The Lean Management System Assessment is a simple tool to
assess the overall status of your Lean management
implementation. The eight dimensions of assessment cover
process and behavior and serve as standards for your
organization to strive toward Lean excellence.
Lean Management
Assessment
© Operational Excellence Consulting. All rights reserved. 2
Contents
Scoring System
2
Overview of Lean Management Assessment
1
Assessment Guidelines
4
Assessment Criteria
3
NOTE: This is a PARTIAL PREVIEW. To
download the complete presentation, please visit:
https://www.oeconsulting.com.sg
© Operational Excellence Consulting. All rights reserved. 3
Introduction to the Lean Management Assessment
§ It is a good practice to periodically assess the overall status of your Lean
management implementation
§ The Lean Management System Assessment tool is based on the
application of plan, do, check, act (PDCA) thinking embedded in Lean, an
idea derived from the Lean principle of pursuit of perfection
§ The Lean management standards cover process and behavior and define
five levels of maturity
§ The assessment tool can be applied to the organization, business unit
and/or sub-unit level
§ A practical approach to assess your Lean implementation progress
© Operational Excellence Consulting. All rights reserved. 4
3 Benefits of Conducting a Lean Management System
Assessment
1. The dimensions and questions themselves should help to clarify what you
are working toward, for yourself and for the rest of your organization
2. An assessment should tell you where you stand relative to your standards
and relative to your earlier status
3. The results of an assessment will help you identify where you need to
focus efforts to improve
© Operational Excellence Consulting. All rights reserved. 5
The Lean Management Assessment Framework
1
5
4
3
2
Pre-Lean
Starting
Recognizable
Stabilizing
Sustaining
Visual
Controls
Standard
Accountability
Processes
Lean
Standard
Work
Value
Stream
Mapping
Process
Definition
Process
Discipline
Process
Improvement
Root
Cause
Problem
Solving
Eight Dimensions of Assessment
Five
Maturity
Levels
© Operational Excellence Consulting. All rights reserved. 6
Comparison with Other Lean Assessment Frameworks
§ The Lean Assessment Framework is based on the Gemba Worksheets from
the book “Creating A Lean Culture” by David Mann
§ It is much simpler and easier to apply as compared to the Shingo Model
and the Baldrige Excellence Framework
§ The Lean management assessment criteria consist of:
• Eight dimensions or categories
• Five levels of maturity
§ Scoring system
• 5-point scale (1=minimum, 5=maximum)
• Scoring can be conducted by a single assessor or a team of assessors
© Operational Excellence Consulting. All rights reserved. 7
Eight Dimensions of Assessment
1. Visual Controls
2. Standard Accountability Processes
3. Lean Standard Work
4. Value Stream Mapping
5. Process Definition
6. Process Discipline
7. Process Improvement
8. Root Cause Problem Solving
© Operational Excellence Consulting. All rights reserved. 8
Five Levels of Maturity
1 5
4
3
2
Pre-Lean Starting Recognizable Stabilizing Sustaining
Direction of Improvement
© Operational Excellence Consulting. All rights reserved. 9
Scoring System
§ Each dimension is rated on a scale of 1 (minimum) to 5 (maximum)
Dimensions Maximum Score
1 Visual Controls 5
2 Standard Accountability Processes 5
3 Lean Standard Work 5
4 Value Stream Mapping 5
5 Process Definition 5
6 Process Discipline 5
7 Process Improvement 5
8 Root Cause Problem Solving 5
Total 40
© Operational Excellence Consulting. All rights reserved. 10
Scoring System
§ Each dimension of assessment has five levels of Lean maturity from
1 to 5:
§ Assign a score or rating that best reflects your current performance
• Minimum score = 1
• Maximum score = 5
§ The maximum possible score is 8 x 5 = 40 points.
1 5
4
3
2
Pre-Lean Starting Recognizable Stabilizing Sustaining
© Operational Excellence Consulting. All rights reserved. 11
Example – Score Profile Data for Lean Management
Assessment
Dimensions Actual Maximum
1 Visual Controls 3 5
2 Standard Accountability Processes 4 5
3 Lean Standard Work 4 5
4 Value Stream Mapping 2.7 5
5 Process Definition 2.3 5
6 Process Discipline 2.3 5
7 Process Improvement 2.7 5
8 Root Cause Problem Solving 3 5
Total 24 40
© Operational Excellence Consulting. All rights reserved. 12
Example – Radar Chart for Lean Management
Assessment
0
1
2
3
4
5
Visual Controls
Standard
Accountability
Processes
Lean Standard Work
Value Stream Mapping
Process Definition
Process Discipline
Process Improvement
Root Cause Problem
Solving
Actual
Maximum
© Operational Excellence Consulting. All rights reserved. 13
Visual Controls
