Examination Paper of Project Management
1
IIBM Institute of Business Management
IIBM Institute of Business Management
Examination Paper MM.100
Project Management
Section A: Objective Type & Short Questions (30 marks)
 This section consists of Multiples choice & short Note Type questions.
 Answer all the questions.
 Part one carries 1 mark each &Part Two carries 5 marks each.
Part One:
Multiple choices:
1. A theoretical approach applied to every systematic quantitative evaluation of a public or
private project is known as________.
a. Benefits-cost Analysis
b. Cost-benefits Analysis
c. Financial Analysis
d. Economic Analysis
2. Which of the following comes under value analysis Job Plan?
a. Analysis
b. Recording Ideas
c. Investigation
d. All of the above
3. Leadership through imaginative________ provide to organization competitive advantage.
a. Improve
b. Change
c. Quality
d. None of the above
4. ________it is the succession of strategies used by business management as a product goes
through its life cycle.
a. Product life cycle management
b. Structure of the costs
c. Comprehensive
d. Activity-based management
5. ERR stands for_______
6. A plan for eliminating constraints to end market opportunities and advancing sustainable
competitiveness is called______
a. Competitive Strategy
b. Strategy
c. Competitive advantage
Examination Paper of Project Management
2
IIBM Institute of Business Management
d. None of the above
7. BPR stands for______
a. Business Process Re-engineering
b. Business Project Re-engineering
c. Business Procedure Re-engineering
d. None of the above
8. Which of the following is 2nd
Phase of Balanced scorecard process?
a. Deployment
b. The strategic foundation
c. Three critical components
d. None of the above
9. Total life-cycle cost are minimized for both the producer and the customer is True or false.
10. LCC stands for________.
Part Two:
1. Define the Cost Benefit Analysis?
2. Explain the Total Quality Management?
3. What is the difference between Activity based management and Activity-based costing?
4. List the Reasons for Divisionalisation?
END OF SECTION A
Section B: Caselets (40 marks)
 This section consists of Caselets.
 Answer all the questions.
 Each caselet carries 20 marks.
 Detailed information should form the part of your answer (Word limit 200 to 250 words).
Caselet 1
Project partnering at British Airports Authority (BAA)
The construction sector in recent times has not been noted for its high levels of performance. Firms
like BAA, who own and operate airports including Heathrow and Gatwick – London’s two major
airports – rely heavily on their suppliers, including their construction suppliers, for their own
performance. Where construction projects are delayed, the financial consequences can be disastrous.
Examination Paper of Project Management
3
IIBM Institute of Business Management
Furthermore, the disciplines of working on airport premises, including the security issues, play a
significant part in the daily working lives of project staff. New firms bringing new staff onto the
airport sites invariably require time to bring them up to speed with the appropriate ways of working.
Particular problems include:
 Security – all personnel with access to airside parts of the airport (i.e. past passport control) must
be security vetted and trained. The vetting process takes six weeks, so firms must prepare project
staff in advance;
 Deliveries – getting materials into the airport is problematic, due to significant congestion and
lack of availability of areas for storage;
 Constant use of terminal buildings by passengers – the closing of areas causes problems with
passenger capacity. The firms are required to work with the constraints of passengers using the
areas around where the work is being carried out and physical and noise intrusion must be kept to
a minimum;
 The commercial activities (shops and restaurants) are the economic lifeblood of the business, with
large ground-rents. The objective of projects involving these areas is not simply to complete
works on time but as early as possible, so that the areas can start to generate rental incomes.
The traditional approach to managing fit-out projects (changing internal layouts to accommodate
different facilities and in particular new retail facilities) was that every contract was different, and
would be negotiated with different contractors. These would then employ their own sub-contractors to
carry out parts of the work. The approach that has worked far better for all concerned has been
through the appointment of lead contractors, with long-term contracts – in most cases 10 years – to be
the prime supplier of fit-out services to B.A.A. This particular contract was awarded to MACE. As
part of the agreement, BAA has paid for MACE staff to attend training programmes. This has
extended further, with help being offered to their suppliers – of both materials and labour – for
development. Where particular problems are identified, the supplier can be asked to take part in an
improvement programme. Satisfactory completion can result in similar long-term deals (tied to
continual improvement) being offered to those suppliers. In some cases the problems – particularly
with designs for areas – have been the responsibility of BAA. The mechanisms are now in place to
identify these problems and to introduce new practices to avoid them in future.
1) Summarizes the arguments for such a policy of partnering with a major supplier such as BAA and
MACE have done here.
2) Carry out further research to identify further examples of partnering in projects. How well do they
appear to be working?
Caselet 2
The Big Dig
Any project that involves tunnelling is risky. Any project that involved tunneling under a city whilst
trying to keep that city fully operational, is very risky. When that city is bottom in the USA, it is in a
risk category all of its own. This does not, how – ever, excuse the financial performance of this
project, the results of which are exceptional and even make the performance of previous ‘stars of
disaster’ such as the Channel Tunnel, look good. During the 1950s, the Commonwealth of
Massachusetts commissioned new roads as part of a national road-building frenzy that took place at
that time. The result was a partly elevated freeway that cut the city off from its old harbour and over
time coped increasingly less well with the volumes of traffic that were trying to use it. For many
years, the project had been the subject of much politicking and had been rejected by a number of
national administrations. In 1993, it was given the go-ahead. At this time the budget was $US2.6
Examination Paper of Project Management
4
IIBM Institute of Business Management
billion, an enormous sum of money for an 8-mile tunnel, but given the technical complexity of the
task, this was considered acceptable. Gradually the costs rose, until in 1998, the estimated final cost
was 410.4 billion. By mid-2000 this had risen to $13 billion and by mid-2001 to over $15 billion. It
was still considered a technical success, but both politically and economically, it was a disaster. In
project management terms it is also a disaster – a 500 per cent-plus overrun on budget can only be
described as ‘talented’. How did such a financial disaster occur? The first is a feature of many large
‘political’ projects – that the ‘real cost’ would not be politically acceptable. The original budget was
deliberately deflated to make the project happen. The second is technical risk – that of the tunnelling
process. The ground through which the tunnelling is being carried out is reclaimed land that was
originally under the sea. The tunnelling process being used was also new, presenting a degree of
technical novelty.
1) How might the project be considered a technical success but an economic, political and project
management disaster?
2) Suggest how the 500 per cent-plus overrun might have come about.
END OF SECTION B
Section C: Applied Theory (30 marks)
 This section consists of Long Questions.
 Answer all the questions.
 Each question carries 15 marks.
 Detailed information should form the part of your answer (Word limit 150 to 200 words).
1. What is cost Audit? Explain the types, objective and advantage of cost Audit?
2. Define Target Costing? What are the steps required to install a comprehensive target costing
approach?
END OF SECTION C
S-2-300813

