDesign of an accuracy control system in ship building  industry
Design of an accuracy control system in ship building industry
 
Gas cyl rule5
Gas cyl rule5Gas cyl rule5
Gas cyl rule5
 
Ship maintenance performance measurement
Ship maintenance performance measurementShip maintenance performance measurement
Ship maintenance performance measurement
 
Cat
Cat Cat
Cat
 
Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)
 
Sales formulas
Sales formulasSales formulas
Sales formulas
 
A practical approach for ship construction cost estimation
A practical approach for ship construction cost estimationA practical approach for ship construction cost estimation
A practical approach for ship construction cost estimation
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

Project audit & closure

  • 1. Project Closure CHAPTER FOURTEEN Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin
  • 2. Where We Are NowWhere We Are NowWhere We Are NowWhere We Are Now 14–2
  • 3. Major Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project ClosureMajor Tasks of Project Closure 1. Evaluate if the project delivered the expected benefits to all stakeholders. • Was the project managed well? • Was the customer satisfied? 1. Assess what was done wrong and what contributed to successes. 2. Identify changes to improve the delivery of future projects. 14–3
  • 4. Project Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring ActivitiesProject Monitoring Activities • A review of why the project was selected. • A reassessment of the project’s role in the organization’s priorities. • A check on the organizational culture to ensure it facilitates the type of project being implemented. • An assessment of how well the project team is functioning well and if its is appropriately staffed. • A check on external factors that might change where the project is heading or its importance. • A review of all factors relevant to the project and to managing future projects. 14–4
  • 5. Project Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review DeliverablesProject Closure and Review Deliverables FIGURE 14.1 14–5
  • 6. Project ClosureProject ClosureProject ClosureProject Closure • Types of Project Closure – Normal – Premature – Perpetual – Failed Project – Changed Priority • Close-out Plan: Questions to be Asked – What tasks are required to close the project? – Who will be responsible for these tasks? – When will closure begin and end? – How will the project be delivered? 14–6
  • 7. Wrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure ChecklistWrap-up Closure Checklist TABLE 14.1 14–7
  • 8. Implementing ClosedownImplementing ClosedownImplementing ClosedownImplementing Closedown 1. Getting delivery acceptance from the customer. 2. Shutting down resources and releasing to new uses. 3. Reassigning project team members. 4. Closing accounts and paying all bills. 5. Evaluating the project team, project team members, and the project manager. 14–8
  • 9. Creating the Final ReportCreating the Final ReportCreating the Final ReportCreating the Final Report • Executive Summary – Project goals met/unmet – Stakeholder satisfaction with project – User reactions to quality of deliverables • Analysis – Project mission and objective – Procedures and systems used – Organization resources used • Recommendations – Technical improvements – Corrective actions • Lessons Learned – Reminders – Retrospectives • Appendix – Backup data – Critical information 14–9
  • 10. Project Performance EvaluationsProject Performance EvaluationsProject Performance EvaluationsProject Performance Evaluations • Reasons for Poor-Quality Project Performance Evaluations: –Evaluations of individuals are left to supervisors of the team member’s home department. –Typically measure team performance only on time, cost, and specifications. 14–10
  • 11. Pre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: TeamPre-Implementation Conditions: Team • Are standards and goals for measuring performance clear, challenging, and attainable? Lead to positive consequences? • Are responsibilities and performance standards known by all team members? • Are team rewards adequate? Management believes teams are important? • Is there a career path for successful project managers • Does the team have discretionary authority to manage short-term difficulties? • Is there a high level of trust within the organization culture? • Are there criteria beyond time, cost, and specifications? 14–11
  • 12. Sample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback SurveySample Team Evaluation and Feedback Survey TABLE 14.2 14–12
  • 13. Project Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: IndividualProject Performance Evaluation: Individual • Performance Assessment Responsibilities: –Functional organization or functional matrix: the individual’s area manager. • The area manager may solicit the project manager’s opinion of the individual’s performance on a specific project. –Balanced matrix: the project manager and the area manager jointly evaluate an individual’s performance. –Project matrix and project organizations: the project manager is responsible for appraising individual performance. 14–13
  • 14. Conducting Performance ReviewsConducting Performance ReviewsConducting Performance ReviewsConducting Performance Reviews • Begin by asking the individual to evaluate his or her own performance. • Avoid drawing comparisons with other team members; rather, assess the individual in terms of established standards and expectations. • Focus criticism on specific behaviors rather than on the individual personally. • Be consistent and fair in treatment of all team members. • Treat the review as one point in an ongoing process. 14–14
  • 15. Individual Performance AssessmentIndividual Performance AssessmentIndividual Performance AssessmentIndividual Performance Assessment • Multirater appraisal (“360-degree feedback) –Involves soliciting feedback concerning team members’ performance from all of the people that their work affects. • Project managers, area managers, peers, subordinates, and customers. 14–15