Intent: Visual Controls should do at least one of two things:
§ Reflect the actual vs. expected pace or progression of work (admin, support or line processes).
§ Capture delays, interruptions, frustrations that arise doing the work.
Diagnostic Questions:
1. Can you see visual cycle pr procedure tracking charts in the area? Do they show expected vs. actual times?
2. Are the charts current to this or last shift?
3. Are incidents that delay work described clearly? (What we had but did not want, wanted but did not have)?
4. Are visuals reviewed regularly? How frequently? How can you tell?
5. Can leaders and task-level people in the area cite improvements from problems noted on visual charts?
6. Are visuals used here for support tasks, e.g., materials, transport, attendance, assignments, qualifications?
7. Do leaders regularly review the visuals? How often? How can you tell?
© Operational Excellence Consulting. All rights reserved. 14
Visual Controls
Assessment: Rate this area from 1 to 5 on the scale below and note rationale for the rating.
1. Pre-Lean 2. Starting 3. Recognizable 4. Stabilizing 5. Sustainable
§ No visuals/cycle
tracking in place.
§ Some cycle tracking
charts; irregularly
filled in.
§ Most charts record
numbers, do not
document delays,
problems.
§ Where problems
described, too vague
for action.
§ No or irregular review
for action on
problems.
§ Visuals more ”check
the box” than tool to
highlight problems,
delays, and drive
improvement.
§ Many front line and
support areas here
use visuals/cycle
tracking charts.
§ Charts are current.
§ Most descriptions of
problems are
complete, specific
enough for next steps
(cause analysis or
corrective action).
§ Charts reviewed daily
or on regular
schedule.
§ Problems noted on
charts often result in
assignments for
action.
§ Visuals used for most
line, support and
admin activities here.
§ Visuals used at most
handoffs between
functions/
departments with
regular joint review for
action.
§ Charts revised,
added, dropped as
things change.
§ Nearly all problem
descriptions clear,
complete, actionable.
§ Daily/regular reviews
of charts drive
assignments for
cause analysis or
corrective action.
§ Visuals/cycle tracking
charts regularly used
throughout the area,
front line, support,
and admin activities.
§ Visuals/tracking
charts initiated at
least daily by line
leaders and
occasionally by
executives.
§ Visuals/cycle tracking
charts regularly drive
improvements, are
also periodically
analyzed to identify
and act on recurring
problems.
Rationale for this rating:
No=0%, Few<25%, Some<50%, Many>50%, Most>75%, All=100%
© Operational Excellence Consulting. All rights reserved. 15
Standard Accountability Processes
Intent: Standard Accountability processes
§ Accountability processes should convert problems/opportunities noted on visuals, the floor, or from suggestions to task
assignments – for cause analysis and/or corrective action in a daily Post-It (or equivalent) process for briefer tasks, a
weekly A3 process for longer ones.
Diagnostic Questions:
1. How are improvement assignments and projects managed here; visually, by spreadsheet or list, or not at all?
2. Are regular (daily or weekly) meetings held here to make new task assignments to address problems and follow up on
overdue assignments?
3. Do the regular meetings here have clear purpose and agenda – other than today’s anticipated work? What is it?
4. Do visual controls/cycle tracking charts result in task assignments to address interruptions, delays, capacity losses?
5. How many area leaders are familiar with and able to apply basic project management approaches – like work
breakdown structures and dependencies – in thinking through and defining task assignments?
6. How well integrated are support, customer, or supplier groups in this area’s improvement activities?
© Operational Excellence Consulting. All rights reserved. 16
Standard Accountability Processes
Assessment: Rate this area from 1 to 5 on the scale below and note rationale for the rating.
1. Pre-Lean 2. Starting 3. Recognizable 4. Stabilizing 5. Sustainable
§ No regularly occurring
visual process to
make or follow up on
task assignments for
improvement based
on identified problems
or delays.
§ Daily or weekly start
up/team meetings
held regularly for
improvement task
assignment; many are
completed on time.
§ Many of the
assignments are to
support or admin
groups vs. line area,
or are made in
response to major
problems.
§ Many using green/red
coding for on time
completion or past
due tasks.
§ Team or area (line
and support group)
meetings regularly
(daily/weekly) held to
make, follow up on
improvement task
assignments.
§ Tasks posted visible
to all.
§ Attendance is
consistent; most tasks
are completed, most