Contenu connexe

Tendances

Major projects in Victoria: challenges, issues, and where to from here?
Major projects in Victoria: challenges, issues, and where to from here?Major projects in Victoria: challenges, issues, and where to from here?
Major projects in Victoria: challenges, issues, and where to from here?Paul O'Connor
 
Classification & Construction Type.
Classification & Construction Type.Classification & Construction Type.
Classification & Construction Type.faizanNoor8
 
CFW Supply Chain Development
CFW Supply Chain DevelopmentCFW Supply Chain Development
CFW Supply Chain DevelopmentRae Davies
 
Procurement & contract.(bot)
Procurement & contract.(bot)Procurement & contract.(bot)
Procurement & contract.(bot)rajlaxmipardeshi
 
Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis Azam FA
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A SeminarPang Khai Shuen
 
A Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical FrameworkA Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical FrameworkRicardo Magno Antunes
 
Our Blue Economy - Karp Strategies
Our Blue Economy - Karp StrategiesOur Blue Economy - Karp Strategies
Our Blue Economy - Karp StrategiesCarter Craft
 
why ppp modeled infrastructure projects
why ppp modeled infrastructure projectswhy ppp modeled infrastructure projects
why ppp modeled infrastructure projectsIJAEMSJORNAL
 
Project management chapter 4
Project management chapter 4Project management chapter 4
Project management chapter 4VancityInstitute
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 

Tendances (17)

Major projects in Victoria: challenges, issues, and where to from here?
Major projects in Victoria: challenges, issues, and where to from here?Major projects in Victoria: challenges, issues, and where to from here?
Major projects in Victoria: challenges, issues, and where to from here?
 