  • 16. RetrospectivesRetrospectivesRetrospectivesRetrospectives • Lessons Learned –An analysis carried out during and shortly after the project life cycle to capture positive and negative project learning—“what worked and what didn’t?” • Goals of Retrospectives –To reuse learned solutions –To stop repetitive mistakes 14–16
  • 17. Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d)Retrospectives (cont’d) • Barriers to Organizational Learning –Lack of post-project time for developing lessons –No post-project direction or support for teams –Lessons become blame sessions –Lessons are not applied in other locations –Organizational culture does not recognize value of learning 14–17
  • 18. The Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective AnalysesThe Value of Retrospective Analyses • Making Retrospectives Effective: –Use an independent facilitator to guide the project team through the analysis project activities. –Include a minimum of three in-process learning gates during the life project cycle. –Designate a team member as owner for each point in the retrospective. –Develop an easy-to-use learning repository to ensure future utilization of retrospective lessons. –Mandate use of retrospectives as part of the normal process for all projects. 14–18
  • 19. Characteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a FacilitatorCharacteristics of a Facilitator 1. No direct involvement or direct interest in the project. 2. Perceived as impartial and fair 3. Respect of senior management and other project stakeholders. 4. Willingness to listen. 5. Independence and authority to report results without fear of recriminations from special interests. 6. Perceived as having the best interests of the organization in making decisions. 7. Broad-based experience in the organization or industry. 14–19
  • 20. Initiating the Retrospective ReviewInitiating the Retrospective Review • Have automatic times or points when reviews will take place. Avoid surprises. • Conduct reviews carefully and with sensitivity • Review staff must independent from the project. • Review reports need to be used and accessible. • Reviews support organizational culture • Project closures should be planned and orderly. • Certain “core conditions” must be in place to support team and individual evaluation. • Conduct individual and team evaluations separate from pay or merit reviews. 14–20
  • 21. The Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives ProcessThe Retrospectives Process FIGURE 14.2 14–21
  • 22. Conducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective AnalysisConducting a Retrospective Analysis • Initiation and Staffing • Data Collection and Analysis • Reporting 14–22
  • 23. Project Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review QuestionnaireProject Process Review Questionnaire TABLE 14.3 1. Were the project objectives and strategic intent of the project clearly and explicitly communicated? 2. Were the objectives and strategy in alignment? 3. Were the stakeholders identified and included in the planning? 4. Were project resources adequate for this project? 5. Were people with the right skill sets assigned to this project? 6. Were time estimates reasonable and achievable? 7. Were the risks for the project appropriately identified and assessed before the project started? 8. Were the processes and practices appropriate for this type of project? Should projects of similar size and type use these systems? Why/why not? 9. Did outside contractors perform as expected? Explain. 10. Were communication methods appropriate and adequate among all stakeholders? Explain. 11. Is the customer satisfied with the project product? 12. Are the customers using the project deliverables as intended? Are they satisfied? 13. Were the project objectives met? 14. Are the stakeholders satisfied their strategic intents have been met? 15. Has the customer or sponsor accepted a formal statement that the terms of the project charter and scope have been met? 16. Were schedule, budget, and scope standards met? 17. Is there any one important area that needs to be reviewed and improved upon? Can you identify the cause? 14–23
  • 24. Organizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review QuestionnaireOrganizational Culture Review Questionnaire TABLE 14.4 1. Was the organizational culture supportive for this type of project? 2. Was senior management support adequate? 3. Were people with the right skills assigned to this project? 4. Did the project office help or hinder management of the project? Explain. 5. Did the team have access to organizational resources (people, funds, equipment)? 6. Was training for this project adequate? Explain. 7. Were lessons learned from earlier projects useful? Why? Where? 8. Did the project have a clear link to organizational objectives? Explain. 9. Was project staff properly reassigned? 10. Was the Human Resources Office helpful in finding new assignments? Comment. 14–24
  • 25. Archiving RetrospectivesArchiving RetrospectivesArchiving RetrospectivesArchiving Retrospectives • Classifying of Projects: – Project type – Size – Staffing – Technology level – Strategic or support – Issues and problems – Project mission and objectives – Procedures and systems used – Organization resources used 14–25
  • 26. Key TermsKey TermsKey TermsKey Terms Lessons learned Organization evaluation Performance review Project closure Project evaluation Project facilitator Retrospective Team evaluation 360-degree review 14–26
  • 28. Project CloseoutProject Closeout ChecklistChecklist Project CloseoutProject Closeout ChecklistChecklist 14–28
  • 30. Euro Conversion—Euro Conversion— Project ClosureProject Closure ChecklistChecklist Euro Conversion—Euro Conversion— Project ClosureProject Closure ChecklistChecklist 14–30