on time, most leaders
use green/red coding
for on time or late task
completion.
§ Tasks respond to both
major, minor
incidents.
§ Much reference to
customer/user/ patient
perspective.
§ Accountability
meetings crisp,
agenda followed,
attendance faithful.
§ Small assignments to
visual accountability
board; larger ones to
A3 projects.
§ Green/red coding is
routine.
§ Tasks from many
sources, not just
visuals but also
employee
suggestions, gemba
walks, support areas.
§ Many in area use
project management
skills on project work.
§ Customer perspective
is a given.
§ Using the
accountability
processes is routine
in the area.
§ All leaders regularly
use basic project
management tools to
determine task
assignments,
dependencies,
durations.
§ Support and admin
representatives
routinely participate in
line accountability
process and have
their own.
§ Customer’s
perspective informs
most assignments,
admin, support, front
line.
Rationale for this rating:
No=0%, Few<25%, Some<50%, Many>50%, Most>75%, All=100%
© Operational Excellence Consulting. All rights reserved. 17
Leader Standard Work
Intent: Leader Standard Work should reflect process focus:
§ The closer to the task execution level, the more frequent the focus (admin, support processes, production/patient care).
§ Should reflect “go to the place, talk with the people, observe the process” for all levels of leadership.
§ Review of visuals (Current? Quality of entries? Regular in shift review?), accountability (assignments linked to problems
from visuals), follow up on improvements in leader’s standard work (faithful execution of redefined processes).
Diagnostic Questions:
1. Do leaders in this area have standard work? Do they follow it? Do they routinely have it with them? Can leaders
describe how standard work has helped them be more effective (if they see it that way)?
2. Are task level people in the area aware of the content of their leaders’ standard work?
3. Are leader standard work documents used as working “diaries” to record notes and observations? Do supervisors
meet with subordinate leaders to review these documents periodically? Ever? How often?
4. How often do this area’s supervisors review subordinates leaders’ standard work for updating based on new issues
and changes, e.g., resulting from accountability board tasks?
5. Is there a defined place where completed standard work documents are stored for a few months? Is it used?
6. Has leader standard work been used in this area to facilitate transitions between leaders?
7. Is leader standard work focused on compliance or improvements or balanced?
© Operational Excellence Consulting. All rights reserved. 18
Leader Standard Work
Assessment: Rate this area from 1 to 5 on the scale below and note rationale for the rating.
1. Pre-Lean 2. Starting 3. Recognizable 4. Stabilizing 5. Sustainable
§ No leader standard
work (LSW) in place.
§ Leader standard work
exists for a few
positions.
§ It’s rarely carried, is
followed sporadically.
§ The original content
has not been revised,
redefined.
§ Most leaders view it
as a check in the box
activity to drive
compliance with
defined processes
with little or no
emphasis on
improvement.
§ Standard work exists
for all line leaders in
area: team,
supervisor, manager.
§ Most have their
standard work with
them, follow it, use it
as working record of
the day.
§ Most leaders can give
examples illustrating
how leader standard
work has helped them
sustained
improvements.
§ All leaders in the area
carry, follow, and use
their standard work as
a daily working
record.
§ All superiors regularly
review subordinate
leaders’ LSW
documents with them
weekly.
§ All leaders can talk
about how LSW
benefits them and the
process.
§ LSW is revised to
reflect and sustain
process changes.
§ All transitions
between leaders
include review
(possible revision),
and walk through of
LSW.
§ All new leaders follow
LSW.
§ All new leaders follow
LSW from day one on
job.
§ Weekly LSW
document review with
superior used as
monitoring,
communication, and
improvement method.
§ Defined process for
turn-in, storage of
LSW documents.
Rationale for this rating:
No=0%, Few<25%, Some<50%, Many>50%, Most>75%, All=100%
© Operational Excellence Consulting. All rights reserved. 19
Operational Excellence Consulting is a management training and consulting
firm that assists organizations in improving business performance and
effectiveness. Based in Singapore, the firm’s mission is to create business
value for organizations through innovative design and operational excellence
management training and consulting solutions. For more information, please
visit www.oeconsulting.com.sg
© Operational Excellence Consulting. All rights reserved.
Appendix
Lean Assessment Worksheets