CRNM - CARICOM Construction & Installation Services Sector
CRNM - CARICOM Construction & Installation Services SectorCRNM - CARICOM Construction & Installation Services Sector
CRNM - CARICOM Construction & Installation Services Sector
 
Classification & Construction Type.
Classification & Construction Type.Classification & Construction Type.
Classification & Construction Type.
 
Woo (korea)
Woo (korea)Woo (korea)
Woo (korea)
 
CFW Supply Chain Development
CFW Supply Chain DevelopmentCFW Supply Chain Development
CFW Supply Chain Development
 
Procurement & contract.(bot)
Procurement & contract.(bot)Procurement & contract.(bot)
Procurement & contract.(bot)
 
Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
 
FPSO
FPSOFPSO
FPSO
 
A Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical FrameworkA Production Model for Construction: A Theoretical Framework
A Production Model for Construction: A Theoretical Framework
 
062 Logistics & Productivity PART 1
062  Logistics & Productivity PART 1062  Logistics & Productivity PART 1
062 Logistics & Productivity PART 1
 
Our Blue Economy - Karp Strategies
Our Blue Economy - Karp StrategiesOur Blue Economy - Karp Strategies
Our Blue Economy - Karp Strategies
 
why ppp modeled infrastructure projects
why ppp modeled infrastructure projectswhy ppp modeled infrastructure projects
why ppp modeled infrastructure projects
 
Project management chapter 4
Project management chapter 4Project management chapter 4
Project management chapter 4
 
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
Innovative BIM Solution For Project Management And Quantity Surveying Mr. Ken...
 
Train to nZEB brochure_onlinefinal
Train to nZEB brochure_onlinefinalTrain to nZEB brochure_onlinefinal
Train to nZEB brochure_onlinefinal
 
022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)022 Construction Productivity (PART 1)
022 Construction Productivity (PART 1)
 

En vedette

Emba iibm case study solutions & multiple answers
Emba iibm case study solutions & multiple answersEmba iibm case study solutions & multiple answers
Emba iibm case study solutions & multiple answersNMIMS ASSIGNMENTS HELP
 
Examination paper of materials management
Examination paper of materials managementExamination paper of materials management
Examination paper of materials managementNMIMS ASSIGNMENTS HELP
 
Iibm principles and_practices_of_mamagement
Iibm principles and_practices_of_mamagementIibm principles and_practices_of_mamagement
Iibm principles and_practices_of_mamagementNMIMS ASSIGNMENTS HELP
 
Bms isbm case study answers and solutions
Bms isbm case study answers and solutionsBms isbm case study answers and solutions
Bms isbm case study answers and solutionsNMIMS ASSIGNMENTS HELP
 
Bms isbm case study answers & solutions 1
Bms isbm case study answers & solutions 1Bms isbm case study answers & solutions 1
Bms isbm case study answers & solutions 1NMIMS ASSIGNMENTS HELP
 
Emba isbm case study answers & solutions 3
Emba isbm case study answers & solutions 3Emba isbm case study answers & solutions 3
Emba isbm case study answers & solutions 3NMIMS ASSIGNMENTS HELP
 
Mba iibms case study answers & solutions
Mba iibms case study answers & solutionsMba iibms case study answers & solutions
Mba iibms case study answers & solutionsNMIMS ASSIGNMENTS HELP
 
abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...
abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...
abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...nicolas coviello
 