Contenu connexe

Tendances

Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leadersLean Teams USA
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)Zeeshan Syed
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3TKMG, Inc.
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingTimothy Wooi
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can seeRenee Troughton
 
Operational Excellence Powerpoint Presentation Slides
Operational Excellence Powerpoint Presentation SlidesOperational Excellence Powerpoint Presentation Slides
Operational Excellence Powerpoint Presentation SlidesSlideTeam
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthGoLeanSixSigma.com
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with exampleMouhcine Nahal
 

Tendances (20)

Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leaders
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean Office
Lean OfficeLean Office
Lean Office
 
KPI ppt
KPI pptKPI ppt
KPI ppt
 
Kaizen
KaizenKaizen
Kaizen
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)
 
Standard Work
Standard WorkStandard Work
Standard Work
 
Kaizen
Kaizen Kaizen
Kaizen
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
 
Operational Excellence Powerpoint Presentation Slides
Operational Excellence Powerpoint Presentation SlidesOperational Excellence Powerpoint Presentation Slides
Operational Excellence Powerpoint Presentation Slides
 
Visual Management
Visual Management Visual Management
Visual Management
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-Depth
 
Visual management
Visual managementVisual management
Visual management
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with example
 

Similaire à Lean Management System Assessment

Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...LeanKanbanIndia
 
Kristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatKristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatTEST Huddle
 
Lean Management System
Lean Management SystemLean Management System
Lean Management SystemBusiness901
 
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsThree Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsSafetyChain Software
 
Two Views of Ops Excellence
Two Views of Ops ExcellenceTwo Views of Ops Excellence
Two Views of Ops ExcellenceWalter Taraska
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingSafetyChain Software
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreGrant Thornton LLP
 
Perforamance measurement
Perforamance measurementPerforamance measurement
Perforamance measurementbreeza08
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality managementAnitha Velusamy
 
Performance+management+and+learning
Performance+management+and+learningPerformance+management+and+learning
Performance+management+and+learningAlauddin Ahmed
 
My Vision
My VisionMy Vision
My Visionmelynch
 
Performance mnagement introduction
Performance mnagement introductionPerformance mnagement introduction
Performance mnagement introductionSatish Bidgar
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations managementselinasimpson1301
 
Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)encognize G.K.
 

Similaire à Lean Management System Assessment (20)

Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
People Presentation
People PresentationPeople Presentation
People Presentation
 
Kristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatKristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's Seat
 
Lean Daily Management System
Lean Daily Management SystemLean Daily Management System
Lean Daily Management System
 
Lean Management System
Lean Management SystemLean Management System
Lean Management System
 
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsThree Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
 
Two Views of Ops Excellence
Two Views of Ops ExcellenceTwo Views of Ops Excellence
Two Views of Ops Excellence
 
Dit yvol5iss28
Dit yvol5iss28Dit yvol5iss28
Dit yvol5iss28
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error Proofing
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignore
 
Perforamance measurement
Perforamance measurementPerforamance measurement
Perforamance measurement
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality management
 
Performance+management+and+learning
Performance+management+and+learningPerformance+management+and+learning
Performance+management+and+learning
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
My Vision
My VisionMy Vision
My Vision
 
Performance mnagement introduction
Performance mnagement introductionPerformance mnagement introduction
Performance mnagement introduction
 
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)Seven Advanced Tools of Quality (Seven Advanced QC Tools)
Seven Advanced Tools of Quality (Seven Advanced QC Tools)
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations management
 
Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)
 

Plus de Operational Excellence Consulting

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
ISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness TrainingISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness TrainingOperational Excellence Consulting
 
ISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness TrainingISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness TrainingOperational Excellence Consulting
 
Six Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating PerformanceSix Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating PerformanceOperational Excellence Consulting
 
Kaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into OpportunitiesKaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into OpportunitiesOperational Excellence Consulting
 
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterOperational Excellence Consulting
 

Plus de Operational Excellence Consulting (20)

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
ISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness TrainingISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
ISO 37002:2021 (Whistleblowing Management Systems) Awareness Training
 
ISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness TrainingISO 37000:2021 (Governance of Organizations) Awareness Training
ISO 37000:2021 (Governance of Organizations) Awareness Training
 
Six Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating PerformanceSix Sigma Improvement Process: Transforming Processes, Elevating Performance
Six Sigma Improvement Process: Transforming Processes, Elevating Performance
 
Kaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into OpportunitiesKaizen Event Guide: Transforming Challenges into Opportunities
Kaizen Event Guide: Transforming Challenges into Opportunities
 
Kaizen: Elevating Continuous Improvement for Success
Kaizen: Elevating Continuous Improvement for SuccessKaizen: Elevating Continuous Improvement for Success
Kaizen: Elevating Continuous Improvement for Success
 
Strategic Planning: A3 Hoshin Planning Process
Strategic Planning: A3 Hoshin Planning ProcessStrategic Planning: A3 Hoshin Planning Process
Strategic Planning: A3 Hoshin Planning Process
 
A3 Problem Solving Process & Tools
A3 Problem Solving Process & ToolsA3 Problem Solving Process & Tools
A3 Problem Solving Process & Tools
 
Digital Strategic Business Planning Methodology
Digital Strategic Business Planning MethodologyDigital Strategic Business Planning Methodology
Digital Strategic Business Planning Methodology
 
Root Cause Analysis (RCA)
Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Root Cause Analysis (RCA)
 
Business Process Reengineering (BPR)
Business Process Reengineering (BPR)Business Process Reengineering (BPR)
Business Process Reengineering (BPR)
 
5 Steps of Problem Solving
5 Steps of Problem Solving5 Steps of Problem Solving
5 Steps of Problem Solving
 
Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)Seven Basic Tools of Quality (Seven Basic QC Tools)
Seven Basic Tools of Quality (Seven Basic QC Tools)
 
Problem Solving & Visualization Tools
Problem Solving & Visualization ToolsProblem Solving & Visualization Tools
Problem Solving & Visualization Tools
 
8D Problem Solving Process & Tools
8D Problem Solving Process & Tools8D Problem Solving Process & Tools
8D Problem Solving Process & Tools
 
Digital Transformation Process Poster
Digital Transformation Process PosterDigital Transformation Process Poster
Digital Transformation Process Poster
 
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness PosterISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
ISO/IEC 27001:2022 (Information Security Management Systems) Awareness Poster
 
Four Steps of Jidoka Poster
Four Steps of Jidoka PosterFour Steps of Jidoka Poster
Four Steps of Jidoka Poster
 
Lean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process PosterLean Startup: Build-Measure-Learn Process Poster
Lean Startup: Build-Measure-Learn Process Poster
 
AIDA Marketing Model Poster
AIDA Marketing Model PosterAIDA Marketing Model Poster
AIDA Marketing Model Poster
 

Dernier

Navigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsNavigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsYourLegal Accounting
 
First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCTammy Jackson
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsYourLegal Accounting
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfHolger Mueller
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312LR1709MUSIC
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxtmthompson1
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerPusat Herbal Resmi BPOM
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.SNSW group8
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© رnafizanafzal
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Hararedoctorjoe1984
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckHajeJanKamps
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...drm1699
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledCaitlinCummins3
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...srcw2322l101
 
obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...
obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...
obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...yulianti213969
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497dipikakk482
 

Dernier (20)

Navigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsNavigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA Firms
 
First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLC
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...
obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...
obat aborsi jakarta wa 081336238223 jual obat aborsi cytotec asli di jakarta9...
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497
 