Chap 4 - Native Advertising vs Automatisation des contenus - Paris8
Chap 4 - Native Advertising vs Automatisation des contenus - Paris8Chap 4 - Native Advertising vs Automatisation des contenus - Paris8
Chap 4 - Native Advertising vs Automatisation des contenus - Paris8Sarah Berthault
 
Audit personnalisé Performance Tourisme
Audit personnalisé Performance TourismeAudit personnalisé Performance Tourisme
Audit personnalisé Performance TourismePerformance_Tourisme
 

En vedette (20)

Consumer behavior
Consumer behaviorConsumer behavior
Consumer behavior
 
Hr management
Hr managementHr management
Hr management
 
Gdm isms case study solutions
Gdm isms case study solutionsGdm isms case study solutions
Gdm isms case study solutions
 
Managerial economics
Managerial economicsManagerial economics
Managerial economics
 
Iibm managerial economics
Iibm managerial economicsIibm managerial economics
Iibm managerial economics
 
Marketing management
Marketing managementMarketing management
Marketing management
 
Emba iibm case study solutions & multiple answers
Emba iibm case study solutions & multiple answersEmba iibm case study solutions & multiple answers
Emba iibm case study solutions & multiple answers
 
Business communication
Business communicationBusiness communication
Business communication
 
Examination paper of materials management
Examination paper of materials managementExamination paper of materials management
Examination paper of materials management
 
Iibm principles and_practices_of_mamagement
Iibm principles and_practices_of_mamagementIibm principles and_practices_of_mamagement
Iibm principles and_practices_of_mamagement
 
Bms isbm case study answers and solutions
Bms isbm case study answers and solutionsBms isbm case study answers and solutions
Bms isbm case study answers and solutions
 
Dms isms case study solutions
Dms isms case study solutionsDms isms case study solutions
Dms isms case study solutions
 
Bms isbm case study answers & solutions 1
Bms isbm case study answers & solutions 1Bms isbm case study answers & solutions 1
Bms isbm case study answers & solutions 1
 
Marketing management (4)
Marketing management (4)Marketing management (4)
Marketing management (4)
 
International business
International businessInternational business
International business
 
Emba isbm case study answers & solutions 3
Emba isbm case study answers & solutions 3Emba isbm case study answers & solutions 3
Emba isbm case study answers & solutions 3
 
Mba iibms case study answers & solutions
Mba iibms case study answers & solutionsMba iibms case study answers & solutions
Mba iibms case study answers & solutions
 
abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...
abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...
abstractairanica-33982-volume-29-solitudini-persiane-photographies-de-riccard...
 
Chap 4 - Native Advertising vs Automatisation des contenus - Paris8
Chap 4 - Native Advertising vs Automatisation des contenus - Paris8Chap 4 - Native Advertising vs Automatisation des contenus - Paris8
Chap 4 - Native Advertising vs Automatisation des contenus - Paris8
 
Audit personnalisé Performance Tourisme
Audit personnalisé Performance TourismeAudit personnalisé Performance Tourisme
Audit personnalisé Performance Tourisme
 

Similaire à Project management 250613

Project management 250613
Project management 250613Project management 250613
Project management 250613Pankaj Roy
 
Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Yash Mittal
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docxMargaritoWhitt221
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfMartinsAras
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriaNewman Jonathan
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docxcravennichole326
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxcravennichole326
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projectsTim McManus
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTIRJET Journal
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 SigmaDimitrios Kordas
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxwalterl4
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Eric Janvier
 
Resilience Pathway2.0 modified
Resilience Pathway2.0 modifiedResilience Pathway2.0 modified
Resilience Pathway2.0 modifiedEric Schellekens
 
Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021diplomadetyra
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyAhmed Mahmoud
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaNarendra Vasudeva
 
Chunnel project project cost management
Chunnel  project project cost managementChunnel  project project cost management
Chunnel project project cost managementSagar Rana
 
White Paper_RIBER_Kunal
White Paper_RIBER_KunalWhite Paper_RIBER_Kunal
White Paper_RIBER_Kunalkunalparekh27
 