Lean Management System Assessment

  • 1. © Operational Excellence Consulting. All rights reserved. © Operational Excellence Consulting. All rights reserved. The Lean Management System Assessment is a simple tool to assess the overall status of your Lean management implementation. The eight dimensions of assessment cover process and behavior and serve as standards for your organization to strive toward Lean excellence. Lean Management Assessment
  • 2. © Operational Excellence Consulting. All rights reserved. 2 Contents Scoring System 2 Overview of Lean Management Assessment 1 Assessment Guidelines 4 Assessment Criteria 3 NOTE: This is a PARTIAL PREVIEW. To download the complete presentation, please visit: https://www.oeconsulting.com.sg
  • 3. © Operational Excellence Consulting. All rights reserved. 3 Introduction to the Lean Management Assessment § It is a good practice to periodically assess the overall status of your Lean management implementation § The Lean Management System Assessment tool is based on the application of plan, do, check, act (PDCA) thinking embedded in Lean, an idea derived from the Lean principle of pursuit of perfection § The Lean management standards cover process and behavior and define five levels of maturity § The assessment tool can be applied to the organization, business unit and/or sub-unit level § A practical approach to assess your Lean implementation progress
  • 4. © Operational Excellence Consulting. All rights reserved. 4 3 Benefits of Conducting a Lean Management System Assessment 1. The dimensions and questions themselves should help to clarify what you are working toward, for yourself and for the rest of your organization 2. An assessment should tell you where you stand relative to your standards and relative to your earlier status 3. The results of an assessment will help you identify where you need to focus efforts to improve
  • 5. © Operational Excellence Consulting. All rights reserved. 5 The Lean Management Assessment Framework 1 5 4 3 2 Pre-Lean Starting Recognizable Stabilizing Sustaining Visual Controls Standard Accountability Processes Lean Standard Work Value Stream Mapping Process Definition Process Discipline Process Improvement Root Cause Problem Solving Eight Dimensions of Assessment Five Maturity Levels
  • 6. © Operational Excellence Consulting. All rights reserved. 6 Comparison with Other Lean Assessment Frameworks § The Lean Assessment Framework is based on the Gemba Worksheets from the book “Creating A Lean Culture” by David Mann § It is much simpler and easier to apply as compared to the Shingo Model and the Baldrige Excellence Framework § The Lean management assessment criteria consist of: • Eight dimensions or categories • Five levels of maturity § Scoring system • 5-point scale (1=minimum, 5=maximum) • Scoring can be conducted by a single assessor or a team of assessors
  • 7. © Operational Excellence Consulting. All rights reserved. 7 Eight Dimensions of Assessment 1. Visual Controls 2. Standard Accountability Processes 3. Lean Standard Work 4. Value Stream Mapping 5. Process Definition 6. Process Discipline 7. Process Improvement 8. Root Cause Problem Solving
  • 8. © Operational Excellence Consulting. All rights reserved. 8 Five Levels of Maturity 1 5 4 3 2 Pre-Lean Starting Recognizable Stabilizing Sustaining Direction of Improvement
  • 9. © Operational Excellence Consulting. All rights reserved. 9 Scoring System § Each dimension is rated on a scale of 1 (minimum) to 5 (maximum) Dimensions Maximum Score 1 Visual Controls 5 2 Standard Accountability Processes 5 3 Lean Standard Work 5 4 Value Stream Mapping 5 5 Process Definition 5 6 Process Discipline 5 7 Process Improvement 5 8 Root Cause Problem Solving 5 Total 40
  • 10. © Operational Excellence Consulting. All rights reserved. 10 Scoring System § Each dimension of assessment has five levels of Lean maturity from 1 to 5: § Assign a score or rating that best reflects your current performance • Minimum score = 1 • Maximum score = 5 § The maximum possible score is 8 x 5 = 40 points. 1 5 4 3 2 Pre-Lean Starting Recognizable Stabilizing Sustaining
  • 11. © Operational Excellence Consulting. All rights reserved. 11 Example – Score Profile Data for Lean Management Assessment Dimensions Actual Maximum 1 Visual Controls 3 5 2 Standard Accountability Processes 4 5 3 Lean Standard Work 4 5 4 Value Stream Mapping 2.7 5 5 Process Definition 2.3 5 6 Process Discipline 2.3 5 7 Process Improvement 2.7 5 8 Root Cause Problem Solving 3 5 Total 24 40
  • 12. © Operational Excellence Consulting. All rights reserved. 12 Example – Radar Chart for Lean Management Assessment 0 1 2 3 4 5 Visual Controls Standard Accountability Processes Lean Standard Work Value Stream Mapping Process Definition Process Discipline Process Improvement Root Cause Problem Solving Actual Maximum