Similaire à Project management 250613 (20)

Project management 250613
Project management 250613Project management 250613
Project management 250613
 
Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdf
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docx
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
 
BBA III ppt.ppt
BBA III ppt.pptBBA III ppt.ppt
BBA III ppt.ppt
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
 
CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015
 
Resilience Pathway2.0 modified
Resilience Pathway2.0 modifiedResilience Pathway2.0 modified
Resilience Pathway2.0 modified
 
Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy Study
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
Chunnel project project cost management
Chunnel  project project cost managementChunnel  project project cost management
Chunnel project project cost management
 
White Paper_RIBER_Kunal
White Paper_RIBER_KunalWhite Paper_RIBER_Kunal
White Paper_RIBER_Kunal
 

Dernier

Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEMISSRITIMABIOLOGYEXP
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroomSamsung Business USA
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxryandux83rd
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...HetalPathak10
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...Nguyen Thanh Tu Collection
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfChristalin Nelson
 

Dernier (20)

Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
 
CARNAVAL COM MAGIA E EUFORIA _
CARNAVAL COM MAGIA E EUFORIA            _CARNAVAL COM MAGIA E EUFORIA            _
CARNAVAL COM MAGIA E EUFORIA _
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
 
Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdf
 

Project management 250613

  • 1. Examination Paper of Project Management 1 IIBM Institute of Business Management IIBM Institute of Business Management Examination Paper MM.100 Project Management Section A: Objective Type & Short Questions (30 marks)  This section consists of Multiples choice & short Note Type questions.  Answer all the questions.  Part one carries 1 mark each &Part Two carries 5 marks each. Part One: Multiple choices: 1. A theoretical approach applied to every systematic quantitative evaluation of a public or private project is known as________. a. Benefits-cost Analysis b. Cost-benefits Analysis c. Financial Analysis d. Economic Analysis 2. Which of the following comes under value analysis Job Plan? a. Analysis b. Recording Ideas c. Investigation d. All of the above 3. Leadership through imaginative________ provide to organization competitive advantage. a. Improve b. Change c. Quality d. None of the above 4. ________it is the succession of strategies used by business management as a product goes through its life cycle. a. Product life cycle management b. Structure of the costs c. Comprehensive d. Activity-based management 5. ERR stands for_______ 6. A plan for eliminating constraints to end market opportunities and advancing sustainable competitiveness is called______ a. Competitive Strategy b. Strategy c. Competitive advantage
  • 2. Examination Paper of Project Management 2 IIBM Institute of Business Management d. None of the above 7. BPR stands for______ a. Business Process Re-engineering b. Business Project Re-engineering c. Business Procedure Re-engineering d. None of the above 8. Which of the following is 2nd Phase of Balanced scorecard process? a. Deployment b. The strategic foundation c. Three critical components d. None of the above 9. Total life-cycle cost are minimized for both the producer and the customer is True or false. 10. LCC stands for________. Part Two: 1. Define the Cost Benefit Analysis? 2. Explain the Total Quality Management? 3. What is the difference between Activity based management and Activity-based costing? 4. List the Reasons for Divisionalisation? END OF SECTION A Section B: Caselets (40 marks)  This section consists of Caselets.  Answer all the questions.  Each caselet carries 20 marks.  Detailed information should form the part of your answer (Word limit 200 to 250 words). Caselet 1 Project partnering at British Airports Authority (BAA) The construction sector in recent times has not been noted for its high levels of performance. Firms like BAA, who own and operate airports including Heathrow and Gatwick – London’s two major airports – rely heavily on their suppliers, including their construction suppliers, for their own performance. Where construction projects are delayed, the financial consequences can be disastrous.