  • 13. © Operational Excellence Consulting. All rights reserved. 13 Visual Controls Intent: Visual Controls should do at least one of two things: § Reflect the actual vs. expected pace or progression of work (admin, support or line processes). § Capture delays, interruptions, frustrations that arise doing the work. Diagnostic Questions: 1. Can you see visual cycle pr procedure tracking charts in the area? Do they show expected vs. actual times? 2. Are the charts current to this or last shift? 3. Are incidents that delay work described clearly? (What we had but did not want, wanted but did not have)? 4. Are visuals reviewed regularly? How frequently? How can you tell? 5. Can leaders and task-level people in the area cite improvements from problems noted on visual charts? 6. Are visuals used here for support tasks, e.g., materials, transport, attendance, assignments, qualifications? 7. Do leaders regularly review the visuals? How often? How can you tell?
  • 14. © Operational Excellence Consulting. All rights reserved. 14 Visual Controls Assessment: Rate this area from 1 to 5 on the scale below and note rationale for the rating. 1. Pre-Lean 2. Starting 3. Recognizable 4. Stabilizing 5. Sustainable § No visuals/cycle tracking in place. § Some cycle tracking charts; irregularly filled in. § Most charts record numbers, do not document delays, problems. § Where problems described, too vague for action. § No or irregular review for action on problems. § Visuals more ”check the box” than tool to highlight problems, delays, and drive improvement. § Many front line and support areas here use visuals/cycle tracking charts. § Charts are current. § Most descriptions of problems are complete, specific enough for next steps (cause analysis or corrective action). § Charts reviewed daily or on regular schedule. § Problems noted on charts often result in assignments for action. § Visuals used for most line, support and admin activities here. § Visuals used at most handoffs between functions/ departments with regular joint review for action. § Charts revised, added, dropped as things change. § Nearly all problem descriptions clear, complete, actionable. § Daily/regular reviews of charts drive assignments for cause analysis or corrective action. § Visuals/cycle tracking charts regularly used throughout the area, front line, support, and admin activities. § Visuals/tracking charts initiated at least daily by line leaders and occasionally by executives. § Visuals/cycle tracking charts regularly drive improvements, are also periodically analyzed to identify and act on recurring problems. Rationale for this rating: No=0%, Few<25%, Some<50%, Many>50%, Most>75%, All=100%
  • 15. © Operational Excellence Consulting. All rights reserved. 15 Standard Accountability Processes Intent: Standard Accountability processes § Accountability processes should convert problems/opportunities noted on visuals, the floor, or from suggestions to task assignments – for cause analysis and/or corrective action in a daily Post-It (or equivalent) process for briefer tasks, a weekly A3 process for longer ones. Diagnostic Questions: 1. How are improvement assignments and projects managed here; visually, by spreadsheet or list, or not at all? 2. Are regular (daily or weekly) meetings held here to make new task assignments to address problems and follow up on overdue assignments? 3. Do the regular meetings here have clear purpose and agenda – other than today’s anticipated work? What is it? 4. Do visual controls/cycle tracking charts result in task assignments to address interruptions, delays, capacity losses? 5. How many area leaders are familiar with and able to apply basic project management approaches – like work breakdown structures and dependencies – in thinking through and defining task assignments? 6. How well integrated are support, customer, or supplier groups in this area’s improvement activities?
  • 16. © Operational Excellence Consulting. All rights reserved. 16 Standard Accountability Processes Assessment: Rate this area from 1 to 5 on the scale below and note rationale for the rating. 1. Pre-Lean 2. Starting 3. Recognizable 4. Stabilizing 5. Sustainable § No regularly occurring visual process to make or follow up on task assignments for improvement based on identified problems or delays. § Daily or weekly start up/team meetings held regularly for improvement task assignment; many are completed on time. § Many of the assignments are to support or admin groups vs. line area, or are made in response to major problems. § Many using green/red coding for on time completion or past due tasks. § Team or area (line and support group) meetings regularly (daily/weekly) held to make, follow up on improvement task assignments. § Tasks posted visible to all. § Attendance is consistent; most tasks are completed, most on time, most leaders use green/red coding for on time or late task completion. § Tasks respond to both major, minor incidents. § Much reference to customer/user/ patient perspective. § Accountability meetings crisp, agenda followed, attendance faithful. § Small assignments to visual accountability board; larger ones to A3 projects. § Green/red coding is routine. § Tasks from many sources, not just visuals but also employee suggestions, gemba walks, support areas. § Many in area use project management skills on project work. § Customer perspective is a given. § Using the accountability processes is routine in the area. § All leaders regularly use basic project management tools to determine task assignments, dependencies, durations. § Support and admin representatives routinely participate in line accountability process and have their own. § Customer’s perspective informs most assignments, admin, support, front line. Rationale for this rating: No=0%, Few<25%, Some<50%, Many>50%, Most>75%, All=100%
  • 17. © Operational Excellence Consulting. All rights reserved. 17 Leader Standard Work Intent: Leader Standard Work should reflect process focus: § The closer to the task execution level, the more frequent the focus (admin, support processes, production/patient care). § Should reflect “go to the place, talk with the people, observe the process” for all levels of leadership. § Review of visuals (Current? Quality of entries? Regular in shift review?), accountability (assignments linked to problems from visuals), follow up on improvements in leader’s standard work (faithful execution of redefined processes). Diagnostic Questions: 1. Do leaders in this area have standard work? Do they follow it? Do they routinely have it with them? Can leaders describe how standard work has helped them be more effective (if they see it that way)? 2. Are task level people in the area aware of the content of their leaders’ standard work? 3. Are leader standard work documents used as working “diaries” to record notes and observations? Do supervisors meet with subordinate leaders to review these documents periodically? Ever? How often? 4. How often do this area’s supervisors review subordinates leaders’ standard work for updating based on new issues and changes, e.g., resulting from accountability board tasks? 5. Is there a defined place where completed standard work documents are stored for a few months? Is it used? 6. Has leader standard work been used in this area to facilitate transitions between leaders? 7. Is leader standard work focused on compliance or improvements or balanced?
  • 18. © Operational Excellence Consulting. All rights reserved. 18 Leader Standard Work Assessment: Rate this area from 1 to 5 on the scale below and note rationale for the rating. 1. Pre-Lean 2. Starting 3. Recognizable 4. Stabilizing 5. Sustainable § No leader standard work (LSW) in place. § Leader standard work exists for a few positions. § It’s rarely carried, is followed sporadically. § The original content has not been revised, redefined. § Most leaders view it as a check in the box activity to drive compliance with defined processes with little or no emphasis on improvement. § Standard work exists for all line leaders in area: team, supervisor, manager. § Most have their standard work with them, follow it, use it as working record of the day. § Most leaders can give examples illustrating how leader standard work has helped them sustained improvements. § All leaders in the area carry, follow, and use their standard work as a daily working record. § All superiors regularly review subordinate leaders’ LSW documents with them weekly. § All leaders can talk about how LSW benefits them and the process. § LSW is revised to reflect and sustain process changes. § All transitions between leaders include review (possible revision), and walk through of LSW. § All new leaders follow LSW. § All new leaders follow LSW from day one on job. § Weekly LSW document review with superior used as monitoring, communication, and improvement method. § Defined process for turn-in, storage of LSW documents. Rationale for this rating: No=0%, Few<25%, Some<50%, Many>50%, Most>75%, All=100%
  • 19. © Operational Excellence Consulting. All rights reserved. 19 Operational Excellence Consulting is a management training and consulting firm that assists organizations in improving business performance and effectiveness. Based in Singapore, the firm’s mission is to create business value for organizations through innovative design and operational excellence management training and consulting solutions. For more information, please visit www.oeconsulting.com.sg
  • 20. © Operational Excellence Consulting. All rights reserved. Appendix Lean Assessment Worksheets