  • 3. Examination Paper of Project Management 3 IIBM Institute of Business Management Furthermore, the disciplines of working on airport premises, including the security issues, play a significant part in the daily working lives of project staff. New firms bringing new staff onto the airport sites invariably require time to bring them up to speed with the appropriate ways of working. Particular problems include:  Security – all personnel with access to airside parts of the airport (i.e. past passport control) must be security vetted and trained. The vetting process takes six weeks, so firms must prepare project staff in advance;  Deliveries – getting materials into the airport is problematic, due to significant congestion and lack of availability of areas for storage;  Constant use of terminal buildings by passengers – the closing of areas causes problems with passenger capacity. The firms are required to work with the constraints of passengers using the areas around where the work is being carried out and physical and noise intrusion must be kept to a minimum;  The commercial activities (shops and restaurants) are the economic lifeblood of the business, with large ground-rents. The objective of projects involving these areas is not simply to complete works on time but as early as possible, so that the areas can start to generate rental incomes. The traditional approach to managing fit-out projects (changing internal layouts to accommodate different facilities and in particular new retail facilities) was that every contract was different, and would be negotiated with different contractors. These would then employ their own sub-contractors to carry out parts of the work. The approach that has worked far better for all concerned has been through the appointment of lead contractors, with long-term contracts – in most cases 10 years – to be the prime supplier of fit-out services to B.A.A. This particular contract was awarded to MACE. As part of the agreement, BAA has paid for MACE staff to attend training programmes. This has extended further, with help being offered to their suppliers – of both materials and labour – for development. Where particular problems are identified, the supplier can be asked to take part in an improvement programme. Satisfactory completion can result in similar long-term deals (tied to continual improvement) being offered to those suppliers. In some cases the problems – particularly with designs for areas – have been the responsibility of BAA. The mechanisms are now in place to identify these problems and to introduce new practices to avoid them in future. 1) Summarizes the arguments for such a policy of partnering with a major supplier such as BAA and MACE have done here. 2) Carry out further research to identify further examples of partnering in projects. How well do they appear to be working? Caselet 2 The Big Dig Any project that involves tunnelling is risky. Any project that involved tunneling under a city whilst trying to keep that city fully operational, is very risky. When that city is bottom in the USA, it is in a risk category all of its own. This does not, how – ever, excuse the financial performance of this project, the results of which are exceptional and even make the performance of previous ‘stars of disaster’ such as the Channel Tunnel, look good. During the 1950s, the Commonwealth of Massachusetts commissioned new roads as part of a national road-building frenzy that took place at that time. The result was a partly elevated freeway that cut the city off from its old harbour and over time coped increasingly less well with the volumes of traffic that were trying to use it. For many years, the project had been the subject of much politicking and had been rejected by a number of national administrations. In 1993, it was given the go-ahead. At this time the budget was $US2.6
  • 4. Examination Paper of Project Management 4 IIBM Institute of Business Management billion, an enormous sum of money for an 8-mile tunnel, but given the technical complexity of the task, this was considered acceptable. Gradually the costs rose, until in 1998, the estimated final cost was 410.4 billion. By mid-2000 this had risen to $13 billion and by mid-2001 to over $15 billion. It was still considered a technical success, but both politically and economically, it was a disaster. In project management terms it is also a disaster – a 500 per cent-plus overrun on budget can only be described as ‘talented’. How did such a financial disaster occur? The first is a feature of many large ‘political’ projects – that the ‘real cost’ would not be politically acceptable. The original budget was deliberately deflated to make the project happen. The second is technical risk – that of the tunnelling process. The ground through which the tunnelling is being carried out is reclaimed land that was originally under the sea. The tunnelling process being used was also new, presenting a degree of technical novelty. 1) How might the project be considered a technical success but an economic, political and project management disaster? 2) Suggest how the 500 per cent-plus overrun might have come about. END OF SECTION B Section C: Applied Theory (30 marks)  This section consists of Long Questions.  Answer all the questions.  Each question carries 15 marks.  Detailed information should form the part of your answer (Word limit 150 to 200 words). 1. What is cost Audit? Explain the types, objective and advantage of cost Audit? 2. Define Target Costing? What are the steps required to install a comprehensive target costing approach? END OF SECTION C S-2-300813